CN104329113B - A kind of method of surface drilling standing seat earth release mash gas extraction - Google Patents
A kind of method of surface drilling standing seat earth release mash gas extraction Download PDFInfo
- Publication number
- CN104329113B CN104329113B CN201410446247.6A CN201410446247A CN104329113B CN 104329113 B CN104329113 B CN 104329113B CN 201410446247 A CN201410446247 A CN 201410446247A CN 104329113 B CN104329113 B CN 104329113B
- Authority
- CN
- China
- Prior art keywords
- ground
- coal seam
- drilling
- explosive
- working face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F7/00—Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/263—Methods for stimulating production by forming crevices or fractures using explosives
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明提供了一种地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法,包括如下步骤:在工作面上覆地表沿着工作面推进方向凿钻多个地面钻井至煤层工作面底板以下2~3m处;采用“L形”钻孔技术,在地面钻井的底部沿着工作面推进方向钻凿水平钻孔连通两条地面钻井;将炸药填充于水平钻孔中,并用导爆索贯穿相邻炸药,向地面钻井中注水封孔;引爆炸药,炸药爆破松动煤层,产生大量裂隙,进而达到卸压增透的目的;将地面钻井和水平钻孔中的水抽出,瓦斯抽采管接入地面钻井,抽采所述煤层中的瓦斯。本发明利用地面钻井,爆破工作面底板岩层,抽采煤层瓦斯,具有成本低,安全性高,简化抽采瓦斯工序等优点。
The present invention provides a method for depressurizing and extracting gas from ground drilling, loosening and blasting the coal seam floor, comprising the following steps: drilling multiple ground wells on the ground surface of the working face along the advancing direction of the working face to the bottom of the coal seam working face for 2 ~3m; using the "L-shaped" drilling technology, a horizontal borehole is drilled at the bottom of the ground well along the advancing direction of the working face to connect two ground wells; explosives are filled in the horizontal borehole, and a detonating cord is used to penetrate Adjacent to the explosive, inject water into the ground drilling to seal the hole; detonate the explosive, and the explosive will loosen the coal seam and generate a large number of cracks, thereby achieving the purpose of pressure relief and permeability enhancement; the water in the ground drilling and horizontal drilling is pumped out, and the gas drainage pipe is connected Wells are drilled on the ground to extract the gas in the coal seam. The invention uses the ground to drill wells, blast the bottom plate rock layer of the working face, and extract the coal seam gas, and has the advantages of low cost, high safety, simplified gas extraction process, and the like.
Description
技术领域technical field
本发明涉及煤矿爆破技术领域,具体涉及一种地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法。The invention relates to the technical field of coal mine blasting, in particular to a method for depressurizing and extracting gas from a coal seam floor by ground drilling and loosening blasting.
背景技术Background technique
高瓦斯低透气性煤层的开采常常伴有大量瓦斯涌出的难题,严重影响和制约着煤矿的安全开采。解决此难题的根本在于预抽煤层瓦斯,预抽瓦斯的方法主要通过井下的瓦斯抽采巷向工作面煤层进行钻孔预抽瓦斯,采用此种方法需要在工作面煤层底板岩层中布置两条瓦斯抽采巷道,必要时还需要在工作面煤层顶板岩层中再布置一条瓦斯抽采巷,此方法不仅巷道布置费用高昂,耗费时间长,劳动强度大,且容易发生事故。The mining of high-gassy and low-permeability coal seams is often accompanied by the problem of a large amount of gas gushing out, which seriously affects and restricts the safe mining of coal mines. The root of solving this problem lies in the pre-extraction of coal seam gas. The method of pre-extraction of gas is mainly to drill holes for pre-extraction of gas from the coal seam of the working face through the underground gas extraction roadway. This method needs to be arranged in the coal seam floor of the working face For the gas drainage roadway, if necessary, another gas drainage roadway needs to be arranged in the coal seam roof strata of the working face. This method is not only expensive for roadway layout, but also time-consuming, labor-intensive and prone to accidents.
发明内容Contents of the invention
为解决上述技术问题,本发明提供了一种地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法,可以通过地面钻井的方式对工作面煤层进行松动爆破,对低透气性煤层进行卸压增透进而抽采煤层瓦斯。In order to solve the above-mentioned technical problems, the present invention provides a method for depressurizing and extracting gas from the coal seam floor by ground drilling, loosening and blasting, which can loosen and blast the coal seam of the working face by ground drilling, and depressurize and increase the pressure of the low-permeability coal seam. Permeate and extract coal seam gas.
为达到上述目的,本发明采用如下技术方案:To achieve the above object, the present invention adopts the following technical solutions:
一种地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法,包括如下步骤:A method for depressurizing and extracting gas by loosening and blasting a coal seam floor by ground drilling, comprising the following steps:
(a)在工作面上覆地表沿着工作面推进方向凿钻多个地面钻井至煤层工作面底板以下2~3m处;(a) Drill multiple ground wells on the overlying surface of the working face along the advancing direction of the working face to a place 2-3m below the floor of the coal seam working face;
(b)利用“L形”钻孔技术,在步骤(a)中所述地面钻井的底部沿着工作面推进方向凿钻水平钻孔,所述水平钻孔连通相邻所述地面钻井;(b) using "L-shaped" drilling technology, drilling horizontal boreholes along the advancing direction of the working face at the bottom of the ground wells described in step (a), and the horizontal boreholes are connected to adjacent ground wells;
(c)将炸药填充于步骤(b)中所述水平钻孔中,并用导爆索贯穿相邻所述炸药;(c) filling explosives in the horizontal borehole described in step (b), and penetrating the adjacent explosives with a detonating cord;
(d)向步骤(a)中所述地面钻井中注水进行封孔;(d) injecting water into the surface drilling described in step (a) to seal the hole;
(e)引爆步骤(c)中所述炸药,所述炸药爆破松动所述煤层,产生大量裂隙;(e) detonating the explosive described in step (c), the explosive blasting loosens the coal seam and produces a large number of cracks;
(f)将所述地面钻井和所述水平钻孔中的水抽出,瓦斯抽采管接入所述地面钻井,抽采所述煤层中的瓦斯。(f) pump out the water in the ground well and the horizontal borehole, connect the gas extraction pipe to the ground well, and extract the gas in the coal seam.
本发明所述的地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法,其中,步骤(a)中所述的地面钻孔间距为200~300m。The method for extracting gas by ground drilling loosening and blasting the coal seam floor according to the present invention, wherein the distance between the ground drilling holes in the step (a) is 200-300m.
本发明所述的地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法,其中,步骤(a)中所述地面钻井直径为75~145mm。The method for extracting gas by loosening and blasting coal seam floors by ground drilling according to the present invention, wherein the diameter of the ground drilling in the step (a) is 75-145 mm.
本发明所述的地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法,其中,步骤(b)中所述的水平钻孔直径与地面钻井直径相同。The method for extracting gas by ground drilling for loosening and blasting coal seam floors according to the present invention, wherein the diameter of the horizontal drilling in step (b) is the same as that of the ground drilling.
本发明所述的地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法,其中,步骤(c)中所述炸药为水胶炸药或乳化炸药。The method for pressure relief and drainage of coal seam floor by ground drilling and loosening blasting of coal seam floor according to the present invention, wherein the explosive in step (c) is water-gel explosive or emulsion explosive.
本发明所述的地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法,其中,步骤(d)中所述的地面钻井注水封孔至与地面平齐或水柱垂高超过300m。The method for extracting gas by ground drilling, loosening and blasting the coal seam floor for pressure relief and extraction according to the present invention, wherein the ground drilling described in step (d) is filled with water to seal the hole until it is flush with the ground or the vertical height of the water column exceeds 300m.
本发明与现有的预抽瓦斯的方法对比,无需掘进瓦斯抽采巷且减少了抽采钻孔的布置,具有成本低,工期短,劳动量轻,高效、安全等优点,同时还大大简化了瓦斯抽采过程;步骤(a)中所述的地面钻孔间距为200~300m,有利于兼顾水平孔的平直性和地面钻井的数量;步骤(d)中所述的地面钻井注水封孔至与地面平齐或水柱垂高超过300m,以此爆炸封孔压力和瓦斯不至于外泄。Compared with the existing pre-extraction method of gas, the present invention does not need to excavate the gas extraction roadway and reduces the arrangement of extraction boreholes, and has the advantages of low cost, short construction period, light labor, high efficiency and safety, and greatly simplifies The gas drainage process is completed; the ground drilling distance described in step (a) is 200-300m, which is conducive to taking into account the straightness of the horizontal hole and the number of ground drilling wells; the ground drilling water injection seal described in step (d) The hole should be level with the ground or the vertical height of the water column should exceed 300m, so that the pressure and gas of the explosion sealing hole will not leak out.
附图说明Description of drawings
图1为本发明地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法的示意图;Fig. 1 is the schematic diagram of the method for depressurizing and extracting gas from ground drilling and loosening blasting coal seam floor of the present invention;
图2为本发明地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法的效果示意图。Fig. 2 is a schematic diagram of the effect of the method for releasing pressure and extracting gas from the ground drilling and loosening the coal seam floor of the present invention.
1—地面钻井;2—水柱;3—岩层;4—煤层;5—水平钻孔;6—雷管;7—导爆索;8—水胶炸药;9—碎石;10—裂隙;11—地面。1—ground drilling; 2—water column; 3—rock formation; 4—coal seam; 5—horizontal drilling; 6—detonator; 7—detonating cord; 8—water gel explosive; ground.
下面结合具体实施例和附图对本发明地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法作进一步说明。The method for depressurizing and extracting gas from the coal seam floor of the ground drilling loosening and blasting will be further described below in conjunction with specific embodiments and accompanying drawings.
具体实施方式detailed description
实施例1Example 1
本实施例一种地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法,包括以下步骤:In this embodiment, a method for depressurizing and extracting gas by loosening and blasting coal seam floors by drilling holes on the ground includes the following steps:
(a)在工作面上覆地表沿着工作面推进方向每隔200m凿钻直径为75mm的地面钻井1至煤层4工作面底板以下2m处;(a) On the overlying surface of the working face along the advancing direction of the working face, drill the ground drilling 1 with a diameter of 75mm every 200m to the place 2m below the floor of the working face of the coal seam 4;
(b)利用“L形”钻孔技术,在地面钻井1的底部沿着工作面推进方向凿钻直径为75mm水平钻孔5,水平钻孔5连通相邻地面钻井1;(b) Utilize the "L-shaped" drilling technology to drill a horizontal borehole 5 with a diameter of 75mm along the advancing direction of the working face at the bottom of the ground well 1, and the horizontal borehole 5 is connected to the adjacent ground well 1;
(c)将炸药8填充于步骤(b)中所述水平钻孔5中,并用导爆索7贯穿相邻炸药8,炸药8为水胶炸药;(c) explosives 8 are filled in the horizontal borehole 5 described in step (b), and run through adjacent explosives 8 with detonating cord 7, and explosives 8 are water-gel explosives;
(d)向步骤(b)中地面钻井1中注水封孔至与地面11平齐;(d) Injecting water into the surface drilling 1 in step (b) to seal the hole until it is flush with the ground 11;
(e)使用雷管6引爆步骤(c)中炸药8,炸药8爆炸松动煤层4,产生大量裂隙10;(e) Use the detonator 6 to detonate the explosive 8 in the step (c), and the explosive 8 explodes to loosen the coal seam 4 and produce a large number of cracks 10;
(f)将地面钻井1和水平钻孔5中的水抽出,瓦斯抽采管接入地面钻井1,抽采煤层4中的瓦斯。(f) The water in the ground well 1 and the horizontal borehole 5 is pumped out, the gas extraction pipe is connected to the ground well 1, and the gas in the coal seam 4 is extracted.
实施例2Example 2
本实施例一种地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法,包括以下步骤:In this embodiment, a method for depressurizing and extracting gas by loosening and blasting coal seam floors by drilling holes on the ground includes the following steps:
(a)在工作面上覆地表沿着工作面推进方向每隔300m凿钻直径为145mm的地面钻井1至煤层4工作面底板以下3m处;(a) On the overlying surface of the working face along the advancing direction of the working face, drill the ground drilling 1 with a diameter of 145mm every 300m to the place 3m below the floor of the working face of the coal seam 4;
(b)利用“L形”钻孔技术,在地面钻井1的底部沿着工作面推进方向凿钻直径为145mm水平钻孔5,水平钻孔5连通相邻地面钻井1;(b) Utilize the "L-shaped" drilling technology to drill a horizontal borehole 5 with a diameter of 145mm along the advancing direction of the working face at the bottom of the ground well 1, and the horizontal borehole 5 is connected to the adjacent ground well 1;
(c)将炸药8填充于步骤(b)中所述水平钻孔5中,并用导爆索7贯穿相邻炸药8,炸药8为乳化炸药;(c) filling the explosive 8 in the horizontal borehole 5 described in the step (b), and passing through the adjacent explosive 8 with the detonating cord 7, and the explosive 8 is an emulsion explosive;
(d)向步骤(b)中地面钻井1中注水封孔至水柱2垂高超过300m;(d) Injecting water into the ground well 1 in step (b) to seal the hole until the vertical height of the water column 2 exceeds 300m;
(e)使用雷管6引爆步骤(c)中炸药8,炸药8爆炸松动煤层4,产生大量裂隙10;(e) Use the detonator 6 to detonate the explosive 8 in the step (c), and the explosive 8 explodes to loosen the coal seam 4 and produce a large number of cracks 10;
(f)将地面钻井1和水平钻孔5中的水抽出,瓦斯抽采管接入地面钻井1,抽采煤层4中的瓦斯。(f) The water in the ground well 1 and the horizontal borehole 5 is pumped out, the gas extraction pipe is connected to the ground well 1, and the gas in the coal seam 4 is extracted.
在爆破过程中要保留人员和机械设备距离地面钻井30m的安全距离,防止爆破过程中的水、渣粒破坏设备或伤到人员。During the blasting process, a safe distance of 30m between personnel and mechanical equipment should be kept from the ground drilling to prevent water and slag particles from damaging the equipment or injuring personnel during the blasting process.
以上所述的实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明权利要求书确定的保护范围内。The above-mentioned embodiments are only descriptions of preferred implementations of the present invention, and are not intended to limit the scope of the present invention. Variations and improvements should fall within the scope of protection defined by the claims of the present invention.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410446247.6A CN104329113B (en) | 2014-09-03 | 2014-09-03 | A kind of method of surface drilling standing seat earth release mash gas extraction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410446247.6A CN104329113B (en) | 2014-09-03 | 2014-09-03 | A kind of method of surface drilling standing seat earth release mash gas extraction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104329113A CN104329113A (en) | 2015-02-04 |
CN104329113B true CN104329113B (en) | 2016-10-05 |
Family
ID=52403905
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410446247.6A Expired - Fee Related CN104329113B (en) | 2014-09-03 | 2014-09-03 | A kind of method of surface drilling standing seat earth release mash gas extraction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104329113B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121644B (en) * | 2016-06-17 | 2018-05-29 | 中国矿业大学 | The water-filling pressure-bearing unloading pressure by blasting of cellular structure and supporting reinforcement are crosslinked based on drilling in coal and rock plane |
CN106894816A (en) * | 2017-02-23 | 2017-06-27 | 中国矿业大学 | Far field key stratum based on set square structural model cuts top release shield lane method |
CN106948860B (en) * | 2017-05-27 | 2018-09-18 | 中煤科工集团重庆研究院有限公司 | Method for extracting coal seam gas based on cooperation of U-shaped well and directional drilling |
CN107120137B (en) * | 2017-07-12 | 2019-03-15 | 安徽理工大学 | A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method |
CN108708722B (en) * | 2018-03-27 | 2020-01-14 | 山东科技大学 | Method for efficiently preventing rock burst of low-permeability coal seam |
CN111810225A (en) * | 2020-08-28 | 2020-10-23 | 中煤科工集团重庆研究院有限公司 | Ground L-shaped well under-pressure blasting crack-making and gas drainage and mining method |
CN113217081B (en) * | 2021-05-18 | 2023-10-03 | 重庆大学 | Method for eliminating gas by controllable combustion of high-gas low-permeability coal seam |
CN113669062B (en) * | 2021-09-27 | 2023-11-03 | 重庆大学 | A fault-activated impact rock pressure control method based on ground pressure blasting |
WO2023121952A1 (en) * | 2021-12-22 | 2023-06-29 | Palmer Daniel B | Underground mining methods via boreholes and multilateral blast-holes |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6280000B1 (en) * | 1998-11-20 | 2001-08-28 | Joseph A. Zupanick | Method for production of gas from a coal seam using intersecting well bores |
CN101979835B (en) * | 2010-09-21 | 2012-06-20 | 安徽省煤田地质局第一勘探队 | Method for preventing coal and gas burst by drill communicated coal mining exhaust |
RU2453705C1 (en) * | 2011-01-13 | 2012-06-20 | Учреждение Российской академии наук Институт проблем комплексного освоения недр Российской академии наук (УРАН ИПКОН РАН) | Method for degassing of coal beds |
CN102418549B (en) * | 2011-08-15 | 2013-09-25 | 河南理工大学 | Technical method for extracting coal bed methane from constructed coal development area |
CN103195466B (en) * | 2013-03-30 | 2015-08-19 | 重庆大学 | A kind of directed hydraulic pressure demolition improves the method for gas permeability of coal seam |
-
2014
- 2014-09-03 CN CN201410446247.6A patent/CN104329113B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104329113A (en) | 2015-02-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104329113B (en) | A kind of method of surface drilling standing seat earth release mash gas extraction | |
CN108643877B (en) | Method for increasing permeability and extracting gas by staged fracturing of long borehole in underground coal seam | |
US9273553B2 (en) | Mining method for gassy and low permeability coal seams | |
CN103195466B (en) | A kind of directed hydraulic pressure demolition improves the method for gas permeability of coal seam | |
CN109736805A (en) | A kind of method of the modified release watershed management bump of thick-layer tight roof | |
RU2373398C1 (en) | Method of degasification and softening of rocks | |
CN112593936B (en) | Advanced comprehensive control method for multi-disaster area of deep mine | |
CN102678120A (en) | Method for releasing pressure and removing danger of rock burst | |
CN103939099B (en) | The prevention and controls of the dangerous coal seam group bump of a kind of thump | |
CN107816365B (en) | Coal seam drilling, blasting and pumping integrated outburst prevention method | |
CN102536240B (en) | Method for preventing rock burst by adopting high-pressure fracturing | |
CN103306714B (en) | Gas control method for drilling hole and hole three-purpose in close-range coal seam group bottom drainage roadway | |
CN108412453B (en) | Coal mining water and gas co-control system and construction method | |
CN105089493B (en) | Ground vertical well combines pressure released seam gas pumping method with underground layer-through drilling | |
CN104763462A (en) | Method for extracting high-pressure hydraulic cave-manufacturing gas from rock roadway crossing hole | |
CN107120137B (en) | A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method | |
CN103498680B (en) | Improve the method for fully mechanized coal face period of beginning mining top-coal recovery rate | |
CN109209472A (en) | The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple | |
CN102828768A (en) | Method and system for gas pumping of high-gas coal mines | |
CN104832176A (en) | One-tunnel-multi-use arrangement method of low-breathability coal seam group pressure relief gas extraction high-drainage tunnel | |
CN105971662A (en) | Method for gas extraction by coal seam roof weakening through L-shaped drilling staged fracturing | |
RU2419723C1 (en) | Degasation method of developed coal beds | |
CN104564127A (en) | Method for extracting gas in coal seams under overlying hung thick igneous rocks | |
CN107620581B (en) | Construction method of one-well dual-purpose coal mine shaft inspection hole | |
CN103670412B (en) | A kind of Mined-out Area control of high-dipping ore block exploitation and Depressurized mining method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161005 Termination date: 20190903 |