[go: up one dir, main page]

CN104113135B - Accident transformer station interval failure fast positioning method - Google Patents

Accident transformer station interval failure fast positioning method Download PDF

Info

Publication number
CN104113135B
CN104113135B CN201410207606.2A CN201410207606A CN104113135B CN 104113135 B CN104113135 B CN 104113135B CN 201410207606 A CN201410207606 A CN 201410207606A CN 104113135 B CN104113135 B CN 104113135B
Authority
CN
China
Prior art keywords
signal
station
transformer
main frame
interval
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410207606.2A
Other languages
Chinese (zh)
Other versions
CN104113135A (en
Inventor
孟祥博
李云陟
袁泉
赵阳
刘杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinzhou Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinzhou Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinzhou Power Supply Co of State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410207606.2A priority Critical patent/CN104113135B/en
Publication of CN104113135A publication Critical patent/CN104113135A/en
Application granted granted Critical
Publication of CN104113135B publication Critical patent/CN104113135B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Locating Faults (AREA)

Abstract

A kind of accident transformer station interval failure fast positioning method; the protection separating brake outlet signal of the protection device being spaced by each for transformer station bar passes to transformer station's main frame and concentrator station main frame with measure and control device switch sub-gate signal through network simultaneously, synthesizes interval accident resultant signal according to AND gate logic;By grave gas actuating signal, load-carrying Gas Signal, main transformer high-pressure side and low-side switch sub-gate signal is had to synthesize according to AND gate logic;The actuating signal hauling oneself willingly into protection device divided with bus connection switch, switching signal synthesizes according to AND gate logic;Full station accident resultant signal is synthesized according still further to disjunction gate logic;It is fabricated to forward table input database;Being set to eject immediately and eject after key frame ejection by the trigger condition that each transformer station key frame and interval split screen eject on concentrator station main frame, multiple picture layereds arrange.Provide the benefit that convenient operation, intuitive display, just can trigger monitoring station main frame when protection act causes separating brake and eject key frame and split screen.

Description

事故变电站间隔故障快速定位方法Rapid positioning method for interval faults in accidental substations

技术领域 technical field

本发明涉及一种事故变电站间隔故障快速定位方法。 The invention relates to a rapid positioning method for interval faults in accidental substations.

背景技术 Background technique

随着自动化设备的发展,无人值守变电站逐渐普及,在数个无人值守变电站的运行过程中,需要有集控中心对这些变电站进行统一调度,集控中心的运行人员需要每天面对监视计算机,对区域内所有变电站进行监视控制。 With the development of automation equipment, unattended substations are becoming more and more popular. During the operation of several unattended substations, a centralized control center is required to conduct unified scheduling of these substations. The operators of the centralized control center need to face the monitoring computer every day. , monitor and control all substations in the area.

由于区域大小不同,集控中心的运行人员一般同时对数十座变电站进行监视控制,一旦某个变电站发生事故分闸时,运行人员需要首先确认弹出的事故报文,然后根据事故报文在数十座变电站中查找发生事故的变电站,然后再在该变电站中的数十条间隔线路中查找发生分闸的间隔分画面,最后按照规定对该间隔开关进行恢复性操作。在以往的间隔画面显示方法中,查找问题变电站间隔画面需要反复多次操作,浪费了大量的时间,影响了工作效率。 Due to the different sizes of the areas, the operators of the centralized control center usually monitor and control dozens of substations at the same time. Find the substation where the accident occurred in the ten substations, and then search for the bay sub-screen where the switch is opened among dozens of bay lines in the substation, and finally perform a restorative operation on the bay switch according to the regulations. In the previous method of displaying interval screens, it is necessary to repeat multiple operations to find faulty substation interval screens, which wastes a lot of time and affects work efficiency.

发明内容 Contents of the invention

本发明要解决的技术问题是提供一种方便操作,显示直观,当保护动作(此时产生保护出口信号)造成分闸时(此时产生开关分闸信号)才会产生对应的间隔事故总信号和全站事故总信号,触发监控站主机主屏幕弹出主画面和分画面,并且在多个变电站发生分闸故障时,可以弹出多个故障间隔画面并分层显示,可对故障进行快速定位查找的事故变电站间隔故障快速定位方法。 The technical problem to be solved by the present invention is to provide a convenient operation and intuitive display. When the protection action (the protection exit signal is generated at this time) causes the opening (the switch opening signal is generated at this time), the corresponding interval accident total signal will be generated. And the total accident signal of the whole station, triggering the main screen of the monitoring station host to pop up the main screen and sub-screen, and when multiple substations have an opening fault, multiple fault interval screens can be popped up and displayed in layers, and the fault can be quickly located and searched Rapid fault location method for bay faults in accidental substations.

本发明的技术解决方案是: Technical solution of the present invention is:

一种事故变电站间隔故障快速定位方法,其步骤如下: A method for quickly locating interval faults in an accidental substation, the steps of which are as follows:

1、将变电站各条间隔的保护装置的保护分闸出口信号与对应的测控装置开关分闸信号经网络同时传给变电站主机和集控站主机,分别按照“与”门逻辑合成为对应的间隔事故总信号; 1. The protection opening and exit signals of the protection devices in each bay of the substation and the corresponding measurement and control device switch opening signals are transmitted to the substation host and the centralized control station host through the network at the same time, and are synthesized into corresponding intervals according to the "AND" gate logic accident signal;

2、将变电站变压器重瓦斯动作信号与对应的主变高压侧开关分闸信号及主变低压侧开关分闸信号同时经变电站主机和集控站主机按照“与”门逻辑合成,将变电站变压器有载重瓦斯信号与对应的主变高压侧开关分闸信号及主变低压侧开关分闸信号经变电站主机和集控站主机按照“与”门逻辑合成; 2. The substation transformer heavy gas action signal is combined with the corresponding main transformer high-voltage side switch opening signal and main transformer low-voltage side switch opening signal through the substation host and centralized control station host according to the "AND" logic, and the substation transformer has The load-bearing gas signal and the corresponding main transformer high-voltage side switch opening signal and main transformer low-voltage side switch opening signal are synthesized by the substation host and centralized control station host according to the "AND" gate logic;

3、将变电站备自投保护装置的动作信号与母联开关分、合闸信号经变电站主机和集控站主机按照“与”门逻辑合成; 3. The action signal of the substation standby automatic switching protection device is combined with the bus tie switch opening and closing signals through the substation host and the centralized control station host according to the "AND" gate logic;

4、由变电站主机和集控站主机将按照“与”门逻辑合成的各信号按照“或门”逻辑合成为全站事故总信号; 4. The substation host and centralized control station host will synthesize the signals synthesized according to the logic of "AND" gate into the total accident signal of the whole station according to the logic of "OR gate";

5、将全站事故总信号、各间隔事故总信号以及变电站内各间隔的所有硬接点信号和软信号按顺序制作成转发表并录入变电站主机数据库和集控站主机数据库; 5. Make the general accident signal of the whole station, the general accident signal of each interval, and all the hard contact signals and soft signals of each interval in the substation into a forwarding table in sequence and enter it into the substation host database and the centralized control station host database;

6、在集控站主机上,将各变电站主接线图画面弹出的触发条件设置为接收到该变电站的全站事故总信号时立即弹出;将该变电站的间隔接线图分画面的弹出条件设置为接收到相应间隔的间隔事故总信号,在变电站的主接线图画面弹出后再弹出相应的间隔接线图分画面;主接线图画面弹出时占据主屏幕显示的左半部分,间隔接线图分画面弹出后占据主屏幕显示的右半部分,并且当弹出多个画面时按照分层排列,最新弹出的画面在最底层,依次类推;对其他未发生故障的变电站的监视画面将自动切换到备用屏幕上。 6. On the host computer of the centralized control station, set the trigger condition for the pop-up of the main wiring diagram screen of each substation to pop up immediately when the total accident signal of the substation is received; set the pop-up condition of the split wiring diagram sub-screen of the substation to After receiving the total interval accident signal of the corresponding bay, the corresponding bay wiring diagram sub-screen pops up after the main wiring diagram screen of the substation pops up; when the main wiring diagram screen pops up, it occupies the left half of the main screen display, and the bay wiring diagram sub-screen pops up Then it occupies the right half of the main screen display, and when multiple screens pop up, they are arranged in layers, the latest pop-up screen is at the bottom, and so on; the monitoring screens of other non-failure substations will automatically switch to the backup screen .

在变电站主机和集控站主机内,全站事故总信号的保持时间为3秒,3秒后自动复归。当一座变电站的某条线路发生分闸时,远方集控中心会根据该变电站的事故总信号立即弹出该变电站相应间隔的画面,如果事故总信号保持时间设置较短,那么多个保护信号造成的开关分闸时会产生多个事故总信号,在集控站侧会弹出多个相同的画面,影响运行人员的正常监视;如果事故总信号保持时间过长,或者无法自动复归,那么当发生事故的变电站内有其他开关随后发生分闸时,集控中心无法弹出分闸线路的画面,影响运行人员的正常工作。 In the host computer of the substation and the centralized control station, the hold time of the total accident signal of the whole station is 3 seconds, and it will automatically reset after 3 seconds. When a certain line of a substation is opened, the remote centralized control center will immediately pop up the picture of the corresponding interval of the substation according to the total accident signal of the substation. When the switch is opened, multiple accident total signals will be generated, and multiple identical screens will pop up on the side of the centralized control station, which will affect the normal monitoring of the operating personnel; When other switches in the substation are subsequently opened, the centralized control center cannot pop up the picture of the opening line, which affects the normal work of the operators.

本发明在变电站侧的转发表中增加事故总及间隔事故总信号,将变电站内保护装置的分闸出口信号与开关分闸信号进行“与“门合成,当保护动作(此时产生保护出口信号)造成分闸时(此时产生开关分闸信号)才会产生对应的间隔事故总信号和全站事故总信号,触发监控站主机主屏幕弹出主画面和分画面,提示集控站的运行人员进行相应的处理,而人为的合闸或分闸操作不会触发间隔事故总信号,因此不影响远方运行人员的正常工作。 The present invention adds the total accident and interval accident total signals in the forwarding table on the substation side, and combines the opening and exit signals of the protection device in the substation with the opening and closing signals of the switch. ) causes the opening of the gate (at this time, the switch opening signal is generated) will generate the corresponding interval accident total signal and the whole station accident total signal, triggering the main screen of the monitoring station host to pop up the main screen and sub-screen, prompting the operators of the centralized control station The corresponding processing is carried out, and the artificial closing or opening operation will not trigger the main signal of the interval accident, so it will not affect the normal work of the remote operator.

附图说明 Description of drawings

图1是本发明的事故总信号生成示意图; Fig. 1 is the generation schematic diagram of accident general signal of the present invention;

图2是本发明的转发表部分内容示意图; Fig. 2 is a schematic diagram of part of the content of the forwarding table of the present invention;

图3是本发明的集控站主机画图生成示意图。 Fig. 3 is a schematic diagram of drawing and generating by the host computer of the centralized control station of the present invention.

具体实施方式 detailed description

如图所示,该事故变电站间隔故障快速定位方法,其步骤如下: As shown in the figure, the rapid location method of interval faults in the accidental substation, the steps are as follows:

1、如图1所示,将变电站各条间隔(间隔1、间隔2…间隔n)的保护装置的保护分闸出口信号与对应的测控装置开关分闸信号经网络同时传给变电站主机和集控站主机,分别按照“与”门逻辑合成为对应的间隔事故总信号。 1. As shown in Figure 1, the protection opening and exit signals of the protection devices of each interval (interval 1, interval 2...interval n) of the substation and the corresponding measurement and control device switch opening signal are simultaneously transmitted to the substation host and the collector through the network. The host computer of the control station synthesizes the corresponding interval accident total signal according to the logic of the "AND" gate.

2、将变电站变压器重瓦斯动作信号与对应的主变高压侧开关分闸信号及主变低压侧开关分闸信号同时经变电站主机和集控站主机按照“与”门逻辑合成,将变电站变压器有载重瓦斯信号与对应的主变高压侧开关分闸信号及主变低压侧开关分闸信号经变电站主机和集控站主机按照“与”门逻辑合成;本实施例中一个变电站内有两台变压器,分别为1号变压器和2号变压器。 2. The substation transformer heavy gas action signal is combined with the corresponding main transformer high-voltage side switch opening signal and main transformer low-voltage side switch opening signal through the substation host and centralized control station host according to the "AND" logic, and the substation transformer has The load-bearing gas signal and the corresponding main transformer high-voltage side switch opening signal and main transformer low-voltage side switch opening signal are synthesized by the substation host and the centralized control station host according to the "AND" logic; in this embodiment, there are two transformers in one substation , respectively No. 1 transformer and No. 2 transformer.

3、将变电站备自投保护装置的动作信号与母联开关分、合闸信号经变电站主机和集控站主机按照“与”门逻辑合成。 3. The action signal of the automatic switching protection device of the substation and the opening and closing signal of the bus tie switch are synthesized by the substation host and the centralized control station host according to the "AND" gate logic.

4、由变电站主机和集控站主机将按照“与”门逻辑合成的各信号按照“或门”逻辑合成为全站事故总信号例;在变电站主机和集控站主机内,全站事故总信号的保持时间为3秒,3秒后自动复归。 4. The substation mainframe and centralized control station mainframe will synthesize the signals synthesized according to the "AND" logic according to the "OR gate" logic into the total station accident signal; in the substation mainframe and centralized control station mainframe, the total station accident signal The hold time of the signal is 3 seconds, and it will automatically reset after 3 seconds.

5、将全站事故总信号、各间隔事故总信号以及变电站内各间隔的所有硬接点信号和软信号按顺序制作成转发表,如图2所示,并录入变电站主机数据库和集控站主机数据库。 5. Make the total accident signal of the whole station, the general accident signal of each interval, and all the hard contact signals and soft signals of each interval in the substation into a forwarding table in sequence, as shown in Figure 2, and enter it into the substation host database and centralized control station host database.

6、在集控站主机上,将各变电站主接线图画面弹出的触发条件设置为接收到该变电站的全站事故总信号时立即弹出;将该变电站的间隔接线图分画面的弹出条件设置为接收到相应间隔的间隔事故总信号,在变电站的主接线图画面弹出后再弹出相应的间隔接线图分画面;主接线图画面弹出时占据主屏幕显示的左半部分,间隔接线图分画面弹出后占据主屏幕显示的右半部分,并且当弹出多个画面时按照分层排列,最新弹出的画面在最底层,依次类推;对其他未发生故障的变电站的监视画面将自动切换到备用屏幕上。图3中以集控站主机接收变电站1全站事故总、变电站2全站事故总、变电站n全站事故总和变电站1间隔事故总、变电站2间隔事故总和变电站n间隔事故总为例,相应弹出变电站1、变电站2、变电站n主接线图画图和变电站1、变电站2、变电站n间隔线路分画图。 6. On the host computer of the centralized control station, set the trigger condition for the pop-up of the main wiring diagram screen of each substation to pop up immediately when the total accident signal of the substation is received; set the pop-up condition of the split wiring diagram sub-screen of the substation to After receiving the total interval accident signal of the corresponding bay, the corresponding bay wiring diagram sub-screen pops up after the main wiring diagram screen of the substation pops up; when the main wiring diagram screen pops up, it occupies the left half of the main screen display, and the bay wiring diagram sub-screen pops up Then it occupies the right half of the main screen display, and when multiple screens pop up, they are arranged in layers, the latest pop-up screen is at the bottom, and so on; the monitoring screens of other non-failure substations will automatically switch to the backup screen . In Fig. 3, the centralized control station mainframe receives the total accident total of substation 1, the total accident total of substation 2, the total accident total of substation n total station, the total accident total of substation 1 interval, the sum total of accidents of substation 2 interval and the total accident total of substation n interval, and the corresponding pop-up Substation 1, substation 2, substation n main wiring diagram and substation 1, substation 2, substation n interval circuit diagram.

Claims (2)

1. an accident transformer station interval failure fast positioning method, is characterized in that step is as follows:
1), the protection separating brake outlet signal of the protection device being spaced by each for transformer station bar switchs sub-gate signal through net with corresponding measure and control device Network passes to transformer station's main frame and concentrator station main frame simultaneously, by transformer station's main frame and concentrator station main frame by each protection separating brake outlet signal with Corresponding measure and control device switch sub-gate signal synthesizes the interval accident resultant signal of correspondence respectively according to AND gate logic;
2), substation transformer grave gas actuating signal is divided with corresponding main transformer high side switch sub-gate signal and main transformer low-side switch Lock signal synthesizes according to AND gate logic through transformer station's main frame and concentrator station main frame simultaneously, and substation transformer has load-carrying gas Signal and corresponding main transformer high side switch sub-gate signal and main transformer low-side switch sub-gate signal are through transformer station's main frame and concentrator station master Machine synthesizes according to AND gate logic;
3), the actuating signal of transformer substation spare power automatic switching protection device and bus connection switch divided, switching signal is through transformer station's main frame and concentrator station master Machine synthesizes according to AND gate logic;
4), by transformer station's main frame and concentrator station main frame, each signal synthesized according to AND gate logic is synthesized according to disjunction gate logic Full station accident resultant signal;
5), by all hard contact point signal and the soft signal at interval each in station accident resultant signal entirely, each interval accident resultant signal and transformer station It is fabricated to forward table typing transformer station host data base and concentrator station host data base in order;
6), on concentrator station main frame, it is set to receive the complete of this transformer station by the trigger condition that each Substation Bus Arrangement figure picture ejects Stand accident resultant signal time eject immediately;By the ejection condition setting of the interval wiring diagram split screen of this transformer station for receiving accordingly between Every interval accident resultant signal, after the main wiring diagram picture of transformer station ejects, eject corresponding interval wiring diagram split screen again;Main Wiring diagram picture occupies the left-half that main screen shows when ejecting, interval wiring diagram split screen occupies after ejecting The right half part that main screen shows, and when eject multiple picture time according to hierarchal arrangement, the picture of up-to-date ejection at the bottom, The like;The supervision picture of the transformer station that other do not break down will be automatically switched on standby screen.
Accident transformer station the most according to claim 1 interval failure fast positioning method, is characterized in that in transformer station's main frame and collection control In station host, the retention time of full station accident resultant signal is 3 seconds, automatic resetting after 3 seconds.
CN201410207606.2A 2014-05-16 2014-05-16 Accident transformer station interval failure fast positioning method Active CN104113135B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410207606.2A CN104113135B (en) 2014-05-16 2014-05-16 Accident transformer station interval failure fast positioning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410207606.2A CN104113135B (en) 2014-05-16 2014-05-16 Accident transformer station interval failure fast positioning method

Publications (2)

Publication Number Publication Date
CN104113135A CN104113135A (en) 2014-10-22
CN104113135B true CN104113135B (en) 2017-01-04

Family

ID=51709815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410207606.2A Active CN104113135B (en) 2014-05-16 2014-05-16 Accident transformer station interval failure fast positioning method

Country Status (1)

Country Link
CN (1) CN104113135B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109301937A (en) * 2018-10-31 2019-02-01 国网湖南省电力有限公司 A method and system for synthesizing accident total signal in substation for dispatching

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2934005C (en) * 2008-05-09 2019-03-05 Accenture Global Services Limited Method and system for managing a power grid
CN201608563U (en) * 2010-02-08 2010-10-13 保定天威恒通电气有限公司 Electric arc light intelligent remote monitoring system
CN202535165U (en) * 2012-03-31 2012-11-14 上海市电力公司 Remote-control throwing-withdrawing reclosing control apparatus
CN103354353B (en) * 2013-06-24 2015-06-17 国家电网公司 Intelligent power-distribution-network whole-line quick-reacting main protection and determination system and method

Also Published As

Publication number Publication date
CN104113135A (en) 2014-10-22

Similar Documents

Publication Publication Date Title
CN102035202B (en) A Network Reconfiguration System
CN101419267B (en) A fast online diagnosis and analysis method for grid faults
CN104638618B (en) A kind of GIS bus equipment tripping operation fast recovery of power supply method
CN103607042B (en) The distribution network failure processing method of long fault indicator for overhead lines towards outskirts of a town
CN105515188A (en) Power distribution network centralized feed line automatic fault processing method
CN112769231B (en) Main distribution integrated alarm pushing method and device of intelligent power grid dispatching control system
CN103872640B (en) A kind of distribution power automation terminal unit off-line fault rapidly self-healing control method
CN102074938A (en) Single-phase earth fault isolation system and method for electrical distribution network
CN104360237A (en) Intelligent on-line distinguishing method for main equipment failures of regional power grid
CN109726214A (en) A kind of equipment fault disposition aid decision-making method and system
CN103346497B (en) Intelligent substation electrical virtual circuit isolation method and system
CN104113135B (en) Accident transformer station interval failure fast positioning method
CN102184203A (en) Method for constructing network reconfiguration database
CN105048629B (en) The hard pressing plate anti-misoperation warning system of relay protection
CN103632414B (en) The device of a kind of subway train signal system on-line monitoring and early warning
CN107271804A (en) The failure wave-recording method and apparatus of power system
CN106774068B (en) Intelligent substation anti-mistake realization method and realization system
CN107607857A (en) A kind of 110kV backup auto-activating device analysis methods based on RTDS Real Time Digital Simulators
CN106685088A (en) An anti-misoperation operating system for the secondary pressure plate of an electrical protection device
CN105680426B (en) A kind of 35kv line fault power loss accident intelligent processing method neural network based
CN105119250B (en) Relay protection Remote Dynamic methods of exhibiting based on Data Integration
CN111969709A (en) Intelligent alarm method and system based on power system spare power automatic switching analysis
CN103972986B (en) A kind of intelligent substation protective device drive method that do not have a power failure
CN108198638B (en) Shutdown breaker routine test system and method based on soft logic
CN105515166B (en) 110 kilovolts of system busbar combining units of intelligent substation double bus scheme mode can back brake maintenance voltage allocation plan

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant