CN104240009A - Method for managing wiring relation by bar code combination - Google Patents
Method for managing wiring relation by bar code combination Download PDFInfo
- Publication number
- CN104240009A CN104240009A CN201410405415.7A CN201410405415A CN104240009A CN 104240009 A CN104240009 A CN 104240009A CN 201410405415 A CN201410405415 A CN 201410405415A CN 104240009 A CN104240009 A CN 104240009A
- Authority
- CN
- China
- Prior art keywords
- wiring
- barcode
- work order
- work
- terminals
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000012795 verification Methods 0.000 claims abstract description 8
- 238000012423 maintenance Methods 0.000 description 4
- 238000004891 communication Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000013518 transcription Methods 0.000 description 1
- 230000035897 transcription Effects 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
技术领域 technical field
本发明涉及一种使用条码组合管理配线关系的方法。 The invention relates to a method for managing wiring relationship by using barcode combination.
背景技术 Background technique
电力通信机房配线系统主要包括光纤配线、音频配线、数字配线和网络配线等,对于安控、继保、自动化、信息等重要业务,起着承上启下的重要作用。随着通信建设发展,机房配线系统模块数量巨大,维护工作繁重,设备、配线端子间配线连接关系使用传统的手工抄录方式进行维护,准确性差,效率低。容易造成数据不一致,漏录及查找不便,从而延缓电话、网络等重要业务缺陷的判断、分析与处理,严重影响机房设备的维护与管理效率。 The power communication room wiring system mainly includes optical fiber wiring, audio wiring, digital wiring, and network wiring, etc., and plays an important role in connecting important businesses such as security control, relay protection, automation, and information. With the development of communication construction, the number of wiring system modules in the computer room is huge, and the maintenance work is heavy. The wiring connection relationship between equipment and wiring terminals is maintained by traditional manual transcription, which has poor accuracy and low efficiency. It is easy to cause data inconsistency, missing records and inconvenient search, thus delaying the judgment, analysis and processing of important business defects such as telephone and network, and seriously affecting the maintenance and management efficiency of equipment in the computer room.
发明内容 Contents of the invention
本发明涉及一种使用条码组合管理配线关系的方法,它可以实现配线关系的快速采集、生成以及关系查找,建立配线工作管理规范,闭环流程,减少工作疏漏,提高配线维护的信息化、智能化水平和工作效率。 The invention relates to a method for managing wiring relationships by using a barcode combination, which can realize rapid collection, generation and relationship search of wiring relationships, establish wiring work management norms, close-loop processes, reduce work omissions, and improve wiring maintenance information level of automation, intelligence and work efficiency.
本发明采用了以下技术方案:一种使用条码组合管理配线关系的方法,它包括以下步骤:步骤一,通过机房配线资源管理系统管理相应的配线模块、设备及其相应的端子与接口,为每个配线端子建立编码;步骤二,通过打印配线两端端子或端子的编码成为新的条码,以组合条码形式标识配线;步骤三,通过智能终端,下载最新的配线关系数据,在现场扫描两端的端子与配线本身条码形成验证,从而完结配线工作流程,形成闭环管理,杜绝配线工作的疏漏。 The present invention adopts the following technical solutions: a method for managing wiring relationships using barcode combinations, which includes the following steps: Step 1: manage the corresponding wiring modules, equipment and their corresponding terminals and interfaces through the wiring resource management system in the computer room , to establish a code for each wiring terminal; step 2, print the codes of the terminals or terminals at both ends of the wiring to become a new barcode, and identify the wiring in the form of a combined barcode; step 3, download the latest wiring relationship through the smart terminal Data, scan the terminals at both ends and the barcode of the wiring itself to form a verification, thus completing the wiring workflow, forming a closed-loop management, and eliminating the omission of the wiring work.
所述的步骤一中管理过程为: The management process in the first step is:
步骤A,对机房配线资源管理系统进行图形化的虚拟配线操作,此时每步操作将会通过计算机记录操作的内容; Step A, perform a graphical virtual wiring operation on the wiring resource management system in the computer room, and at this time, each operation will record the content of the operation through the computer;
步骤B,通过计算机调用步骤A中的每步的操作内容,形成电子工单及其工作内容明细,下发电子工作单; Step B, calling the operation content of each step in step A through the computer, forming an electronic work order and its work content details, and issuing the electronic work order;
步骤C,采用手持终端设备在工作状态下定期扫描信号介入,并尝试与机房配线工作无线网络进行联系; Step C, use the handheld terminal device to regularly scan the signal to intervene in the working state, and try to communicate with the wireless network of the computer room wiring work;
步骤D,判断手持终端设备是否已经完成机房配线工作无线网络接入,若已经接入,转入步骤E,若没有接入则转入步骤C; Step D, judging whether the handheld terminal device has completed the computer room wiring work and wireless network access, if it has been connected, go to step E, if not, go to step C;
步骤E,手持终端设备通过机房配线工作无线网络向配线资源管理系统的服务器进行工单查询,看是否存在该机房中的配线工作单,若存在工单,转入步骤F,若不存在工作单,可以等待出现工单; Step E, the handheld terminal device queries the server of the wiring resource management system for a work order through the wireless network of the computer room wiring work, to see if there is a wiring work order in the computer room, if there is a work order, go to step F, if not There is a work order, and you can wait for the work order to appear;
步骤F:下载电子工单到手持终端设备; Step F: Download the electronic work order to the handheld terminal device;
步骤G:配线资源管理系统根据下载的电子工单,根据工单中的操作,将配线两端连接端口条码组合作为新的配线操作条码自动进行条码标签打印; Step G: According to the downloaded electronic work order and the operation in the work order, the wiring resource management system automatically prints the barcode label combination of the connection port barcodes at both ends of the wiring as a new wiring operation barcode;
步骤H:工作人员拿到条码后,在手持终端设备中,扫描操作条码,调阅操作工单及其操作,按照工单操作顺序,选择一个操作条码; Step H: After getting the barcode, the staff scans the operation barcode on the handheld terminal device, reads the operation work order and its operation, and selects an operation bar code according to the operation order of the work order;
步骤I:根据步骤H中选择的条码,扫描配线两端端口,形成现场条码; Step I: According to the barcode selected in step H, scan the ports at both ends of the wiring to form an on-site barcode;
步骤J:由所述的手持终端设备扫描完成现场条码与操作条码的验证,若验证通过,转入步骤K;若验证不通过,转入步骤I; Step J: Complete the verification of the on-site barcode and the operation barcode by scanning the handheld terminal device, if the verification is passed, go to step K; if the verification is not passed, go to step I;
步骤K:将条码粘贴或替换到配线标签底部; Step K: Paste or replace the barcode on the bottom of the wiring label;
步骤L:判断工单内部操作是否全部完成,完成,转入步骤M,未完成,转入步骤H; Step L: Determine whether all internal operations of the work order are completed, if completed, go to step M, if not completed, go to step H;
步骤M:由手持终端设备通过无线网络向配线资源服务器回传工单完结信息。 Step M: The hand-held terminal device sends back the completion information of the work order to the wiring resource server through the wireless network.
所述的步骤E由于工单产生的频率低,可根据人为设定周期T,在没有发现工单后等待一个时间周期T。 In the step E, since the frequency of work orders is low, the period T can be set artificially, and a time period T can be waited after no work orders are found.
本发明具有以下有益效果:采用了以上技术方案后,本发明可以通过配线标签粘贴配线两端条码形成新的配线条码,配合智能管理终端,完成配线工作的验证、关系自动管理与识别办法。本发明基于物联网条码技术,可以实现配线关系的快速采集、生成以及关系查找,建立配线工作管理规范,闭环流程,减少工作疏漏,提高配线维护的信息化、智能化水平和工作效率,它不但不仅提高了设备参数采集的效率,还可保证巡检人员的到位率,避免数据输入错误。 The present invention has the following beneficial effects: after adopting the above technical scheme, the present invention can form a new wiring barcode by pasting the barcodes at both ends of the wiring with the wiring label, and cooperate with the intelligent management terminal to complete the verification of wiring work, automatic relationship management and Identification method. Based on the barcode technology of the Internet of Things, the present invention can realize the rapid collection, generation and relationship search of wiring relationships, establish wiring work management specifications, close-loop processes, reduce work omissions, and improve the informatization, intelligence level and work efficiency of wiring maintenance , it not only improves the efficiency of equipment parameter collection, but also ensures the availability of inspection personnel and avoids data input errors.
附图说明 Description of drawings
图1为本发明机房配线资源管理系统管理过程的流程图。 Fig. 1 is a flow chart of the management process of the computer room wiring resource management system of the present invention.
具体实施方式 Detailed ways
在图1中,本发明一种使用条码组合管理配线关系的方法,它包括以下步骤:步骤一,通过机房配线资源管理系统管理相应的配线模块、设备及其相应的端子与接口,为每个配线端子建立编码;步骤二,通过打印配线两端端子或端子的编码成为新的条码,以组合条码形式标识配线; In Fig. 1, a method of using a barcode combination to manage the wiring relationship of the present invention includes the following steps: Step 1, manage the corresponding wiring modules, equipment and their corresponding terminals and interfaces through the wiring resource management system in the computer room, Establish a code for each wiring terminal; step 2, print the codes of the terminals or terminals at both ends of the wiring to become a new barcode, and identify the wiring in the form of a combined barcode;
步骤三,通过智能终端,下载最新的配线关系数据,在现场扫描两端的端子与配线本身条码形成验证,从而完结配线工作流程,形成闭环管理,杜绝配线工作的疏漏。 Step 3: Download the latest wiring relationship data through the smart terminal, scan the terminals at both ends and the barcode of the wiring itself for verification on site, so as to complete the wiring workflow, form a closed-loop management, and eliminate wiring work omissions.
本发明步骤一中管理过程为: Management process in step 1 of the present invention is:
步骤A,对机房配线资源管理系统进行图形化的虚拟配线操作,此时每步操作将会通过计算机记录操作的内容; Step A, perform a graphical virtual wiring operation on the wiring resource management system in the computer room, and at this time, each operation will record the content of the operation through the computer;
步骤B,通过计算机调用步骤A中的每步的操作内容,形成电子工单及其工作内容明细,下发电子工作单; Step B, calling the operation content of each step in step A through the computer, forming an electronic work order and its work content details, and issuing the electronic work order;
步骤C,采用手持终端设备在工作状态下定期扫描信号介入,并尝试与机房配线工作无线网络进行联系; Step C, use the handheld terminal device to regularly scan the signal to intervene in the working state, and try to communicate with the wireless network of the computer room wiring work;
步骤D,判断手持终端设备是否已经完成机房配线工作无线网络接入,若已经接入,转入步骤E,若没有接入则转入步骤C; Step D, judging whether the handheld terminal device has completed the computer room wiring work and wireless network access, if it has been connected, go to step E, if not, go to step C;
步骤E,手持终端设备通过机房配线工作无线网络向配线资源管理系统的服务器进行工单查询,看是否存在该机房中的配线工作单,若存在工单,转入步骤F,若不存在工作单,可以等待出现工单,步骤E由于工单产生的频率低,可根据人为设定时间周期T,在没有发现工单后等待一个时间周期T,时间周期为1天; Step E, the handheld terminal device queries the server of the wiring resource management system for a work order through the wireless network of the computer room wiring work, to see if there is a wiring work order in the computer room, if there is a work order, go to step F, if not If there is a work order, you can wait for the work order to appear. In step E, due to the low frequency of work orders, you can manually set the time period T, and wait for a time period T after no work order is found. The time period is 1 day;
步骤F:下载电子工单到手持终端设备; Step F: Download the electronic work order to the handheld terminal device;
步骤G:配线资源管理系统根据下载的电子工单,根据工单中的操作,将配线两端连接端口条码组合作为新的配线操作条码自动进行条码标签打印; Step G: According to the downloaded electronic work order and the operation in the work order, the wiring resource management system automatically prints the barcode label combination of the connection port barcodes at both ends of the wiring as a new wiring operation barcode;
步骤H:工作人员拿到条码后,在手持终端设备中,扫描操作条码,调阅操作工单及其操作,按照工单操作顺序,选择一个操作条码; Step H: After getting the barcode, the staff scans the operation barcode on the handheld terminal device, reads the operation work order and its operation, and selects an operation bar code according to the operation order of the work order;
步骤I:根据步骤H中选择的条码,扫描配线两端端口,形成现场条码; Step I: According to the barcode selected in step H, scan the ports at both ends of the wiring to form an on-site barcode;
步骤J:由所述的手持终端设备扫描完成现场条码与操作条码的验证,若验证通过,转入步骤K;若验证不通过,转入步骤I; Step J: Complete the verification of the on-site barcode and the operation barcode by scanning the handheld terminal device, if the verification is passed, go to step K; if the verification is not passed, go to step I;
步骤K:将条码粘贴或替换到配线标签底部; Step K: Paste or replace the barcode on the bottom of the wiring label;
步骤L:判断工单内部操作是否全部完成,完成,转入步骤M,未完成,转入步骤H; Step L: Determine whether all internal operations of the work order are completed, if completed, go to step M, if not completed, go to step H;
步骤M:由手持终端设备通过无线网络向配线资源服务器回传工单完结信息。 Step M: The hand-held terminal device sends back the completion information of the work order to the wiring resource server through the wireless network.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410405415.7A CN104240009A (en) | 2014-08-18 | 2014-08-18 | Method for managing wiring relation by bar code combination |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410405415.7A CN104240009A (en) | 2014-08-18 | 2014-08-18 | Method for managing wiring relation by bar code combination |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104240009A true CN104240009A (en) | 2014-12-24 |
Family
ID=52228030
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410405415.7A Pending CN104240009A (en) | 2014-08-18 | 2014-08-18 | Method for managing wiring relation by bar code combination |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104240009A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109474331A (en) * | 2018-12-18 | 2019-03-15 | 京信通信系统(中国)有限公司 | O&M monitoring method, device, storage medium and the terminal device of Optical Distribution Network |
CN112381192A (en) * | 2020-11-10 | 2021-02-19 | 深圳供电局有限公司 | Wiring management system and method for power data center |
CN117153361A (en) * | 2023-10-30 | 2023-12-01 | 苏州阿基米德网络科技有限公司 | Data processing method and device of medical equipment asset management system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202183107U (en) * | 2011-07-25 | 2012-04-04 | 南京普天通信股份有限公司 | Intelligent management device for optical fiber physical port |
CN102708352A (en) * | 2012-06-07 | 2012-10-03 | 南京普天通信股份有限公司 | Method for managing optical fiber jumpers and optical fiber ports by applying pairing two-dimensional code labels |
CN202856733U (en) * | 2012-06-04 | 2013-04-03 | 赵忠旭 | Optical cable management system ocms |
CN103868672A (en) * | 2014-03-06 | 2014-06-18 | 杭州中恒电气股份有限公司 | Method and system for connecting, pairing and detecting optical fibers under environment of carrying out inserting connection on plurality of paths of optical paths |
-
2014
- 2014-08-18 CN CN201410405415.7A patent/CN104240009A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202183107U (en) * | 2011-07-25 | 2012-04-04 | 南京普天通信股份有限公司 | Intelligent management device for optical fiber physical port |
CN202856733U (en) * | 2012-06-04 | 2013-04-03 | 赵忠旭 | Optical cable management system ocms |
CN102708352A (en) * | 2012-06-07 | 2012-10-03 | 南京普天通信股份有限公司 | Method for managing optical fiber jumpers and optical fiber ports by applying pairing two-dimensional code labels |
CN103868672A (en) * | 2014-03-06 | 2014-06-18 | 杭州中恒电气股份有限公司 | Method and system for connecting, pairing and detecting optical fibers under environment of carrying out inserting connection on plurality of paths of optical paths |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109474331A (en) * | 2018-12-18 | 2019-03-15 | 京信通信系统(中国)有限公司 | O&M monitoring method, device, storage medium and the terminal device of Optical Distribution Network |
CN109474331B (en) * | 2018-12-18 | 2021-02-23 | 京信通信系统(中国)有限公司 | Operation and maintenance monitoring method and device for optical distribution network, storage medium and terminal equipment |
CN112381192A (en) * | 2020-11-10 | 2021-02-19 | 深圳供电局有限公司 | Wiring management system and method for power data center |
CN117153361A (en) * | 2023-10-30 | 2023-12-01 | 苏州阿基米德网络科技有限公司 | Data processing method and device of medical equipment asset management system |
CN117153361B (en) * | 2023-10-30 | 2024-01-26 | 苏州阿基米德网络科技有限公司 | Data processing method and device of medical equipment asset management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106815681B (en) | Two-dimensional code-based closed-loop management platform for secondary equipment in substations and its management system | |
CN202093536U (en) | Intelligent routing inspection system for substation equipment | |
CN105528677A (en) | Quality tracing method and system applied to construction process | |
CN104376432A (en) | A maintenance method for fire protection facilities | |
CN105913181A (en) | Electric power construction management hand-held portable operation system and operation method therefor | |
CN103530664A (en) | Production management system of tunnel segment | |
CN104182828A (en) | Method for carrying out secondary equipment whole life cycle management by electronic label | |
CN112669110A (en) | Server label management method and related equipment | |
CN103646312A (en) | Public bicycle information reading method based on two-dimension code | |
CN104966176A (en) | Palm portable office operation system and information processing method thereof | |
CN204480305U (en) | Machine room assets move operation management system | |
CN107908994A (en) | Wood-based product's processing progress tracking and clout information management system based on cloud platform | |
CN103164778A (en) | 10kV user tour information managing system | |
CN107679873A (en) | A method for traceability management of coding information based on SMT online placement products | |
CN106327208A (en) | Product quality tracing system and method for injection molding machine | |
CN103576658B (en) | A kind of production tracing control method for lead-acid battery | |
CN105225071A (en) | Based on the power communication identity management method of Quick Response Code | |
CN105630734A (en) | Configuration method and device for ex-factory parameters of power equipment terminal | |
CN110910526A (en) | Inspection system and method based on intelligent mobile terminal | |
CN104240009A (en) | Method for managing wiring relation by bar code combination | |
CN117035687A (en) | Power grid business fixed asset process configuration method, system and computer storage medium | |
KR20090124059A (en) | Integrated Block Quality Management System and Method | |
CN106557930A (en) | A kind of banking equipment based on identification code reports cut-in method and system for repairment | |
CN102651063A (en) | Method for warehousing information of electronic device | |
CN104866879B (en) | Realize method, system and the lead sealing of power equipment inspection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20141224 |