A kind of for solving karez Frozen-thawed cycled destruction methods
Technical field
The present invention relates to karez protection field, particularly one is for solving karez Frozen-thawed cycled destruction methods.
Background technology
The karez history of existing more than 2000 year so far in Xinjiang is that local working people utilizes earth grade, and the Tianshan Mountains snow-broth permeated the ground need not be drawn the ancient water conservancy projects of earth's surface for the production of, life by any power.
Xinjiang region has water karez to have more than 500, still waters good farmland, large stretch of oasis, and play Social benefit and economic benefit greatly, within 2006, Xinjiang karez is listed in key historical sites under state protection.
There is the karez quantity of water in Xinjiang from 1949 1473, to 618 of statistics during Third National historical relic generaI investigation in 2010.There is water karez quantity to decrease 855 in this 61 year, reduce with the speed of 14 every year on average, karez decline rate startling soon.
As Fig. 1, karez is made up of closed conduit 1, vertical shaft 2, open channel 3, flooded dam four part.Wherein, in the long-term air themperature of the closed conduit of below ground, humidity more stable (temperature about 20 DEG C, humidity about 90%), pit mouth (intersection on vertical shaft and ground) is then be exposed in the environment of Gobi desert, Xinjiang, the seasonality of this environment and day and night temperature very large (summer surface temperature reach 60 DEG C, winter temperature then can be down to-25 DEG C, humidity is less than 30%).
Such as in the winter time, due to the temperature difference, wet difference effect, damp and hot steam in closed conduit will rise along vertical shaft and blow out from Shaft bank, poor owing to there is huge humiture in outer pole short distance near Shaft bank, damp and hot steam, in pit mouth rapid condensation, makes the moisture content of the borehole wall surrounding soil body continue to rise.In addition by the impact of underground water capillary effect of increasing, the humiture of the pit mouth soil body also can raise.Gobi desert, Xinjiang in winter extreme minimum temperature can reach subzero twenty or thirty degree, congelation makes capillary water in the soil body move to cold junction, and then humidity in Shaft bank section soil layer can be increased again, sub-zero temperature makes capillary water glaciation in the soil body, causes Shaft bank surrounding soil to expand.
When temperature rising in the past in winter freezing soil melts, stress release, structural relaxation.Water content evaporation in the soil body near spring and summer pit mouth in season, there is face crack in soil body dehydration shrinkage, the effect gone round and begun again like this, and soil structures is destroyed, and cohesive force is lost, and causes damage of soil body.The bottom sheet pull out type fracture before this of pit mouth section soil layer, then develops into block pull out type fracture with plastic zone expand, finally forms large area fall damage.The pit mouth soil body caves in, and the body that caves in crashes into after closed conduit causes closed conduit to deposit and current are blocked, and after the blocking of closed conduit current, the bubble closed conduit canal wall soil body is invaded in the rising of closed conduit water level, and cause the closed conduit soil body to cave in, last whole karez destroys dry.
Summary of the invention
The present invention proposes a kind of for solving karez Frozen-thawed cycled destruction methods, solve the vertical shaft of karez in prior art by fall damage easy after freeze thawing circulating effect, the body that caves in crashes into closed conduit and causes closed conduit to deposit, the final problem destroying whole karez.
Technical scheme of the present invention is achieved in that
A kind of for solving karez Frozen-thawed cycled destruction methods, comprise the following steps:
1), centered by the pit mouth of karez, remove loosening the soil of pit mouth and surrounding ground, dig the circular groove that 10-20cm is dark, leveling compacting circular groove surface;
2), remove loosening the soil of vertical shaft inwall, dig the annular groove of 10-20cm towards vertical shaft radial direction, and flatten compacting;
3), in annular groove stick undercloak, in annular groove upper end with at distance below ground 1.5m place, upper support ring and the lower support ring of a circle protrusion is set with loam brick respectively, is coated with last layer mortar topping at the external surface of undercloak;
4), etc. mortar dry, lower support ring is placed a lower well lid, and the soffit of lower well lid be conical, well lid in placement one on upper support ring;
5), in circular groove ground soil is filled out, until and ground level.
Further, described upper well lid is wooden upper well lid.
Further, described lower well lid is well lid under PVC.
Beneficial effect of the present invention:
1, remove loosening the soil of pit mouth and surrounding ground, dig the circular groove that 10-20cm is dark, leveling compacting circular groove surface, pit mouth can be made more firm, prevent pit mouth from caving in.
2, remove loosening the soil of vertical shaft inwall, prevent from loosening the soil and peel off, cause closed conduit to deposit, and for below loam brick reinforce solid vertical shaft inwall is provided.
3, stick loam brick in annular groove, outside loam brick, scribble mortar topping, play support on the one hand, reinforce the effect of vertical shaft, prevent vertical shaft inwall original soil from loosening and peel off, cause closed conduit to deposit; Also make vertical shaft inwall from the destruction of Frozen-thawed cycled on the other hand.
4, lower well lid mainly plays and blocks damp and hot steam, and be located at underground 1.5 meters of, being that Xinjiang region is maximum freezes deep location, when damp and hot steam in closed conduit is risen to bottom lower well lid, steam can condense into the globule and drop back in closed conduit, ensures the drying of the pit mouth soil body, avoids Frozen-thawed cycled; Lower well lid bottom design shape coning, drips under making the centre position of the globule of condensation bottom well lid, ensures that the globule directly instills closed conduit, can not drop in vertical shaft inwall.
5, the sandy soil that upper well lid can intercept earth's surface enter the vertical shaft of karez, prevent blocking vertical shaft and closed conduit, cover ground soil and effectively can protect well lid; adopt wood materials, economic environmental protection, be convenient to open; lower well lid uses PVC material, ensures the durability in high humidity environment.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of existing karez;
Fig. 2 is the structural representation of the vertical shaft of karez after adopting the inventive method process.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
A kind of for solving karez Frozen-thawed cycled destruction methods, comprise the following steps:
1), centered by the pit mouth 4 of karez, remove loosening the soil of pit mouth 4 and surrounding ground 12, dig the dark circular groove of 10-20cm 5, leveling compacting circular groove 5 surface;
2), remove loosening the soil of vertical shaft inwall, dig the annular groove of 10-20cm towards vertical shaft radial direction, and flatten compacting;
3), in annular groove, stick undercloak 6, in annular groove upper end with at 1.5m place, ground less than 12, upper support ring 7 and the lower support ring 8 of a circle protrusion is set with loam brick respectively, is coated with last layer mortar topping 9 at the external surface of undercloak 6;
4), etc. mortar dry, lower support ring 8 is placed a lower well lid 10, and the soffit of lower well lid 10 be conical, well lid 11 in placement one on upper support ring 7;
5), in circular groove fill out ground soil, until with ground 12 level.
Further, described upper well lid 11 is wooden upper well lid.
Further, described lower well lid 10 is well lid under PVC.
Remove loosening the soil of pit mouth 4 and surrounding ground 12, dig the dark circular groove of 10-20cm 5, leveling compacting circular groove 5 surface, pit mouth 4 can be made more firm, prevent pit mouth 4 from caving in.Remove loosening the soil of vertical shaft inwall, dig the annular groove of 10-20cm, prevent from loosening the soil and peel off, cause closed conduit to deposit, and provide solid plinth base for undercloak 6 below.Stick undercloak 6 in annular groove, outside undercloak 6, scribble mortar topping 9, play support on the one hand, reinforce the effect of vertical shaft 2, prevent vertical shaft inwall original soil from loosening and peel off, cause closed conduit to deposit; Also make vertical shaft inwall from the destruction of Frozen-thawed cycled on the other hand.Lower well lid 10 mainly plays and blocks damp and hot steam, and be located at 1.5m place, 12 times, ground, being that Xinjiang region is maximum freezes deep location, when damp and hot steam in closed conduit 1 is risen to bottom lower well lid 10, steam can condense into the globule and drop back in closed conduit, ensures the drying of pit mouth 4 soil body, avoids Frozen-thawed cycled; Lower well lid 10 bottom design shape coning, drips under making the centre position of the globule of condensation bottom lower well lid 10, ensures that the globule directly instills closed conduit, can not drop in vertical shaft inwall.The sandy soil that upper well lid 11 can intercept earth's surface enter the vertical shaft 2 of karez, prevent blocking vertical shaft 2 and closed conduit 1, cover ground soil and can effectively protect well lid 11; adopt wood materials, economic environmental protection, be convenient to open; lower well lid 10 uses PVC material, ensures the durability in high humidity environment.
Dig the dark circular groove of 10-20cm 5 and dig the annular groove of 10-20cm, the degree of depth is dark, can not destroy the original state of vertical shaft 2, can clean out again and loosen the soil, prevent from loosening the soil and peel off, and causes closed conduit 1 to deposit or vertical shaft 2 caves in.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.