CN104127981A - Fire fighting system for super high-rise cyclic relay type construction - Google Patents
Fire fighting system for super high-rise cyclic relay type construction Download PDFInfo
- Publication number
- CN104127981A CN104127981A CN201410388322.8A CN201410388322A CN104127981A CN 104127981 A CN104127981 A CN 104127981A CN 201410388322 A CN201410388322 A CN 201410388322A CN 104127981 A CN104127981 A CN 104127981A
- Authority
- CN
- China
- Prior art keywords
- fire
- water
- super high
- fighting system
- rise
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 33
- 125000004122 cyclic group Chemical group 0.000 title abstract 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 80
- 238000005086 pumping Methods 0.000 claims description 21
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000004519 manufacturing process Methods 0.000 claims description 5
- 230000002265 prevention Effects 0.000 claims description 3
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000007599 discharging Methods 0.000 abstract 1
- 239000010865 sewage Substances 0.000 abstract 1
- 239000008235 industrial water Substances 0.000 description 7
- 239000011449 brick Substances 0.000 description 2
- 238000005034 decoration Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 239000003643 water by type Substances 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000010348 incorporation Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
Landscapes
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
Abstract
The invention relates to a fire fighting facility in the field of building construction and in particular relates to a fire fighting system for super high-rise cyclic relay type construction. The fire fighting system for the super high-rise cyclic relay type construction comprises outdoor fire water supply and indoor fire water supply, wherein the indoor fire water supply is arranged in a super high-rise building under construction and comprises a base pump station (1) arranged on a first floor and a sub pump station (2) arranged in a reinforced layer in each stage, and the sub pump stations are communicated with each other by virtue of a temporary fire fighting vertical pipe (3); the base pump station (1) is connected with a municipal pipe network and is communicated with the outdoor fire water supply and the indoor sub pump station (2) in each stage. The fire fighting system for the super high-rise cyclic relay type construction adopts multiple fire water pumps and multiple water tanks for supplying water in a relaying way, temporary water is supplied to a top layer, water for different super high-rise constructions, fire water and water for discharging sewage are supplied, and good comprehensive benefit is obtained.
Description
Technical field
The present invention relates to a kind of fire fighting device of the realm of building construction, particularly a kind of being applied in the interim fire-fighting system of building in high-rise building.
Background technology
Because tying system and not yet come into operation building the formal fire of high-rise building, more there is no automatic alarm and water sprinkler system, fire compartment has not yet been separated, so its fire-proof function is very weak.Meanwhile, along with the increase of high-rise building height, construction industrial water has difficulties equally.
Summary of the invention
For problem above, the requirement of integrated construction industrial water of the present invention and fire demand water, has invented the interim fire-fighting system of this continuous relay formula.
Concrete solution is: a kind of Super High continuous relay formula construction fire-fighting system, comprise outdoor fire fighting feedwater and interior fire supply, it is characterized in that, this Super High continuous relay formula construction is arranged on and is building on high-rise building by fire-fighting system, wherein interior fire supply is located at and builds in high-rise building, comprise and be arranged in the base pump station of the first floor and be arranged in point pumping plant in enhancement Layers at different levels, each point of pumping plant is connected by interim standpipe; Described base pump station connects city planting ductwork and is connected with outdoor fire fighting feedwater and indoor at different levels points of pumping plants.
Further, described point of pumping plant comprises fire water box and water pump, and fire water box adopts two groups of 1.5m × 1.5m × 3m welded steel plates and is interconnected, and fire water box two ends are erected on beam, and bearing is set.
Further, described interim standpipe is arranged in position, elevator hall, is divided into up water supply riser, descending fire water-supply standpipe, and up water supply riser is communicated with the fire water box of adjacent layer fraction pumping plant.
Further, described up water supply riser arranges two.
Further, described fire water box is also connected with descending production water supply riser.
Further, a place is set is connected with descending fire water-supply standpipe, the fire hydrant that bore is DN65mm building in high-rise building every layer.
Further, the main of described connection base pump station and municipal water supply is DN100mm steel pipe.
Further, the fire hydrant that is circular layout in building body outside, interval is not more than 60m, and each fire hydrant basically forms annular fire prevention network.
Beneficial effect: the present invention is applied in building in high-rise building, it is the interim fire-fighting system of a kind of Super High, it adopts stage by stage, with different levels set-up mode, and with traditional approach comparison, fire-fighting is safer, operate simpler, owing to adopting water supply by stage, fire extinguisher canvas hose internal pressure is less, can adopt the welded still pipe that cost is lower to make processing, and water pump also can adopt other common high-level structure to have enough to meet the need used water pump, run on maintenance cost and significantly reduce; Multistage fire pump and multistage water tank water relay, be fed to top layer by interim water, meets the supply of different Super High construction waters, fire demand water and blowdown water, has good comprehensive benefit.
Brief description of the drawings
Fig. 1 is that Super High continuous relay formula construction fire-fighting system facade is arranged schematic diagram;
In figure, 1-base pump station; 2-divides pumping plant; 21-fire water box; 22-water pump; The interim standpipe of 3-; The up water supply riser of 31-; The descending fire water-supply standpipe of 32-; The descending production water supply riser of 4-; 5-main.
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described.
The interim fire-fighting system incorporation engineering of Super High structure construction actual needs, determines the standpipe overall length of each subregion and selects water pump lift, and then carrying out the integral arrangement of fire water-supply pipe network, optimizes the design of interim fire-fighting system.
As shown in Figure 1, Super High continuous relay formula construction fire-fighting system of the present invention, be arranged on and building on high-rise building, comprise outdoor fire fighting feedwater and interior fire supply, interior fire supply is located to be built in high-rise building, comprise and be arranged in the base pump station 1 of the first floor and be arranged in point pumping plant 2 in enhancement Layers at different levels, each point of pumping plant is connected by interim standpipe 3; Base pump station 1 connects city planting ductwork and is connected with outdoor fire fighting feedwater and indoor at different levels points of pumping plants 2.
For different high-rise buildings, n level pumping plant is set, lay respectively at the first floor and the first enhancement Layer, the second enhancement Layer, n enhancement Layer, first floor pumping plant is responsible for fire-fighting and the industrial water of the first floor to the first enhancement Layer, the first enhancement Layer pumping plant is responsible for fire-fighting and the industrial water of the first enhancement Layer to the second enhancement Layer, the second enhancement Layer pumping plant is responsible for fire-fighting and the industrial water of the second enhancement Layer to the n enhancement Layer, and n enhancement Layer pumping plant is responsible for fire-fighting and the industrial water of n enhancement Layer to top layer.By the requirement of calculative determination fire pump lift, finally select the water pump of suitable lift.
Divide pumping plant 2 to comprise fire water box 21 and water pump 22, fire water box 21 adopts two groups of 1.5m × 1.5m × 3m welded steel plates and is interconnected, and fire water box two ends are erected on beam, and bearing is set, and ensures that freely-supported supports, and bearing can adopt builds 100 high brick beam settings by laying bricks or stones.
When structure construction, interim standpipe 3 is arranged in position, elevator hall, is divided into up water supply riser 31, descending fire water-supply standpipe 32, and up water supply riser is communicated with the fire water box of adjacent layer fraction pumping plant.Normal water supply during for guarantee maintenance, up water supply riser 31 arranges two.Fire water box is also connected with descending production water supply riser 4, ensures industrial water.When low district supplies water, interim standpipe and water tank are arranged in to peripheral position, to reduce the impact of later stage on finishing.
A place is set is connected with descending fire water-supply standpipe 32, the fire hydrant that bore is DN65mm building in high-rise building every layer.On-the-spot first layer plane production, life and fire water-supply access from city planting ductwork, along the buried laying of spot plane construction road.Being communicated with base pump station and municipal water supply main is DN100mm steel pipe.Multiple SX100-1.6 type fire hydrants that are circular layout in building body outside, interval is not more than 60m, and each fire hydrant basically forms annular fire prevention network.
By fire pump, fire water is suppressed upstairs, the enhancement Layer position of integrated structure design, arranges 2 grades of fire water boxs and water pump at enhancement Layer, and classification is suppressed interim water is fed to structural top and roofing position.
The present invention adopts multistage fire pump and multistage water tank water relay, and interim water is fed to top layer, meets the supply of different Super High construction waters, fire demand water and blowdown water.Carry out in turn with main structure construction, stage by stage, with different levels setting, complete successively each subregion pipe network, top pipe network is still with structure follow-up simultaneously, guarantees that interim fire-fighting system accomplishes comprehensive covering of each floor, each construction stage.
During structure construction, ensure that standpipe extends the highest scope of operation, automatic control system ensures storing water in water tank amount, guarantees the reliability of fire-disaster emergency.Meanwhile, in interim fire-fighting system horizontal layout, during structure construction, be arranged in Core Walls Structure position, guarantee operation side fire fighting supply, during decoration construction, be arranged in peripheral Administrative Area, both guaranteed fire fighting supply, do not affect again decoration construction.The facade of interim fire-fighting system arranges, in guarantee, the each work layer in low, high district supplies water uninterruptedly, can meet fire demand water requirement completely.
The present invention also can arrange automatic control system circuit, controls fire water box water level bound, adopts dual control management in conjunction with artificial inspection, guarantees water yield abundance in fire water box, meets fire-fighting needs.
Claims (8)
1. a Super High continuous relay formula construction fire-fighting system, comprise outdoor fire fighting feedwater and interior fire supply, it is characterized in that, this Super High continuous relay formula construction is arranged on and is building on high-rise building by fire-fighting system, wherein interior fire supply is located at and builds in high-rise building, comprise and be arranged in the base pump station (1) of the first floor and be arranged in point pumping plant (2) in enhancement Layers at different levels, each point of pumping plant is connected by interim standpipe (3); Described base pump station (1) connects city planting ductwork and is connected with outdoor fire fighting feedwater and indoor at different levels points of pumping plants (2).
2. Super High continuous relay formula construction fire-fighting system according to claim 1, it is characterized in that, described point of pumping plant (2) comprises fire water box (21) and water pump (22), fire water box (21) adopts two groups of 1.5m × 1.5m × 3m welded steel plates and is interconnected, fire water box two ends are erected on beam, and bearing is set.
3. Super High continuous relay formula construction fire-fighting system according to claim 1, it is characterized in that, described interim standpipe (3) is arranged in position, elevator hall, be divided into up water supply riser (31), descending fire water-supply standpipe (32), up water supply riser is communicated with the fire water box of adjacent layer fraction pumping plant.
4. Super High continuous relay formula construction fire-fighting system according to claim 2, is characterized in that, described up water supply riser (31) arranges two.
5. Super High continuous relay formula construction fire-fighting system according to claim 2, is characterized in that, described fire water box is also connected with descending production water supply riser (4).
6. Super High continuous relay formula construction fire-fighting system according to claim 1, is characterized in that, a place is set is connected with descending fire water-supply standpipe (32), the fire hydrant that bore is DN65mm building in high-rise building every layer.
7. Super High continuous relay formula construction fire-fighting system according to claim 1, is characterized in that, the main of described connection base pump station and municipal water supply is DN100mm steel pipe.
8. Super High continuous relay formula construction fire-fighting system according to claim 1, is characterized in that, the fire hydrant that is circular layout in building body outside, and interval is not more than 60m, and each fire hydrant basically forms annular fire prevention network.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410388322.8A CN104127981A (en) | 2014-08-08 | 2014-08-08 | Fire fighting system for super high-rise cyclic relay type construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410388322.8A CN104127981A (en) | 2014-08-08 | 2014-08-08 | Fire fighting system for super high-rise cyclic relay type construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104127981A true CN104127981A (en) | 2014-11-05 |
Family
ID=51800993
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410388322.8A Pending CN104127981A (en) | 2014-08-08 | 2014-08-08 | Fire fighting system for super high-rise cyclic relay type construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104127981A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104958856A (en) * | 2015-07-29 | 2015-10-07 | 盛玉伟 | Temporary fire-fighting water supply system and method in building under construction |
CN108532676A (en) * | 2017-03-02 | 2018-09-14 | 中国中元国际工程有限公司 | A kind of fire fighting of super high-rise building waterworks |
CN109316698A (en) * | 2018-11-13 | 2019-02-12 | 梁勇旗 | A kind of double-hole tunnel two-way subregion relay moisturizing pipeline dry type water fire fighting system |
CN109339850A (en) * | 2018-11-13 | 2019-02-15 | 梁勇旗 | A kind of list hole tunnel single channel subregion relay moisturizing pipeline dry type water fire fighting system |
CN109432662A (en) * | 2018-11-26 | 2019-03-08 | 中建三局集团有限公司 | Fire fighting water system and its construction method for the construction of super highrise building stage |
CN109529236A (en) * | 2018-11-13 | 2019-03-29 | 梁勇旗 | A kind of tunnel subregion relay moisturizing pipeline dry water fire control system |
CN109529221A (en) * | 2018-11-13 | 2019-03-29 | 梁勇旗 | A kind of tunnel subregion relay moisturizing pipeline dry water fire-fighting method |
CN109811830A (en) * | 2019-03-11 | 2019-05-28 | 中国建筑第四工程局有限公司 | A kind of super high-rise building annular pressure maintaining fire water-supply method and system |
CN109944289A (en) * | 2019-04-08 | 2019-06-28 | 三一汽车制造有限公司 | A kind of high building fire fighting water system |
CN110170125A (en) * | 2019-06-24 | 2019-08-27 | 王芳 | The interim fire-fighting system of super high-rise building in a kind of work progress |
CN111330201A (en) * | 2018-12-18 | 2020-06-26 | 林城宇 | Temporary fire-fighting water system for construction site |
CN111437544A (en) * | 2020-03-02 | 2020-07-24 | 浙江杭可科技股份有限公司 | Fire control drainage system based on cylinder lithium cell safety control |
CN115162466A (en) * | 2022-09-01 | 2022-10-11 | 中建八局第二建设有限公司 | Temporary water supply system for super high-rise building and construction method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202263324U (en) * | 2011-08-25 | 2012-06-06 | 东北大学 | Primary and secondary linear array relay pump system |
CN202387152U (en) * | 2011-11-04 | 2012-08-22 | 霍俊勇 | High-rise relay fire water supply system |
CN203989639U (en) * | 2014-08-08 | 2014-12-10 | 北京建工四建工程建设有限公司 | Super High continuous relay formula construction fire-fighting system |
-
2014
- 2014-08-08 CN CN201410388322.8A patent/CN104127981A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202263324U (en) * | 2011-08-25 | 2012-06-06 | 东北大学 | Primary and secondary linear array relay pump system |
CN202387152U (en) * | 2011-11-04 | 2012-08-22 | 霍俊勇 | High-rise relay fire water supply system |
CN203989639U (en) * | 2014-08-08 | 2014-12-10 | 北京建工四建工程建设有限公司 | Super High continuous relay formula construction fire-fighting system |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104958856A (en) * | 2015-07-29 | 2015-10-07 | 盛玉伟 | Temporary fire-fighting water supply system and method in building under construction |
CN108532676A (en) * | 2017-03-02 | 2018-09-14 | 中国中元国际工程有限公司 | A kind of fire fighting of super high-rise building waterworks |
CN109529236B (en) * | 2018-11-13 | 2021-03-05 | 梁勇旗 | Dry-type water fire control system of tunnel partition relay water replenishing pipeline |
CN109316698A (en) * | 2018-11-13 | 2019-02-12 | 梁勇旗 | A kind of double-hole tunnel two-way subregion relay moisturizing pipeline dry type water fire fighting system |
CN109339850A (en) * | 2018-11-13 | 2019-02-15 | 梁勇旗 | A kind of list hole tunnel single channel subregion relay moisturizing pipeline dry type water fire fighting system |
CN109529236A (en) * | 2018-11-13 | 2019-03-29 | 梁勇旗 | A kind of tunnel subregion relay moisturizing pipeline dry water fire control system |
CN109529221A (en) * | 2018-11-13 | 2019-03-29 | 梁勇旗 | A kind of tunnel subregion relay moisturizing pipeline dry water fire-fighting method |
CN109316698B (en) * | 2018-11-13 | 2023-09-05 | 梁勇旗 | Dry-type water fire-fighting system for double-tunnel double-channel partition relay water supplementing pipeline |
CN109432662A (en) * | 2018-11-26 | 2019-03-08 | 中建三局集团有限公司 | Fire fighting water system and its construction method for the construction of super highrise building stage |
CN109432662B (en) * | 2018-11-26 | 2023-08-01 | 中建三局集团有限公司 | Fire-fighting water system for super high-rise building construction stage and construction method thereof |
CN111330201A (en) * | 2018-12-18 | 2020-06-26 | 林城宇 | Temporary fire-fighting water system for construction site |
CN109811830A (en) * | 2019-03-11 | 2019-05-28 | 中国建筑第四工程局有限公司 | A kind of super high-rise building annular pressure maintaining fire water-supply method and system |
CN109944289A (en) * | 2019-04-08 | 2019-06-28 | 三一汽车制造有限公司 | A kind of high building fire fighting water system |
CN110170125A (en) * | 2019-06-24 | 2019-08-27 | 王芳 | The interim fire-fighting system of super high-rise building in a kind of work progress |
CN111437544A (en) * | 2020-03-02 | 2020-07-24 | 浙江杭可科技股份有限公司 | Fire control drainage system based on cylinder lithium cell safety control |
CN115162466A (en) * | 2022-09-01 | 2022-10-11 | 中建八局第二建设有限公司 | Temporary water supply system for super high-rise building and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104127981A (en) | Fire fighting system for super high-rise cyclic relay type construction | |
CN109432662B (en) | Fire-fighting water system for super high-rise building construction stage and construction method thereof | |
US20180051437A1 (en) | Prefabricated bamboo composite utility tunnel | |
WO2011155992A4 (en) | Lift-slab construction system and method for constructing multi-story buildings using pre-manufactured structures | |
CN210104850U (en) | Fire-fighting water supply system for high-rise building | |
CN103603504A (en) | Method of hoisting super high-rise building electrochemical large-diameter rises along with progress of main structure | |
CN106193310A (en) | The movable dwellings that use steel construction herringbone beam, can move integrally | |
CN104695549A (en) | Rotatable building | |
CN203989639U (en) | Super High continuous relay formula construction fire-fighting system | |
CN105951879B (en) | A kind of comprehensive pipe gallery structure | |
CN208981417U (en) | Indoor fire-fighting water supply system | |
CN104294908A (en) | Intelligent type integrated airtight sewage lifting pump station | |
KR101224271B1 (en) | Fire extinguishing water supply system using branch piping and pressure reducing valve | |
CN203947755U (en) | A kind of large Steel Cantilever trussed construction high-altitude construction first floor steel truss erecting device | |
CN102140819A (en) | Structure for discharging accumulated water from bottom layer of underground three-dimensional (3D) parking garage | |
CN106320432A (en) | Rainwater and wastewater collecting and reusing system | |
CN110219315A (en) | A kind of base pit dewatering and interim waterworks for firefighting integral construction method | |
CN202865922U (en) | Building layering water-supplying system | |
CN207376792U (en) | A kind of basement waterworks for firefighting | |
CN219569070U (en) | Combined fire-fighting water tank | |
CN210658522U (en) | High-rise building construction fire control water supply equipment | |
CN203361319U (en) | Intelligent integrated sewage closed lifting pump station | |
CN104929243A (en) | Movable portable dwelling | |
CN104314311A (en) | Height-adjustable horizontal 360-degree spraying device for construction tower crane | |
CN211114027U (en) | Landscape pool and underground water tank integrated device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20141105 |