[go: up one dir, main page]

CN104299307A - Lock group management system - Google Patents

Lock group management system Download PDF

Info

Publication number
CN104299307A
CN104299307A CN201410632364.1A CN201410632364A CN104299307A CN 104299307 A CN104299307 A CN 104299307A CN 201410632364 A CN201410632364 A CN 201410632364A CN 104299307 A CN104299307 A CN 104299307A
Authority
CN
China
Prior art keywords
host
unlocking
lock
control center
substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410632364.1A
Other languages
Chinese (zh)
Other versions
CN104299307B (en
Inventor
王玮
刘建超
薛娜
张兆广
吕铭刚
张征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Langfang Power Supply Co of State Grid Jibei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Langfang Power Supply Co of State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Langfang Power Supply Co of State Grid Jibei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410632364.1A priority Critical patent/CN104299307B/en
Publication of CN104299307A publication Critical patent/CN104299307A/en
Application granted granted Critical
Publication of CN104299307B publication Critical patent/CN104299307B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lock And Its Accessories (AREA)

Abstract

本发明公开了一种锁群管理系统,包括:主机、程序钥匙、钥匙数据传送装置以及锁具,钥匙数据传送装置用于将主机生成的开锁序列传送给程序钥匙并给程序钥匙充电,程序钥匙用于基于开锁序列来开启锁具,其特征在于,管理系统分层配置为具有集控中心、集控中心下设的多个分控中心以及每个分控中心分别下设的多个子站,每个子站中安装有多个锁具,且各子站的多个锁具能够由相应的单把程序钥匙开启。本发明通过自上而下的分层集控管理,增强了电力机房锁群管理的安全性。

The invention discloses a lock group management system, comprising: a host computer, a program key, a key data transmission device and a lockset. The key data transmission device is used to transmit the unlock sequence generated by the host computer to the program key and charge the program key. To open the lock based on the unlocking sequence, it is characterized in that the management system is configured hierarchically to have a centralized control center, multiple sub-control centers under the centralized control center, and multiple sub-stations under each sub-control center, each sub-station Multiple locks are installed in the station, and the multiple locks of each substation can be unlocked by a corresponding single program key. The invention enhances the security of the lock group management in the electric machine room through top-down layered centralized control management.

Description

Lock cluster management system
Technical field
The present invention relates to a kind of lock group management domain, the particularly microcomputer management system of a kind of lock group for electric power machine room.
Background technology
Due to the various lockset in electric power machine room and key various, be difficult to management, therefore a more popular topic become gradually to the research of the lock group Managed Solution of electric power machine room, and create some lock cluster management systems being applied to electric power machine room.
But, lock cluster management system for electric power machine room usual lockset for single machine room inside and key manage, the management can not mating electric power machine room well has the characteristic of hierarchy management (such as, according to administrative division or membership).Such as, for being multiple electric power machine rooms that " township " is arranged according to administrative region, power department at county level cannot carry out unified management and supervision to the lock group service condition of these electric power machine rooms.
Summary of the invention
For the above-mentioned technical matters existed in prior art, the invention provides a kind of lock cluster management system, it carries out lock group management for the hierarchy management characteristic of electric power machine room in real world applications.
To achieve these goals, the invention provides a kind of lock cluster management system, comprise: main frame, program key, key data conveyer and lockset, the sequence of unblanking that described key data conveyer is used for being generated by described main frame sends described program key to and charges to described program key, described program key is used for opening described lockset based on described sequence of unblanking, it is characterized in that
Described management system layered configuration is for having centralized control center, multiple distributed control center that centralized control center divides into and multiple substations that each distributed control center is divided into respectively, in each substation, multiple lockset is installed, and multiple locksets of each substation can by corresponding single key operated program, wherein said multiple lockset comprises five anti-class locksets and non-five anti-class locksets, described non-five anti-class locksets are that spoon leads to lockset, the spoon that described list is provided with program key anti-class lockset matches with five of corresponding substation contact electrode and can opens this corresponding substation leads to the unlocking head of the mechanical lock in lockset,
Described centralized control center comprises the first main frame and described key data conveyer, and is configured to the lockset managing all substations;
Described distributed control center comprises the second main frame and described key data conveyer, and is configured to the lockset managing multiple substations that it is divided into;
Described substation comprises the 3rd main frame and described key data conveyer, and is configured to the lockset managing our station;
Communicate to connect between described first, second and the 3rd main frame.
Preferably, described first main frame concrete configuration is store the lockset information of all substations and unlock staff's information and generate based on to the demand of unblanking of any one lockset in all substations and relevant unlock staff's information sequence of unblanking; The lockset information of multiple substation that described second main frame concrete configuration is divided into for the distributed control center stored belonging to it and unlock staff's information, and the demand of unblanking of any one lockset in the multiple substations divided into based on the distributed control center belonging to it and relevant unlock staff's information generate sequence of unblanking; Described 3rd host configuration is for storing the lockset information of the substation belonging to it and unlock staff's information and generating based on to the demand of unblanking of lockset in this substation and relevant unlock staff's information sequence of unblanking.
Preferably, described second host configuration is obtain described first main frame to the authorization message of this second main frame, and generates based on the demand of unblanking of any one lockset in this authorization message, multiple substations of dividing into the distributed control center belonging to it and relevant unlock staff's information sequence of unblanking; Described 3rd main frame is further configured to and obtains corresponding described second main frame to the authorization message of the 3rd main frame, and based on this authorization message, generate to the demand of unblanking of lockset in the substation belonging to it and relevant unlock staff's information sequence of unblanking.
Preferably, described first main frame can be further configured to by based on lockset and unblank sequence and the relevant unlock staff's information that generate are sent to the second main frame of the distributed control center belonging to the 3rd main frame of the substation belonging to this lockset and this substation; And described second main frame and the 3rd main frame are further configured to and receive and unblank sequence and the relevant unlock staff's information that store from described first main frame.
Preferably, described second main frame be further configured to by based on lockset and unblank sequence and the relevant unlock staff's information that generate are sent to the 3rd main frame of the substation belonging to this lockset; 3rd main frame is further configured to and receives and unblank sequence and the relevant unlock staff's information that store from described second main frame.
Preferably, described management system specifically carrys out layered configuration for having described centralized control center, described distributed control center and described substation according to the level that electric power machine room is residing in electric system.
Preferably, described program key is configured to and described first, second and the 3rd hosi wireless communication.
By lock cluster management system provided by the invention, centralized control center can manage the lockset of all substations, distributed control center can only manage the lockset of administrative substation, each substation can only manage the lockset of our station, achieve top-down layering serial Communication, significantly enhance the safety and reliability of electric power machine room lock group management.
Accompanying drawing explanation
Fig. 1 is the structural representation of the lock cluster management system of the embodiment of the present invention.
Embodiment
For making those skilled in the art understand the present invention better, with reference to the accompanying drawings embodiments of the invention are described in detail.
Fig. 1 is the structural representation of the lock cluster management system of the embodiment of the present invention.This lock cluster management system comprises: main frame, program key, key data conveyer and lockset, key data conveyer is used for sending the sequence of unblanking that main frame generates to program key and to the charging of program key, program key is used for opening lockset based on sequence of unblanking.
As shown in the figure, multiple substations that system has multiple distributed control centers that centralized control center, a centralized control center divides into, each distributed control center is divided into respectively, in each substation, multiple lockset is installed, and multiple locksets of each substation can by corresponding single key operated program, wherein multiple lockset comprises five anti-class locksets and non-five anti-class locksets, non-five anti-class locksets are that spoon leads to lockset, and single spoon program key being provided with anti-class lockset matches with five of corresponding substation contact electrode and can opening this corresponding substation leads to the unlocking head of the mechanical lock in lockset;
Centralized control center comprises centralized control center's main frame (the first main frame) and key data conveyer, and is configured to the lockset managing all substations;
Distributed control center comprises distributed control center main frame (the second main frame) and key data conveyer, and is configured to the lockset managing multiple substations that it is divided into;
Substation comprises substation main frame (the 3rd main frame) and key data conveyer, and is configured to the lockset managing our station;
Communicated by Fiber connection or wireless connections between centralized control center's main frame, distributed control center main frame and substation main frame.
For the hierarchy management characteristic of electric power machine room in real world applications, by this top-down layer-management, achieve and unified systematized management and monitoring are carried out to multiple machine room, significantly enhance the safety and reliability of electric power machine room lock group management.In addition, the spoon that the program key of each substation is provided with anti-class lockset matches with five of corresponding substation contact electrode and can opens this corresponding substation leads to the unlocking head of the mechanical lock in lockset, therefore multiple locksets of each substation only need single program key by opening, simplify the program of unblanking of substation.
Specifically, centralized control center's host configuration is store the lockset information of all substations and unlock staff's information and generate based on to the demand of unblanking of any one lockset in all substations and relevant unlock staff's information sequence of unblanking; Thus centralized control center can manage the lockset of all substations.
The lockset information of multiple substation that distributed control center host configuration is divided into for the distributed control center stored belonging to it and unlock staff's information, and the demand of unblanking of any one lockset in the multiple substations divided into based on the distributed control center belonging to it and relevant unlock staff's information generate sequence of unblanking; Thus distributed control center can manage the lockset of the multiple substations divided into.
Substation main frame is for storing the lockset information of the substation belonging to it and unlock staff's information and generating based on to the demand of unblanking of lockset in this substation and relevant unlock staff's information sequence of unblanking; Thus each substation can manage the lockset of our station.
In another embodiment, centralized control center can by based on lockset and unblank sequence and the relevant unlock staff's information that generate are sent to distributed control center main frame and the substation main frame of the substation belonging to this lockset; Subsequently, distributed control center main frame and substation main frame receive and store unblank sequence and the relevant unlock staff's information from centralized control center's main frame.Substation main frame can utilize unblank sequence and the unlatching of relevant unlock staff's information realization lockset order that receive.In this control mode, achieve centralized control center and directly lockset management is carried out to its lower all substations administered.
In addition, in a variant embodiment, unblank sequence and relevant unlock staff's information of the corresponding substation that centralized control center can only be generated are sent to the distributed control center main frame corresponding to this substation, are forwarded to corresponding substation main frame by distributed control center main frame.
In addition, distributed control center can also be realized and directly lockset management be carried out to substation.In the case, distributed control center main frame by based on lockset and unblank sequence and the relevant unlock staff's information that generate are sent to the substation main frame of the substation belonging to this lockset; Substation main frame receives and stores unblank sequence and the relevant unlock staff's information from the second main frame.
In a preferred embodiment, distributed control center host configuration is obtain centralized control center main frame to the authorization message of this distributed control center main frame, and generates based on the demand of unblanking of any one lockset in authorization message, multiple substations of dividing into the distributed control center belonging to it and relevant unlock staff's information sequence of unblanking; And substation host configuration is obtain corresponding distributed control center main frame to the authorization message of this substation main frame, and based on this authorization message, generate to the demand of unblanking of lockset in our station and relevant unlock staff's information sequence of unblanking.
That is, each substation that divides into that distributed control center needs the mandate of centralized control center to realize manages; Substation also needs the mandate of distributed control center could realize the management of the lock group to our station.Thus, enhance the dynamics of centralized-control type management, further increase security and the standardization of lock group management.In addition, what deserves to be explained is, in the present embodiment, there is no under the prerequisite of authorizing centralized control center, distributed control center main frame does not have the authority of authorizing subordinate each substation main frame usually.
Owing to being communicated by Fiber connection or wireless connections between centralized control center's main frame, distributed control center main frame and substation main frame.Therefore, can be realized by the management software that each main frame is installed authorizing.Utilize traditional user name, the mode of password, or utilize rivest, shamir, adelman to realize authorization function.Such as, centralized control center's main frame has database, in database, store the information of all substations of the information such as the user name (host id) of each distributed control center main frame and password and its lower management.Distributed control center main frame sends authorization requests by the Fiber connection between itself and centralized control center or wireless connections to centralized control center, host id, password is comprised in this authorization requests, host MAC address can be comprised alternatively in addition, relevant information etc. that this distributed control center divides into substation, centralized control center verifies the information comprised in authorization requests, after being verified, send authorization code, after distributed control center main frame receives authorization code, authorization code is input in management software and namely opens the corresponding function module.Authorization code can be disposable, also can be have ageing (such as, only within one month effectively).
The level that the present invention is particularly useful for utilizing electric power machine room residing in electric system is to set centralized control center, distributed control center and substation.
In addition, although the present invention provides the management system of three-layer type, but those skilled in the art are on the basis not deviating from spirit of the present invention and essence, such as two-layer management system (namely only having centralized control center and each substation of subordinate) can be envisioned, also can envision the multiple field lock cluster management system more than three layers.
The present invention is not limited to above-mentioned specific embodiment; do not deviating under the present invention's spirit and real situation thereof; those of ordinary skill in the art can make various corresponding change and distortion according to the present invention, but these corresponding changes and distortion all should belong within the protection domain of claims of the present invention.

Claims (7)

1.一种锁群管理系统,包括:主机、程序钥匙、钥匙数据传送装置以及锁具,所述钥匙数据传送装置用于将所述主机生成的开锁序列传送给所述程序钥匙并给所述程序钥匙充电,所述程序钥匙用于基于所述开锁序列来开启所述锁具,其特征在于,1. A lock group management system, comprising: a host, a program key, a key data transmission device and a lockset, the key data transmission device is used to transmit the unlocking sequence generated by the host to the program key and to the program Key charging, the program key is used to unlock the lock based on the unlocking sequence, characterized in that, 所述管理系统分层配置为具有集控中心、集控中心下设的多个分控中心以及每个分控中心分别下设的多个子站,每个子站中安装有多个锁具,且各子站的多个锁具能够由相应的单把程序钥匙开启,其中所述多个锁具包括五防类锁具和非五防类锁具,所述非五防类锁具为匙通锁具,所述单把程序钥匙设置有与相应子站的五防类锁具相匹配的接触电极和能够开启该相应子站的匙通锁具中的机械锁的解锁头;The management system is configured hierarchically to have a centralized control center, multiple sub-control centers under the centralized control center, and multiple sub-stations under each sub-control center. Multiple locks are installed in each sub-station, and each A plurality of locks in the substation can be opened by a corresponding single program key, wherein the plurality of locks include five-proof locks and non-five-proof locks, the non-five-proof locks are key pass locks, and the single The program key is provided with a contact electrode matching the five-proof lock of the corresponding substation and an unlocking head capable of opening the mechanical lock in the key pass lock of the corresponding substation; 所述集控中心包括第一主机和所述钥匙数据传送装置,并配置为管理所有子站的锁具;The centralized control center includes a first host and the key data transmission device, and is configured to manage the locks of all substations; 所述分控中心包括第二主机和所述钥匙数据传送装置,并配置为管理其下设的多个子站的锁具;The sub-control center includes a second host and the key data transmission device, and is configured to manage the locks of multiple sub-stations under it; 所述子站包括第三主机和所述钥匙数据传送装置,并配置为管理本站的锁具;The substation includes a third host and the key data transmission device, and is configured to manage the locks of the station; 所述第一、第二以及第三主机之间通信连接。The first, second and third hosts are communicated with each other. 2.如权利要求1所述的锁群管理系统,其特征在于,2. lock group management system as claimed in claim 1, is characterized in that, 所述第一主机具体配置为存储有所有子站的锁具信息和开锁人员信息并基于对所有子站中的任一个锁具的开锁需求和相关开锁人员信息生成开锁序列;The first host is specifically configured to store lock information and unlocking personnel information of all substations, and generate an unlocking sequence based on the unlocking requirements for any lock in all substations and related unlocking personnel information; 所述第二主机具体配置为存储有其所属的分控中心下设的多个子站的锁具信息和开锁人员信息,并基于对其所属的分控中心下设的多个子站中的任一个锁具的开锁需求和相关开锁人员信息生成开锁序列;The second host is specifically configured to store lock information and unlocking personnel information of a plurality of sub-stations under the sub-control center to which it belongs, and based on any one of the locks in the sub-stations under the sub-control center to which it belongs The unlocking requirements and related unlocking personnel information generate an unlocking sequence; 所述第三主机配置为存储有其所属的子站的锁具信息和开锁人员信息并基于对该子站中锁具的开锁需求和相关开锁人员信息生成开锁序列。The third host is configured to store lock information and unlocking personnel information of the substation to which it belongs, and generate an unlocking sequence based on unlocking requirements for locks in the substation and related unlocking personnel information. 3.如权利要求1所述的锁群管理系统,其特征在于,3. lock group management system as claimed in claim 1, is characterized in that, 所述第二主机配置为获取所述第一主机对该第二主机的授权信息,并基于该授权信息、对其所属的分控中心下设的多个子站中的任一个锁具的开锁需求和相关开锁人员信息生成开锁序列;The second host is configured to obtain the authorization information of the first host to the second host, and based on the authorization information, the unlocking requirement and Relevant unlocking personnel information generates an unlocking sequence; 所述第三主机进一步配置为获取相应所述第二主机对该第三主机的授权信息,并基于该授权信息、对其所属的子站中锁具的开锁需求和相关开锁人员信息生成开锁序列。The third host is further configured to obtain the authorization information corresponding to the second host to the third host, and generate an unlocking sequence based on the authorization information, the unlocking requirement of the lock in the substation to which it belongs, and the relevant unlocking personnel information. 4.如权利要求2所述的锁群管理系统,其特征在于,4. lock group management system as claimed in claim 2, is characterized in that, 所述第一主机进一步配置为将所基于的锁具而生成的开锁序列和相关开锁人员信息发送至该锁具所属的子站的第三主机和该子站所属的分控中心的第二主机;The first host is further configured to send the unlocking sequence and related unlocking personnel information generated based on the lock to the third host of the substation to which the lock belongs and the second host of the sub-control center to which the substation belongs; 所述第二主机和第三主机进一步配置为接收并存储来自所述第一主机的开锁序列和相关开锁人员信息。The second host and the third host are further configured to receive and store the unlocking sequence and related unlocking personnel information from the first host. 5.如权利要求2所述的锁群管理系统,其特征在于,5. lock group management system as claimed in claim 2, is characterized in that, 所述第二主机进一步配置为将所基于的锁具而生成的开锁序列和相关开锁人员信息发送至该锁具所属的子站的第三主机;The second host is further configured to send the unlocking sequence and related unlocking personnel information generated based on the lock to the third host of the substation to which the lock belongs; 第三主机进一步配置为接收并存储来自所述第二主机的开锁序列和相关开锁人员信息。The third host is further configured to receive and store the unlock sequence and related unlocking personnel information from the second host. 6.如权利要求1-5中任一项所述的锁群管理系统,其特征在于,6. The lock group management system according to any one of claims 1-5, characterized in that, 所述管理系统具体按照电力机房在电力系统中所处的层级来分层配置为具有所述集控中心、所述分控中心和所述子站。Specifically, the management system is configured hierarchically according to the level of the electric machine room in the power system to have the centralized control center, the sub-control center and the substations. 7.如权利要求1-5中任一项所述的锁群管理系统,其特征在于,7. The lock group management system according to any one of claims 1-5, characterized in that, 所述程序钥匙配置为与所述第一、第二以及第三主机无线通信。The program key is configured to communicate wirelessly with the first, second and third hosts.
CN201410632364.1A 2014-11-11 2014-11-11 Lock cluster management system Active CN104299307B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410632364.1A CN104299307B (en) 2014-11-11 2014-11-11 Lock cluster management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410632364.1A CN104299307B (en) 2014-11-11 2014-11-11 Lock cluster management system

Publications (2)

Publication Number Publication Date
CN104299307A true CN104299307A (en) 2015-01-21
CN104299307B CN104299307B (en) 2016-08-31

Family

ID=52319026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410632364.1A Active CN104299307B (en) 2014-11-11 2014-11-11 Lock cluster management system

Country Status (1)

Country Link
CN (1) CN104299307B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000224163A (en) * 1999-01-28 2000-08-11 Internatl Business Mach Corp <Ibm> Access control system, keys, locks and information propagating method
CN101692524A (en) * 2009-08-31 2010-04-07 宁波电业局 Method and device for preventing faulty operation of electric power system based on wireless communication
CN201947061U (en) * 2011-03-07 2011-08-24 安徽省电力公司芜湖供电公司 Distribution network dispatching intelligent anti-mistake and real-time management system
WO2012073265A1 (en) * 2010-12-02 2012-06-07 Cisa S.P.A Method for the control and management of keys for access to spaces delimited by electronic locks and the like, and device that can be enabled as key according to the method
CN202677489U (en) * 2012-04-17 2013-01-16 珠海华伟电气科技股份有限公司 Electric power microcomputer error prevention namely intelligent lock group integrated management system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000224163A (en) * 1999-01-28 2000-08-11 Internatl Business Mach Corp <Ibm> Access control system, keys, locks and information propagating method
CN101692524A (en) * 2009-08-31 2010-04-07 宁波电业局 Method and device for preventing faulty operation of electric power system based on wireless communication
WO2012073265A1 (en) * 2010-12-02 2012-06-07 Cisa S.P.A Method for the control and management of keys for access to spaces delimited by electronic locks and the like, and device that can be enabled as key according to the method
CN201947061U (en) * 2011-03-07 2011-08-24 安徽省电力公司芜湖供电公司 Distribution network dispatching intelligent anti-mistake and real-time management system
CN202677489U (en) * 2012-04-17 2013-01-16 珠海华伟电气科技股份有限公司 Electric power microcomputer error prevention namely intelligent lock group integrated management system

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
刘婷婷等: "电力自动化机房防误锁群综合管理系统及其管理方法研究", 《电子世界》 *
汪晓彤: "新型电力地区调度远动主站配置方案探讨", 《安徽电气工程职业技术学院学报》 *
缪欣等: "集控站分层分控管理模式研究", 《信息技术》 *
贺伟等: "大集中模式的变电站五防管理系统分析", 《内蒙古电力技术》 *
魏冬晴: "集控站防误闭锁系统设置方案及应用管理", 《安徽电气工程职业技术学院学报》 *

Also Published As

Publication number Publication date
CN104299307B (en) 2016-08-31

Similar Documents

Publication Publication Date Title
CN103430183B (en) For the physical security mandate of utility application
CN104468179B (en) The method and control device executed by control device
CN207409010U (en) The newer temporary password access control system of encryption parameter dynamic
CN105184935B (en) It is a kind of can wechat share the blue-tooth intelligence lock system of password
CN107313660A (en) The method for unlocking of intelligent lock system and smart lock
WO2019240669A1 (en) A system and method for managing electronic locks
CN110192228A (en) A kind of generation method and its system of the off-line verification code based on intelligent door lock system
CN103996233B (en) A kind of fingerprint cabinet lock based on bluetooth and control method
CN106789875A (en) A kind of block chain service unit, block chain service system and its communication means
CN102761551A (en) System and method for multilevel cross-domain access control
US11165569B2 (en) Method and device for securely operating a field device
JP2013185346A (en) Entrance/exit management system
CN102656839A (en) Device and method for securing a negotiation of at least one cryptographic key between units
CN106295377A (en) A kind of medical treatment endowment data secure exchange agent apparatus and construction method thereof
CN104052817A (en) Intelligent door and intelligent door control method and system
US20180114384A1 (en) Cloud-based keyless access control system for housing facilities
CN104283881B (en) Method for the Certificate Authority and safe handling of Internet of Things sensing equipment
CN115134378A (en) Block chain intelligent medical system
CN103985169B (en) Handheld terminal and USB port is utilized to carry out door lock open and close system and control method
CN109191616A (en) intelligent lock system
CN109785482A (en) A kind of smart lock based on bluetooth mesh technology
CN204390320U (en) A kind of dynamic puzzle-lock system
CN102710016A (en) Intelligent remote hierarchical key management and control system
Kaschel et al. High security ubiquitous H-IoT on a WBAN-based EHR using blockchain
CN108989306A (en) A kind of mobile terminal safety managing and control system and implementation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant