CN104124660A - Wiring construction lead wire coil transportation wire barrow - Google Patents
Wiring construction lead wire coil transportation wire barrow Download PDFInfo
- Publication number
- CN104124660A CN104124660A CN201410337994.6A CN201410337994A CN104124660A CN 104124660 A CN104124660 A CN 104124660A CN 201410337994 A CN201410337994 A CN 201410337994A CN 104124660 A CN104124660 A CN 104124660A
- Authority
- CN
- China
- Prior art keywords
- rectangular frame
- wire
- support rod
- pay
- vehicle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 17
- WABPQHHGFIMREM-UHFFFAOYSA-N lead(0) Chemical compound [Pb] WABPQHHGFIMREM-UHFFFAOYSA-N 0.000 title 1
- 238000000034 method Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000009347 mechanical transmission Effects 0.000 description 2
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
一种架线施工导线盘运输放线车,包括运输车、托举装置和张力机,运输车由矩形框架和滚轮组成,滚轮设置于矩形框架上,矩形框架前端中间位置设置有转向轮,矩形框架前端梁的两端位置设置有前犁;托举装置对称设置于矩形框架左右两侧,托举装置由液压杆、线盘轴和支杆组成,液压杆和支杆分别铰接于矩形框架上,液压杆和支杆之间通过转轴连接,支杆上端设置有瓦座,线盘轴两端贯穿瓦座内部;张力机铰接于支杆上端外侧面。
A wire reel transport and pay-off vehicle for wire construction, including a transport vehicle, a lifting device and a tension machine. The transport vehicle is composed of a rectangular frame and rollers. Front plows are installed at both ends of the front beam of the frame; the lifting device is symmetrically arranged on the left and right sides of the rectangular frame, and the lifting device is composed of a hydraulic rod, a reel shaft and a support rod, and the hydraulic rod and the support rod are respectively hinged on the rectangular frame , the hydraulic rod and the support rod are connected by a rotating shaft, the upper end of the support rod is provided with a tile seat, and the two ends of the coil shaft run through the interior of the tile seat; the tension machine is hinged on the outer surface of the upper end of the support rod.
Description
技术领域 technical field
本发明涉及一种电力放线装置,尤其涉及一种架线施工导线盘运输放线车。 The invention relates to an electric power pay-off device, in particular to a wire reel transport pay-off vehicle for wire construction.
背景技术 Background technique
据目前掌握的相关资料,国内有些厂家针对较小吨位的导线盘已经研发生产了相关的导线放线车,设备放线和调整属于机械式传动,例如河北鸿达电力生产的放线车,承载力小、机械传动,不能依靠自身动力实现导线盘的装卸。同时,从目前了解到的相关导线运输设备,现有施工使用的导线盘支架为分体式设计,由左右两个支腿组成,施工时临时安装,自身不携带行走机构,较大部件安装需要使用吊车,人工安装强度较大。 According to the relevant information currently available, some domestic manufacturers have developed and produced related wire pay-off vehicles for smaller-tonnage wire reels. Small force, mechanical transmission, can not rely on its own power to realize the loading and unloading of the wire reel. At the same time, from the relevant wire transportation equipment known so far, the wire reel bracket used in the existing construction is a split design, consisting of two left and right outriggers, which are temporarily installed during construction, and do not carry the walking mechanism itself, and need to be used for larger parts. Crane, manual installation is more intensive.
针对设备放线和调整采用机械式传动的导线放线车,控制精度低,机械冲击大,安全性低,易于损坏,且不能依靠自身动力实现导线盘的装卸,需要使用吊车,费用较高。同时,现有的导线运输设备,其主要共性问题就是设备行走特点的差异,大部分导线放线架由左右支架组成安装,不具有行走功能,另外具有行走功能的放线架,行走轮距太大,不适用特高压重型导线盘的施工作业。 The wire pay-off car with mechanical transmission for equipment release and adjustment has low control accuracy, large mechanical impact, low safety, easy damage, and cannot rely on its own power to load and unload the wire reel. It needs to use a crane, which is expensive. At the same time, the main common problem of the existing wire transportation equipment is the difference in the walking characteristics of the equipment. Most wire pay-off racks are composed of left and right brackets and do not have a walking function. Large, not suitable for construction operations of UHV heavy-duty wire coils.
国外的拖挂式导线放线车行走轮距不能调节,仅仅适用于小吨位导线盘和较宽的路面行驶,使用范围有限。 The wheel base of the foreign trailer-type wire pay-off vehicle cannot be adjusted, and it is only suitable for small-tonnage wire reels and wide roads, and the scope of use is limited.
发明内容 Contents of the invention
针对现有技术存在的缺陷,本发明提供了一种架线施工导线盘运输放线车,能大大降低施工成本,同时提高施工效率。 Aiming at the defects in the prior art, the present invention provides a wire reel transport and pay-off vehicle for wire erection construction, which can greatly reduce the construction cost and improve the construction efficiency at the same time.
具体是技术方案为:一种架线施工导线盘运输放线车,包括运输车、托举装置和张力机,运输车由矩形框架和滚轮组成,滚轮设置于矩形框架上,矩形框架前端中间位置设置有转向轮,矩形框架前端梁的两端位置设置有前犁;托举装置对称设置于矩形框架左右两侧,托举装置由液压杆、线盘轴和支杆组成,液压杆和支杆分别铰接于矩形框架上,液压杆和支杆之间通过转轴连接,支杆上端设置有瓦座,线盘轴两端贯穿瓦座内部;张力机铰接于支杆上端外侧面。 Specifically, the technical solution is: a wire reel transport and pay-off vehicle for wire construction, including a transport vehicle, a lifting device and a tension machine. The transport vehicle is composed of a rectangular frame and rollers. The rollers are arranged on the rectangular frame. Steering wheels are provided, and front plows are provided at both ends of the front beam of the rectangular frame; the lifting device is symmetrically arranged on the left and right sides of the rectangular frame, and the lifting device is composed of a hydraulic rod, a reel shaft and a support rod, and the hydraulic rod and the support rod Respectively hinged on the rectangular frame, the hydraulic rod and the support rod are connected by a rotating shaft, the upper end of the support rod is provided with a tile seat, and the two ends of the coil shaft pass through the interior of the tile seat; the tension machine is hinged on the outer surface of the upper end of the support rod.
所述矩形框架各部分之间为螺栓连接,后端横梁一端与其对应一侧的梁为转轴连接。 The parts of the rectangular frame are connected by bolts, and one end of the rear beam is connected with the beam on the corresponding side by a rotating shaft.
所述前犁与矩形框架为销轴连接。 The front plow is connected with the rectangular frame by a pin shaft.
所述张力机在水平位置时其轴线与瓦座轴线在同一直线上。 When the tension machine is in a horizontal position, its axis is on the same straight line as the axis of the tile seat.
所述转向轮上设置有拖杠。 The steering wheel is provided with a drag bar.
本发明造价成本低,使用方便;运输车通过外力的牵引可通过各种复杂地形且行走稳定;通过托举装置可直接对线盘进行托举操作,降低了对起吊设备的使用率,从而降低施工成本;通过张力机可以实现自动平稳放线操作,降低劳动强度且提高工作效率。 The invention is low in cost and easy to use; the transport vehicle can pass through various complex terrains and walk stably through the traction of external force; the lifting device can directly carry out the lifting operation on the wire reel, which reduces the utilization rate of the lifting equipment, thereby reducing Construction cost; through the tension machine, the automatic and smooth unwinding operation can be realized, which reduces labor intensity and improves work efficiency.
附图说明 Description of drawings
图1为本发明结构示意图; Fig. 1 is a structural representation of the present invention;
图2为图1左视图; Fig. 2 is the left side view of Fig. 1;
图3为本发明托举装置结构示意图; Fig. 3 is a structural schematic diagram of the lifting device of the present invention;
图4为本发明运输车结构示意图。 Fig. 4 is a structural schematic diagram of the transport vehicle of the present invention.
具体实施方式 Detailed ways
如图1和图2所示,一种架线施工导线盘运输放线车,包括运输车、托举装置和张力机1,如图4所示,运输车由矩形框架2和滚轮3组成,滚轮3设置于矩形框架2上,矩形框架2前端中间位置设置有转向轮4,矩形框架2前端梁的两端位置设置有前犁5;托举装置对称设置于矩形框架2左右两侧,如图2和图3所示,托举装置由液压杆6、支杆7和线盘轴8组成,液压杆6和支杆7分别铰接于矩形框架2上,液压杆6和支杆7之间通过转轴连接,支杆7上端设置有瓦座9,瓦座9内侧面设置有轴瓦,线盘轴8两端贯穿瓦座9内部;张力机1铰接于支杆7上端外侧面。 As shown in Figures 1 and 2, a wire reel transport and pay-off vehicle for stringing construction includes a transport vehicle, a lifting device and a tensioner 1. As shown in Figure 4, the transport vehicle is composed of a rectangular frame 2 and rollers 3. The roller 3 is arranged on the rectangular frame 2, the steering wheel 4 is arranged at the middle position of the front end of the rectangular frame 2, and the front plow 5 is arranged at the two ends of the front beam of the rectangular frame 2; the lifting device is symmetrically arranged on the left and right sides of the rectangular frame 2, as As shown in Figures 2 and 3, the lifting device is composed of a hydraulic rod 6, a support rod 7 and a reel shaft 8, and the hydraulic rod 6 and the support rod 7 are respectively hinged on the rectangular frame 2, and between the hydraulic rod 6 and the support rod 7 Connected by a rotating shaft, the upper end of the pole 7 is provided with a tile seat 9, and the inner surface of the tile seat 9 is provided with a bearing bush, and the two ends of the bobbin shaft 8 run through the interior of the tile seat 9;
矩形框架2各部分之间为螺栓连接,容易拆卸,从而方便运输和组装,后端横梁10一端与其对应一侧的梁为转轴连接,在使用时将后端横梁10打开,调整运输车位置使放线盘进入矩形框架2内部,将线盘轴8贯穿于放线盘的中心孔内,调整托举装置将线盘轴8两端放入瓦座9内并固定,液压杆6由油泵11控制,通过液压杆6将放线盘托起,转向轮4上设置有拖杠12,通过拖杠12进行牵引移动;在运输车运动过程中张力机1轴向处于竖直位置,从而降低本发明的整体宽度,提高在移动过程中的通过性,前犁5与矩形框架2为销轴连接,在运输车运动过程中将前犁5抬起。 The parts of the rectangular frame 2 are connected by bolts, which are easy to disassemble, thereby facilitating transportation and assembly. One end of the rear cross beam 10 is connected to the beam on the corresponding side by a rotating shaft. When in use, the rear cross beam 10 is opened, and the position of the transport vehicle is adjusted so that The pay-off reel enters the inside of the rectangular frame 2, inserts the reel shaft 8 through the center hole of the pay-off reel, adjusts the lifting device, puts both ends of the reel shaft 8 into the tile seat 9 and fixes it, and the hydraulic rod 6 is driven by the oil pump 11 control, the pay-off reel is held up by the hydraulic rod 6, the steering wheel 4 is provided with a drag bar 12, and the drag bar 12 is used for traction and movement; during the movement of the transport vehicle, the tension machine 1 is in a vertical position in the axial direction, thereby reducing the cost. The overall width of the invention improves the passability during the moving process, and the front plow 5 is connected with the rectangular frame 2 by a pin shaft, and the front plow 5 is lifted during the movement of the transport vehicle.
在到达放线位置时,将前犁5放置于地面,防止运输车在放线过程中发生位移,旋转张力机1,使张力机1轴向处于水平状态,张力机1在水平位置时其轴线与瓦座9轴线在同一直线上。利用联轴器将张力机1与线盘轴8连接,启动张力机1,张力机1带动放线盘转动进行放线,当放线盘重量过大,由于其巨大的惯性导致转动速度加快时张力机1对其提供制动的力,使放线盘可以始终保持匀速转动,从而达到平稳放线的目的。 When reaching the wire-releasing position, place the front plow 5 on the ground to prevent the transport vehicle from shifting during the wire-releasing process, and rotate the tension machine 1 so that the axis of the tension machine 1 is in a horizontal state. When the tension machine 1 is in a horizontal position, its axis On the same straight line with the tile seat 9 axis. Use a coupling to connect the tension machine 1 with the reel shaft 8, start the tension machine 1, and the tension machine 1 drives the pay-off reel to rotate for pay-off. When the weight of the pay-off reel is too large, the rotation speed is accelerated due to its huge inertia Tension machine 1 provides braking force to it, so that the pay-off reel can always keep rotating at a constant speed, so as to achieve the purpose of smooth pay-off.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410337994.6A CN104124660A (en) | 2014-07-16 | 2014-07-16 | Wiring construction lead wire coil transportation wire barrow |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410337994.6A CN104124660A (en) | 2014-07-16 | 2014-07-16 | Wiring construction lead wire coil transportation wire barrow |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104124660A true CN104124660A (en) | 2014-10-29 |
Family
ID=51769979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410337994.6A Pending CN104124660A (en) | 2014-07-16 | 2014-07-16 | Wiring construction lead wire coil transportation wire barrow |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104124660A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104332901A (en) * | 2014-11-13 | 2015-02-04 | 苏州胜信光电科技有限公司 | Movable cable pay-off rack |
CN109713611A (en) * | 2018-12-21 | 2019-05-03 | 桑坡德 | Equipment is used in a kind of adjustable power cable erection |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102009872A (en) * | 2010-10-15 | 2011-04-13 | 河南通达电缆股份有限公司 | Aluminum-clad steel wire active pay-off and rewinding equipment |
CN202424070U (en) * | 2012-02-15 | 2012-09-05 | 河南电力博大科技有限公司 | Tensioner |
CN203033563U (en) * | 2013-01-23 | 2013-07-03 | 陈斌 | Wire-barrow |
CN103342264A (en) * | 2013-06-18 | 2013-10-09 | 国家电网公司 | Electric paying-off automobile |
CN203562706U (en) * | 2013-10-29 | 2014-04-23 | 国家电网公司 | Wire and cable transport and pay-off vehicle |
CN203624689U (en) * | 2013-11-29 | 2014-06-04 | 国家电网公司 | Lifting wire-barrow |
-
2014
- 2014-07-16 CN CN201410337994.6A patent/CN104124660A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102009872A (en) * | 2010-10-15 | 2011-04-13 | 河南通达电缆股份有限公司 | Aluminum-clad steel wire active pay-off and rewinding equipment |
CN202424070U (en) * | 2012-02-15 | 2012-09-05 | 河南电力博大科技有限公司 | Tensioner |
CN203033563U (en) * | 2013-01-23 | 2013-07-03 | 陈斌 | Wire-barrow |
CN103342264A (en) * | 2013-06-18 | 2013-10-09 | 国家电网公司 | Electric paying-off automobile |
CN203562706U (en) * | 2013-10-29 | 2014-04-23 | 国家电网公司 | Wire and cable transport and pay-off vehicle |
CN203624689U (en) * | 2013-11-29 | 2014-06-04 | 国家电网公司 | Lifting wire-barrow |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104332901A (en) * | 2014-11-13 | 2015-02-04 | 苏州胜信光电科技有限公司 | Movable cable pay-off rack |
CN109713611A (en) * | 2018-12-21 | 2019-05-03 | 桑坡德 | Equipment is used in a kind of adjustable power cable erection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104030172B (en) | Derrick mast mechanism and tower crane | |
CN201339157Y (en) | Portable road paving device | |
CN104727598B (en) | Without avoiding-type simple lifting parking device | |
CN202687622U (en) | Portable power cable and wire pay-off device | |
CN104124660A (en) | Wiring construction lead wire coil transportation wire barrow | |
CN207671388U (en) | Inflation film winder quickly up and down winding apparatus | |
CN104310242B (en) | Three line group tower crane | |
CN103490328A (en) | Multifunctional vehicle special for track construction | |
CN106356767B (en) | Cable reel paying-off device | |
CN203833394U (en) | Labor-saving winding tool flexible in winding and unwinding | |
CN202625429U (en) | Friction type plastic tube winding machine | |
CN103950786A (en) | Locomotive power traction cable contraction and release device | |
CN207330157U (en) | A kind of gravity type cable drum | |
CN103420299B (en) | A kind of cable drum maintenance cable extraction winch | |
CN204760906U (en) | Cable dish pay -off | |
CN204030452U (en) | A kind of cable unwrapping wire special-purpose vehicle | |
CN103420222A (en) | Friction-type plastic pipe winding machine | |
CN203845603U (en) | Towage and cable setting and tensioning integrated cable tow truck | |
CN108483342B (en) | A kind of truck that assists in the installation and disassembly of I-shaped wire reels | |
CN204897047U (en) | a line car | |
CN211393651U (en) | Tower arm support rod of crawler crane | |
CN106628909B (en) | A kind of workshop weight handling system | |
CN207631979U (en) | A kind of cooling fin transport device | |
CN206188111U (en) | Resistant line pay off rack of waiting | |
CN102963821A (en) | Gantry crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20141029 |