CN104199362B - 一种城市轨道列车的实时速度跟踪控制方法及系统 - Google Patents
一种城市轨道列车的实时速度跟踪控制方法及系统 Download PDFInfo
- Publication number
- CN104199362B CN104199362B CN201410453755.7A CN201410453755A CN104199362B CN 104199362 B CN104199362 B CN 104199362B CN 201410453755 A CN201410453755 A CN 201410453755A CN 104199362 B CN104199362 B CN 104199362B
- Authority
- CN
- China
- Prior art keywords
- speed
- fuzzy
- railway train
- city railway
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Feedback Control In General (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410453755.7A CN104199362B (zh) | 2014-09-09 | 2014-09-09 | 一种城市轨道列车的实时速度跟踪控制方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410453755.7A CN104199362B (zh) | 2014-09-09 | 2014-09-09 | 一种城市轨道列车的实时速度跟踪控制方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104199362A CN104199362A (zh) | 2014-12-10 |
CN104199362B true CN104199362B (zh) | 2017-12-12 |
Family
ID=52084663
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410453755.7A Active CN104199362B (zh) | 2014-09-09 | 2014-09-09 | 一种城市轨道列车的实时速度跟踪控制方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104199362B (zh) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105150876B (zh) * | 2015-07-21 | 2017-06-06 | 株洲南车时代电气股份有限公司 | 一种基于轨枕检测的磁悬浮列车测速方法 |
CN105447116B (zh) * | 2015-11-16 | 2019-03-26 | 徐州工业职业技术学院 | 基于Mamdani算法的停车诱导决策方法 |
CN106056238B (zh) * | 2016-05-20 | 2020-01-03 | 北京交通大学 | 列车区间运行轨迹的规划方法 |
CN106569499A (zh) * | 2016-11-11 | 2017-04-19 | 华南智能机器人创新研究院 | 一种机器人自适应控制伺服驱动的方法及系统 |
CN106444363B (zh) * | 2016-12-14 | 2019-08-06 | 浙江中控技术股份有限公司 | 一种pid参数整定方法及整定系统 |
CN108153145B (zh) * | 2017-12-22 | 2020-10-16 | 合肥工大高科信息科技股份有限公司 | 一种基于pid和滤波算法的列车速度自动控制方法 |
CN109100160B (zh) * | 2018-09-25 | 2020-05-29 | 安徽江淮汽车集团股份有限公司 | 用于电动汽车续航里程试验的车速控制方法及系统 |
CN110083056A (zh) * | 2019-05-28 | 2019-08-02 | 北京交通大学 | 一种城轨列车pid控制器自动调整方法 |
CN110750072A (zh) * | 2019-10-25 | 2020-02-04 | 西安航普电子有限责任公司 | 一种高精度智能化随动控制系统 |
CN111142374B (zh) * | 2020-01-03 | 2023-04-28 | 江西理工大学 | 一种悬挂式永磁磁悬浮列车自动驾驶系统的速度控制方法 |
CN113805478B (zh) * | 2021-09-15 | 2024-02-23 | 深圳市塞防科技有限公司 | 车辆pid参数的调试方法及车辆 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1021094A (ja) * | 1996-07-08 | 1998-01-23 | Mitsubishi Electric Corp | リアルタイム制御方式 |
US6110214A (en) * | 1996-05-03 | 2000-08-29 | Aspen Technology, Inc. | Analyzer for modeling and optimizing maintenance operations |
CN102358287A (zh) * | 2011-09-05 | 2012-02-22 | 北京航空航天大学 | 一种用于车辆自动驾驶机器人的轨迹跟踪控制方法 |
CN103092076A (zh) * | 2013-01-06 | 2013-05-08 | 华东交通大学 | 动车组制动过程多模型自适应pid控制 |
-
2014
- 2014-09-09 CN CN201410453755.7A patent/CN104199362B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6110214A (en) * | 1996-05-03 | 2000-08-29 | Aspen Technology, Inc. | Analyzer for modeling and optimizing maintenance operations |
JPH1021094A (ja) * | 1996-07-08 | 1998-01-23 | Mitsubishi Electric Corp | リアルタイム制御方式 |
CN102358287A (zh) * | 2011-09-05 | 2012-02-22 | 北京航空航天大学 | 一种用于车辆自动驾驶机器人的轨迹跟踪控制方法 |
CN103092076A (zh) * | 2013-01-06 | 2013-05-08 | 华东交通大学 | 动车组制动过程多模型自适应pid控制 |
Non-Patent Citations (1)
Title |
---|
预测模糊PID在高速列车速度控制中的研究;陈小强等;《系统仿真学报》;20140131;第26卷(第1期);第1.2节至第3.1节 * |
Also Published As
Publication number | Publication date |
---|---|
CN104199362A (zh) | 2014-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104199362B (zh) | 一种城市轨道列车的实时速度跟踪控制方法及系统 | |
CN102275601B (zh) | 一种智能控车方法及装置 | |
Wang et al. | A survey on optimal trajectory planning for train operations | |
CN105243430B (zh) | 列车节能运行的目标速度曲线的优化方法 | |
CN102981408B (zh) | 一种动车组运行过程建模与自适应控制方法 | |
CN108153145A (zh) | 一种基于pid和滤波算法的列车速度自动控制方法 | |
CN106143540B (zh) | 轨道交通列车全速密贴运行控制曲线的自适应计算方法 | |
CN108163018A (zh) | 一种基于固定距离生成停车策略的列车精确停车方法 | |
CN104228887B (zh) | 一种列车自动运行等级实时调整的方法及系统 | |
Liu et al. | Cooperative optimal control of the following operation of high-speed trains | |
CN109693688B (zh) | 预设性能的列车自动驾驶控制系统及控制方法 | |
Yang et al. | Speed tracking based energy-efficient freight train control through multi-algorithms combination | |
CN110414109A (zh) | 一种列车能耗及最优牵引速度仿真系统 | |
Zhang et al. | Data-driven train operation models based on data mining and driving experience for the diesel-electric locomotive | |
CN109760721A (zh) | 一种列车区间运行实时调整系统及方法 | |
Bin et al. | Energy-efficient speed profile optimization for high-speed railway considering neutral sections | |
CN106056238A (zh) | 列车区间运行轨迹的规划方法 | |
Shangguan et al. | High-speed train platoon dynamic interval optimization based on resilience adjustment strategy | |
CN104691534A (zh) | 一种带有导引模块的气垫船回转率保持控制方法 | |
Hamid et al. | Investigation into train positioning systems for saving energy with optimised train trajectories | |
Chen et al. | A survey of control algorithm for automatic train operation | |
CN102039825A (zh) | 自动列车运转装置及固定位置停止装置 | |
CN104228851B (zh) | 一种城市轨道列车的速度跟踪控制系统 | |
CN106740998B (zh) | 城市轨道交通cbtc系统车载ato节能操控方法 | |
CN105197200B (zh) | 一种基于航迹引导的气垫船进坞过程自动控制系统及控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 312300. B36 building, B03 building, Shishi Plaza Business Garden, Xiao Yue town, Shangyu District, Zhejiang, Shaoxing, China Applicant after: SHAOXING ANKA AUTO PARTS Co.,Ltd. Applicant after: Lin Daosong Address before: 312300. B36 building, B03 building, Shishi Plaza Business Garden, Xiao Yue town, Shangyu District, Zhejiang, Shaoxing, China Applicant before: SHANGYU ANKA TRAILER PARTS CO.,LTD. Applicant before: Lin Daosong |
|
COR | Change of bibliographic data | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230814 Address after: 200120, room 428, 509 Dongfang Road, Shanghai, Pudong New Area Patentee after: Shanghai langshang Sensing Technology Co.,Ltd. Patentee after: Zhang Zongyong Address before: 312300 building B36, business garden, Shishi square, Xiaoyue Town, Shangyu District, Shaoxing City, Zhejiang Province Patentee before: SHAOXING ANKA AUTO PARTS Co.,Ltd. Patentee before: Lin Daosong |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A real-time speed tracking control method and system for urban rail trains Effective date of registration: 20231219 Granted publication date: 20171212 Pledgee: Baiyu Sub branch of Bank of Shanghai Co.,Ltd. Pledgor: Shanghai langshang Sensing Technology Co.,Ltd. Registration number: Y2023980072251 |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240624 Address after: 200135, Room 1104, Building 1, No. 2399 Zhangyang Road, Pudong New Area, Shanghai Patentee after: Shanghai langshang Sensing Technology Co.,Ltd. Country or region after: China Address before: 200120, room 428, 509 Dongfang Road, Shanghai, Pudong New Area Patentee before: Shanghai langshang Sensing Technology Co.,Ltd. Country or region before: China Patentee before: Zhang Zongyong |