[go: up one dir, main page]

CN104195282A - Zero-turriform-hairline control method of 35MnBM for engineering machinery - Google Patents

Zero-turriform-hairline control method of 35MnBM for engineering machinery Download PDF

Info

Publication number
CN104195282A
CN104195282A CN201410405428.4A CN201410405428A CN104195282A CN 104195282 A CN104195282 A CN 104195282A CN 201410405428 A CN201410405428 A CN 201410405428A CN 104195282 A CN104195282 A CN 104195282A
Authority
CN
China
Prior art keywords
hairline
turriform
zero
35mnbm
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410405428.4A
Other languages
Chinese (zh)
Other versions
CN104195282B (en
Inventor
朱林林
信霖
霍方兵
陈健
蒋伟光
张刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiwang Metal Technology Co ltd
Original Assignee
Shandong Xiwang Special Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Xiwang Special Steel Co Ltd filed Critical Shandong Xiwang Special Steel Co Ltd
Priority to CN201410405428.4A priority Critical patent/CN104195282B/en
Publication of CN104195282A publication Critical patent/CN104195282A/en
Application granted granted Critical
Publication of CN104195282B publication Critical patent/CN104195282B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Steel In Its Molten State (AREA)

Abstract

The invention belongs to the technical field of steelmaking, and particularly relates to a zero-turriform-hairline control method of 35MnBM for engineering machinery. The invention aims to improve the internal quality of the 35MnBM for engineering machinery, thereby achieving the goal of zero turriform hairline. A molten steel ultrapurity control technique is adopted in the steelmaking process, and a large compression ratio and high-temperature hydrogen diffusion slow cooling technique is adopted in the steel rolling process, so that the contents of inclusions and gas in the steel achieve the expected goals, thereby implementing zero turriform hairline of the finished product and ensuring the workability of the product.

Description

35MnBM zero turriform hairline control method for engineering machinery
Technical field
The invention belongs to the technical field of steel-making, be specially engineering machinery 35MnBM zero turriform hairline control method.
Background technology
Turriform hairline is mainly that A in steel, C type impurity and loose, gas content (are mainly H 2produce hydrogen embrittlement) etc. in the machining deformation process of steel, be extended along forging rolling direction due to.
Steel for engineering machinery requires very large ratio of forging reduction, reaches as high as 1/4 forging and stamping, therefore required steel has been proposed to very strict requirement, and how many turriform hairlines directly affects the heat forged performance of steel.Hairline is seriously endangering the mechanical property of steel, particularly fatigue strength etc., and quantity, size and distribution for the manufacture of the steel of important parts to hairline have strict restriction.Therefore, for the origin cause of formation of turriform hairline and controlled by Optimization Technology, become to eliminate turriform hairline the emphasis of studying in industry.
Summary of the invention
The object of the invention is to solve the internal soundness of engineering type 35MnBM, to reach the object of zero turriform hairline.Steelmaking process adopts the ultrapure cleanliness control techniques of molten steel, rolling process adopts large compression ratio and high temperature hydrogen diffusion slow cooling technology, make steel inclusion and gas content reach the object of expection, thereby realized zero turriform hairline of finished product, guaranteed the processing characteristics of product.
Technical scheme of the present invention is:
35MnBM zero turriform hairline control method for engineering machinery, concrete steps are as follows:
(1): fully carry out the baking of former auxiliary material, iron alloy, reduce external hydrogen source;
Tundish is toasted, adopt the baking time of 6-8 hour, storing temperature 1000-1200 DEG C, guarantees after baking of tundish that temperature is controlled at and is greater than 1100 DEG C; Adopt box layering roaster to toast insulating covering agent and covering slag, storing temperature is 200-300 DEG C, baking time 3-4 hour; Adopt alloy baking stove to toast for iron alloy, storing temperature is controlled at 300-500 DEG C, baking time 4-6 hour; Reach the object of removing moisture by aforesaid operations, thereby effectively reduce external hydrogen source;
(2): reasonably LF slagging regime, coordinate sufficient low blowing argon gas to stir and add the enough soft blow time, guarantee the abundant floating of inclusion; VD vacuum refining furnace is created super subnormal ambient, further carry out degassed with go to be mingled with processing;
After Converter, carry out deep deoxidation by the aluminium ingot that adds purity >=99%; LF refining process adopts high alkalinity slag system in 4-6, and deoxidation, desulfurization operations are carried out in the large quantity of slag operation of 1-1.2 ton; Low blowing argon gas stirs and adds soft blow time >=20 minute;
VD vacuum refinement process vacuum tightness≤66.5Pa, and keep vacuum hold-time of 10-15 minute;
(3): the cast of casting process whole process protection, low overheat, the casting of permanent pulling rate, and coordinate first and end induction stirring, and reduce strand column crystal rate, improve center equiaxial crystal ratio, loosen and segregation effectively to reduce strand;
Casting process sfgd.: adopt large bag long nozzle and submerged nozzle to carry out protective casting; Adopt double-layer tundish covering agent and special crystallizer covering slag to carry out molten steel covering protection, can effectively prevent on the one hand the secondary oxidation of molten steel, can play on the other hand the effect of further dross inclusion adsorption;
The rational molten steel overheat of casting process control, in the be controlled at≤scope of 30 DEG C, and coordinates permanent pulling rate operation, reduces the fluctuation of molten steel face, stablizes slab quality; By adopting M-EMS and F-EMS first and last to coordinate induction stirring, reduce the generation of segregation;
(4): steel-making, rolling process adopt high temperature hydrogen diffusion slow cooling technology, further reduce gas content;
According to hydrogen diffusion temperature interval, ensure that in time strand, stocking enter to cheat slow cooling on hydrogen diffusion temperature, guarantee the abundant diffusion of hydrogen, the entering to cheat slow cooling temperature and should be controlled at more than 450 DEG C of strand and stocking, and when temperature was reduced to before 100 DEG C, do not allow hole.
Feature of the present invention also has:
In described step (2), the soft blow time is 20-40 minute, guarantees the abundant floating of inclusion.
In described step (2), VD vacuum refinement process vacuum tightness is 66.5-20Pa, and keeps the vacuum hold-time of 10-15 minute, reaches the further degassed object with going to be mingled with.
In described step (3), the rational molten steel overheat of casting process control, is controlled in the scope of 15-30 DEG C.
In described step (4), the entering to cheat slow cooling temperature and should be controlled at 450-560 DEG C of strand and stocking; As preferably, the entering to cheat slow cooling temperature and should be controlled at 500 DEG C of strand and stocking.
In described step (4), slow cooling to the temperature that enters to cheat of strand and stocking is reduced to 80-100 DEG C and has started hole, and as preferably, slow cooling to the temperature that enters to cheat of strand and stocking is reduced to 90 DEG C and has started to cheat.
Beneficial effect of the present invention is:
(1) product through mountain push away, Jilong, Jinan forges on probationly, and through oversampling magnetic-particle inspection, product flawless exists, product qualification rate reaching 100%.
(2) product, through national steel products Quality Supervision and Inspection Center, the inspection of Shan Tui clinical laboratory, all exists without turriform hairline.
Following is that the part of national steel products Quality Supervision and Inspection Center detects data
Trade mark 35MnBM, specification (diameter) 80mm.
1. chemical composition is in table 1.
Table 1
2. macrostructure
0.5 grade of General Loosen, 1.0 grades of center porosities, 0.5 grade of pattern segregation, 0 grade of general spot segregation, 0 grade of edge spot segregation.
3. turriform hairline
3 ladders are for finding hairline.
4. non-metallic inclusion (level)
Category-A: be carefully 0.5
Be slightly 0
Category-B: be carefully 1.0
Be slightly 0
C class: be carefully 0
Be slightly 0
D class: be carefully 1.0
Be slightly 0
DS class: 0.
5. grain fineness number (level) 7.0.
6. decarburized layer deepness 0.628mm.
7. hardening capacity (HRC) J1.5:55.5; J13:49.8; J19:39.6.Hardening capacity heat treating regime requires: 900 DEG C of normalizings; End quenching temperature: 870 DEG C.
Maximum nitride size (μ m) 11.17.
Embodiment
Below by specific embodiment, technical scheme of the present invention is described in detail.
embodiment 1
35MnBM zero turriform hairline control method for engineering machinery, concrete steps are as follows:
(1): fully carry out the baking of former auxiliary material, iron alloy, reduce external hydrogen source;
Tundish is toasted, adopt the baking time of 6 hours, 1200 DEG C of storing temperatures, guarantee after baking of tundish that temperature is controlled at and are greater than 1100 DEG C; Adopt box layering roaster to toast insulating covering agent and covering slag, storing temperature is 200 DEG C, baking time 4 hours; Adopt alloy baking stove to toast for iron alloy, storing temperature is controlled at 300 DEG C, baking time 6 hours; Reach the object of removing moisture by aforesaid operations, thereby effectively reduce external hydrogen source;
(2): reasonably LF slagging regime, coordinate sufficient low blowing argon gas to stir and add the enough soft blow time, guarantee the abundant floating of inclusion; VD vacuum refining furnace is created super subnormal ambient, further carry out degassed with go to be mingled with processing;
After Converter by adding enough aluminium ingots (purity >=99%) to carry out deep deoxidation; LF refining process adopts high alkalinity slag system in 4-6, and deoxidation, desulfurization operations are carried out in the large quantity of slag operation of 1-1.2 ton; Guaranteed the abundant floating of inclusion by 20 minutes sufficient soft blow time;
VD vacuum refinement process surpasses subnormal ambient by creation, and vacuum tightness 20Pa coordinates the vacuum hold-time of 10-15 minute, reaches the further degassed object with going to be mingled with;
(3): casting process whole process protection is poured into a mould, low overheat, the casting of permanent pulling rate, and coordinate first and end induction stirring, and reduce strand column crystal rate, improve center equiaxial crystal ratio, loosen and segregation effectively to reduce thin strand;
Casting process sfgd.: adopt large bag long nozzle and submerged nozzle to carry out protective casting; Adopt double-layer tundish covering agent and special crystallizer covering slag to carry out molten steel covering protection, can effectively prevent on the one hand the secondary oxidation of molten steel, can play on the other hand the effect of further dross inclusion adsorption.
The rational molten steel overheat of casting process control, is controlled in the scope of 30 DEG C, and coordinates permanent pulling rate operation, reduces the fluctuation of molten steel face, stablizes slab quality.By adopting M-EMS and F-EMS first and last to coordinate induction stirring, reduce the generation of segregation.
(4): steel-making, rolling process adopt high temperature hydrogen diffusion slow cooling technology, further reduce gas content;
Root hydrogen diffusion temperature interval, ensures that strand, stocking enter to cheat slow cooling on hydrogen diffusion temperature, guarantee the abundant diffusion of hydrogen in time.Strand and become a useful person enter to cheat slow cooling temperature and should be controlled at 560 DEG C, and be reduced to before 80 DEG C when temperature, do not allowed to cheat.
embodiment 2
35MnBM zero turriform hairline control method for engineering machinery, concrete steps are as follows:
(1): fully carry out the baking of former auxiliary material, iron alloy, reduce external hydrogen source;
Tundish is toasted, adopt the baking time of 8 hours, 1100 DEG C of storing temperatures, guarantee after baking of tundish that temperature is controlled at and are greater than 1100 DEG C; Adopt box layering roaster to toast insulating covering agent and covering slag, storing temperature is 300 DEG C, baking time 3 hours; Adopt alloy baking stove to toast for iron alloy, storing temperature is controlled at 500 DEG C, baking time 4 hours; Reach the object of removing moisture by aforesaid operations, thereby effectively reduce external hydrogen source;
(2): reasonably LF slagging regime, coordinate sufficient low blowing argon gas to stir and add the enough soft blow time, guarantee the abundant floating of inclusion; VD vacuum refining furnace is created super subnormal ambient, further carry out degassed with go to be mingled with processing;
After Converter by adding enough aluminium ingots (purity >=99%) to carry out deep deoxidation; LF refining process adopts high alkalinity slag system in 4-6, and deoxidation, desulfurization operations are carried out in the large quantity of slag operation of 1-1.2 ton; Guaranteed the abundant floating of inclusion by 40 minutes sufficient soft blow time;
VD vacuum refinement process surpasses subnormal ambient by creation, and vacuum tightness 66.5Pa coordinates the vacuum hold-time of 10-15 minute, reaches the further degassed object with going to be mingled with;
(3): the cast of casting process whole process protection, low overheat, the casting of permanent pulling rate, and coordinate first and end induction stirring, and reduce strand column crystal rate, improve center equiaxial crystal ratio, loosen and segregation effectively to reduce strand;
Casting process sfgd.: adopt large bag long nozzle and submerged nozzle to carry out protective casting; Adopt double-layer tundish covering agent and special crystallizer covering slag to carry out molten steel covering protection, can effectively prevent on the one hand the secondary oxidation of molten steel, can play on the other hand the effect of further dross inclusion adsorption.
The rational molten steel overheat of casting process control, is controlled in the scope of 15 DEG C, and coordinates permanent pulling rate operation, reduces the fluctuation of molten steel face, stablizes slab quality.By adopting M-EMS and F-EMS first and last to coordinate induction stirring, reduce the generation of segregation.
(4): steel-making, rolling process adopt high temperature hydrogen diffusion slow cooling technology, further reduce gas content;
Root hydrogen diffusion temperature interval, ensures that strand, stocking enter to cheat slow cooling on hydrogen diffusion temperature, guarantee the abundant diffusion of hydrogen in time.Strand and become a useful person enter to cheat slow cooling temperature and should be controlled at more than 450 DEG C, and be reduced to before 100 DEG C when temperature, do not allowed to cheat.

Claims (8)

1. 35MnBM zero turriform hairline control method for engineering machinery, concrete steps are as follows:
(1): fully carry out the baking of former auxiliary material, iron alloy, reduce external hydrogen source;
Tundish is toasted, adopt the baking time of 6-8 hour, storing temperature 1000-1200 DEG C, guarantees after baking of tundish that temperature is controlled at and is greater than 1100 DEG C; Adopt box layering roaster to toast insulating covering agent and covering slag, storing temperature is 200-300 DEG C, baking time 3-4 hour; Adopt alloy baking stove to toast for iron alloy, storing temperature is controlled at 300-500 DEG C, baking time 4-6 hour;
(2): reasonably LF slagging regime, coordinate sufficient low blowing argon gas to stir and add the enough soft blow time, guarantee the abundant floating of inclusion; VD vacuum refining furnace is created super subnormal ambient, further carry out degassed with go to be mingled with processing;
After Converter, carry out deep deoxidation by the aluminium ingot that adds purity >=99%; LF refining process adopts high alkalinity slag system in 4-6, and deoxidation, desulfurization operations are carried out in the large quantity of slag operation of 1-1.2 ton; Low blowing argon gas stirs and adds soft blow time >=20 minute;
VD vacuum refinement process vacuum tightness≤66.5Pa, and keep vacuum hold-time of 10-15 minute;
(3): the cast of casting process whole process protection, low overheat, the casting of permanent pulling rate, and coordinate first and end induction stirring, and reduce strand column crystal rate, improve center equiaxial crystal ratio, loosen and segregation effectively to reduce strand;
Casting process sfgd.: adopt large bag long nozzle and submerged nozzle to carry out protective casting; Adopt double-layer tundish covering agent and special crystallizer covering slag to carry out molten steel covering protection;
The rational molten steel overheat of casting process control, in the be controlled at≤scope of 30 DEG C, and coordinates permanent pulling rate operation, by adopting M-EMS and F-EMS first and last to coordinate induction stirring;
(4): steel-making, rolling process adopt high temperature hydrogen diffusion slow cooling technology, further reduce gas content;
According to hydrogen diffusion temperature interval, ensure in time entering to cheat slow cooling temperature and should being controlled at more than 450 DEG C of strand and stocking, and be reduced to before 100 DEG C when temperature, do not allow to cheat.
2. 35MnBM zero turriform hairline control method for engineering machinery according to claim 1, its feature is as follows:
In described step (2), the soft blow time is 20-40 minute.
3. 35MnBM zero turriform hairline control method for engineering machinery according to claim 1, its feature is as follows:
In described step (2), VD vacuum refinement process vacuum tightness is 66.5-20Pa, and keeps the vacuum hold-time of 10-15 minute.
4. 35MnBM zero turriform hairline control method for engineering machinery according to claim 1, its feature is as follows:
In described step (3), the rational molten steel overheat of casting process control, is controlled in the scope of 15-30 DEG C.
5. 35MnBM zero turriform hairline control method for engineering machinery according to claim 1, its feature is as follows:
In described step (4), the entering to cheat slow cooling temperature and should be controlled at 450-560 DEG C of strand and stocking.
6. 35MnBM zero turriform hairline control method for engineering machinery according to claim 1, its feature is as follows:
In described step (4), strand and stocking enter to cheat slow cooling to temperature be reduced to 80-100 DEG C started hole.
7. 35MnBM zero turriform hairline control method for engineering machinery according to claim 5, its feature is as follows:
In described step (4), the entering to cheat slow cooling temperature and should be controlled at 500 DEG C of strand and stocking.
8. 35MnBM zero turriform hairline control method for engineering machinery according to claim 6, its feature is as follows:
In described step (4), strand and stocking enter to cheat slow cooling to temperature be reduced to 90 DEG C started hole.
CN201410405428.4A 2014-08-18 2014-08-18 Zero-turriform-hairline control method of 35MnBM for engineering machinery Active CN104195282B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410405428.4A CN104195282B (en) 2014-08-18 2014-08-18 Zero-turriform-hairline control method of 35MnBM for engineering machinery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410405428.4A CN104195282B (en) 2014-08-18 2014-08-18 Zero-turriform-hairline control method of 35MnBM for engineering machinery

Publications (2)

Publication Number Publication Date
CN104195282A true CN104195282A (en) 2014-12-10
CN104195282B CN104195282B (en) 2017-01-25

Family

ID=52080644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410405428.4A Active CN104195282B (en) 2014-08-18 2014-08-18 Zero-turriform-hairline control method of 35MnBM for engineering machinery

Country Status (1)

Country Link
CN (1) CN104195282B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105177442A (en) * 2015-08-19 2015-12-23 山东西王特钢有限公司 Low-alloy high-strength steel billet and manufacturing method thereof
CN108998725A (en) * 2018-07-17 2018-12-14 石家庄钢铁有限责任公司 Track link rail 35MnBM steel and preparation method thereof
CN109082500A (en) * 2018-08-28 2018-12-25 包头钢铁(集团)有限责任公司 The control method of rail hydrogen content

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101654761A (en) * 2009-05-25 2010-02-24 莱芜钢铁股份有限公司 Carbon-manganese composite microalloyed steel for engineering machinery and preparation method thereof
CN103952640A (en) * 2014-04-26 2014-07-30 广东韶钢松山股份有限公司 35MnB steel and preparation method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101654761A (en) * 2009-05-25 2010-02-24 莱芜钢铁股份有限公司 Carbon-manganese composite microalloyed steel for engineering machinery and preparation method thereof
CN103952640A (en) * 2014-04-26 2014-07-30 广东韶钢松山股份有限公司 35MnB steel and preparation method thereof

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
俞海明: "《转炉钢水的炉外精炼技术》", 31 August 2011 *
周彦等: "35MnBH工程机械用钢试制", 《包钢科技》 *
王新江: "《现代电炉炼钢生产技术手册》", 31 March 2009 *
马传庆: "工程机械履带用钢的研制", 《特钢技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105177442A (en) * 2015-08-19 2015-12-23 山东西王特钢有限公司 Low-alloy high-strength steel billet and manufacturing method thereof
CN108998725A (en) * 2018-07-17 2018-12-14 石家庄钢铁有限责任公司 Track link rail 35MnBM steel and preparation method thereof
CN109082500A (en) * 2018-08-28 2018-12-25 包头钢铁(集团)有限责任公司 The control method of rail hydrogen content

Also Published As

Publication number Publication date
CN104195282B (en) 2017-01-25

Similar Documents

Publication Publication Date Title
CN105861951B (en) Nickel and stainless steel super large-scale continuous casting billet manufacture method
CN104561772B (en) A kind of 130mm~150mm thickness ultralow temperature steel plate and its production method
CN101549353B (en) Method for producing low-alloy large-size square steel by continuous casting and rolling
CN105908080B (en) A kind of ocean platform potassium steel and its continuous casting steel billet preparation method
CN105177215A (en) Efficient production process of high aluminum-alloy-content structure round steel
CN102816979A (en) Production method of low-carbon sulfur series free-cutting steel continuous casting billet
CN105458205B (en) The production method of high nickel steel Gr.8 continuous cast round billets
CN105506454B (en) 60~80mm of one kind thickness low cost Q460GJE Z35 steel plates and its production method
CN102021490A (en) X12CrMoWVNbN10-1-1 high-temperature structural steel and production method thereof
CN114871397A (en) High-quality steel wire rod for cold heading and preparation method thereof
CN111041352B (en) External refining production method of wire rod for cutting diamond wire
CN103103307B (en) Method for producing steel for low-nitrogen stranded wire by use of non-vacuum process of converter
CN104212934A (en) Control method for titanium nitride inclusion of gear steel bar material
CN106086595A (en) A kind of it is prevented effectively from the production technology that marine anchor chain round steel cracks
CN105734401A (en) Hydropower low-crack-sensitivity SX780CF steel plate with thickness of 80-150mm and production method thereof
CN105537549A (en) Production method of continuous casting round billet of seamless steel tube steel at low temperature of minus 100 DEG C
CN102776443B (en) 420MPa-level low-alloy high-intensity ultra-thick steel plate and manufacturing method thereof
CN108893682B (en) Die steel billet and preparation method thereof
CN105132616B (en) Method for preventing surface of flange steel from cracking
CN104018058A (en) Control method of component and surface quality of Fe-Mn alloy electroslag remelting ingot
CN104195282A (en) Zero-turriform-hairline control method of 35MnBM for engineering machinery
CN109868415B (en) Smelting method of low-sulfur low-boron pipeline steel
CN113846263B (en) High-toughness heat-resistant steel without delta ferrite and preparation method thereof
CN109825663A (en) A kind of fine processing method of high-performance steel material
CN102051439B (en) Method for smelting high aluminum steel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: West Industrial Park 256209 Shandong province Binzhou city Zouping County

Patentee after: XIWANG METAL TECHNOLOGY Co.,Ltd.

Address before: West Industrial Park 256209 Shandong province Binzhou city Zouping County

Patentee before: SHANDONG XIWANG SPECIAL STEEL Co.,Ltd.

CP01 Change in the name or title of a patent holder
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Control method of 35MnBM zero tower hairline for construction machinery

Effective date of registration: 20211227

Granted publication date: 20170125

Pledgee: Xiwang Group Finance Co.,Ltd.

Pledgor: XIWANG METAL TECHNOLOGY Co.,Ltd.

Registration number: Y2021980016144

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220711

Granted publication date: 20170125

Pledgee: Xiwang Group Finance Co.,Ltd.

Pledgor: XIWANG METAL TECHNOLOGY Co.,Ltd.

Registration number: Y2021980016144

PC01 Cancellation of the registration of the contract for pledge of patent right