CN104236020B - Method and device for controlling air conditioning system - Google Patents
Method and device for controlling air conditioning system Download PDFInfo
- Publication number
- CN104236020B CN104236020B CN201410522631.XA CN201410522631A CN104236020B CN 104236020 B CN104236020 B CN 104236020B CN 201410522631 A CN201410522631 A CN 201410522631A CN 104236020 B CN104236020 B CN 104236020B
- Authority
- CN
- China
- Prior art keywords
- time
- conditioning system
- air conditioning
- temperature
- heat load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Air Conditioning Control Device (AREA)
Abstract
The invention provides a method and device for controlling an air conditioning system and relates to the technical field of air conditioners. The method includes the steps that the real-time sensible heat load and the real-time latent heat load of a building are acquired and the rated sensible heat and the rated latent heat of the tail end of the air conditioning system of the building are acquired; according to the real-time sensible heat load and the rated sensible heat, the sensible heat load percent of the real-time sensible heat load to the rated sensible heat is acquired; according to the real-time latent heat load and the rated latent heat, the latent heat load percent of the real-time latent heat load to the rated latent heat is acquired; according to the real-time sensible heat load percent and the real-time latent heat load percent, real-time chilled water boundary temperature is determined; according to the real-time chilled water boundary temperature, the chilled water average temperature of the air conditioning system is adjusted, so that the chilled water average temperature is smaller than or equal to the real-time chilled water boundary temperature. According to the method and device, the problems that the refrigeration capacity and the dehumidification capacity of the air conditioning system are affected and energy consumption is large due to an existing control strategy of the air conditioning system can be solved.
Description
Technical field
The present invention relates to air-conditioning technical field, particularly relate to control method and the device of a kind of air conditioning system.
Background technology
At present, the default chilled water leaving water temperature with the central air-conditioning of chilled water system is generally 7 DEG C, presets backwater temperature
Degree is 12 DEG C, and chilled water mean temperature is 9.5 DEG C in this case, and this chilled water mean temperature can ensure that under design conditions
Refrigeration and dehumidification requirements.Most current central air conditioner system keeps chilled water leaving water temperature to be 7 DEG C in actual moving process
Constant, and chilled-water flow also keeps constant, under this control mode, during air conditioning system sub-load, return water temperature may
Can be less than presetting return water temperature, i.e. 12 DEG C, the most only 9 to 10 DEG C, chilled water mean temperature now is 8 to 8.5 DEG C, and this is cold
Although freezing water mean temperature to disclosure satisfy that the demand of load, but energy-saving effect being bad.
In order to realize the energy-saving effect of air conditioning system, a kind of common Energy Saving Strategy is that the water pump to air conditioning system becomes
Frequently, to regulate chilled-water flow, it is ensured that return water temperature reaches 12 DEG C such that it is able to maintain 7 DEG C chilled water leaving water temperature and
The state of the return water temperature of 12 DEG C, i.e. can maintain chilled water mean temperature is 9.5 DEG C.Now in the situation ensureing cooling needs
The energy-saving run of air conditioning system can be realized down.Another kind of common Energy Saving Strategy is to improve the water outlet of air conditioning system freezing unit
Temperature, generally the efficiency of air-conditioning refrigeration system can be along with chilled water leaving water temperature, or the raising of refrigerant evaporating temperature
And raise, therefore conventional in building energy conservation a kind of Energy Saving Strategy is to improve chilled water supply water temperature, to realize improving refrigeration
The performance of main frame, reduces the purpose of main frame energy consumption.Furthermore it is also possible to consider above two mode, to realize air conditioning system
Energy-conservation purpose.
But, current Energy Saving Strategy can affect the exchange capability of heat of the end air treatment system of air conditioning system, thus shadow
Ring refrigeration and the dehumidifying effect of air conditioning system, it is impossible to meet the heat exchange demand of the air conditioning terminal of air conditioning system;Meanwhile, architectural
The load most time of central air-conditioning is less than design load, and carries out freezing and dehumidifying according to the design condition under design load
Room can be caused supercool, cause energy waste.
Summary of the invention
Embodiments of the invention provide control method and the device of a kind of air conditioning system, to solve currently to regulate chilled water flow
The strategy of amount and improve the refrigeration affecting air conditioning system that the strategy of leaving water temperature of air conditioning system freezing unit caused and remove
The problem of wet ability, and can solve the problem that and for a long time carry out freezing according to the design condition under design load and dehumidifying can cause room
Between supercool, problem that energy consumption is bigger.
For reaching above-mentioned purpose, the present invention adopts the following technical scheme that
A kind of control method of air conditioning system, including:
Obtain the real-time sensible heat load of building and real-time latent heat load, and obtain the specified sensible heat of air conditioning system end of building
Amount and specified amount of latent heat;
According to described real-time sensible heat load and described air conditioning system end specified sensible heat amount, obtain described real-time sensible heat load
Real-time sensible heat load percentage ratio with described air conditioning system end specified sensible heat amount;
According to described real-time latent heat load and the described specified amount of latent heat of air conditioning system end, obtain described real-time latent heat load
Real-time latent heat load percentage ratio with the described specified amount of latent heat of air conditioning system end;
The most freezing waterside is determined according to described real-time sensible heat load percentage ratio and described real-time latent heat load percentage ratio
Boundary's temperature;
According to the chilled water mean temperature of described real-time freezing water boundaries temperature regulation air conditioning system, so that described freezing
Water mean temperature is less than or equal to described real-time freezing water boundaries temperature.
Concrete, described determine that one is real according to described real-time sensible heat load percentage ratio and described real-time latent heat load percentage ratio
Time chilled water boundary temperature, including:
According to described real-time sensible heat load percentage ratio, with described real-time sensible heat load hundred in acquisition air conditioning system characteristic
The first minimum chilled water mean temperature that proportion by subtraction is corresponding;
According to described real-time latent heat load percentage ratio, obtain in described air conditioning system characteristic and bear with described real-time latent heat
The second minimum chilled water mean temperature that lotus percentage ratio is corresponding;
Described first minimum chilled water mean temperature is contrasted with the second minimum chilled water mean temperature, with described
One minimum chilled water mean temperature and the minima of the second minimum chilled water mean temperature are as described real-time freezing water boundaries temperature
Degree;
The described chilled water mean temperature according to described real-time freezing water boundaries temperature regulation air conditioning system, including:
The chilled water supply water temperature of regulation air conditioning system and/or chilled water water supply flow, average to regulate described chilled water
Temperature is to described real-time freezing water boundaries temperature.
Further, the control method of described air conditioning system, also include:
Obtain building the whole year by time sensible heat load and the whole year by time latent heat load;
According to the described whole year by time sensible heat load and described air conditioning system end specified sensible heat amount, obtain the described whole year by time
The whole year of sensible heat load and described air conditioning system end specified sensible heat amount by time sensible heat load percentage ratio;
According to the described whole year by time latent heat load and the specified amount of latent heat of air conditioning system end, obtain the described whole year by time latent heat
The whole year of load and the described specified amount of latent heat of air conditioning system end by time latent heat load percentage ratio;
According to the described whole year by time sensible heat load percentage ratio and the described whole year by time latent heat load percentage ratio determine that one is annual
By time chilled water boundary temperature;
According to the described whole year by time chilled water boundary temperature, annual by time total heat load and chilled-water flow calculate determine cold
Freeze water supply water temperature;
According to the cooling water return water temperature pre-set, air conditioning system refrigeration host computer rate of load condensate function and described chilled water
Supply water temperature, the refrigerating efficiency COP of acquisition air conditioning system refrigeration host computer:
Wherein, COP is the refrigerating efficiency of described air conditioning system refrigeration host computer;TchwoutFor described chilled water supply water temperature;
TcwinFor described cooling water return water temperature;F (ld) is described air conditioning system refrigeration host computer rate of load condensate function;
Operating load according to refrigeration host computer and described refrigerating efficiency, determine described refrigeration host computer energy consumption, be formulated
For:
Echiller=Q1÷COP
Wherein, EchillerFor described refrigeration host computer energy consumption;Q1Operating load for described refrigeration host computer;
Pump energy consumption, cooling tower energy consumption and described refrigeration host computer energy consumption according to the air conditioning system pre-set, determines
Described chilled water mean temperature be the described whole year by time chilled water boundary temperature time air conditioning system by time energy consumption, each little to the whole year
Time by time energy consumption add up, acquire the first annual energy consumption of air conditioning system;
Obtain that described chilled water supply water temperature is air conditioning system during refrigeration host computer nominal condition leaving water temperature second is complete
Year energy consumption;
According to described second annual energy consumption and the described first annual energy consumption, determine described chilled water mean temperature be described entirely
Year by time chilled water boundary temperature time the annual amount of energy saving of air conditioning system, be formulated as:
Eas=Eat,r-Eat,s
Wherein, EasFor described annual amount of energy saving;Eat,rFor the described second annual energy consumption;Eat,sFor the described first annual energy
Consumption.
Concrete, the control method of described air conditioning system, also include:
According to the described whole year by time sensible heat load percentage ratio, obtain in described air conditioning system characteristic with the described whole year by
Time the 3rd minimum chilled water mean temperature corresponding to sensible heat load percentage ratio;
According to the described whole year by time latent heat load percentage ratio, obtain in described air conditioning system characteristic with the described whole year by
Time the 4th minimum chilled water mean temperature corresponding to latent heat load percentage ratio;
Described 3rd minimum chilled water mean temperature and the 4th minimum chilled water mean temperature are carried out by time contrast, with institute
State the minima of the 3rd minimum chilled water mean temperature and the 4th minimum chilled water mean temperature as the described whole year by time freezing
Water boundaries temperature.
Concrete, the described real-time sensible heat load obtaining building and in real time latent heat load, including:
Obtain the real-time sensible heat load of building, be formulated as:
Q=Qt+Qr+Qi+Qf
Qt=α A1(Tout-Tin)+βA2(Tout-Tin)
Qr=0.899CI
Qi=Qh+Qd
Qf=F ρ Cp(Tout-Tin)
Wherein, Q is described real-time sensible heat load;QtFor body of wall and the heat output of window;α is the heat transfer coefficient of body of wall;A1For wall
The heat transfer area of body;β is the heat transfer coefficient of window;A2Heat transfer area for window;TinFor temperature in building;ToutFor Outer Environment
Temperature;QrFor radiant heat transfer amount;C is the comprehensive shaded coefficient of window;I is solar irradiance;QiFor the dissipating of human body and equipment in building
The sum of heat;QfFor new wind and air penetration cause refrigeration duty;F is to enter the air mass flow in building;ρ is that air is close
Degree;CpFor heat capacity of air;
Obtain the real-time latent heat load of building, be formulated as:
Q '=Q 'f+Q′i
Q′f=rF (Gout-Gin)
Wherein, Q 'fThe latent heat load caused for new wind and infiltration wind;GoutWater capacity for Outer Environment air;GinFor
The water capacity of air in building;Q′iThe latent heat load caused for wet dissipation such as building interior human body and plants;F is for entering in building
Air mass flow;R is the gasification latent heat of default temperature.
A kind of control device of air conditioning system, including:
First computing unit, for obtaining the real-time sensible heat load of building and real-time latent heat load, and obtains the sky of building
Adjusting system end specified sensible heat amount and the specified amount of latent heat of air conditioning system end;According to described real-time sensible heat load and described air-conditioning system
System end specified sensible heat amount, obtains described real-time sensible heat load negative with the real-time sensible heat of described air conditioning system end specified sensible heat amount
Lotus percentage ratio;According to described real-time latent heat load and the described specified amount of latent heat of air conditioning system end, obtain described real-time latent heat and bear
Lotus and the real-time latent heat load percentage ratio of the described specified amount of latent heat of air conditioning system end;
Chilled water boundary temperature computing unit, for the real-time sensible heat load percentage obtained according to described first computing unit
The most freezing water boundaries temperature is determined than with described real-time latent heat load percentage ratio;
Regulation unit, for the described real-time freezing water boundaries temperature determined according to described chilled water boundary temperature computing unit
The chilled water mean temperature of degree regulation air conditioning system, so that described chilled water mean temperature is less than or equal to described real-time chilled water
Boundary temperature.
Additionally, described chilled water boundary temperature computing unit, including:
First enquiry module, for according to described real-time sensible heat load percentage ratio, obtain in air conditioning system characteristic with
The first minimum chilled water mean temperature that described real-time sensible heat load percentage ratio is corresponding;
Second enquiry module, for according to described real-time latent heat load percentage ratio, obtains described air conditioning system characteristic
In the second minimum chilled water mean temperature corresponding with described real-time latent heat load percentage ratio;
First contrast module, for by described first minimum chilled water mean temperature and the second minimum chilled water mean temperature
Contrast, using the minima of described first minimum chilled water mean temperature and the second minimum chilled water mean temperature as described
The most freezing water boundaries temperature;
Described regulation unit, specifically for:
The chilled water supply water temperature of regulation air conditioning system and/or chilled water water supply flow, average to regulate described chilled water
Temperature is to described real-time freezing water boundaries temperature.
Additionally, described first computing unit, be additionally operable to the whole year obtaining building by time sensible heat load and the whole year by time latent heat
Load;According to the described whole year by time sensible heat load and described air conditioning system end specified sensible heat amount, obtain the described whole year by time aobvious
The whole year of thermic load and described air conditioning system end specified sensible heat amount by time sensible heat load percentage ratio;According to the described whole year by time latent
Thermic load and the specified amount of latent heat of air conditioning system end, obtain the described whole year by time latent heat load specified with described air conditioning system end
The whole year of amount of latent heat by time latent heat load percentage ratio;
Described chilled water boundary temperature computing unit, be additionally operable to according to the described whole year by time sensible heat load percentage ratio and described
Annual by time latent heat load percentage ratio determine a whole year by time chilled water boundary temperature;
The control device of described air conditioning system, also includes:
Chilled water supply water temperature determines unit, for according to the described whole year by time chilled water boundary temperature, annual by time complete
Thermic load and chilled-water flow calculate and determine chilled water supply water temperature;
Refrigerating efficiency acquiring unit, for bearing according to the cooling water return water temperature pre-set, air conditioning system refrigeration host computer
Lotus rate function and described chilled water supply water temperature, the refrigerating efficiency COP of acquisition air conditioning system refrigeration host computer:
Wherein, COP is the refrigerating efficiency of described air conditioning system refrigeration host computer;TchwoutFor described chilled water supply water temperature;
TcwinFor described cooling water return water temperature;F (ld) is described air conditioning system refrigeration host computer rate of load condensate function;
Refrigeration host computer energy consumption determines unit, for the operating load according to refrigeration host computer and described refrigerating efficiency, determines institute
State refrigeration host computer energy consumption, be formulated as:
Echiller=Q1÷COP
Wherein, EchillerFor described refrigeration host computer energy consumption;Q1Operating load for described refrigeration host computer;
First annual energy consumption determines unit, for according to the pump energy consumption of air conditioning system pre-set, cooling tower energy consumption
And described refrigeration host computer energy consumption, determine described chilled water mean temperature be the described whole year by time chilled water boundary temperature time sky
Adjusting system by time energy consumption, to annual each hour by time energy consumption add up, acquire the first annual energy consumption of air conditioning system;
Second annual energy consumption acquiring unit, being used for obtaining described chilled water supply water temperature is refrigeration host computer nominal condition water outlet
The annual energy consumption of second of air conditioning system during temperature;
Annual amount of energy saving determines unit, for according to the described second annual energy consumption and the described first annual energy consumption, determining institute
State chilled water mean temperature be the described whole year by time chilled water boundary temperature time the annual amount of energy saving of air conditioning system, use formula table
It is shown as:
Eas=Eat,r-Eat,s
Wherein, EasFor described annual amount of energy saving;Eat,rFor the described second annual energy consumption;Eat,sFor the described first annual energy
Consumption.
It addition, described chilled water boundary temperature computing unit, also include:
3rd enquiry module, for according to the described whole year by time sensible heat load percentage ratio, obtain described air conditioning system feature
In data with the described whole year by time the 3rd minimum chilled water mean temperature corresponding to sensible heat load percentage ratio;
4th enquiry module, for according to the described whole year by time latent heat load percentage ratio, obtain described air conditioning system feature
In data with the described whole year by time the 4th minimum chilled water mean temperature corresponding to latent heat load percentage ratio;
Second contrast module, for by described 3rd minimum chilled water mean temperature and the 4th minimum chilled water mean temperature
Carry out by time contrast, using the minima of described 3rd minimum chilled water mean temperature and the 4th minimum chilled water mean temperature as
The described whole year by time chilled water boundary temperature.
Concrete, described first computing unit, it is used for:
Obtain the real-time sensible heat load of building, be formulated as:
Q=Qt+Qr+Qi+Qf
Qt=α A1(Tout-Tin)+βA2(Tout-Tin)
Qr=0.899CI
Qi=Qh+Qd
Qf=F ρ Cp(Tout-Tin)
Wherein, Q is described real-time sensible heat load;QtFor body of wall and the heat output of window;α is the heat transfer coefficient of body of wall;A1For wall
The heat transfer area of body;β is the heat transfer coefficient of window;A2Heat transfer area for window;TinFor temperature in building;ToutFor Outer Environment
Temperature;QrFor radiant heat transfer amount;C is the comprehensive shaded coefficient of window;I is solar irradiance;QiFor the dissipating of human body and equipment in building
The sum of heat;QfFor new wind and air penetration cause refrigeration duty;F is to enter the air mass flow in building;ρ is that air is close
Degree;CpFor heat capacity of air;
Described first computing unit, is additionally operable to obtain the real-time latent heat load of building, is formulated as:
Q '=Q 'f+Q′i
Q′f=rF (Gout-Gin)
Wherein, Q 'fThe latent heat load caused for new wind and infiltration wind;GoutWater capacity for Outer Environment air;GinFor
The water capacity of air in building;Q′iThe latent heat load caused for wet dissipation such as building interior human body and plants;F is for entering in building
Air mass flow;R is the gasification latent heat of default temperature.
The control method of the air conditioning system that the embodiment of the present invention provides and device, by real-time sensible heat load percentage ratio and institute
State real-time latent heat load percentage ratio and determine the most freezing water boundaries temperature such that it is able to according to the most freezing water boundaries temperature
The chilled water mean temperature of regulation air conditioning system, so that described chilled water mean temperature is less than or equal to described real-time freezing waterside
Boundary's temperature so that this chilled water mean temperature be closer to this in real time freezing water boundaries temperature or with this most freezing water boundaries temperature
Spend identical, thus avoid the strategy of current regulation chilled-water flow and the plan of the leaving water temperature of raising air conditioning system freezing unit
The refrigeration affecting air conditioning system slightly caused and the problem of dehumidifying effect, and long-time according to the design condition under design load
Carry out freezing and dehumidifying can cause room supercool, the problem that energy consumption is bigger.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this
Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, also may be used
To obtain other accompanying drawing according to these accompanying drawings.
The flow chart one of the control method of a kind of air conditioning system that Fig. 1 provides for the embodiment of the present invention;
The flowchart 2 of the control method of a kind of air conditioning system that Fig. 2 (a) provides for the embodiment of the present invention;
The flow chart 3 of the control method of a kind of air conditioning system that Fig. 2 (b) provides for the embodiment of the present invention;
Fig. 3 is the air conditioning system schematic diagram in the embodiment of the present invention;
The structural representation one controlling device of a kind of air conditioning system that Fig. 4 provides for the embodiment of the present invention;
The structural representation two controlling device of a kind of air conditioning system that Fig. 5 provides for the embodiment of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise
Embodiment, broadly falls into the scope of protection of the invention.
The embodiment of the present invention provides the control method of a kind of air conditioning system, as it is shown in figure 1, include:
Step 101, the real-time sensible heat load obtaining building and real-time latent heat load, and obtain the air conditioning system end of building
Specified sensible heat amount and specified amount of latent heat.
Step 102, according to real-time sensible heat load and air conditioning system end specified sensible heat amount, obtain real-time sensible heat load with empty
The real-time sensible heat load percentage ratio of adjusting system end specified sensible heat amount.
Step 103, according to real-time latent heat load and the specified amount of latent heat of air conditioning system end, obtain real-time latent heat load with empty
The real-time latent heat load percentage ratio of the specified amount of latent heat of adjusting system end.
Step 104, according to real-time sensible heat load percentage ratio and in real time latent heat load percentage ratio determine the most freezing waterside
Boundary's temperature.
The chilled water mean temperature of step 105, basis the most freezing water boundaries temperature regulation air conditioning system, so that freezing
Water mean temperature is less than or equal to the most freezing water boundaries temperature.
The control method of the air conditioning system that the embodiment of the present invention provides, by real-time sensible heat load percentage ratio and real-time latent heat
Load percentage ratio determines the most freezing water boundaries temperature such that it is able to regulate air-conditioning system according to the most freezing water boundaries temperature
The chilled water mean temperature of system, so that chilled water mean temperature is less than or equal to the most freezing water boundaries temperature so that this freezing
Water mean temperature is closer to this most freezing water boundaries temperature or identical with this most freezing water boundaries temperature, thus avoids
The impact that the strategy of the strategy of current regulation chilled-water flow and the leaving water temperature of raising air conditioning system freezing unit is caused is empty
The refrigeration of adjusting system and the problem of dehumidifying effect, and carry out freezing and dehumidifying according to the design condition under design load for a long time
Room can be caused supercool, the problem that energy consumption is bigger.
In one embodiment, above-mentioned step 104 is according to real-time sensible heat load percentage ratio and real-time latent heat load percentage ratio
Determine the most freezing water boundaries temperature, can be accomplished in that
According to real-time sensible heat load percentage ratio, obtain in air conditioning system characteristic corresponding with real-time sensible heat load percentage ratio
The first minimum chilled water mean temperature.
According to real-time latent heat load percentage ratio, obtain in air conditioning system characteristic corresponding with real-time latent heat load percentage ratio
The second minimum chilled water mean temperature.
First minimum chilled water mean temperature is contrasted with the second minimum chilled water mean temperature, minimum cold with first
Freeze water mean temperature with the minima of the second minimum chilled water mean temperature as the most freezing water boundaries temperature.
Such as, it is expressed as by publicity: Tb=min (Ts,Tl);
Wherein, TsFor meeting the minimum chilled water mean temperature of real-time sensible heat load demand, the i.e. first minimum freezing level
All temperature;TlFor meeting the minimum chilled water mean temperature of real-time latent heat load demand, the i.e. second minimum chilled water mean temperature.
This air conditioning system characteristic can be to dispatch from the factory in data in air conditioning system, the most as shown in table 1 below:
In air conditioning system characteristic, preset the chilled water return water temperature corresponding to each chilled water supply water temperature, cold
Freeze water mean temperature and enter backwater temperature difference.It addition, each chilled water supply water temperature is also (permissible to there being total heat load percentage ratio
Real-time total heat load percentage ratio, it is also possible to be annual by time total heat load percentage ratio), sensible heat load percentage ratio (can be real
Time sensible heat load percentage ratio, it is also possible to be annual by time sensible heat load percentage ratio), and latent heat load percentage ratio (can be real
Time latent heat load percentage ratio, it is also possible to be annual by time latent heat load percentage ratio).If it addition, having data the most not remember
Carrying, then can be obtained by interpolation calculation method, such as chilled water supply water temperature often differs from 1 degree Celsius, total heat load percentage ratio phase
Difference about 8%, sensible heat load percentage ratio difference about 5%, latent heat load percentage ratio difference about 14%, chilled water return water temperature differs about
0.6 degree Celsius, chilled water mean temperature differs about 0.8 degree Celsius.
The chilled water mean temperature according to the most freezing water boundaries temperature regulation air conditioning system in above-mentioned step 105,
Can be accomplished in that
The chilled water supply water temperature of regulation air conditioning system and/or chilled water water supply flow, to regulate chilled water mean temperature
To the most freezing water boundaries temperature.
Additionally, the real-time sensible heat load obtaining building in above-mentioned steps 101 and real-time latent heat load, can be by as follows
Formula realizes:
Q=Qt+Qr+Qi+Qf
Qt=α A1(Tout-Tin)+βA2(Tout-Tin)
Qr=0.899CI
Qi=Qh+Qd
Qf=F ρ Cp(Tout-Tin)
Wherein, Q is real-time sensible heat load;QtFor body of wall and the heat output of window;α is the heat transfer coefficient of body of wall;A1For body of wall
Heat transfer area;β is the heat transfer coefficient of window;A2Heat transfer area for window;TinFor temperature in building;ToutFor Outer Environment temperature;
QrFor radiant heat transfer amount;C is the comprehensive shaded coefficient of window;I is solar irradiance;QiFor human body and the heat dissipation capacity of equipment in building
Sum;QfFor new wind and air penetration cause refrigeration duty;F is to enter the air mass flow in building;ρ is atmospheric density;CpFor
Heat capacity of air.
Q '=Q 'f+Q′i
Q′f=rF (Gout-Gin)
Wherein, Q 'fThe latent heat load caused for new wind and infiltration wind;GoutWater capacity for Outer Environment air;GinFor
The water capacity of air in building;Q′iThe latent heat load caused for wet dissipation such as building interior human body and plants;F is for entering in building
Air mass flow;R is the gasification latent heat of default temperature.
The real-time sensible heat load of above-mentioned acquisition building and the mode of real-time latent heat load can emulate soft by building load
Part (such as Dest, Energyplus etc.) calculates, but is not only limited to this.
In order to make those skilled in the art be better understood by the present invention, a more specifically embodiment is set forth below,
As shown in Fig. 2 (a), the embodiment of the present invention provides the control method of a kind of air conditioning system, including:
Step 201, the real-time sensible heat load obtaining building and real-time latent heat load, and obtain the air conditioning system end of building
Specified sensible heat amount and specified amount of latent heat.
Wherein, the mode of the real-time sensible heat load and real-time latent heat load that obtain building may refer to above-mentioned steps 101 institute
Showing, here is omitted.
And the air conditioning system end specified sensible heat amount built and the specified amount of latent heat of air conditioning system end can be in air conditioning systems
Precalculate acquisition when design and erection, such as, can use building load simulation software (such as Dest, Energyplus etc.)
Calculate.
Step 202, according to real-time sensible heat load and air conditioning system end specified sensible heat amount, obtain real-time sensible heat load with empty
The real-time sensible heat load percentage ratio of adjusting system end specified sensible heat amount.
Step 203, according to real-time latent heat load and the specified amount of latent heat of air conditioning system end, obtain real-time latent heat load with empty
The real-time latent heat load percentage ratio of the specified amount of latent heat of adjusting system end.
Step 204, according to real-time sensible heat load percentage ratio, obtain in air conditioning system characteristic with real-time sensible heat load hundred
The first minimum chilled water mean temperature that proportion by subtraction is corresponding.
This air conditioning system characteristic can be as listed in Table 1, and the most calculated real-time sensible heat load percentage ratio is
70%, then the first of its correspondence the minimum chilled water mean temperature should be 14.3 degrees Celsius.
Step 205, according to real-time latent heat load percentage ratio, obtain in air conditioning system characteristic with real-time latent heat load hundred
The second minimum chilled water mean temperature that proportion by subtraction is corresponding.
The most calculated real-time latent heat load percentage ratio is 43%, then the second of its correspondence cold water mean temperature should
It it is 12.7 degrees Celsius.
Step 206, the first minimum chilled water mean temperature is contrasted with the second minimum chilled water mean temperature, with
One minimum chilled water mean temperature and the minima of the second minimum chilled water mean temperature are as the most freezing water boundaries temperature.
Such as, above-mentioned sensible heat load percentage ratio is 70%, when latent heat load percentage ratio is 43%, and the first minimum chilled water
Mean temperature should be 14.3 degrees Celsius, and the second cold water mean temperature should be 12.7 degrees Celsius, then should determine that 12.7 degrees Celsius are
This most freezing water boundaries temperature.
Step 207, the chilled water supply water temperature of regulation air conditioning system and/or chilled water water supply flow, to regulate chilled water
Mean temperature is to this most freezing water boundaries temperature.
By regulation chilled water mean temperature to the most freezing water boundaries temperature, it is possible to realize air conditioning system and i.e. meet sensible heat
Load and the work requirements of latent heat load, again can be the most energy-conservation.
It addition, as shown in Fig. 2 (b), the mode of concrete determination amount of energy saving illustrates as follows:
Step 208, obtain building the whole year by time sensible heat load and the whole year by time latent heat load.
Wherein, the whole year of building by time sensible heat load and the whole year by time latent heat load can pass through building load simulation software
(such as Dest, Energyplus etc.) calculate.
Step 209, according to the whole year by time sensible heat load and air conditioning system end specified sensible heat amount, obtain annual by time sensible heat
The whole year of load and air conditioning system end specified sensible heat amount by time sensible heat load percentage ratio.
Step 210, according to the whole year by time latent heat load and the specified amount of latent heat of air conditioning system end, obtain annual by time latent heat
The whole year of load and the specified amount of latent heat of air conditioning system end by time latent heat load percentage ratio.
Step 211, according to the whole year by time sensible heat load percentage ratio and the whole year by time latent heat load percentage ratio determine that one is annual
By time chilled water boundary temperature.
Wherein it is possible to be accomplished in that according to the whole year by time sensible heat load percentage ratio, obtain air conditioning system feature
In data with the whole year by time the 3rd minimum chilled water mean temperature corresponding to sensible heat load percentage ratio;According to the whole year by time latent heat bear
Lotus percentage ratio, obtain in air conditioning system characteristic with the whole year by time the 4th minimum freezing level corresponding to latent heat load percentage ratio
All temperature;3rd minimum chilled water mean temperature is contrasted with the 4th minimum chilled water mean temperature, minimum cold with the 3rd
Freeze the minima of water mean temperature and the 4th minimum chilled water mean temperature as the whole year by time chilled water boundary temperature.It is concrete
Implementation is similar to step 204-206, and here is omitted.
Step 212, according to the whole year by time chilled water boundary temperature, annual by time total heat load and chilled-water flow calculate really
Determine chilled water supply water temperature.
Step 213, the cooling water return water temperature according to pre-setting, air conditioning system refrigeration host computer rate of load condensate function and cold
Freeze water supply water temperature, obtain the refrigerating efficiency of air conditioning system refrigeration host computer.
Concrete, the process of step 213, can be formulated as:
Wherein, COP is the refrigerating efficiency of air conditioning system refrigeration host computer;TchwoutFor chilled water supply water temperature;TcwinFor cooling
Water return water temperature;F (ld) is air conditioning system refrigeration host computer rate of load condensate function.What deserves to be explained is, the public affairs of above-mentioned steps 213 correspondence
Formula unique formula of non-computational refrigerating efficiency, the refrigerating efficiency of this air conditioning system refrigeration host computer can also obtain by other means
?.
Step 214, according to the operating load of refrigeration host computer and refrigerating efficiency, determine refrigeration host computer energy consumption.
Concrete, the process of step 214, can be formulated as:
Echiller=Q1÷COP
Wherein, EchillerFor refrigeration host computer energy consumption;Q1Operating load for refrigeration host computer.
The pump energy consumption of air conditioning system, cooling tower energy consumption and the refrigeration host computer energy consumption that step 215, basis pre-set,
Determine chilled water mean temperature be annual by time chilled water boundary temperature time air conditioning system by time energy consumption, to annual each hour
By time energy consumption add up, acquire the first annual energy consumption of air conditioning system.
Wherein, annual 8760 hours within each hour, are referred to the whole year.
Wherein, the pump energy consumption of air conditioning system, cooling tower energy consumption can be to count in advance according to respective power and operation time
Determining, here is omitted.
Step 216, acquisition chilled water supply water temperature are the air conditioning system second during refrigeration host computer nominal condition leaving water temperature
Annual energy consumption.
Can also calculate chilled water supply water temperature by the formula in above-mentioned steps 213 and mode is refrigeration host computer name volunteer
The annual energy consumption of air conditioning system second during condition leaving water temperature.It addition, chilled water supply water temperature is refrigeration host computer nominal condition water outlet
Temperature belongs to the conventional setting in air conditioning system field, and therefore the annual energy consumption of its correspondence can also be by the money of dispatching from the factory of air conditioning system
Directly obtaining in material etc., this refrigeration host computer nominal condition leaving water temperature can be typically 7 degrees Celsius.
Step 217, according to the annual energy consumption of the second annual energy consumption and first, determine chilled water mean temperature for annual by time cold
The annual amount of energy saving of air conditioning system when freezing water boundaries temperature.
Above-mentioned steps 217, can be formulated as:
Eas=Eat,r-Eat,s
Wherein, EasFor annual amount of energy saving;Eat,rIt it is the second annual energy consumption;Eat,sIt it is the first annual energy consumption.
What deserves to be explained is, " first ", " second " in the embodiment of the present invention etc. is merely to carry out the district of identical noun
Point, do not represent priority.It addition, what deserves to be explained is, by the regulation chilled water supply water temperature of air conditioning system and/or cold
Freeze water water supply flow, to regulate the chilled water mean temperature chilled water boundary temperature to the present invention, all at the protection model of the present invention
Within enclosing.
It addition, the present invention can also use the return water temperature boundary condition as control air conditioning system of chilled water, or cold
Freeze the supply water temperature of water with that enter backwater temperature difference and be used as boundary condition.
The air conditioning system that the embodiment of the present invention is applied is as it is shown on figure 3, include refrigeration host computer 31, the fan unit being connected two-by-two
Pipe 32 and chilled water pump 33.
The control method of the air conditioning system that the embodiment of the present invention provides, by sensible heat load percentage ratio and latent heat load percentage
Ratio determines a chilled water boundary temperature such that it is able to the chilled water according to chilled water boundary temperature regulation air conditioning system is the warmest
Degree, so that chilled water mean temperature is less than or equal to chilled water boundary temperature so that this chilled water mean temperature is closer to this
Chilled water boundary temperature or identical with this chilled water boundary temperature, thus avoid the strategy of current regulation chilled-water flow and carry
The refrigeration affecting air conditioning system that the strategy of the leaving water temperature of high air conditioning system fridge group is caused and the problem of dehumidifying effect,
With for a long time carry out freezing according to the design condition under design load and dehumidifying can cause room supercool, bigger the asking of energy consumption
Topic.
Corresponding to above-mentioned embodiment of the method, the embodiment of the present invention also provides for the control device of a kind of air conditioning system, such as Fig. 4
Shown in, including:
First computing unit 41, can obtain the real-time sensible heat load of building and real-time latent heat load, and obtain building
Air conditioning system end specified sensible heat amount and the specified amount of latent heat of air conditioning system end;According to real-time sensible heat load and air conditioning system end
Specified sensible heat amount, obtains the real-time sensible heat load percentage ratio of real-time sensible heat load and air conditioning system end specified sensible heat amount;According to
Latent heat load and the specified amount of latent heat of air conditioning system end in real time, obtains real-time latent heat load and the specified amount of latent heat of air conditioning system end
Real-time latent heat load percentage ratio.
Chilled water boundary temperature computing unit 42, the real-time sensible heat load percentage that can obtain according to the first computing unit 41
The most freezing water boundaries temperature is determined than with real-time latent heat load percentage ratio.
Regulation unit 43, can adjust according to the most freezing water boundaries temperature that chilled water boundary temperature computing unit 42 determines
The chilled water mean temperature of joint air conditioning system, so that chilled water mean temperature is less than or equal to the most freezing water boundaries temperature.
Additionally, in one embodiment, this chilled water boundary temperature computing unit 42, including:
First enquiry module 421, can be according to real-time sensible heat load percentage ratio, with reality in acquisition air conditioning system characteristic
Time the first minimum chilled water mean temperature corresponding to sensible heat load percentage ratio.
Second enquiry module 422, can be according to real-time latent heat load percentage ratio, with reality in acquisition air conditioning system characteristic
Time the second minimum chilled water mean temperature corresponding to latent heat load percentage ratio.
First contrast module 423, can be by the first minimum chilled water mean temperature and the second minimum chilled water mean temperature
Contrast, using the first minimum chilled water mean temperature with the minima of the second minimum chilled water mean temperature as the most freezing
Water boundaries temperature.
Regulation unit 43, specifically can regulate chilled water supply water temperature and/or the chilled water water supply flow of air conditioning system, with
Regulation chilled water mean temperature is to the most freezing water boundaries temperature.
It addition, this first computing unit 41, it is also possible to obtain whole year of building by time sensible heat load and the whole year by time latent heat
Load;According to the whole year by time sensible heat load and air conditioning system end specified sensible heat amount, obtain annual by time sensible heat load and air-conditioning
The whole year of system end specified sensible heat amount by time sensible heat load percentage ratio;According to the whole year by time latent heat load and air conditioning system end
Specified amount of latent heat, obtain annual by time latent heat load and the specified amount of latent heat of air conditioning system end the whole year by time latent heat load percentage
Ratio.
It addition, this chilled water boundary temperature computing unit 42, it is also possible to according to the whole year by time sensible heat load percentage ratio and complete
Year by time latent heat load percentage ratio determine a whole year by time chilled water boundary temperature.
It addition, as it is shown in figure 5, the control device of above-mentioned air conditioning system, also include:
Chilled water supply water temperature determines unit 44, can according to the whole year by time chilled water boundary temperature, annual by Shi Quanre
Load and chilled-water flow calculate and determine chilled water supply water temperature.
Refrigerating efficiency acquiring unit 45, can be according to the cooling water return water temperature pre-set, air conditioning system refrigeration host computer
Rate of load condensate function and chilled water supply water temperature, obtain the refrigerating efficiency of air conditioning system refrigeration host computer.
It is formulated as:
Wherein, COP is the refrigerating efficiency of air conditioning system refrigeration host computer;TchwoutFor chilled water supply water temperature;TcwinFor cooling
Water return water temperature;F (ld) is air conditioning system refrigeration host computer rate of load condensate function.
Refrigeration host computer energy consumption determines unit 46, can determine refrigeration according to the operating load of refrigeration host computer and refrigerating efficiency
Main frame energy consumption.
It is formulated as:
Echiller=Q1÷COP
Wherein, EchillerFor refrigeration host computer energy consumption;Q1Operating load for refrigeration host computer.
First annual energy consumption determines unit 47, can be according to the pump energy consumption of the air conditioning system pre-set, cooling tower energy
Consumption and refrigeration host computer energy consumption, determine chilled water mean temperature be annual by time chilled water boundary temperature time air conditioning system by time
Energy consumption, to annual each hour by time energy consumption add up, acquire the first annual energy consumption of air conditioning system.
Second annual energy consumption acquiring unit 48, can obtain chilled water supply water temperature is that refrigeration host computer nominal condition goes out water temperature
The annual energy consumption of second of air conditioning system when spending.
Annual amount of energy saving determines unit 49, can determine freezing level according to the second annual energy consumption and the first annual energy consumption
All temperature be annual by time chilled water boundary temperature time the annual amount of energy saving of air conditioning system.
It is formulated as:
Eas=Eat,r-Eat,s
Wherein, EasFor annual amount of energy saving;Eat,rIt it is the second annual energy consumption;Eat,sIt it is the first annual energy consumption.
Concrete, as it is shown in figure 5, this chilled water boundary temperature computing unit 42, it is also possible to including:
3rd enquiry module 424, can according to the whole year by time sensible heat load percentage ratio, obtain in air conditioning system characteristic
With the whole year by time the 3rd minimum chilled water mean temperature corresponding to sensible heat load percentage ratio.
4th enquiry module 425, can according to the whole year by time latent heat load percentage ratio, obtain in air conditioning system characteristic
With the whole year by time the 4th minimum chilled water mean temperature corresponding to latent heat load percentage ratio.
Second contrast module 426, can be by the 3rd minimum chilled water mean temperature and the 4th minimum chilled water mean temperature
Carry out by time contrast, using the minima of the 3rd minimum chilled water mean temperature and the 4th minimum chilled water mean temperature as the whole year
By time chilled water boundary temperature.
Concrete, this first computing unit 41, the real-time sensible heat load of building can be obtained, be formulated as:
Q=Qt+Qr+Qi+Qf
Qt=α A1(Tout-Tin)+βA2(Tout-Tin)
Qr=0.899CI
Qi=Qh+Qd
Qf=F ρ Cp(Tout-Tin)
Wherein, Q is real-time sensible heat load;QtFor body of wall and the heat output of window;α is the heat transfer coefficient of body of wall;A1For body of wall
Heat transfer area;β is the heat transfer coefficient of window;A2Heat transfer area for window;TinFor temperature in building;ToutFor Outer Environment temperature;
QrFor radiant heat transfer amount;C is the comprehensive shaded coefficient of window;I is solar irradiance;QiFor human body and the heat dissipation capacity of equipment in building
Sum;QfFor new wind and air penetration cause refrigeration duty;F is to enter the air mass flow in building;ρ is atmospheric density;CpFor
Heat capacity of air;
First computing unit 41, it is also possible to obtain the real-time latent heat load of building, be formulated as:
Q '=Q 'f+Q′i
Q′f=rF (Gout-Gin)
Wherein, Q 'fThe latent heat load caused for new wind and infiltration wind;GoutWater capacity for Outer Environment air;GinFor
The water capacity of air in building;Q′iThe latent heat load caused for wet dissipation such as building interior human body and plants;F is for entering in building
Air mass flow;R is the gasification latent heat of default temperature.
The specific implementation controlling device of the air conditioning system that the embodiment of the present invention provides may refer to above-mentioned method
Embodiment, here is omitted.
The control device of the air conditioning system that the embodiment of the present invention provides, by real-time sensible heat load percentage ratio and real-time latent heat
Load percentage ratio determines the most freezing water boundaries temperature such that it is able to according to chilled water boundary temperature regulation air conditioning system
Chilled water mean temperature, so that chilled water mean temperature is less than or equal to the most freezing water boundaries temperature so that this freezing level
All temperature are closer to this most freezing water boundaries temperature or identical with this most freezing water boundaries temperature, thus avoid current
What the strategy of the strategy of regulation chilled-water flow and the leaving water temperature of raising air conditioning system freezing unit was caused affects air-conditioning system
The refrigeration of system and the problem of dehumidifying effect, and for a long time carry out freezing according to the design condition under design load and dehumidifying can be led
Cause room is supercool, the problem that energy consumption is bigger.
Those skilled in the art are it should be appreciated that embodiments of the invention can be provided as method, system or computer program
Product.Therefore, the reality in terms of the present invention can use complete hardware embodiment, complete software implementation or combine software and hardware
Execute the form of example.And, the present invention can use at one or more computers wherein including computer usable program code
The upper computer program product implemented of usable storage medium (including but not limited to disk memory, CD-ROM, optical memory etc.)
The form of product.
The present invention is with reference to method, equipment (system) and the flow process of computer program according to embodiments of the present invention
Figure and/or block diagram describe.It should be understood that can the most first-class by computer program instructions flowchart and/or block diagram
Flow process in journey and/or square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided
Instruction arrives the processor of general purpose computer, special-purpose computer, Embedded Processor or other programmable data processing device to produce
A raw machine so that the instruction performed by the processor of computer or other programmable data processing device is produced for real
The device of the function specified in one flow process of flow chart or multiple flow process and/or one square frame of block diagram or multiple square frame now.
These computer program instructions may be alternatively stored in and computer or other programmable data processing device can be guided with spy
Determine in the computer-readable memory that mode works so that the instruction being stored in this computer-readable memory produces and includes referring to
Make the manufacture of device, this command device realize at one flow process of flow chart or multiple flow process and/or one square frame of block diagram or
The function specified in multiple square frames.
These computer program instructions also can be loaded in computer or other programmable data processing device so that at meter
Perform sequence of operations step on calculation machine or other programmable devices to produce computer implemented process, thus at computer or
The instruction performed on other programmable devices provides for realizing at one flow process of flow chart or multiple flow process and/or block diagram one
The step of the function specified in individual square frame or multiple square frame.
The present invention applies specific embodiment principle and the embodiment of the present invention are set forth, above example
Explanation be only intended to help to understand method and the core concept thereof of the present invention;Simultaneously for one of ordinary skill in the art,
According to the thought of the present invention, the most all will change, in sum, in this specification
Hold and should not be construed as limitation of the present invention.
Claims (10)
1. the control method of an air conditioning system, it is characterised in that including:
Obtain real-time sensible heat load and the real-time latent heat load of building, and obtain building air conditioning system end specified sensible heat amount and
Specified amount of latent heat;
According to described real-time sensible heat load and described air conditioning system end specified sensible heat amount, obtain described real-time sensible heat load and institute
State the real-time sensible heat load percentage ratio of air conditioning system end specified sensible heat amount;
According to described real-time latent heat load and the specified amount of latent heat of air conditioning system end, obtain described real-time latent heat load and described sky
The real-time latent heat load percentage ratio of the specified amount of latent heat of adjusting system end;
The most freezing water boundaries temperature is determined according to described real-time sensible heat load percentage ratio and described real-time latent heat load percentage ratio
Degree;
According to the chilled water mean temperature of described real-time freezing water boundaries temperature regulation air conditioning system, so that described freezing level
All temperature is less than or equal to described real-time freezing water boundaries temperature.
The control method of air conditioning system the most according to claim 1, it is characterised in that described negative according to described real-time sensible heat
Lotus percentage ratio and described real-time latent heat load percentage ratio determine the most freezing water boundaries temperature, including:
According to described real-time sensible heat load percentage ratio, with described real-time sensible heat load percentage ratio in acquisition air conditioning system characteristic
The first corresponding minimum chilled water mean temperature;
According to described real-time latent heat load percentage ratio, obtain in described air conditioning system characteristic with described real-time latent heat load hundred
The second minimum chilled water mean temperature that proportion by subtraction is corresponding;
Described first minimum chilled water mean temperature is contrasted with the second minimum chilled water mean temperature, with described first
Low chilled water mean temperature and the minima of the second minimum chilled water mean temperature are as described real-time freezing water boundaries temperature;
The described chilled water mean temperature according to described real-time freezing water boundaries temperature regulation air conditioning system, including:
The chilled water supply water temperature of regulation air conditioning system and/or chilled water water supply flow, to regulate described chilled water mean temperature
To described real-time freezing water boundaries temperature.
The control method of air conditioning system the most according to claim 2, it is characterised in that also include:
Obtain building the whole year by time sensible heat load and the whole year by time latent heat load;
According to the described whole year by time sensible heat load and described air conditioning system end specified sensible heat amount, obtain the described whole year by time sensible heat
The whole year of load and described air conditioning system end specified sensible heat amount by time sensible heat load percentage ratio;
According to the described whole year by time latent heat load and the specified amount of latent heat of air conditioning system end, obtain the described whole year by time latent heat load
With whole year of the described specified amount of latent heat of air conditioning system end by time latent heat load percentage ratio;
According to the described whole year by time sensible heat load percentage ratio and the described whole year by time latent heat load percentage ratio determine a whole year by time
Chilled water boundary temperature;
According to the described whole year by time chilled water boundary temperature, annual by time total heat load and chilled-water flow calculate and determine chilled water
Supply water temperature;
Supply water according to the cooling water return water temperature pre-set, air conditioning system refrigeration host computer rate of load condensate function and described chilled water
Temperature, the refrigerating efficiency COP of acquisition air conditioning system refrigeration host computer:
Wherein, COP is the refrigerating efficiency of described air conditioning system refrigeration host computer;TchwoutFor described chilled water supply water temperature;TcwinFor
Described cooling water return water temperature;F (ld) is described air conditioning system refrigeration host computer rate of load condensate function;
Operating load according to refrigeration host computer and described refrigerating efficiency, determine described refrigeration host computer energy consumption, be formulated as:
Echiller=Q1÷COP
Wherein, EchillerFor described refrigeration host computer energy consumption;Q1Operating load for described refrigeration host computer;
Pump energy consumption, cooling tower energy consumption and described refrigeration host computer energy consumption according to the air conditioning system pre-set, determines described
Chilled water mean temperature be the described whole year by time chilled water boundary temperature time air conditioning system by time energy consumption, to annual each hour
By time energy consumption add up, acquire the first annual energy consumption of air conditioning system;
Obtain the second annual energy that described chilled water supply water temperature is air conditioning system during refrigeration host computer nominal condition leaving water temperature
Consumption;
According to described second annual energy consumption and the described first annual energy consumption, determine described chilled water mean temperature be the described whole year by
Time chilled water boundary temperature time the annual amount of energy saving of air conditioning system, be formulated as:
Eas=Eat,r-Eat,s
Wherein, EasFor described annual amount of energy saving;Eat,rFor the described second annual energy consumption;Eat,sFor the described first annual energy consumption.
The control method of air conditioning system the most according to claim 3, it is characterised in that also include:
According to the described whole year by time sensible heat load percentage ratio, obtain in described air conditioning system characteristic with the described whole year by time aobvious
The 3rd minimum chilled water mean temperature that thermic load percentage ratio is corresponding;
According to the described whole year by time latent heat load percentage ratio, obtain in described air conditioning system characteristic with the described whole year by time latent
The 4th minimum chilled water mean temperature that thermic load percentage ratio is corresponding;
Described 3rd minimum chilled water mean temperature and the 4th minimum chilled water mean temperature are carried out by time contrast, with described the
The minima of three minimum chilled water mean temperatures and the 4th minimum chilled water mean temperature as the described whole year by time freezing waterside
Boundary's temperature.
The control method of air conditioning system the most according to claim 2, it is characterised in that the real-time sensible heat of described acquisition building
Load and in real time latent heat load, including:
Obtain the real-time sensible heat load of building, be formulated as:
Q=Qt+Qr+Qi+Qf
Qt=α A1(Tout-Tin)+βA2(Tout-Tin)
Qr=0.899CI
Qi=Qh+Qd
Qf=F ρ Cp(Tout-Tin)
Wherein, Q is described real-time sensible heat load;QtFor body of wall and the heat output of window;α is the heat transfer coefficient of body of wall;A1For body of wall
Heat transfer area;β is the heat transfer coefficient of window;A2Heat transfer area for window;TinFor temperature in building;ToutFor Outer Environment temperature;
QrFor radiant heat transfer amount;C is the comprehensive shaded coefficient of window;I is solar irradiance;QiFor human body and the heat dissipation capacity of equipment in building
Sum;QfFor new wind and air penetration cause refrigeration duty;F is to enter the air mass flow in building;ρ is atmospheric density;CpFor
Heat capacity of air;
Obtain the real-time latent heat load of building, be formulated as:
Q '=Q 'f+Q′i
Q′f=rF (Gout-Gin)
Wherein, Q 'fThe latent heat load caused for new wind and infiltration wind;GoutWater capacity for Outer Environment air;GinFor building
The water capacity of interior air;Q′iThe latent heat load caused for wet dissipation such as building interior human body and plants;F is to enter the sky in building
Throughput;R is the gasification latent heat of default temperature.
6. the control device of an air conditioning system, it is characterised in that including:
First computing unit, for obtaining the real-time sensible heat load of building and real-time latent heat load, and obtains the air-conditioning system of building
System end specified sensible heat amount and the specified amount of latent heat of air conditioning system end;According to described real-time sensible heat load and described air conditioning system end
Hold specified sensible heat amount, obtain the real-time sensible heat load hundred of described real-time sensible heat load and described air conditioning system end specified sensible heat amount
Proportion by subtraction;According to described real-time latent heat load and the described specified amount of latent heat of air conditioning system end, obtain described real-time latent heat load with
The real-time latent heat load percentage ratio of the described specified amount of latent heat of air conditioning system end;
Chilled water boundary temperature computing unit, for according to described first computing unit obtain real-time sensible heat load percentage ratio and
Described real-time latent heat load percentage ratio determines the most freezing water boundaries temperature;
Regulation unit, adjusts for the described real-time freezing water boundaries temperature determined according to described chilled water boundary temperature computing unit
The chilled water mean temperature of joint air conditioning system, so that described chilled water mean temperature is less than or equal to described real-time freezing water boundaries
Temperature.
The control device of air conditioning system the most according to claim 6, it is characterised in that described chilled water boundary temperature calculates
Unit, including:
First enquiry module, for according to described real-time sensible heat load percentage ratio, obtains in air conditioning system characteristic with described
The first minimum chilled water mean temperature that sensible heat load percentage ratio is corresponding in real time;
Second enquiry module, for according to described real-time latent heat load percentage ratio, obtain in described air conditioning system characteristic with
The second minimum chilled water mean temperature that described real-time latent heat load percentage ratio is corresponding;
First contrast module, for carrying out described first minimum chilled water mean temperature with the second minimum chilled water mean temperature
Contrast, using the minima of described first minimum chilled water mean temperature and the second minimum chilled water mean temperature as described in real time
Chilled water boundary temperature;
Described regulation unit, specifically for:
The chilled water supply water temperature of regulation air conditioning system and/or chilled water water supply flow, to regulate described chilled water mean temperature
To described real-time freezing water boundaries temperature.
The control device of air conditioning system the most according to claim 7, it is characterised in that described first computing unit, also uses
In obtain building the whole year by time sensible heat load and the whole year by time latent heat load;According to the described whole year by time sensible heat load and described
Air conditioning system end specified sensible heat amount, obtain the described whole year by time sensible heat load and described air conditioning system end specified sensible heat amount
Annual by time sensible heat load percentage ratio;According to the described whole year by time latent heat load and the specified amount of latent heat of air conditioning system end, obtain
The described whole year by time latent heat load and the described specified amount of latent heat of air conditioning system end the whole year by time latent heat load percentage ratio;
Described chilled water boundary temperature computing unit, be additionally operable to according to the described whole year by time sensible heat load percentage ratio and the described whole year
By time latent heat load percentage ratio determine a whole year by time chilled water boundary temperature;
The control device of described air conditioning system, also includes:
Chilled water supply water temperature determines unit, for according to the described whole year by time chilled water boundary temperature, annual bear by Shi Quanre
Lotus and chilled-water flow calculate and determine chilled water supply water temperature;
Refrigerating efficiency acquiring unit, for according to the cooling water return water temperature pre-set, air conditioning system refrigeration host computer rate of load condensate
Function and described chilled water supply water temperature, the refrigerating efficiency COP of acquisition air conditioning system refrigeration host computer:
Wherein, COP is the refrigerating efficiency of described air conditioning system refrigeration host computer;TchwoutFor described chilled water supply water temperature;TcwinFor
Described cooling water return water temperature;F (ld) is described air conditioning system refrigeration host computer rate of load condensate function;
Refrigeration host computer energy consumption determines unit, for the operating load according to refrigeration host computer and described refrigerating efficiency, determines described system
Cold main frame energy consumption, is formulated as:
Echiller=Q1÷COP
Wherein, EchillerFor described refrigeration host computer energy consumption;Q1Operating load for described refrigeration host computer;
First annual energy consumption determines unit, for according to the pump energy consumption of air conditioning system pre-set, cooling tower energy consumption and
Described refrigeration host computer energy consumption, determine described chilled water mean temperature be the described whole year by time chilled water boundary temperature time air-conditioning system
Unite by time energy consumption, to annual each hour by time energy consumption add up, acquire the first annual energy consumption of air conditioning system;
Second annual energy consumption acquiring unit, being used for obtaining described chilled water supply water temperature is refrigeration host computer nominal condition leaving water temperature
Time the second annual energy consumption of air conditioning system;
Annual amount of energy saving determines unit, for according to the described second annual energy consumption and the described first annual energy consumption, determining described cold
Freeze water mean temperature be the described whole year by time chilled water boundary temperature time the annual amount of energy saving of air conditioning system, be formulated
For:
Eas=Eat,r-Eat,s
Wherein, EasFor described annual amount of energy saving;Eat,rFor the described second annual energy consumption;Eat,sFor the described first annual energy consumption.
The control device of air conditioning system the most according to claim 8, it is characterised in that described chilled water boundary temperature calculates
Unit, also includes:
3rd enquiry module, for according to the described whole year by time sensible heat load percentage ratio, obtain described air conditioning system characteristic
In with the described whole year by time the 3rd minimum chilled water mean temperature corresponding to sensible heat load percentage ratio;
4th enquiry module, for according to the described whole year by time latent heat load percentage ratio, obtain described air conditioning system characteristic
In with the described whole year by time the 4th minimum chilled water mean temperature corresponding to latent heat load percentage ratio;
Second contrast module, for carrying out described 3rd minimum chilled water mean temperature with the 4th minimum chilled water mean temperature
By time contrast, using the minima of described 3rd minimum chilled water mean temperature and the 4th minimum chilled water mean temperature as described
Annual by time chilled water boundary temperature.
The control device of air conditioning system the most according to claim 7, it is characterised in that described first computing unit, uses
In:
Obtain the real-time sensible heat load of building, be formulated as:
Q=Qt+Qr+Qi+Qf
Qt=α A1(Tout-Tin)+βA2(Tout-Tin)
Qr=0.899CI
Qi=Qh+Qd
Qf=F ρ Cp(Tout-Tin)
Wherein, Q is described real-time sensible heat load;QtFor body of wall and the heat output of window;α is the heat transfer coefficient of body of wall;A1For body of wall
Heat transfer area;β is the heat transfer coefficient of window;A2Heat transfer area for window;TinFor temperature in building;ToutFor Outer Environment temperature;
QrFor radiant heat transfer amount;C is the comprehensive shaded coefficient of window;I is solar irradiance;QiFor human body and the heat dissipation capacity of equipment in building
Sum;QfFor new wind and air penetration cause refrigeration duty;F is to enter the air mass flow in building;ρ is atmospheric density;CpFor
Heat capacity of air;
Described first computing unit, is additionally operable to obtain the real-time latent heat load of building, is formulated as:
Q '=Q 'f+Q′i
Q′f=rF (Gout-Gin)
Wherein, Q 'fThe latent heat load caused for new wind and infiltration wind;GoutWater capacity for Outer Environment air;GinFor building
The water capacity of interior air;Q′iThe latent heat load caused for wet dissipation such as building interior human body and plants;F is to enter the sky in building
Throughput;R is the gasification latent heat of default temperature.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410522631.XA CN104236020B (en) | 2014-09-30 | 2014-09-30 | Method and device for controlling air conditioning system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410522631.XA CN104236020B (en) | 2014-09-30 | 2014-09-30 | Method and device for controlling air conditioning system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104236020A CN104236020A (en) | 2014-12-24 |
CN104236020B true CN104236020B (en) | 2017-01-11 |
Family
ID=52224614
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410522631.XA Expired - Fee Related CN104236020B (en) | 2014-09-30 | 2014-09-30 | Method and device for controlling air conditioning system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104236020B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101506215B1 (en) * | 2015-01-16 | 2015-03-26 | (주)가교테크 | Prediction Method of Cooling and Heating Loads Using Predicted Solar Insolation |
CN104976741A (en) * | 2015-07-23 | 2015-10-14 | 魏强 | Central air conditioner control method |
CN105320118B (en) * | 2015-12-07 | 2019-02-01 | 张迎春 | Air-conditioning system electricity needs response control mehtod based on cloud platform |
WO2018223263A1 (en) * | 2017-06-05 | 2018-12-13 | 深圳市建恒测控股份有限公司 | Method for calculating effective heat and energy efficiency of air-conditioning system and method for displaying energy flow diagram |
CN109323409B (en) * | 2018-09-30 | 2021-06-18 | 广东美的制冷设备有限公司 | Air conditioner and control method and device thereof |
CN109323421B (en) * | 2018-09-30 | 2021-04-20 | 广东美的制冷设备有限公司 | Air conditioner and control method and device thereof |
CN114459132B (en) * | 2022-01-05 | 2024-04-12 | 洛阳市轨道交通集团有限责任公司 | Method and system for controlling air conditioner of large subway system by step adjustment based on departure logarithm |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3439004B2 (en) * | 1995-10-06 | 2003-08-25 | 高砂熱学工業株式会社 | Air conditioning system, air conditioner and air conditioning method |
CN1946974A (en) * | 2004-03-31 | 2007-04-11 | 大金工业株式会社 | Air conditioner and its control method |
CN103512156A (en) * | 2013-10-12 | 2014-01-15 | 广州市设计院 | Energy saving method and fresh air load step processing device of air conditioner fresh air system |
CN103776129A (en) * | 2012-10-24 | 2014-05-07 | 姚琛 | Air conditioning system and enthalpy difference control method and system for tail end air conditioner thereof |
-
2014
- 2014-09-30 CN CN201410522631.XA patent/CN104236020B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3439004B2 (en) * | 1995-10-06 | 2003-08-25 | 高砂熱学工業株式会社 | Air conditioning system, air conditioner and air conditioning method |
CN1946974A (en) * | 2004-03-31 | 2007-04-11 | 大金工业株式会社 | Air conditioner and its control method |
CN103776129A (en) * | 2012-10-24 | 2014-05-07 | 姚琛 | Air conditioning system and enthalpy difference control method and system for tail end air conditioner thereof |
CN103512156A (en) * | 2013-10-12 | 2014-01-15 | 广州市设计院 | Energy saving method and fresh air load step processing device of air conditioner fresh air system |
Non-Patent Citations (1)
Title |
---|
中央空调冷源与水系统的研究;陈玉远;《重庆大学硕士学位论文》;20061231;第79-81页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104236020A (en) | 2014-12-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104236020B (en) | Method and device for controlling air conditioning system | |
WO2016011937A1 (en) | Temperature and humidity control method and apparatus for air-conditioner | |
US20210148592A1 (en) | Building cooling systems with energy optimization and model predictive control | |
CN103075768B (en) | Thermostatic and humidistatic air conditioning unit group and control method | |
CN104197446A (en) | Dynamic double-cold-source pre-cooling energy-saving air conditioning system | |
CN204730411U (en) | Central air conditioning cooling water system energy-saving controller | |
CN204730410U (en) | A kind of full working scope adaptive controller of combined air conditioning box | |
Marini | Optimization of HVAC systems for distributed generation as a function of different types of heat sources and climatic conditions | |
CN114459133B (en) | Energy-saving control method and energy-saving control system for central air conditioning system | |
JP2011043306A (en) | Energy saving air conditioning control system | |
Liu et al. | Research on operating characteristics of direct-return chilled water system controlled by variable temperature difference | |
CN212720195U (en) | Cooling water system control device based on system overall energy efficiency ratio COP is best | |
CN212566080U (en) | Radiation air-conditioning system with constant temperature layer coupled with air heat pump | |
CN117190406A (en) | Optimal scheduling method for air conditioning system based on human body thermal comfort | |
CN113587384A (en) | Control method and device of air conditioner, air conditioner and storage medium | |
CN202204090U (en) | Cooling tower free refrigeration energy-saving device | |
CN105605748B (en) | Air-water joint adjustment control method and system for air conditioning system | |
CN102692052A (en) | Cold and hot water type precise air conditioning system | |
CN113449900B (en) | Comprehensive energy optimization method and system for terminal user | |
US20220373206A1 (en) | Chiller controller for optimized efficiency | |
CN108507126A (en) | A kind of fuzzy control method, device and the air-conditioning of central air-conditioning freezing water | |
CN204491851U (en) | Be applied to the high energy efficiency space enclosing structure that the thermal transmittance of golf calorific value building is variable | |
Wenzel et al. | Flexibilization of energy supply using the example of industrial hall climatization and cold production | |
CN111780302A (en) | Humidity control device and method for reheating by using chilled water | |
CN118935811B (en) | Operation control method and system for double-source double-effect heat pump unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170111 Termination date: 20210930 |
|
CF01 | Termination of patent right due to non-payment of annual fee |