CN104213846B - Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing - Google Patents

Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing Download PDF

Info

Publication number
CN104213846B
CN104213846B CN201310219765.XA CN201310219765A CN104213846B CN 104213846 B CN104213846 B CN 104213846B CN 201310219765 A CN201310219765 A CN 201310219765A CN 104213846 B CN104213846 B CN 104213846B
Authority
CN
China
Prior art keywords
pipe
sealing
section
packer
intubates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310219765.XA
Other languages
Chinese (zh)
Other versions
CN104213846A (en
Inventor
朱洪征
吕亿明
牛彩云
李大建
王百
赵晓伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201310219765.XA priority Critical patent/CN104213846B/en
Publication of CN104213846A publication Critical patent/CN104213846A/en
Application granted granted Critical
Publication of CN104213846B publication Critical patent/CN104213846B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a casing completion multi-section fracturing horizontal well selective exploitation tubular column and a working method thereof, which are designed for realizing the selective and section-by-section exploitation of a horizontal well. The multi-stage packer of the separation sleeve is connected outside the water-proof oil pipe of the pipe column; the water-proof oil pipe is internally connected with a deep well pump, a connecting sealing insertion pipe, a constant pressure valve and a sealing cylinder which are opposite to each partition section of the sleeve and a bottom guide plug; the upper end of the bottom-sealing perforated pipe is connected with a sealing insertion pipe, and the pipe body is connected with a constant pressure valve and a sealing cylinder in each partition section. When the horizontal well is in operation, the packer is used for separating the horizontal well section, then the sealing insertion pipe and the bottom-sealing perforated pipe are put in, the sealing barrel is combined in the separation pipe column to form a secondary sealing section, the sealing insertion pipe is dragged, and selective exploitation of the horizontal section and sectional production water exploration are carried out. The invention can be used in multiple stages, the number of stages is not limited, selective exploitation under the conditions of casing pipe micro-deformation and damage can be realized, or the exploitation from top to bottom section by section and the production and water exploration by section can be realized, the flooding of the whole well can be avoided, and the good development effect can be ensured.

Description

套管完井多段压裂水平井选择性开采管柱及其工作方法Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing

技术领域technical field

本发明涉及一种套管完井多段压裂水平井选择性开采管柱及其工作方法,属于油田采油技术领域。The invention relates to a casing completion multi-stage fracturing horizontal well selective recovery pipe string and a working method thereof, belonging to the field of oil recovery technology.

背景技术Background technique

利用水平井开采低渗透油田可较大程度地改善开发效果,提高采收率。随着水平井钻井技术和改造手段的进步,水平井的水平段越来越长,改造段数越来越多。受注水开发及裂缝发育的影响,水平井各层段存在着受力不均及贡献大小不一的问题。部分水平段的水淹会殃及全井,快速增加井内含水,缩短无水采油期,加速递减产量,若不明确见水方向和层位,不清楚各层压力及产能状况,无针对性的动态现场调整措施,会使井下套管发生损坏和变形,严重影响水平井的开发效果。Using horizontal wells to develop low-permeability oilfields can greatly improve the development effect and increase the recovery factor. With the advancement of horizontal well drilling technology and stimulation methods, the horizontal section of horizontal well is getting longer and the number of stimulation sections is increasing. Affected by water injection development and fracture development, there are problems of uneven stress and different contributions in various layers of horizontal wells. Water flooding in part of the horizontal section will affect the whole well, rapidly increasing the water cut in the well, shortening the water-free oil production period, and accelerating the decline in production. Dynamic on-site adjustment measures will damage and deform the downhole casing, seriously affecting the development effect of horizontal wells.

目前,低渗透小流量水平井的选择性开采及分段生产测试找水基本采用开关器定时控制和逐一生产各层段,在地面化验分析各段含水,判断出水层段。然而,井下开关器开关正常否只能在测试结束后知晓,若开关失灵,将会导致测试失败。另外,水平井套管的微变和结垢会使自封封隔器无法下入,遇油膨胀无法拖动和起出。At present, the selective mining of low-permeability and low-flow horizontal wells and the water detection of staged production tests basically use switch timing control and produce each layer one by one. The water content of each stage is analyzed on the ground to determine the water-producing layer. However, whether the switch of the downhole switch is normal can only be known after the end of the test. If the switch fails, the test will fail. In addition, the slight change and fouling of the horizontal well casing will make the self-sealing packer unable to run in, and cannot be dragged and pulled out when it expands when encountering oil.

发明内容Contents of the invention

本发明的目的在于提供一种套管完井多段压裂水平井选择性开采管柱及其工作方法,其能解决上述技术问题,实现水平井选择性地逐段开采、分段求产和找水。The purpose of the present invention is to provide a casing completion multi-stage fracturing horizontal well selective production string and its working method, which can solve the above-mentioned technical problems and realize the selective production, stage-by-stage production and search for horizontal wells in horizontal wells. water.

本套管完井多段压裂水平井选择性开采管柱的技术内容如下:The technical content of the casing completion multi-stage fracturing horizontal well selective production string is as follows:

本管柱隔水油管外部由上向下依次连接分隔套管的多级封隔器;隔水油管内由上向下依次连接深井泵、连接丢手封隔器的密封插管、相对套管各隔段的定压阀和密封筒,隔水油管底端连接导向丝堵;封底带孔管上端连接密封插管,管身连接各隔段内的定压阀和密封筒。The outer part of the tubing string is connected to the multi-stage packer separating the casing from top to bottom; The constant pressure valve and sealing cylinder of each compartment, the bottom end of the oil pipe is connected to the guide plug; the upper end of the bottom-sealed perforated tube is connected to the sealing intubation tube, and the pipe body is connected to the constant pressure valve and sealing cylinder in each compartment.

本套管完井多段压裂水平井选择性开采管柱的工作方法如下:The working method of the casing completion multistage fracturing horizontal well selective production string is as follows:

先利用分隔管柱的多级封隔器分隔水平井段;再下入密封插管和封底带孔管,在分隔管柱内结合密封筒形成次级密封段;拖动密封插管,进行水平段选择性开采和分段求产找水。First use the multi-stage packer of the separated string to separate the horizontal well section; then run the sealing intubation tube and the bottom-sealed perforated pipe, and combine the sealing cylinder in the separating string to form a secondary sealing section; drag the sealing intubation tube to carry out horizontal well section Segment selective mining and segmental production seeking water.

本发明能够多级使用,级数不受限制,能实现套管微变和损坏条件下的选择性开采,或从上至下逐段的开采及分段求产找水,能避免全井水淹,保证良好的开发效果。The invention can be used in multiple stages, and the number of stages is not limited, and can realize selective mining under the condition of slight change and damage of the casing, or mining from top to bottom section by section and seeking production and water in sections, and can avoid full well water Flood to ensure a good development effect.

附图说明Description of drawings

图1为套管完井多段压裂水平井选择性开采管柱进行水平井中部采油的示意图。Fig. 1 is a schematic diagram of the selective recovery of the middle part of the horizontal well by the casing completion multi-stage fracturing horizontal well with the string.

具体实施方式detailed description

实施例:Example:

参照图1对本发明的实施例进一步说明:Embodiments of the present invention are further described with reference to Fig. 1:

本管柱隔水油管10外部由上向下依次连接分隔套管14的Y445丢手封隔器12、Y441插管上封隔器7和Y441插管下封隔器3;隔水油管10内由上向下依次连接深井泵13、连接Y445丢手封隔器12的密封插管11、相对套管14上隔段的上定压阀9和上密封筒8、相对套管14中隔段的中定压阀5和下密封筒4、相对套管14下隔段的下定压阀2和导向丝堵1;封底带孔管6上端连接密封插管11,管身连接各隔段内的定压阀和密封筒。The outside of the tubing string 10 is connected from top to bottom with the Y445 hand-off packer 12 of the separating casing 14, the upper packer 7 of the Y441 intubation and the lower packer 3 of the Y441 intubation; From top to bottom, connect the deep well pump 13, the sealing cannula 11 connected to the Y445 hand-off packer 12, the upper constant pressure valve 9 and the upper sealing cylinder 8 of the upper section of the opposite casing 14, and the middle section of the opposite casing 14. The middle constant pressure valve 5 and the lower sealing cylinder 4, the lower constant pressure valve 2 and the guide plug 1 of the lower section of the casing 14; Constant pressure valve and sealing cylinder.

本管柱的工作方法如下:The working method of this pipe string is as follows:

1)下入分隔管柱:首先,按段数及段间距要求,将导向丝堵1、各封隔器、各定压阀和各密封筒与隔水油管10安装连接,然后下入井内相应位置,入井后的Y445丢手封隔器12、Y441插管上封隔器7和Y441插管下封隔器3将套管14分隔成四段。1) Run the separation pipe string: first, install and connect the guide plug 1, each packer, each constant pressure valve and each sealing cylinder with the water-resisting tubing 10 according to the number of sections and the interval between the sections, and then run into the corresponding position in the well After entering the well, the casing 14 is divided into four sections by the Y445 drop packer 12, the Y441 upper intubation packer 7 and the Y441 intubation lower packer 3.

2)坐封:用水泥车从井口打压20MPa,管内憋压,使Y441插管上封隔器7和Y441插管下封隔器3首先坐封;然后继续加压,开启上定压阀9、中定压阀5和下定压阀2,沟通油层。2) Setting: Use a cement truck to pressurize 20MPa from the wellhead, hold the pressure inside the pipe, and make the upper packer 7 of the Y441 intubation and the lower packer 3 of the Y441 intubation first set; then continue to pressurize and open the upper constant pressure valve 9 , The middle constant pressure valve 5 and the lower constant pressure valve 2 communicate with the oil layer.

3)井口卸压后投球,待钢球落到Y445丢手封隔器12的丢手接头球座后,用泵车一次打压至压力突然落为零,此时丢手内套脱离丢手接头,起出丢手接头以上的隔水油管10,其余管柱安装在井下。3) Throw the ball after depressurization at the wellhead. After the steel ball falls to the ball seat of the drop joint of the Y445 drop packer 12, use a pump truck to press it once until the pressure suddenly drops to zero. At this time, the drop inner sleeve is separated from the drop joint , take out the oil riser 10 above the hands-off joint, and all the other pipe strings are installed in the downhole.

4)下入生产管柱:将密封插管11和封底带孔管6下入隔水油管10内,连接井下管柱内的各密封筒,组成新的各次级密封段。4) Running into the production string: run the sealing intubation tube 11 and the bottom-sealed perforated pipe 6 into the water riser 10, and connect the sealing cylinders in the downhole string to form new secondary sealing sections.

5)开泵采油:根据需要开采的层段,拖动密封插管11和封底带孔管6,沟通任意段内的油层,进行开采。5) Oil production by pumping: According to the layers to be exploited, drag the sealing intubation tube 11 and the bottom-sealed perforated pipe 6 to communicate with the oil layers in any section for extraction.

6)起出分隔管柱:先起出密封插管11和封底带孔管6,再下入打捞筒,逐级打捞Y445丢手封隔器12、Y441插管上封隔器9和Y441插管下封隔器4。6) Pull out the separation string: firstly pull out the sealed cannula 11 and the bottom-sealed perforated pipe 6, then lower the overshot, and salvage the Y445 discarded packer 12, the Y441 cannulated upper packer 9 and the Y441 inserted cannula step by step. Down pipe packer 4.

Claims (1)

1. the method for work of a cased hole completion multistage frac water horizontal well selectivity mining tubular column, it is characterised in that separate net horizontal section first with the multiple-string packer separating tubing string;Enter down sealing again and intubate pipe with holes with back cover, form secondary seal section separating in tubing string in conjunction with sealing drum;Dragging sealing intubates, and carries out the exploitation of horizontal segment selectivity and product water detection is asked in segmentation;
The specific works step of described method of work is as follows:
1) enter to separate tubing string under: first, by hop count and certain distance requirement, it is directed to plug (1), each packer, each constant pressure valve and each sealing drum be connected with water proof oil pipe (10) installation, then G.I.H relevant position, enters the Y445 back-off packer (12) after well, Y441 intubates upper packer (7) and Y441 intubates lower packet (3) and sleeve pipe (14) is separated into four sections;
2) set: suppress 20MPa with cementing truck from well head, build the pressure in pipe, make Y441 intubate upper packer (7) and Y441 intubates lower packet (3) and first sets;Then proceed to pressurization, constant pressure valve (9), middle constant pressure valve (5) and lower constant pressure valve (2) in unlatching, link up oil reservoir;
3) pitching after well head release, after the back-off sub ball seat that Y445 back-off packer (12) fallen by steel ball, once suppress with pump truck that to fall suddenly to pressure be zero, inner sleeve of now giving up departs from back-off sub, tripping out the water proof oil pipe (10) of more than back-off sub, all the other tubing strings are arranged on down-hole;
4) enter flow string under: sealing intubated and enter in water proof oil pipe (10) under (11) and back cover pipe with holes (6), connect each sealing drum in down-hole string, form new each secondary seal section;
5) turn on pump recovers the oil: production horizon section as required, drags sealing and intubates (11) and back cover pipe with holes (6), links up the oil reservoir in any section, exploit;
6) separation tubing string is tripped out: first trip out sealing and intubate (11) and back cover pipe with holes (6), enter fishing socket down again, step by step salvage Y445 back-off packer (12), Y441 intubates upper packer (7) and Y441 intubates lower packet (3).
CN201310219765.XA 2013-06-05 2013-06-05 Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing Active CN104213846B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310219765.XA CN104213846B (en) 2013-06-05 2013-06-05 Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310219765.XA CN104213846B (en) 2013-06-05 2013-06-05 Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing

Publications (2)

Publication Number Publication Date
CN104213846A CN104213846A (en) 2014-12-17
CN104213846B true CN104213846B (en) 2016-07-13

Family

ID=52095716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310219765.XA Active CN104213846B (en) 2013-06-05 2013-06-05 Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing

Country Status (1)

Country Link
CN (1) CN104213846B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437641B (en) * 2015-08-11 2018-12-04 中国石油化工股份有限公司 The long-acting two-tube water injection string of independent safety
CN105134184B (en) * 2015-09-11 2018-04-03 中国石油天然气股份有限公司 A continuous inspection process string and method for horizontal wells
CN105937393B (en) * 2016-06-27 2022-11-04 中国石油天然气股份有限公司 A horizontal well drag-type liquid production profile test string and its test method
RU2653216C1 (en) * 2017-04-26 2018-05-07 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Method and device for research and operation of horizontal well with zones of permeability variations
CN107956457B (en) * 2018-01-08 2023-09-26 北京合力奇点科技有限公司 Oil extraction water control device, directional well oil extraction pipe string for well completion and well completion method thereof
CN109653715A (en) * 2018-12-29 2019-04-19 中国石油天然气股份有限公司 A kind of horizontal well section staggered displacement and imbibition displacement oil injection-production tubing string and method
RU2726662C1 (en) * 2019-12-09 2020-07-15 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Device for serial operation of formation of horizontal well
CN111577257B (en) * 2020-06-19 2023-03-28 陕西捷奥能源科技有限公司 Horizontal well subsection setting type flow metering water exploration pipe column and water exploration method thereof
CN111852428A (en) * 2020-08-03 2020-10-30 中国石油天然气股份有限公司 A method for combined fracturing of external isolation and coiled tubing
CN117514115B (en) * 2023-12-18 2024-05-10 河南省地质研究院 Completion device and method for fracturing horizontal well based on high-rank coal bed gas

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2309246C1 (en) * 2006-02-02 2007-10-27 Олег Марсович Гарипов Downhole machine
CN201474673U (en) * 2009-08-19 2010-05-19 中国石油天然气股份有限公司 Oil production pipe column for sectional water control of horizontal well
CN101864921A (en) * 2010-06-11 2010-10-20 大港油田集团有限责任公司 Well completion and oil production string of horizontal well and well completion and oil production processes thereof
CN201705276U (en) * 2010-06-11 2011-01-12 大港油田集团有限责任公司 Well completion and flow string of horizontal well
CN102505921A (en) * 2011-11-04 2012-06-20 中国石油天然气股份有限公司 A water-seeking pipe string for an open-hole horizontal well
CN203321480U (en) * 2013-06-05 2013-12-04 中国石油天然气股份有限公司 Selective Production String of Multi-Stage Fracturing Horizontal Well Completion with Casing

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2309246C1 (en) * 2006-02-02 2007-10-27 Олег Марсович Гарипов Downhole machine
CN201474673U (en) * 2009-08-19 2010-05-19 中国石油天然气股份有限公司 Oil production pipe column for sectional water control of horizontal well
CN101864921A (en) * 2010-06-11 2010-10-20 大港油田集团有限责任公司 Well completion and oil production string of horizontal well and well completion and oil production processes thereof
CN201705276U (en) * 2010-06-11 2011-01-12 大港油田集团有限责任公司 Well completion and flow string of horizontal well
CN102505921A (en) * 2011-11-04 2012-06-20 中国石油天然气股份有限公司 A water-seeking pipe string for an open-hole horizontal well
CN203321480U (en) * 2013-06-05 2013-12-04 中国石油天然气股份有限公司 Selective Production String of Multi-Stage Fracturing Horizontal Well Completion with Casing

Also Published As

Publication number Publication date
CN104213846A (en) 2014-12-17

Similar Documents

Publication Publication Date Title
CN104213846B (en) Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing
CN103015955B (en) Open-hole horizontal well multi-cluster sliding sleeve staged fracturing string and fracturing method thereof
CN201705276U (en) Well completion and flow string of horizontal well
CN103452542B (en) Switchable fracturing sliding sleeve
CN104234638B (en) Mechanical water-seeking string and water-seeking method for multi-stage fracturing horizontal well with casing completion
CN203321480U (en) Selective Production String of Multi-Stage Fracturing Horizontal Well Completion with Casing
CN101864921A (en) Well completion and oil production string of horizontal well and well completion and oil production processes thereof
CN102747967A (en) Casing well completion, multi-stage fracturing horizontal well, multi-stage and segmental water-finding pipe string and method
CN103643931A (en) Completion and fracture integrated pipe column of offshore openhole horizontal well and construction method of pipe column
CN103422846B (en) Open hole horizontal well completion and fracturing integrated string
CN206917640U (en) The steady oil system of offshore oilfield horizontal well automatic control water
CN105952378A (en) Tree-shape structure well drilling and completion and yield increasing method
CN112127802A (en) Infinite grade full-bore staged fracturing sand control pipe column and production method thereof
CN108868734A (en) Dissolvable packer multi-layer fracturing and completion integrated pressure dividing string and method for gas well
CN103452531A (en) Method for underbalanced tubing descending, non-well-killing gas lifting, rotary pumping, pump maintaining and tubing maintaining
CN103573229A (en) Open hole oil production technology and separated pipe string
CN204186371U (en) Staged fracturing tool pipe column with first-section perforated casing sliding sleeve
CN104420836B (en) Horizontal Well Segmented Setting Wellhead Flow Method for Finding Water String and Its Water Finding Method
CN107795304A (en) A multi-layer simultaneous production string and its application method
CN202266250U (en) A ball cage assembly structure of an intelligent sliding sleeve opening tool
CN104912535B (en) A multi-cluster fracturing sliding sleeve in a stage
CN104632195B (en) A water-seeking pipe string and method for a gas-lift-aided horizontal well
CN203939477U (en) An integrated pipe string for oil testing and well completion operations
CN202788638U (en) Casing well completion, multi-stage fracturing, horizontal well multi-stage and segmental water-seeking string
CN204283371U (en) Completion string

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant