CN104269603B - Working platform integrating working shelter and antenna installation platform - Google Patents
Working platform integrating working shelter and antenna installation platform Download PDFInfo
- Publication number
- CN104269603B CN104269603B CN201410515861.3A CN201410515861A CN104269603B CN 104269603 B CN104269603 B CN 104269603B CN 201410515861 A CN201410515861 A CN 201410515861A CN 104269603 B CN104269603 B CN 104269603B
- Authority
- CN
- China
- Prior art keywords
- platform
- stair
- shelter
- antenna
- pedestal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title abstract description 7
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 43
- 239000002184 metal Substances 0.000 claims description 22
- 229910052751 metal Inorganic materials 0.000 claims description 22
- 238000010586 diagram Methods 0.000 claims description 16
- 230000008054 signal transmission Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 18
- 239000010959 steel Substances 0.000 description 18
- 230000005540 biological transmission Effects 0.000 description 6
- 241000521257 Hydrops Species 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 3
- 206010030113 Oedema Diseases 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 241000233855 Orchidaceae Species 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000000873 masking effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 238000010561 standard procedure Methods 0.000 description 1
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The invention discloses a working platform integrating a working shelter and an antenna installation platform. The working platform comprises a bottom plate and a frame arranged on the bottom plate. The working shelter is arranged in the frame. A large platform is arranged on the top of the frame. A base with an antenna rotating table is arranged on the large platform. A stair rotating table is arranged on the left side of the large platform. A stair is arranged on the left side of the working shelter. The top end of the stair is connected with the stair rotating table. Supporting rods are arranged below the stair and the stair rotating table. The base is fixed to the large platform through a first flange. A second flange is arranged at the top end of the base and connected with the antenna rotating table. Under the condition that no antenna rotating table exists for connection, a cover plate covers the top end of the base so that rainwater can be prevented from entering the shelter. The working platform has the advantages that short-distance signal transmission between a transmitter and an antenna and short-distance signal transmission between a receiver and the antenna can be achieved, loss generated in the signal transmission process can be reduced, the capacity of radar for detecting low-altitude small targets can be improved, and the performance of the radar can be given into full play.
Description
Technical field
The present invention relates to a kind of integrate work shelter, the work platformses of antenna mounting platform.
Background technology
With the development and the protection of periphery trees of urban skyscraper, radar antenna is constantly being increased using steel tower
Antenna height reduces building and masking of the trees to radar with this, and the performance characterisitic for making radar excellent is fully sent out
Wave.At the same time, the signal in the Receiver And Transmitter in work shelter from antenna farther out, signal is continuous in the transmission
Decay, have impact on the performance characterisitic of radar.In addition with the trend that air services amount increases, flight increases, air traffic control radar
The status of traffic control in the air seems more important.Aviation that will be in effective overlay area to flying based on air traffic control radar
Device is reliably detected, and the installation of air traffic control radar needs a plateform system to support.
The content of the invention
The present invention is for avoiding weak point present in above-mentioned prior art, there is provided a kind of collection work shelter, antenna peace
Assembling platform in the work platformses of one, to solve the problems, such as that air traffic control radar lacks platform in prior art.
The present invention is employed the following technical solutions for solving technical problem.
Integrate work shelter, the work platformses of antenna mounting platform, which is structurally characterized in that, including base plate, positioned at institute
The framework on base plate is stated, a work shelter is provided with the framework, at the top of framework, is provided with large platform, the large platform
Around be provided with guardrail, in the guardrail, be provided with a pedestal on the large platform;One is provided with the pedestal
For installing the antenna rotating platform of radar antenna;One is provided with the left of the large platform with the large platform height identical building
Terraced turntable;Stair are provided with the left of the work shelter, and the top of the stair is connected with the stair turntable;
The many support bars for supporting the stair turntable and the stair are provided with below the stair and stair turntable;
The lower end of the pedestal is fixed on the large platform by first flange, and the top of the pedestal is provided with
Second flange and antenna rotating platform are connected;In the case where traditional thread binding of day is fitted without, the cover plate is located at the second flange
Centre and cover the top of the pedestal, with rainwater-proof;There is observation window the pedestal both sides.
Integrate the work shelter, the construction featuress of the work platformses of antenna mounting platform of the present invention lies also in:
The both sides of the stair are provided with handrail.
In the pedestal, an eight diagrams plate, the center of the eight diagrams plate is provided with the upper surface of the first flange
For through hole, a metal hose, the upper port of the metal hose and the pedestal intracavity inter-connection in the through hole, is embedded with,
The intracavity inter-connection of the lower port of the metal hose and the work shelter.
The side of the work shelter is provided with hatch door.
Compared with the prior art, the present invention has the beneficial effect that:
The present invention's integrates work shelter, the work platformses of antenna mounting platform, by base plate, framework, eight diagrams plate, gold
Category flexible pipe, pedestal, stair, support bar, stair turntable, cover plate, rubber ring, high-strength bolt nut collar are formed by combining.Should
System realizes the transmission of short-range signal between transmitter and receiver and antenna, reduces the loss in signals transmission, carries
Detectivity of the high radar to low altitude small target, gives full play to the performance of radar, preferably meets the use needs in market, while
The plateform system is easy to leveling, it is ensured that antenna installation accuracy, high with short production cycle, stiffness and strength, good stability, convenient transportation,
With detachable, partially sealed property it is good the features such as.The plateform system can be set up on the tower top of the steel structure tower of differing heights, from
And realize ensureing the detectivity to airborne aircraft, make system be widely used in scene surveillance radar, landing radar, aerial pipe
System once, secondary radar and terminal regulation equipment, little medium-sized radar antenna.
Plateform system can be according to different steel tower top structure forms, at the top of steel tower, highly versatile;Work shelter
It is unattended, by burying ferrum in shelter and being connected with tower top base plate by high-strength bolt, work shelter is located at tower top, ripple
Lead from shelter ejection and go to be connected to radar antenna, improve the detectivity to airborne aircraft;Framework roof panel, step plate are adopted
Steel grating substitutes checkered steel plate, solves the situation of accumulated snow hydrops.
The present invention's integrates work shelter, the work platformses of antenna mounting platform, with achievable transmitter and connecing
The transmission of short-range signal between receipts machine and antenna, reduces the loss in signals transmission, improves radar to low altitude small target
Detectivity, the advantages of give full play to the performance of radar.
Description of the drawings
Fig. 1 be the present invention integrate work shelter, the axonometric chart of the work platformses of antenna mounting platform.
Fig. 2 be the present invention integrate work shelter, the front view of the base plate of the work platformses of antenna mounting platform.
Fig. 3 be the present invention integrate work shelter, the sectional view of the pedestal of the work platformses of antenna mounting platform.
Fig. 4 be the present invention integrate work shelter, the front view of the eight diagrams plate of the work platformses of antenna mounting platform.
Fig. 5 be the present invention integrate work shelter, the axonometric chart of the pedestal of the work platformses of antenna mounting platform.
Label in 1~accompanying drawing of accompanying drawing 5:1 base plate, 2 frameworks, 3 work shelters, 4 eight diagrams plates, 5 metal hoses, 6 pedestals, 7th floors
Ladder, 8 support bars, 9 stair turntables, 10 cover plates, 11 large platforms, 12 guardrails, 13 antenna rotating platforms, 14 radar antennas, 15 first flanges,
16 second flanges, 17 handrails, 18 hatch doors.
Below by way of specific embodiment, and the invention will be further described to combine accompanying drawing.
Specific embodiment
Referring to Fig. 1~Fig. 5, the present invention's integrates work shelter, the work platformses of antenna mounting platform, including base plate
1st, the framework 2 on the base plate 1, is provided with a work shelter 3 in the framework 2, the top of framework 2 is provided with big putting down
Platform 11, is provided with guardrail 12 around the large platform 11, in the guardrail 12, be provided with a base on the large platform 11
Seat 6;An antenna rotating platform 13 for installing radar antenna 14 is provided with the pedestal 6;The left side of the large platform 11 sets
One is equipped with 11 height identical stair turntable 9 of the large platform;The left side of the work shelter 3 is provided with stair
7, the top of the stair 7 is connected with the stair turntable 9;The lower section of the stair 7 and stair turntable 9 be provided with many with
In the support bar 8 for supporting the stair turntable 9 and the stair 7;
The lower end of the pedestal 6 is fixed on the large platform 11 by first flange 15, the top of the pedestal 6
It is provided with second flange 16 and antenna rotating platform 13 is connected;In the case where traditional thread binding 13, day is fitted without, the cover plate 10
In the centre of the second flange 16 and the top of the pedestal 6 is covered, with rainwater-proof;There is observation 6 both sides of the pedestal
Window.Usually situation bottom base cover plate for sealing, need to overhaul machine waveguide when, can open.
The both sides of the stair 7 are provided with handrail 17.
In the pedestal 6, an eight diagrams plate 4 is provided with the upper surface of the first flange 15, the eight diagrams plate 4
Center is through hole, is embedded with a metal hose 5, the upper port of the metal hose 5 and 6 inner chamber of the pedestal in the through hole
It is connected, the intracavity inter-connection of the lower port of the metal hose 5 and the work shelter 3.
The side of the work shelter 3 is provided with hatch door 18.
In order to solve the key issue that the signal in the Receiver And Transmitter in work shelter is constantly decayed in the transmission.
The present invention provides the Work platform system of a kind of installment work shelter and antenna, and the system backplane, framework, eight diagrams plate, metal are soft
The adnexaes such as pipe, pedestal, stair, support bar, stair turntable, cover plate, rubber ring, high-strength bolt nut collar are constituted.
As Figure 1-5, work platformses of the invention adopt base plate, framework, eight diagrams plate, pedestal, stair, support bar, building
The adnexaes such as terraced turntable, cover plate, guardrail, rubber ring, high-strength bolt nut collar are constituted.Cover plate when without antenna from sealing make
With.The base plate is formed by the steel plate butt welding of two pieces of Q345C to ensure flatness, the solderable top in differing heights after shaping
On tower, as work shelter and the mounting platform of framework;The framework is integrally by making joint entirety by oneself by square steel and square tube
It is welded, while the boss of installation pedestal is welded on frame roof, considers in addition to prevent accumulated snow hydrops etc. from affecting, framework top
Portion replaces checkered steel plate using the steel grating for commonly using at present;The eight diagrams plate is primarily to convenient to metal hose
Replacing and maintenance etc. are operated and are designed;The metal hose is the stainless steel flexible hose with metal o-ring, and which uses in systems
Mainly connect work shelter and pedestal, flexible pipe is connected to the flange at the top of shelter by flange, and western card is coated after connecting
Glue is further sealed, so as to realize partially sealed good result;The pedestal is the cylindrical shape of steel plate butt welding, and diameter is about
1 meter, about 1 meter of height, there be two windows the left and right sides, is easy to maintenance maintenance, upper and lower ends to have the flange of flat welded, main to use
Act in the leveling with framework bolt connection and antenna rotating platform bolt connection and to antenna rotating platform;The stair, support bar and
Stair turntable is that, based on the needs for transporting, stair turntable spiral shell is mounted on framework platform, and support bar is used for supporting stair turntable, stair
One end is bolted on stair turntable, and the other end may be bolted or be overlapped on large platform;The cover plate is that do not having
To the protective effect in pedestal and work shelter in the case of installation antenna pedestal;The guardrail is by bolt and frame roof
Steel plate bolt connection, tower top platform surrounding are guaranteed personal safety by installing dismountable guardrail, while guardrail is apart from platform edges
Boundary keeps certain distance, in case people produces fear near guardrail.
Plateform system of the present invention mainly includes the framework by high strength exploitation on base plate and work shelter, setting
In the pedestal at the top of eight diagrams plate, connection shelter and pedestal metal hose, be bolted and go upstairs, be used in stair turntable
Support the support bar of stair turntable, be bolted to the guardrail on framework top etc..The work shelter is by burying ferrum simultaneously in shelter
It is connected with tower top base plate by high-strength bolt, work shelter is located at tower top, waveguide goes to be connected to radar antenna from shelter ejection,
Improve the detectivity to airborne aircraft;The framework is, after wind resistance and load-bearing analysis are calculated, to select the shaped steel being adapted to
Be welded frame structure, and is connected with base plate by way of bolt nut, and framework platform surrounding installs dismountable shield
Hurdle guarantees personal safety.The metal hose is formed according to our requirement is customized by external coordination producer, and two ends are welded with standard technique
Orchid, the flange for making to reserve at the top of metal hose one end connection shelter using flange, the other end is extend in pedestal, using detachable
The tube wall of Eight Diagrams board clamping metal hose;The stair, support bar and stair turntable are the requirements for the ease of transport, using spiral shell
Dress, stair turntable spiral shell are mounted on framework platform, and support bar is used for supporting stair turntable, stair one end to be bolted to stair and turn
On platform, the other end may be bolted or be overlapped on large platform.
The work platformses of the present invention, its plateform system can be according to different steel tower top structure forms, installed in steel tower top
Portion, highly versatile;Work shelter is unattended, by burying ferrum in shelter and being connected with tower top base plate by high-strength bolt
Connect, work shelter is located at tower top, waveguide goes to be connected to radar antenna from shelter ejection, improves the detection energy to airborne aircraft
Power;Framework roof panel, step plate employ steel grating and substitute checkered steel plate, solve the situation of accumulated snow hydrops.
Metal hose two ends are welded with standard flange, the method for making to reserve at the top of metal hose one end connection shelter using flange
Orchid, the other end are extend in pedestal, using the tube wall of detachable Eight Diagrams board clamping metal hose, while the metal hose side pressure is tight
Eight diagrams plate.
The present invention's integrates work shelter, the work platformses of antenna mounting platform, reduces power consumption, easy for installation, makes
The excellent performance characterisitic of radar is not fully exerted, while the disposable quick peace on different radar steel towers can be realized
Dress, has compared with same category of device that signal transmission distance is short, stiffness and strength is high, wind loading rating is strong, good stability, convenient transportation, has
Detachably, the features such as partially sealed property is good.
Embodiment described above is only that the preferred embodiment of the present invention is described, not the structure to the present invention
Think and scope is defined.On the premise of without departing from design concept of the present invention, technology of this area ordinary person to the present invention
Various modifications and improvement that scheme is made, all should drop into protection scope of the present invention, the technology contents that the present invention is claimed,
All record in detail in the claims.
Claims (3)
1. integrate work shelter, the work platformses of antenna mounting platform, it is characterized in that, including base plate (1), positioned at the bottom
Job shelter (3) is provided with framework (2) on plate (1), framework (2), and framework is provided with large platform at the top of (2)
(11), it is provided with around large platform (11) in guardrail (12), guardrail (12), arranges on the large platform (11)
There is a pedestal (6);An antenna rotating platform (13) for installing radar antenna (14) is provided with pedestal (6);It is described
One is provided with the left of large platform (11) with the large platform (11) height identical stair turntable (9);In the work side
A stair (7) is provided with the left of cabin (3), and the top of stair (7) is connected with stair turntable (9);The building
The many supports for supporting stair turntable (9) and the stair (7) are provided with below terraced (7) and stair turntable (9)
Bar (8);
The lower end of pedestal (6) is fixed on the large platform (11) by first flange (15), the top of pedestal (6)
It is provided with second flange (16) and antenna rotating platform (13) is connected;In the case where antenna rotating platform (13) is fitted without, cover plate
(10) it is located at the centre of the second flange (16) and covers the top of the pedestal (6), with rainwater-proof;The pedestal
(6) there is observation window both sides;
In pedestal (6), an eight diagrams plate (4), the eight diagrams plate is provided with the upper surface of the first flange (15)
(4) center is through hole, is embedded with a metal hose (5) in the through hole, the upper port of metal hose (5) with it is described
Pedestal (6) intracavity inter-connection, the intracavity inter-connection of the lower port of metal hose (5) and work shelter (3).
2. it is according to claim 1 to integrate work shelter, the work platformses of antenna mounting platform, it is characterized in that, institute
The both sides for stating stair (7) are provided with handrail (17).
3. it is according to claim 1 and 2 to integrate work shelter, the work platformses of antenna mounting platform, it is characterized in that,
The side of work shelter (3) is provided with hatch door (18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410515861.3A CN104269603B (en) | 2014-09-29 | 2014-09-29 | Working platform integrating working shelter and antenna installation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410515861.3A CN104269603B (en) | 2014-09-29 | 2014-09-29 | Working platform integrating working shelter and antenna installation platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104269603A CN104269603A (en) | 2015-01-07 |
CN104269603B true CN104269603B (en) | 2017-03-22 |
Family
ID=52161108
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410515861.3A Expired - Fee Related CN104269603B (en) | 2014-09-29 | 2014-09-29 | Working platform integrating working shelter and antenna installation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104269603B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107819189B (en) * | 2017-11-22 | 2023-11-28 | 广东通宇通讯股份有限公司 | Antenna installation device |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203050151U (en) * | 2012-12-05 | 2013-07-10 | 溧阳二十八所系统装备有限公司 | Square compartment of antenna |
EP2722302A1 (en) * | 2012-10-17 | 2014-04-23 | Iveco Magirus Ag | Utility vehicle with monitoring system for monitoring the position of the outriggers |
CN204167461U (en) * | 2014-09-29 | 2015-02-18 | 安徽博微长安电子有限公司 | Integrate the workbench of work shelter, astronomical cycle platform |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8950158B2 (en) * | 2013-03-15 | 2015-02-10 | Chadwick J. Walton | Cellular antenna tower and equipment enclosure based on shipping container |
-
2014
- 2014-09-29 CN CN201410515861.3A patent/CN104269603B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2722302A1 (en) * | 2012-10-17 | 2014-04-23 | Iveco Magirus Ag | Utility vehicle with monitoring system for monitoring the position of the outriggers |
CN203050151U (en) * | 2012-12-05 | 2013-07-10 | 溧阳二十八所系统装备有限公司 | Square compartment of antenna |
CN204167461U (en) * | 2014-09-29 | 2015-02-18 | 安徽博微长安电子有限公司 | Integrate the workbench of work shelter, astronomical cycle platform |
Non-Patent Citations (1)
Title |
---|
某机动雷达高架举升系统设计;江伟,席广辉,宋为民,王林,张安邦;《雷达科学与技术》;20140430(第2期);第218-222页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104269603A (en) | 2015-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8950158B2 (en) | Cellular antenna tower and equipment enclosure based on shipping container | |
CN110512790A (en) | Large space multi-curvature ceiling structure and its construction method | |
CN102074798A (en) | Radar antenna housing | |
CN104269603B (en) | Working platform integrating working shelter and antenna installation platform | |
CN204167461U (en) | Integrate the workbench of work shelter, astronomical cycle platform | |
CN104890895B (en) | A kind of aircraft floor test run noise reduction training wall | |
CN204527526U (en) | The life building antenna of preferred arrangement and radar mast | |
CN201802114U (en) | Communication iron tower | |
CN211215111U (en) | Fire fighting access based on building outer wall | |
CN211143815U (en) | High-voltage line protection device | |
CN104234493B (en) | Integrate the radar Special iron Tower System of shelter, staircase, mounting platform | |
CN204112829U (en) | Integrate the radar Special iron Tower System of shelter, staircase, mounting platform | |
CN204750592U (en) | Take a trial run with falling training wall of making an uproar in aircraft ground | |
CN204750591U (en) | Take a trial run with concatenation unit that falls training wall of making an uproar in aircraft ground | |
CN205840471U (en) | A kind of high stability all steel communications tower | |
CN201649708U (en) | Hanging type corridor structure of integrated house | |
CN205171857U (en) | Ramp type structure that cornices | |
CN206034787U (en) | Rain shelter | |
CN203020404U (en) | Vehicle with operating platform | |
CN208486260U (en) | Photovoltaic tubular pile head auxiliary device | |
CN104908972A (en) | Splicing units of noise reduction flow guide wall for aircraft ground test | |
CN202094300U (en) | Radar antenna cover | |
CN206779778U (en) | Draw and insert-type overhead welding platform | |
CN206458125U (en) | garden landscape rain shelter | |
CN222909601U (en) | KA wave band cloud fog radar and laser radar safety tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170322 |