CN104244605B - Method for improving SMT production efficiency and SMT device utilization rate - Google Patents

Method for improving SMT production efficiency and SMT device utilization rate Download PDF

Info

Publication number
CN104244605B
CN104244605B CN201410445922.3A CN201410445922A CN104244605B CN 104244605 B CN104244605 B CN 104244605B CN 201410445922 A CN201410445922 A CN 201410445922A CN 104244605 B CN104244605 B CN 104244605B
Authority
CN
China
Prior art keywords
equipment
production
group
team
smt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410445922.3A
Other languages
Chinese (zh)
Other versions
CN104244605A (en
Inventor
张志�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhuge Intelligent System Co.,Ltd.
Original Assignee
DONGGUAN ZHUGELIU INTELLIGENT SYSTEM Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGGUAN ZHUGELIU INTELLIGENT SYSTEM Co Ltd filed Critical DONGGUAN ZHUGELIU INTELLIGENT SYSTEM Co Ltd
Priority to CN201410445922.3A priority Critical patent/CN104244605B/en
Publication of CN104244605A publication Critical patent/CN104244605A/en
Application granted granted Critical
Publication of CN104244605B publication Critical patent/CN104244605B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of electronic SMT machines, in particular to a method for improving the SMT production efficiency and the SMT device utilization rate. The method includes the step that after all devices are ranked, grouped and arranged to form blocks, orders of two or more types of products can be arranged at the same time for on-line production. As configurations of a production line are combined in a customized mode in real time according to production of each type of products to be produced, the production efficiency is improved, and the device vacancy rate is lowered; as the production line is not arranged in series any more, working procedure devices which do not need to be used can be directly skipped during configuration combining; newly-added devices can be added into the blocks in real time; when problems which can not be easily solved in a short time occur on certain devices, the whole production line does not need to be stopped for overhauling, the devices can be cancelled from the blocks in real time for repairing, reserved devices are rapidly added into the blocks, influences, caused by device faults, on production are reduced to the maximum degree, and the production efficiency and the device use rate are improved.

Description

A kind of method of raising SMT pasters production efficiency and capacity utilization
Technical field
The present invention relates to electronics chip mounter technical field, referring in particular to a kind of SMT pasters production efficiency and equipment of improving makes With the method for rate.
Background technology
SMT pasters are produced, and are referred to and are first imposed tin cream on the pad of PCB bare boards, are placed on SMD patch electronics elements again On PCB bare boards and in addition the course of processing of reflow soldering, is the key foundation manufacture link of electronics and information industry, is a fund Intensive, technology-intensive field.Build required capital amount millions of units at least of a SMT production line, at most up to ten million units. In order to improve the efficiency of SMT equipment production, SMT industries are explored always in technology and management aspect for many years, during paster Each circulation time accurately need to calculate 1/10th seconds within.
At present, the widely used pasting method of industry be using equipment position and technique be all string data production line balance:
The first step:Material variety, quantity size according to product machine to be produced, process characteristic, can in the existing, working days , in the production line that uses, to select suitable production line;
Second step:According to the configuration of the production line for selecting, program and upload in the equipment of the producing line;
3rd step:Perform upper plate, print solder paste, tin cream SPI on the production line selected to check, paste capacitance-resistance sense small powder, patch The Fructus Anisi Stellati such as IC adapters, stokehold AOI inspections, Reflow Soldering, furnace rear AOI check that this is a series of in chronological sequence, the life that serial is carried out Produce step.
This position and technique string type have following these features:
Stable producing line, the machine of flowing water:All producing lines are serial fixed configurations, and a certain equipment is fixed and belongs to its institute Producing line, other producing line takes less than this equipment.Producing line configuration typically will not be adjusted with the change of machine, because equipment After heavy, accurate, mobile must adjustment level, change the supply of electrically connected and compressed air, the workload of mobile device it is very big and And it is time-consuming.
The complete serial of technique productions is produced, and have selected production line, and producing line configuration just has determined, then be accomplished by root Configure according to producing line material to be assigned on different chip mounters, make each chip mounter balancing the load on line as far as possible.A piece of PCB is naked Plate, i.e. workpiece to be processed, from the beginning of reaching the standard grade, the equipment of each link on this production line all has to flow through, just from this Production line is offline.For even for specific machine, it is not necessary to do a certain operation, the equipment of the operation must also be started shooting work Make, be implemented in " passing through " pattern.
On such position and technique there is problems with the equipment of serial:
One of the characteristics of electronic product it is now:Polytypic, small batch, quickly emerge.This requires that manufacture is also corresponding Reach:The offline thread-changing of heterogenous, small batch, Quick thread.At the aspect of time, it is difficult to provide time enough for we according to The material feature of different orders goes mobile device restructuring producing line.In terms of machine, different machine material gaps may be very big.Example Have 60 kinds of small powders, 5 kinds of Fructus Anisi Stellati such as A machines, it is necessary to which 2 high speed machines paste small powders, and paste Fructus Anisi Stellati just only need to a general machine Can be with.But next one B machines have 40 kinds of small powders, 20 kinds of Fructus Anisi Stellati, then in the case where only small powder is pasted with 1 high speed machine, can Fructus Anisi Stellati can be pasted with two general machines, speed all unmatches high speed machine.This organizes the contradiction that tape cannot reconcile to us:It is full Foot A classes, are but difficult to meet B classes;B classes are met, the extremely inefficient of A classes is pasted;Configuration all meets A and B, then require similar " 2 High+3 is general " such configuration, no matter when A or B is pasted, having the different idlenesses of equipment, this results in great fund (having what kind of device configuration, it is necessary to keep corresponding manapower allocation) is wasted with manpower, (flowing water is given birth in addition with power wastage Stand-by equipment in producing line, it is also desirable to start run on " by pattern ") and hall space waste (dragged down unit area output Rate).
Different machines, for the required time of end equipment before and after printer, SPI, AOI, reflow soldering etc is different 's.Some machines, the speed of chip mounter is slower than them or not need them, causes the idle of them;Some machines, paster The speed of machine is faster than them, and they become bottleneck, causes the idle of chip mounter, but configuration and the producer of industry employing now again Method, for before and after these, end equipment all only can configure one, the front and back end for not meeting same process configurations two or more sets It is standby, while the serial stream plate mode of operation of equipment itself is also determined in serial streamline at present, even if before being configured with multiple stage Rear end equipment, it is also difficult to directly use.
The chip mounter of a usual brand, has its advantage at a or two aspect, for example:In terms of high speed machine, Multi Role Aircraft It is in terms of aspect, general use machine, in terms of aspect of performance, cost, in terms of ease for use, in terms of stability, numerous.But a brand Chip mounter can not possibly be all dominant in terms of each, this just have the chip mounter of different brands is used in mixed way, using respective advantage Potential demand.But industry, in a factory, is limited for conditions such as the configuration of engineering strength, spare part accessories, is generally made at present With a certain equipment to two kinds of brands, the equipment of new brand typically would not be used again.This is because, SMT engineer is to new product The equipment of board needs the study of long period to grope to be familiar with process, and it is highly difficult to configure the accessory spare part of multiple brand equipment. If new brand device configuration is entered production line, old brand equipment is reached to new brand equipment in engineer and Producer same Before familiarity, the operational issue of new brand equipment can be such that the efficiency of production line seriously reduces;If not in time by new brand Device configuration enters production line, then can cause the idle waste of new equipment.
The content of the invention
The present invention be directed to problem above present in SMT pasters production at present, and a kind of raising SMT pasters life for proposing The method for producing efficiency and capacity utilization.
For reaching above-mentioned purpose, the present invention is adopted the following technical scheme that:
A kind of method of raising SMT pasters production efficiency and capacity utilization,
All of equipment in workshop first is lined up to classify with the arrangement of group by the first step:
Row " team ":The equipment of some operation, the combination of some string datas, a string data combination is carried out on locus It is exactly a team, makes this operation all devices form some teams, between every team on locus, is parallel arranged arranged side by side; Certainly, most flexibly line up mode for production, be exactly one team of an equipment, how many platform equipment just organizes how many teams, These team's whole arranged in parallel get up.
Group " group ":The all existing available equipment of same operation, in units of team, the collection that parallel deployment gets up on position Conjunction is exactly the group for having organized;
Second step, when paster is produced, the device resource of each operation according to needed for treating patch products is produced in real time Line configuration, i.e. layout is into " block ":
The equipment of adjacent some teams, can complete an operation in specific paster production task, the parallel layout of these teams, And after making every team join end to end by point-to-point transmission equipment, it is defined as " block ";The concrete grammar of second step is:
The device resource requirements of a certain operation according to needed for treating patch products, choose the group of required operation, then from Team required for selecting in group, is joined end to end these teams by the whole point-to-point transmission equipment of real-time, tunable, that is, The real-time configuration of these teams, the block required for just becoming.
3rd step, after each block configuration is good, works out and downloads, and carries out serial production by technique, forms a group State producing line.
General, the first step is a kind of disposable preparation and adjusts work.After performing the first step first, to concrete Paster production task only need to perform second step and the 3rd step.
One group is the production that the population of devices of same operation assume responsibility for how many machines, this operation with regard to how many Block;The quantity of the block of a certain operation is likely less than the quantity of machine, because some machines may not be needed to travel through whole operations.
Preferably, the equipment in described team can both be that the equipment of single device, or 2 or more than 2 exists Locus serial combination.
The beneficial effects of the present invention is:
As the method for the raising SMT pasters production efficiency of the present invention and capacity utilization first does homework i.e., will All of equipment is lined up to classify with the arrangement of group;During production, the device resource according to needed for patch products is compiled in real time Line up " block ", its essence is to production line according to the order demand amount of carrying out body configuration real-time configuration.
So, the characteristics of the method for the present invention possesses following:
First, the present invention can constitute each operation in real time by each device requirement of the specific indent machine to each operation Block;This machine production is over, and the demand by next machine to equipment, then constitutes new block in real time;Multiple machines can be with Production of reaching the standard grade being arranged simultaneously, and each machine can measuring the configuration that body prepares production line, improve production efficiency reduces equipment Vacancy rate;" configuration of production line is adapted to order requirements " is converted to from " order have to the configuration for deacclimatizing production line ".
2nd, as producing line is no longer that serial is placed, it is not necessary to which the processing apparatus for using, are no longer that execution of must starting shooting passes through Pattern, and can with configuration when directly skip;Increase new equipment if desired, the new brand equipment being even not familiar with, Can be convenient, add block in real time after research, debugging, programming are good;
If the 3, insoluble problem for the moment occurs in certain equipment, also no longer it is must to stop whole piece producing line to overhaul, and Can be to delete in real time to be keeped in repair from block, if there is the backup device of this problem device in existing equipment, can be by Backup device is rapidly added in block, so that equipment fault is minimized to the impact that production brings;It is above-mentioned skip, add, Deletion action is all being rapidly completed by simply manipulating the beginning and end of point-to-point automatic conveying device.
Description of the drawings
Fig. 1 is the structural representation of each equipment arrangement classification of the inventive method
Specific embodiment
1 the present invention is further elaborated below in conjunction with the accompanying drawings:
A kind of method of raising SMT pasters production efficiency and capacity utilization,
All of equipment in workshop first is lined up to classify with the arrangement of group by the first step:
Row " team ":A certain operation in workshop, such as paster operation, have 12 chip mounters, as an example, by this 12 pasters Machine arranges into 7 " teams " (team 1 arrives team 7), and in this 7 teams, some teams are single devices;Some teams are multiple devices.Between 7 teams It is parallel arrangement.
Group " group ":7 teams of this operation constitute a group (group 1);The all existing available equipment of other same operations, Also in units of team, on position, parallel deployment gets up, and also constitutes a group (group 2, and group 3 ... ...).
Second step, when paster is produced, the device resource of each operation according to needed for treating patch products is produced in real time Line configuration, i.e. layout is into " block ":
For example, now with 4 different patch products each to device requirement, we are 47 team's layouts in group 1 Individual block (block 1 arrives block 4), each block corresponds respectively to this processing apparatus required for patch products, it can be seen that first Individual product has only used a team (this is not anxious product at date of delivery), and three products have all used two teams to join end to end volume afterwards Line up block to produce.If second day, in 4 patch products, three all produced and are over afterwards, only first is being continued life Produce, next again have one it is many to device requirement, or very anxious patch products at date of delivery need production, we can be by team 2 Equipment whole layout to team 7 becomes a bulk, and we just possess the production capacity of 11 equipment to produce this product at once.
3rd step, after each block configuration is good, works out and downloads, and carries out serial production by technique, forms a group State producing line.
It can be seen that the population of devices that group is same operation assume responsibility for the production of how many machines, this Operation is with regard to how many block;The quantity of the block that the configuration producing line (in Fig. 1 shown in arrow line) of a certain Product processing is included may be little In the quantity of group, because some product sequences may not be needed to travel through whole operations.
Embodiment described above, simply preferred embodiments of the invention, not limiting the scope of the present invention, therefore Fan Yiben Equivalence changes or modification that construction, feature and principle described in patent application the scope of the claims is done, all should be included in of the invention special In sharp application range.

Claims (5)

1. a kind of method of raising SMT pasters production efficiency and capacity utilization, it is characterised in that
All of equipment in workshop first is lined up to classify with the arrangement of group by the first step:
Row " team ":The equipment of some operation, the combination of some string datas is carried out on locus, a string data combination is exactly One team, makes this operation all devices form some teams, between every team on locus, is parallel arranged arranged side by side;
Group " group ":The all existing available equipment of same operation, in units of team, the set that parallel deployment gets up on position is just It is the group for having organized;
Second step, when paster is produced, the device resource of each operation according to needed for treating patch products carries out product line group in real time State, i.e. layout is into " block ":
The equipment of adjacent some teams, completes an operation in specific paster production task, and the parallel layout of these teams simultaneously passes through After point-to-point transmission equipment makes every team join end to end, " block " is defined as;Concrete grammar is:
The device resource requirements of a certain operation according to needed for treating patch products, choose the group of required operation, then from group Team required for selecting, is joined end to end these teams by the whole point-to-point transmission equipment of real-time, tunable, real-time group of these teams State, the block required for just becoming;
3rd step, after each block configuration is good, works out and downloads, and carries out serial production by technique, forms a configuration and produces Line.
2. the method for a kind of raising SMT pasters production efficiency according to claim 1 and capacity utilization, its feature exist In:Equipment in described team can both be the equipment of single device, or 2 or more than 2 in locus serial Combination.
3. the method for a kind of raising SMT pasters production efficiency according to claim 1 and 2 and capacity utilization, its feature It is:The flow process of processed workpiece, in the block middle polyline shape flowing for easily changing or be easily adjusted.
4. the method for a kind of raising SMT pasters production efficiency according to claim 1 and 2 and capacity utilization, its feature It is:The equipment traveled through by processed workpiece, carries out real-time configuration by the structure to block, and realization is added into or quilt in real time Skip.
5. the method for a kind of raising SMT pasters production efficiency according to claim 1 and 2 and capacity utilization, its feature It is:Described point-to-point transmission equipment is single-point to unicast equipment or multi-multipoint transmission equipment.
CN201410445922.3A 2014-09-03 2014-09-03 Method for improving SMT production efficiency and SMT device utilization rate Active CN104244605B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410445922.3A CN104244605B (en) 2014-09-03 2014-09-03 Method for improving SMT production efficiency and SMT device utilization rate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410445922.3A CN104244605B (en) 2014-09-03 2014-09-03 Method for improving SMT production efficiency and SMT device utilization rate

Publications (2)

Publication Number Publication Date
CN104244605A CN104244605A (en) 2014-12-24
CN104244605B true CN104244605B (en) 2017-03-22

Family

ID=52231685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410445922.3A Active CN104244605B (en) 2014-09-03 2014-09-03 Method for improving SMT production efficiency and SMT device utilization rate

Country Status (1)

Country Link
CN (1) CN104244605B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106793557B (en) * 2017-01-17 2019-08-20 上海辰竹仪表有限公司 Material configuration method and device, SMT production method and production system
CN107231762A (en) * 2017-06-02 2017-10-03 江苏久正光电有限公司 A kind of SMT system of processing and its technique
CN111132472B (en) * 2020-01-19 2022-02-01 联宝(合肥)电子科技有限公司 Method for welding circuit board based on low-temperature solder paste and welding area
CN113313366A (en) * 2021-05-17 2021-08-27 格力电器(南京)有限公司 Method and system for producing STM (Single-T-ray arrowroot) alignment of electronic product
CN114980519B (en) * 2022-05-25 2024-04-26 深圳友特精密配件有限公司 Processing operation method and system based on ultra-long PCBA

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW583560B (en) * 2002-03-01 2004-04-11 Li-Chen Fu Modeling and scheduling of a semiconductor wafer fab
CN101493857A (en) * 2009-02-13 2009-07-29 同济大学 Semiconductor production line model building, optimizing and scheduling method based on petri net and immune arithmetic
CN101604409A (en) * 2009-07-15 2009-12-16 北京化工大学 A Scheduling Method Applied to Multi-entry Complex Manufacturing System
CN102253662A (en) * 2011-04-11 2011-11-23 同济大学 Scheduling method for semiconductor production line based on multi-ant-colony optimization
CN102354117A (en) * 2011-08-08 2012-02-15 温州大学 Production line system adaptive to dynamic configuration of equipment and process sequence method thereof
CN103439885A (en) * 2013-07-26 2013-12-11 同济大学 Semiconductor production line optimized dispatching device
CN103439886A (en) * 2013-07-26 2013-12-11 同济大学 Semiconductor production line self-adaptation dynamic dispatching device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6714830B2 (en) * 2000-02-28 2004-03-30 Canon Kabushiki Kaisha Push-type scheduling for semiconductor fabrication

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW583560B (en) * 2002-03-01 2004-04-11 Li-Chen Fu Modeling and scheduling of a semiconductor wafer fab
CN101493857A (en) * 2009-02-13 2009-07-29 同济大学 Semiconductor production line model building, optimizing and scheduling method based on petri net and immune arithmetic
CN101604409A (en) * 2009-07-15 2009-12-16 北京化工大学 A Scheduling Method Applied to Multi-entry Complex Manufacturing System
CN102253662A (en) * 2011-04-11 2011-11-23 同济大学 Scheduling method for semiconductor production line based on multi-ant-colony optimization
CN102354117A (en) * 2011-08-08 2012-02-15 温州大学 Production line system adaptive to dynamic configuration of equipment and process sequence method thereof
CN103439885A (en) * 2013-07-26 2013-12-11 同济大学 Semiconductor production line optimized dispatching device
CN103439886A (en) * 2013-07-26 2013-12-11 同济大学 Semiconductor production line self-adaptation dynamic dispatching device

Also Published As

Publication number Publication date
CN104244605A (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN104244605B (en) Method for improving SMT production efficiency and SMT device utilization rate
CN102682166A (en) SMT (Surface Mounted Technology) equipment rapid processing system and method
CN103206364B (en) A kind of system and method carrying out monotype pump energy saving traffic control
CN107256005A (en) A kind of reinforcing steel bar numerical control processing method and equipment based on BIM technology
CN107462821B (en) Remote monitoring method and system for wafer test machine
CN109583526A (en) Two dimensional code application method, device and the storage medium of pcb board
CN103970959A (en) Circuit board wiring method and system
CN103336490B (en) Dynamic scheduling method and system for flexible cigarette shred production
CN100382085C (en) Board pattern designing method of integrated designing element in printed circuit board and its device
CN103863575A (en) Maturity-based concurrent digital definition method of large amphibious aircraft
CN116360359A (en) Construction method and simulation system of industrial simulation roles and industrial production line
Matsuda et al. A multi-agent based construction of the digital eco-factory for a printed-circuit assembly line
CN101832809A (en) Liquid weighing device and automatic control method thereof
CN101557680A (en) Transplanting method of multi-connected circuit board
CN103661497B (en) A kind of running number distribution method, device and running number distributing box
CN106066639A (en) Product manufacturing/processing stations/operation foundation/management method, system, equipment
CN103177331B (en) Two dimension Mixed Pinyin production data monitoring method
Gola et al. RMS–system of the future or new trend in science?
CN108490885A (en) A kind of laser PCB engraving systems
CN107801373A (en) A kind of intelligent paste machine mode of operation
CN207232323U (en) A kind of clinac faulty circuit plate is disembarked analoging detecting device
DE10215196A1 (en) System and method for programming and / or for operating an automation system with process-oriented logic
CN201653514U (en) Liquid weighing device
CN103752527A (en) Method for automatically identifying defective products of electronic products
CN204640597U (en) A kind of recycled plastic regenerating and modifying granulation production automation complete set of equipments

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191220

Address after: 314300 West Block 211 Yanbei Road, Wuyuan Street, Haiyan County, Jiaxing City, Zhejiang Province

Patentee after: Jiaxing Dingtie Electronic Technology Co.,Ltd.

Address before: 523000 Guangdong city of Dongguan province Tangxia Luyuan Road No. 71 Tang Chen Industrial Area B Building 3 floor

Patentee before: DONGGUAN ZHUGELIU INTELLIGENT SYSTEM Co.,Ltd.

CP01 Change in the name or title of a patent holder

Address after: 314300 Building 1, West District, 211 Yanbei Road, Wuyuan street, Haiyan County, Jiaxing City, Zhejiang Province

Patentee after: DONGGUAN ZHUGELIU INTELLIGENT SYSTEM Co.,Ltd.

Address before: 314300 Building 1, West District, 211 Yanbei Road, Wuyuan street, Haiyan County, Jiaxing City, Zhejiang Province

Patentee before: Jiaxing Dingtie Electronic Technology Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP03 Change of name, title or address

Address after: 211100 l3386, floor 3, Chuangye building, building 6, No. 1009, Tianyuan East Road, Jiangning District, Nanjing, Jiangsu Province (Jiangning high tech Zone)

Patentee after: Nanjing Zhuge Intelligent System Co.,Ltd.

Address before: 314300 Building 1, West District, 211 Yanbei Road, Wuyuan street, Haiyan County, Jiaxing City, Zhejiang Province

Patentee before: DONGGUAN ZHUGELIU INTELLIGENT SYSTEM Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Room 315, Building 3, Hefengyuan, Longye Road, Longhutang, Xinbei District, Changzhou City, Jiangsu Province, 211100

Patentee after: Jiangsu Zhuge Intelligent System Co.,Ltd.

Address before: 211100 l3386, floor 3, Chuangye building, building 6, No. 1009, Tianyuan East Road, Jiangning District, Nanjing, Jiangsu Province (Jiangning high tech Zone)

Patentee before: Nanjing Zhuge Intelligent System Co.,Ltd.

CP03 Change of name, title or address