CN104242122A - Alignment device for mounting of distribution-box copper bar and alignment method of alignment device - Google Patents

Alignment device for mounting of distribution-box copper bar and alignment method of alignment device Download PDF

Info

Publication number
CN104242122A
CN104242122A CN201410511428.2A CN201410511428A CN104242122A CN 104242122 A CN104242122 A CN 104242122A CN 201410511428 A CN201410511428 A CN 201410511428A CN 104242122 A CN104242122 A CN 104242122A
Authority
CN
China
Prior art keywords
distribution box
copper bar
shaped clip
installation
magnet column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410511428.2A
Other languages
Chinese (zh)
Other versions
CN104242122B (en
Inventor
薛尚青
阙小生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Fujian Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical State Grid Fujian Electric Power Co Ltd
Priority to CN201410511428.2A priority Critical patent/CN104242122B/en
Publication of CN104242122A publication Critical patent/CN104242122A/en
Application granted granted Critical
Publication of CN104242122B publication Critical patent/CN104242122B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本发明涉及一种配电箱铜排安装对准装置,包括U形夹,所述U形夹的左筋臂端部内侧镶嵌有铁块,所述U形夹的右筋臂端部内侧对应镶嵌有磁铁柱,所述磁铁柱与配电箱上的第一安装孔、铜排上的第二安装孔相配合,所述左、右筋臂之间固定连接有便于夹紧的弹簧。本发明还涉及一种配电箱铜排安装对准装置的对准方法,通过U形夹上的铁块与磁铁柱的相互吸引,将配电箱与铜排上的安装孔相互对准,该装置结构简单,操作方便。

The invention relates to a device for installing and aligning copper bars in a distribution box. Inlaid with a magnet column, the magnet column is matched with the first installation hole on the distribution box and the second installation hole on the copper bar, and a spring for easy clamping is fixedly connected between the left and right tendon arms. The invention also relates to an alignment method for the installation and alignment device of the copper bar of the distribution box. Through the mutual attraction between the iron block on the U-shaped clip and the magnet column, the installation holes on the distribution box and the copper bar are aligned with each other, The device has simple structure and convenient operation.

Description

一种配电箱铜排安装对准装置及其对准方法A distribution box copper bar installation and alignment device and its alignment method

技术领域 technical field

本发明涉及一种配电箱铜排安装对准装置及其对准方法。 The invention relates to a device for installing and aligning copper bars of a distribution box and an aligning method thereof.

背景技术 Background technique

配电箱是按电气接线要求将开关设备、测量仪表、保护电器和辅助设备组装在封闭或半封闭金属柜中或屏幅上,构成低压配电箱,通常采用铜排作为各相及接地导电介质,在安装铜排时,通过目视将铜排上的通孔与配电箱上的安装孔对准,再用螺栓螺母固定,但用目视以及用手来对准安装孔,安装效率低,受到铜排安装位置的限制,安装难度大。 The distribution box is a low-voltage distribution box that assembles switchgear, measuring instruments, protective appliances and auxiliary equipment in a closed or semi-closed metal cabinet or on a screen width according to the requirements of electrical wiring. Copper bars are usually used as the phases and grounding conductors. Medium, when installing copper bars, align the through holes on the copper bars with the installation holes on the distribution box by visual inspection, and then fix them with bolts and nuts, but align the installation holes visually and by hand, the installation efficiency Low, limited by the installation position of the copper bar, the installation is difficult.

发明内容 Contents of the invention

本发明针对上述现有技术存在的问题做出改进,即本发明所要解决的技术问题是提供本发明涉及一种结构简单、操作方便的配电箱铜排安装对准装置及其对准方法。 The present invention makes improvements to the problems existing in the above-mentioned prior art, that is, the technical problem to be solved by the present invention is to provide a copper bar installation and alignment device and its alignment method for distribution box with simple structure and convenient operation.

为了解决上述技术问题,本发明的技术方案是:一种配电箱铜排安装对准装置,包括U形夹,所述U形夹的左筋臂端部内侧镶嵌有铁块,所述U形夹的右筋臂端部内侧对应镶嵌有磁铁柱,所述磁铁柱与配电箱上的第一安装孔、铜排上的第二安装孔相配合,所述左、右筋臂之间固定连接有便于夹紧的弹簧。 In order to solve the above technical problems, the technical solution of the present invention is: a device for installing and aligning copper bars in a distribution box, including a U-shaped clip, and an iron block is inlaid on the inner side of the end of the left tendon arm of the U-shaped clip, and the U-shaped clip The inside of the end of the right tendon arm of the shape clip is correspondingly inlaid with a magnet column, and the magnet column is matched with the first installation hole on the distribution box and the second installation hole on the copper bar. The fixed connection has a spring for easy clamping.

进一步的,所述磁铁柱前端为半球状。 Further, the front end of the magnet column is hemispherical.

进一步的,所述U形夹厚度为0.5mm~1mm。 Further, the thickness of the U-shaped clip is 0.5mm~1mm.

进一步的,所述U形夹由塑料制成。 Further, the U-shaped clip is made of plastic.

一种配电箱铜排安装对准装置的对准方法,按以下步骤进行: A method for aligning an installation alignment device for copper bars in a distribution box, which is carried out in the following steps:

(1)将铜排移动到配电箱附近,将第二安装孔大致对准第一安装孔,打开U形夹,将U形夹镶嵌有铁块的右筋臂伸入到配电箱背后,铁块将第一安装孔遮蔽,将U形夹镶嵌有磁铁柱的左筋臂附在铜排的第二安装孔处,将磁铁柱伸入第二安装孔,此时由于磁铁柱与铁块之间相互吸引,使得配电箱第一安装孔与铜排上的第二安装孔对准; (1) Move the copper bar to the vicinity of the distribution box, roughly align the second installation hole with the first installation hole, open the U-shaped clip, and extend the right tendon arm of the U-shaped clip embedded with iron blocks to the back of the distribution box , the iron block covers the first mounting hole, attaches the left tendon arm of the U-shaped clip inlaid with the magnet column to the second mounting hole of the copper bar, and extends the magnet column into the second mounting hole. At this time, due to the magnet column and the iron The blocks are attracted to each other, so that the first installation hole of the distribution box is aligned with the second installation hole on the copper bar;

(2)将螺栓靠近铜排,并按住铜排,同时将U形夹取下,将螺栓穿过第一、第二安装孔,旋紧,配电箱铜排安装结束。 (2) Put the bolts close to the copper bar, hold the copper bar, and remove the U-shaped clamp at the same time, pass the bolt through the first and second mounting holes, and tighten it, the installation of the copper bar of the distribution box is completed.

与现有技术相比,本发明具有以下有益效果:(1)本发明通过设置在U形夹两筋臂上的铁块与磁铁柱的相互吸引,将配电箱上的第一安装孔与铜排上的第二安装孔相互对准,操作方便;(2)配电箱上的第一安装孔与铜排上的第二安装孔对准后,U形夹取下,所述U形夹可以重复利用;(3)U形夹厚度为0.5mm~1mm,且为塑料制成,可以深入到配电箱一些施工人员的手难以伸入的“死角”,十分方便;(4)本发明结构简单,便于推广。 Compared with the prior art, the present invention has the following beneficial effects: (1) The present invention connects the first installation hole on the distribution box The second installation holes on the copper bar are aligned with each other, and the operation is convenient; (2) After the first installation hole on the distribution box is aligned with the second installation hole on the copper bar, the U-shaped clip is removed, and the U-shaped The clip can be reused; (3) The thickness of the U-shaped clip is 0.5mm~1mm, and it is made of plastic, which can penetrate into the "dead corner" of the distribution box where some construction workers' hands are difficult to reach, which is very convenient; (4) This The invention has simple structure and is convenient for popularization.

下面结合附图和具体实施方式对本发明做进一步详细的说明。 The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.

附图说明 Description of drawings

图1为本发明实施例的构造示意图。 Fig. 1 is a schematic structural diagram of an embodiment of the present invention.

图2为本发明实施例配电箱铜排安装构造示意图。 Fig. 2 is a schematic diagram of the installation structure of the copper bars of the distribution box according to the embodiment of the present invention.

图中:1-U形夹,2-左筋臂,3-铁块,4-右筋臂,5-磁铁柱,6-配电箱,61-第一安装孔,7-铜排,71-第二安装孔,8-弹簧,9-螺栓。 In the figure: 1-U-shaped clip, 2-left rib arm, 3-iron block, 4-right rib arm, 5-magnet column, 6-distribution box, 61-first installation hole, 7-copper row, 71 -Second mounting hole, 8-spring, 9-bolt.

具体实施方式 Detailed ways

如图1~2所示,一种新型配电箱铜排7安装对准装置,包括U形夹1,所述U形夹1的左筋臂2端部内侧镶嵌有铁块3,所述U形夹1的右筋臂4端部内侧对应镶嵌有磁铁柱5,所述磁铁柱5与配电箱6上的第一安装孔61、铜排7上的第二安装孔71相配合,所述左筋臂2、右筋臂4之间固定连接有便于夹紧的弹簧8。 As shown in Figures 1 and 2, a new installation and alignment device for copper bars 7 of a distribution box includes a U-shaped clip 1, and an iron block 3 is inlaid on the inner side of the end of the left tendon arm 2 of the U-shaped clip 1. The inside of the end of the right muscle arm 4 of the U-shaped clip 1 is correspondingly inlaid with a magnet column 5, and the magnet column 5 is matched with the first installation hole 61 on the distribution box 6 and the second installation hole 71 on the copper bar 7, A spring 8 for clamping is fixedly connected between the left muscle arm 2 and the right muscle arm 4 .

在本实施例中,所述磁铁柱5前端为半球状,便于磁铁柱5进入第一安装孔61、第二安装孔71内;所述U形夹1厚度为0.5mm~1mm,当然U形夹1的厚度可以适当增加或减少,以便适用于不同的环境;所述U形夹1由塑料制成,也可为其他具有一定弹性、韧性、硬度、无磁性的材料,例如竹片。 In this embodiment, the front end of the magnet column 5 is hemispherical, which is convenient for the magnet column 5 to enter the first installation hole 61 and the second installation hole 71; The thickness of the clip 1 can be appropriately increased or decreased so as to be suitable for different environments; the U-shaped clip 1 is made of plastic, or other materials with certain elasticity, toughness, hardness, and non-magnetic properties, such as bamboo chips.

一种新型配电箱6铜排7安装对准装置的对准方法,按以下步骤进行: A method for aligning the installation and alignment device of a new type of distribution box 6 copper bars 7 is carried out according to the following steps:

(1)将铜排7移动到配电箱6附近,将第二安装孔71大致对准第一安装孔61,打开U形夹1,将U形夹1镶嵌有铁块3的右筋臂4伸入到配电箱6背后,铁块3将第一安装孔61遮蔽,将U形夹1镶嵌有磁铁柱5的左筋臂2覆在铜排7的第二安装孔71处,将磁铁柱5伸入第二安装孔71,此时由于磁铁柱5与铁块3之间相互吸引,使得配电箱6第一安装孔61与铜排7上的第二安装孔71对准; (1) Move the copper bar 7 to the vicinity of the distribution box 6, roughly align the second installation hole 71 with the first installation hole 61, open the U-shaped clip 1, and inlay the U-shaped clip 1 with the right rib arm of the iron block 3 4 protruding into the back of the distribution box 6, the iron block 3 covers the first installation hole 61, the left arm 2 of the U-shaped clip 1 embedded with the magnet column 5 is covered on the second installation hole 71 of the copper bar 7, and the The magnet column 5 extends into the second installation hole 71, and at this time, due to the mutual attraction between the magnet column 5 and the iron block 3, the first installation hole 61 of the distribution box 6 is aligned with the second installation hole 71 on the copper bar 7;

(2)将螺栓9靠近铜排7,并按住铜排7,同时将U形夹1取下,将螺栓9穿过第一、第二安装孔,旋紧,配电箱6铜排7安装结束。 (2) Put the bolt 9 close to the copper bar 7, and press the copper bar 7, remove the U-shaped clip 1 at the same time, pass the bolt 9 through the first and second mounting holes, and tighten, the distribution box 6 copper bar 7 The installation is complete.

以上所述仅为本发明的较佳实施例,凡依本发明申请专利范围所做的均等变化与修饰,皆应属本发明的涵盖范围。 The above descriptions are only preferred embodiments of the present invention, and all equivalent changes and modifications made according to the scope of the patent application of the present invention shall fall within the scope of the present invention.

Claims (5)

1.一种配电箱铜排安装对准装置,其特征在于:包括U形夹,所述U形夹的左筋臂端部内侧镶嵌有铁块,所述U形夹的右筋臂端部内侧对应镶嵌有磁铁柱,所述磁铁柱与配电箱上的第一安装孔、铜排上的第二安装孔相配合,所述左、右筋臂之间固定连接有便于夹紧的弹簧。 1. A device for installing and aligning copper bars in a distribution box, characterized in that: it includes a U-shaped clip, the inner side of the left tendon arm end of the U-shaped clip is inlaid with an iron block, and the right rib arm end of the U-shaped clip is The inner side of the part is correspondingly inlaid with a magnet column, and the magnet column is matched with the first installation hole on the distribution box and the second installation hole on the copper bar. The left and right tendon arms are fixedly connected with clamping spring. 2.根据权利要求1所述的一种配电箱铜排安装对准装置,其特征在于:所述磁铁柱前端为半球状。 2 . The device for installing and aligning copper bars in a distribution box according to claim 1 , wherein the front end of the magnet column is hemispherical. 3 . 3.根据权利要求1所述的一种配电箱铜排安装对准装置,其特征在于:所述U形夹厚度为0.5mm~1mm。 3. The device for installing and aligning copper bars in a distribution box according to claim 1, wherein the thickness of the U-shaped clip is 0.5mm~1mm. 4.根据权利要求1所述的一种配电箱铜排安装对准装置,其特征在于:所述U形夹由塑料制成。 4. The device for installing and aligning copper bars in a distribution box according to claim 1, wherein the U-shaped clip is made of plastic. 5.一种配电箱铜排安装对准方法,其特征在于,采用如权利要求1至4中任一项的新型配电箱铜排安装对准装置,并按以下步骤进行: 5. A method for installing and aligning copper bars in a distribution box, characterized in that a new type of installation and alignment device for copper bars in a distribution box as claimed in any one of claims 1 to 4 is used, and is carried out according to the following steps: (1)将铜排移动到配电箱附近,将第二安装孔初步对准第一安装孔,打开U形夹,将U形夹镶嵌有铁块的右筋臂伸入到配电箱背后,铁块将第一安装孔遮蔽,将U形夹镶嵌有磁铁柱的左筋臂附在铜排的第二安装孔处,将磁铁柱伸入第二安装孔,此时由于磁铁柱与铁块之间相互吸引,使得配电箱第一安装孔与铜排上的第二安装孔精确对准; (1) Move the copper bar to the vicinity of the distribution box, align the second installation hole with the first installation hole, open the U-shaped clip, and extend the right tendon arm of the U-shaped clip embedded with iron blocks to the back of the distribution box , the iron block covers the first mounting hole, attaches the left tendon arm of the U-shaped clip inlaid with the magnet column to the second mounting hole of the copper bar, and extends the magnet column into the second mounting hole. At this time, due to the magnet column and the iron The blocks are attracted to each other, so that the first installation hole of the distribution box is precisely aligned with the second installation hole on the copper bar; (2)将螺栓靠近铜排,并按住铜排,同时将U形夹取下,将螺栓穿过第一、第二安装孔,旋紧,配电箱铜排安装结束。 (2) Put the bolts close to the copper bar, hold the copper bar, and remove the U-shaped clamp at the same time, pass the bolt through the first and second mounting holes, and tighten it, the installation of the copper bar of the distribution box is completed.
CN201410511428.2A 2014-09-29 2014-09-29 A kind of distribution box copper installation alignment methods Active CN104242122B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410511428.2A CN104242122B (en) 2014-09-29 2014-09-29 A kind of distribution box copper installation alignment methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410511428.2A CN104242122B (en) 2014-09-29 2014-09-29 A kind of distribution box copper installation alignment methods

Publications (2)

Publication Number Publication Date
CN104242122A true CN104242122A (en) 2014-12-24
CN104242122B CN104242122B (en) 2016-09-07

Family

ID=52229719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410511428.2A Active CN104242122B (en) 2014-09-29 2014-09-29 A kind of distribution box copper installation alignment methods

Country Status (1)

Country Link
CN (1) CN104242122B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109687325A (en) * 2018-12-26 2019-04-26 六安科耐德电气有限公司 A kind of distribution box copper installation alignment methods and its check and correction equipment
CN115764611A (en) * 2022-11-23 2023-03-07 秦明慧 Distribution box copper bar installation alignment device and alignment method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06127854A (en) * 1992-10-20 1994-05-10 Hitachi Ltd Inverter power supply
CN102091932A (en) * 2011-03-01 2011-06-15 天津市中环三峰电子有限公司 Screw mounting device
CN202586053U (en) * 2012-04-12 2012-12-05 广州三晶电气有限公司 Copper bar installation positioning fixture
CN103124047A (en) * 2013-03-04 2013-05-29 宁波恒升电气有限公司 Copper bar mounting device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06127854A (en) * 1992-10-20 1994-05-10 Hitachi Ltd Inverter power supply
CN102091932A (en) * 2011-03-01 2011-06-15 天津市中环三峰电子有限公司 Screw mounting device
CN202586053U (en) * 2012-04-12 2012-12-05 广州三晶电气有限公司 Copper bar installation positioning fixture
CN103124047A (en) * 2013-03-04 2013-05-29 宁波恒升电气有限公司 Copper bar mounting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109687325A (en) * 2018-12-26 2019-04-26 六安科耐德电气有限公司 A kind of distribution box copper installation alignment methods and its check and correction equipment
CN115764611A (en) * 2022-11-23 2023-03-07 秦明慧 Distribution box copper bar installation alignment device and alignment method thereof

Also Published As

Publication number Publication date
CN104242122B (en) 2016-09-07

Similar Documents

Publication Publication Date Title
WO2015091008A3 (en) A method of managing a hydroelectric turbine array
CN104242122B (en) A kind of distribution box copper installation alignment methods
CN106908330A (en) Compound cross-arm single-direction and dual-direction combination bend test device
WO2012045516A3 (en) Method and detection system for detecting an electric line
DE502004012201D1 (en) METHOD FOR APPLYING AN ELECTRICAL INSULATION
CN203849156U (en) Electrical wire stripping force testing jig
PL419163A1 (en) Clamping device of a electrical energy meter and the electrical energy meter
CN203786210U (en) Grounding resistance auxiliary measuring device
DE102007026323B8 (en) Device and method for attaching electrical, even pre-assembled connection parts such as solder tags, solder contacts, connectors or the like elements
CN104900147A (en) Hardware fitting special for rod number marking
CN205092321U (en) Parallel groove wire clamp
CN205355707U (en) Data plate formula connection mount
DE50213594D1 (en) METHOD FOR DETECTING AN EARTH SHOOT IN AN ELECTRICAL DEVICE NEAR A NEUTRAL POINT, AND DEVICE FOR CARRYING OUT THE METHOD
CN203631951U (en) Tong head set for plugging and unplugging of 2M plugs
CN203179361U (en) Distribution line terminal pole ground training device
DE50306441D1 (en) Device for contacting an electrical conductor
CN203707375U (en) Grounding clamp of substation equipment housing
CN204177834U (en) A kind of test clip of circuit resistance tester
CN203503818U (en) Copper-aluminum terminal
CN203849290U (en) Wire box special for voltage-withstanding test
CN103954807A (en) Wire box special for voltage-withstanding test
DE112005003647A5 (en) Method for operating an electrical device of an automation system
CN202424064U (en) Cable identifying device
CN202201570U (en) Magnetic attraction type concentrator
CN202556283U (en) Tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant