CN104227683A - Electric power overhaul tool box with compartment structure - Google Patents
Electric power overhaul tool box with compartment structure Download PDFInfo
- Publication number
- CN104227683A CN104227683A CN201310246138.5A CN201310246138A CN104227683A CN 104227683 A CN104227683 A CN 104227683A CN 201310246138 A CN201310246138 A CN 201310246138A CN 104227683 A CN104227683 A CN 104227683A
- Authority
- CN
- China
- Prior art keywords
- groove
- box body
- electric power
- box
- power overhaul
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Casings For Electric Apparatus (AREA)
Abstract
本发明公开了一种隔间结构的电力检修工具箱,包括箱体(1)以及与箱体(1)活动连接的箱体盖(2),箱体(1)与箱体盖(2)上分别设有相互配合的锁扣(6)、套环(7),所述箱体(1)内还设有多个用于放置工具的凹槽。本发明采用上述结构,能够避免检修工具相互碰撞、摩擦而造成工具损坏,同时也使得工具的取用较为方便。
The invention discloses an electric maintenance tool box with compartment structure, which comprises a box body (1) and a box body cover (2) movably connected with the box body (1), the box body (1) and the box body cover (2) There are lock buckles (6) and collars (7) that cooperate with each other on the top, and the box body (1) is also provided with a plurality of grooves for placing tools. The present invention adopts the above-mentioned structure, which can avoid tool damage caused by mutual collision and friction of inspection and maintenance tools, and also makes the tools more convenient to take and use.
Description
技术领域 technical field
本发明涉及电力设备基础设施领域,具体是一种隔间结构的电力检修工具箱。 The invention relates to the field of power equipment infrastructure, in particular to a power maintenance toolbox with a compartment structure.
背景技术 Background technique
对于电力基础设施行业来说,检修一项基本的任务,它的目的是为了使设备能够安全、正常地运行,同时遇到故障设备能够及时维修,使其继续工作。 For the electric power infrastructure industry, maintenance is a basic task. Its purpose is to enable the equipment to operate safely and normally, and at the same time to repair the faulty equipment in time so that it can continue to work.
目前,在进行检修工作时,检修人员往往背个书包,书包内放置所需的所有常用工具,使用的时候再翻出来,十分麻烦。另外,各个工具的结构、特性的不同,导致在工具相互碰撞的时候容易造成损坏,影响工具使用。 At present, when carrying out maintenance work, maintenance personnel often carry a schoolbag on their backs, and all the common tools needed are placed in the schoolbags, and they are turned out when used, which is very troublesome. In addition, the structure and characteristics of each tool are different, which makes it easy to cause damage when the tools collide with each other, which affects the use of the tool.
发明内容 Contents of the invention
本发明提供了一种隔间结构的电力检修工具箱,解决了以往检修过程中,取用工具较为麻烦,同时还可能造成工具损坏的问题。 The invention provides an electric maintenance tool box with a compartment structure, which solves the problem that it is troublesome to take and use tools and may cause damage to the tools in the previous maintenance process.
本发明为解决技术问题主要通过以下技术方案实现:一种隔间结构的电力检修工具箱,包括箱体以及与箱体活动连接的箱体盖,箱体与箱体盖上分别设有相互配合的锁扣、套环,所述箱体内还设有多个用于放置工具的凹槽。凹槽内放置检修工具,可避免检修工具相互碰撞摩擦,防止损坏;通过锁扣、套环,可将箱体与箱体盖扣紧,便于转运。 In order to solve the technical problem, the present invention is mainly realized through the following technical solutions: a power maintenance tool box with a compartment structure, including a box body and a box body cover movably connected with the box body, and the box body and the box body cover are respectively provided with mutually cooperating There are locks and collars, and there are multiple grooves for placing tools in the box. The maintenance tools are placed in the groove to avoid collision and friction between the maintenance tools and prevent damage; the box body and the box cover can be fastened by locks and collars for easy transfer. the
进一步地,所述箱体内设有第一凹槽,所述第一凹槽的深度等于或大于箱体的厚度的1/2。 Further, the box is provided with a first groove, and the depth of the first groove is equal to or greater than 1/2 of the thickness of the box.
进一步地,所述箱体内还设有第二凹槽,所述第二凹槽的深度小于第一凹槽的深度。 Further, a second groove is further provided in the box, and the depth of the second groove is smaller than that of the first groove.
进一步地,所述箱体内还设有两个第三凹槽,两个第三凹槽相互平行,且第三凹槽的深度小于第二凹槽的深度。 Further, two third grooves are provided in the box, the two third grooves are parallel to each other, and the depth of the third grooves is smaller than that of the second grooves.
进一步地,所述第一凹槽、第二凹槽、第三凹槽内均设有绝缘层。 Further, an insulating layer is provided in the first groove, the second groove, and the third groove.
进一步地,所述箱体盖的外表面设有反光条。 Further, the outer surface of the box cover is provided with reflective strips.
进一步地,所述反光条位于箱体盖的外表面的中心处。 Further, the reflective strip is located at the center of the outer surface of the case cover.
本发明与现有技术相比具有以下优点和有益效果: Compared with the prior art, the present invention has the following advantages and beneficial effects:
(1)本发明通过设置多个凹槽,将检修工具对应放置在凹槽内,可避免工具相互碰撞而造成损坏,同时也使得工具的取用较为方便。 (1) In the present invention, a plurality of grooves are arranged, and maintenance tools are placed in the grooves correspondingly, which can prevent the tools from colliding with each other and cause damage, and also makes the tools more convenient to take.
(2)本发明通过在各凹槽内设置绝缘层,使箱体具有较好的绝缘性,防止箱体带电可能对工具造成损坏。 (2) In the present invention, an insulating layer is provided in each groove, so that the box has better insulation, and prevents the box from being charged and may cause damage to the tool.
(3)本发明在箱体盖上设置反光条,使其在光线较为昏暗或光线较强时,能够快速确定箱体的位置,同时也能避免工具箱被遗忘丢失。 (3) In the present invention, reflective strips are provided on the box cover so that when the light is relatively dim or the light is strong, the position of the box can be quickly determined, and at the same time, the toolbox can be prevented from being forgotten and lost.
附图说明 Description of drawings
图1为本发明的结构示意图。 Fig. 1 is a structural schematic diagram of the present invention.
具体实施方式 Detailed ways
下面结合实施例对本发明作进一步的详细说明,但本发明的实施方式不限于此。 The present invention will be further described in detail below in conjunction with examples, but the embodiments of the present invention are not limited thereto.
实施例: Example:
如图1所示,本实施例包括箱体1以及与箱体1活动连接的箱体盖2,箱体1与箱体盖2上分别设有相互配合的锁扣6、套环7,所述箱体1内还设有多个用于放置工具的凹槽。 As shown in Figure 1, this embodiment includes a box body 1 and a box body cover 2 that is movably connected with the box body 1. The box body 1 and the box body cover 2 are respectively provided with a lock 6 and a collar 7 that cooperate with each other. The box body 1 is also provided with a plurality of grooves for placing tools. the
作为优选,本实施例的箱体1内设有第一凹槽3,所述第一凹槽3的深度等于或大于箱体1的厚度的1/2。 As a preference, a first groove 3 is provided inside the box body 1 of this embodiment, and the depth of the first groove 3 is equal to or greater than 1/2 of the thickness of the box body 1 .
作为优选,本实施例的箱体1内还设有第二凹槽4,所述第二凹槽4的深度小于第一凹槽3的深度。 As a preference, a second groove 4 is further provided in the box body 1 of this embodiment, and the depth of the second groove 4 is smaller than that of the first groove 3 .
作为优选,本实施例的箱体1内还设有两个第三凹槽5,两个第三凹槽5相互平行,且第三凹槽5的深度小于第二凹槽4的深度。 As a preference, two third grooves 5 are further provided in the box body 1 of this embodiment, the two third grooves 5 are parallel to each other, and the depth of the third grooves 5 is smaller than the depth of the second groove 4 .
作为优选,本实施例的第一凹槽3、第二凹槽4、第三凹槽5内均设有绝缘层。 Preferably, an insulating layer is provided in the first groove 3 , the second groove 4 , and the third groove 5 in this embodiment.
作为优选,本实施例的箱体盖2的外表面设有反光条。 Preferably, the outer surface of the case cover 2 of this embodiment is provided with reflective strips.
作为优选,本实施例的反光条位于箱体盖2的外表面的中心处。 Preferably, the reflective strip of this embodiment is located at the center of the outer surface of the case cover 2 .
本发明已经通过上述实施例进行了说明,但应当理解的是,上述实施例只是用于举例和说明的目的,而非意在将本发明限制于所描述的实施例范围内。此外,本领域技术人员可以理解的是,本发明并不局限于上述实施例,根据本发明的教导还可以做出更多种的变型和修改,这些变型和修改均落在本发明所要求保护的范围以内。 The present invention has been described through the above-mentioned embodiments, but it should be understood that the above-mentioned embodiments are only for the purpose of illustration and description, and are not intended to limit the present invention to the scope of the described embodiments. In addition, those skilled in the art can understand that the present invention is not limited to the above-mentioned embodiments, and more variations and modifications can be made according to the teachings of the present invention, and these variations and modifications all fall within the requirements of the present invention. within the range. the
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310246138.5A CN104227683A (en) | 2013-06-20 | 2013-06-20 | Electric power overhaul tool box with compartment structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310246138.5A CN104227683A (en) | 2013-06-20 | 2013-06-20 | Electric power overhaul tool box with compartment structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104227683A true CN104227683A (en) | 2014-12-24 |
Family
ID=52217038
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310246138.5A Pending CN104227683A (en) | 2013-06-20 | 2013-06-20 | Electric power overhaul tool box with compartment structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104227683A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29607640U1 (en) * | 1996-04-26 | 1996-08-14 | Hans Einhell AG, 94405 Landau | Cases for electrically operated hand tools |
CN2920574Y (en) * | 2006-07-12 | 2007-07-11 | 卓耀霖 | Light reflective tool box |
CN201214240Y (en) * | 2008-06-05 | 2009-04-01 | 济南供电公司 | Combination Toolbox for Operation Team Watchmen |
CN201378192Y (en) * | 2008-12-08 | 2010-01-06 | 广州番禺职业技术学院 | Integrated Wiring Engineering Toolbox |
CN201415399Y (en) * | 2009-06-08 | 2010-03-03 | 启东市昌盛电器有限责任公司 | Electric tool box |
CN201613538U (en) * | 2010-03-15 | 2010-10-27 | 岳志军 | Tool box for detecting and maintaining electronic equipment |
CN201860060U (en) * | 2010-10-21 | 2011-06-08 | 延安供电局 | Combined security tool box for electric line operation |
CN202668523U (en) * | 2012-05-24 | 2013-01-16 | 国家电网公司 | Tool box device special for testing turn-off time of steam turbine valve |
CN203390919U (en) * | 2013-06-20 | 2014-01-15 | 国家电网公司 | Portable tool box for placing electric power overhaul tools |
-
2013
- 2013-06-20 CN CN201310246138.5A patent/CN104227683A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29607640U1 (en) * | 1996-04-26 | 1996-08-14 | Hans Einhell AG, 94405 Landau | Cases for electrically operated hand tools |
CN2920574Y (en) * | 2006-07-12 | 2007-07-11 | 卓耀霖 | Light reflective tool box |
CN201214240Y (en) * | 2008-06-05 | 2009-04-01 | 济南供电公司 | Combination Toolbox for Operation Team Watchmen |
CN201378192Y (en) * | 2008-12-08 | 2010-01-06 | 广州番禺职业技术学院 | Integrated Wiring Engineering Toolbox |
CN201415399Y (en) * | 2009-06-08 | 2010-03-03 | 启东市昌盛电器有限责任公司 | Electric tool box |
CN201613538U (en) * | 2010-03-15 | 2010-10-27 | 岳志军 | Tool box for detecting and maintaining electronic equipment |
CN201860060U (en) * | 2010-10-21 | 2011-06-08 | 延安供电局 | Combined security tool box for electric line operation |
CN202668523U (en) * | 2012-05-24 | 2013-01-16 | 国家电网公司 | Tool box device special for testing turn-off time of steam turbine valve |
CN203390919U (en) * | 2013-06-20 | 2014-01-15 | 国家电网公司 | Portable tool box for placing electric power overhaul tools |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018125638A3 (en) | Modular thermal storage | |
WO2013153084A3 (en) | Charging system | |
CN201860060U (en) | Combined security tool box for electric line operation | |
US10153624B2 (en) | Container for energy storage apparatus | |
CN203390919U (en) | Portable tool box for placing electric power overhaul tools | |
BR112022023043A2 (en) | SYSTEMS, DEVICES AND METHODS FOR RAIL-BASED VEHICLES AND OTHER ELECTRIC VEHICLES WITH MODULAR CASCADE POWER SYSTEMS | |
BR112015020321A2 (en) | coated overload conductors and methods | |
WO2014140430A3 (en) | Multi shell metal particles and uses thereof | |
CN104227683A (en) | Electric power overhaul tool box with compartment structure | |
CN102868099A (en) | Switch cabinet provided with wiring groove | |
WO2014204711A3 (en) | Composite graphene oxide film | |
CN205817777U (en) | A kind of fixture | |
CN205057997U (en) | Power equipment specialized tool frame | |
CN204525232U (en) | Production and processing grip device | |
MX2015010850A (en) | Carton with article protection feature. | |
CN203369506U (en) | Low-voltage meter installation, power connection and live-wire operation tool pocket | |
CN204525229U (en) | Produce fixture | |
WO2015127263A3 (en) | Energy-producing reaction devices, systems and related methods | |
CN105870851A (en) | Plug-in wiring duct | |
CN205021564U (en) | A overhaul case for electric power system | |
CN204913334U (en) | Box body processing frock | |
CN204887768U (en) | Casing for communication equipment | |
CN203951065U (en) | A kind of 10kV combined-type box becomes wire-outgoing breaker insulated isolated device | |
CN204375376U (en) | Overhead transmission line limit for height Sign Board | |
WO2014105016A3 (en) | Systems and methods of monitoring bridging time |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20141224 |
|
WD01 | Invention patent application deemed withdrawn after publication |