A kind of method preventing magnetic storm, core pulse from electrical network being endangered Download PDFInfo
- Publication number
- CN104064964B CN104064964B CN201410220125.5A CN201410220125A CN104064964B CN 104064964 B CN104064964 B CN 104064964B CN 201410220125 A CN201410220125 A CN 201410220125A CN 104064964 B CN104064964 B CN 104064964B
- Authority
- CN
- China
- Prior art keywords
- grounding
- grid
- independent
- neutral point
- current
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 24
- 230000007935 neutral effect Effects 0.000 claims abstract description 41
- 230000005540 biological transmission Effects 0.000 claims abstract description 18
- 239000002184 metal Substances 0.000 claims description 16
- 229910052751 metal Inorganic materials 0.000 claims description 16
- 239000002689 soil Substances 0.000 claims description 9
- 230000001360 synchronised effect Effects 0.000 abstract description 10
- 230000006698 induction Effects 0.000 abstract description 8
- 230000006378 damage Effects 0.000 abstract description 7
- 238000010521 absorption reaction Methods 0.000 abstract 1
- 230000005611 electricity Effects 0.000 abstract 1
- 150000002500 ions Chemical class 0.000 description 7
- 230000000694 effects Effects 0.000 description 6
- 239000004020 conductor Substances 0.000 description 4
- 238000004804 winding Methods 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000000737 periodic effect Effects 0.000 description 3
- 238000011160 research Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 206010064127 Solar lentigo Diseases 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 239000005441 aurora Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000009792 diffusion process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000003197 gene knockdown Methods 0.000 description 1
- 238000010921 in-depth analysis Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 230000001568 sexual effect Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Emergency Protection Circuit Devices (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种防止太阳磁暴、核脉冲对电网危害的方法。The invention relates to a method for preventing solar magnetic storms and nuclear pulses from harming power grids.
背景技术Background technique
众所周知,电网分为同步电网和非同步电网。用交流输电线路连接构成的电网是同步电网,用直流输电线路连接的两个电网之间如果除了直流联络线以外没有其他交流联络线,则两个电网是非同步的。当然,如果两个电网之间没有任何联络线,则两个电网当然各自独立,当然也是非同步的。随着我国特高压技术的发展,地区电网通过特高压交流线或直流线实现了互联。以特高压交流连接的电网将构成规模更大的交流同步电网,同步电网的安全性日益重要。我国之所以同时发展特高压交流和直流联网技术,实际上反映了对特大同步交流电网安全的担心。As we all know, power grids are divided into synchronous power grids and asynchronous power grids. A power grid connected by an AC transmission line is a synchronous power grid. If there is no other AC connection line between two power grids connected by a DC transmission line, the two power grids are asynchronous. Of course, if there is no tie line between the two grids, the two grids are of course independent and of course asynchronous. With the development of UHV technology in China, regional power grids are interconnected through UHV AC or DC lines. The power grid connected by UHV AC will constitute a larger-scale AC synchronous power grid, and the security of the synchronous power grid is becoming increasingly important. The reason why my country develops UHV AC and DC networking technologies at the same time actually reflects the concern about the safety of the ultra-large synchronous AC power grid.
虽然电网发展已经有一百多年的历史,各方面技术也已非常成熟,但随着电网规模的扩大,也出现了一些非常复杂和难以解释的问题,如太阳磁暴和地磁感应电流(GIC)对电网影响的问题,国家电网公司曾作为重大科技项目加以研究,但课题对GIC的成因和传播机理并没有搞清楚,也未提出具体的解决办法。如果说2000年的美国大停电是电网关键联络线过载引起的连锁事件的话,但1984年的加拿大和北美大停电事故,事件虽已过去30年,研究报告也很多,但事故的原因一直没有结论。只查清了一系列跳闸事件的起源为一台主变零序保护率先动作。零序保护动作的实质是电网经此处中性点流向大地的电流突然增大。与我国的电网保护理念不同,西方的电网保护装置向来讲究简单可靠,因此,可以说,此次事故零序电流突然增大是确定无疑的,至于电流为何突然增大则未见有深入分析和报道。但根据众多相关研究资料,当年正值太阳黑子活动剧烈期,加拿大及北极地区极光极为强烈,反应了太阳离子大规模冲击地球,虽然有地球磁场的屏蔽作用,但不免仍有大量离子穿透地球磁场到达地表,而电网由于覆盖面广,距离长,其吸收的太阳离子必然要经泄流回路流动。由于太阳离子是带正电荷的,在电网中形成的离子电流具有非周期、冲击性特点,必然要经阻抗最小的路径泄漏到大地,而中性点接地网是直接接地的,因此,太阳磁暴引起的电流(地磁感应电流GIC)通过变压器中性点流向了大地。核弹产生的脉冲辐射对电网的影响机理也与此类似。Although the power grid has a history of more than 100 years, and all aspects of technology are very mature, but with the expansion of the grid scale, some very complex and difficult to explain problems have emerged, such as solar magnetic storms and geomagnetic induced currents (GIC) The issue of the impact on the power grid has been studied by the State Grid Corporation of China as a major scientific and technological project, but the cause and propagation mechanism of GIC have not been clarified, and no specific solutions have been proposed. If the blackout in the United States in 2000 was a chain event caused by the overload of the key contact line of the power grid, the blackout in Canada and North America in 1984, although 30 years have passed since the incident, and there are many research reports, the cause of the accident has not been concluded. . Only the origin of a series of tripping events was found out, and the zero-sequence protection of a main transformer acted first. The essence of the zero-sequence protection action is that the current of the power grid flowing from the neutral point to the earth suddenly increases. Different from my country's power grid protection concept, Western power grid protection devices have always been simple and reliable. Therefore, it can be said that the sudden increase in zero-sequence current in this accident is certain. As for why the current suddenly increased, there is no in-depth analysis and analysis. reports. However, according to many relevant research data, it was a period of intense sunspot activity that year, and the aurora in Canada and the Arctic region was extremely strong, reflecting the large-scale impact of solar ions on the earth. Although there is a shielding effect of the earth's magnetic field, a large number of ions inevitably still penetrate the earth The magnetic field reaches the earth's surface, and because of the wide coverage and long distance of the power grid, the solar ions absorbed by it must flow through the leakage circuit. Since the solar ions are positively charged, the ion current formed in the power grid has the characteristics of aperiodic and impact, and must leak to the earth through the path with the least impedance, and the neutral point grounding grid is directly grounded. Therefore, the solar magnetic storm The induced current (geomagnetic induction current GIC) flows to the earth through the neutral point of the transformer. The impact mechanism of the pulsed radiation produced by nuclear bombs on the power grid is similar to this.
一个一直被业内忽视的、无可争辩的事实是,中性点直接接地的同步电网上任意两个接地网之间的直流电阻其实是很小的,其大小是输电线路导线的内阻和接地网内阻,大大小于土壤中任两点之间的电阻。因此,对太阳磁暴电流来说,电网其实是一个金属导体,磁暴电流必然要在对地电阻最小的地方泄漏。An indisputable fact that has been ignored by the industry is that the DC resistance between any two grounding grids on a synchronous power grid whose neutral point is directly grounded is actually very small, and its magnitude is the internal resistance of the transmission line conductor and the grounding resistance. The internal resistance of the grid is much smaller than the resistance between any two points in the soil. Therefore, for the solar magnetic storm current, the power grid is actually a metal conductor, and the magnetic storm current must leak at the place with the smallest resistance to the ground.
事实上,加拿大靠北部地区存在着很深的冻土层,而冻土导电率极低,磁暴冲击电流必然转移到南部地区寻找泄流点,如果恰巧南部某处中性点接地网接地效果很好,则该处就是最大的受害点。因此,可以推断,1984年的加拿大和北美大停电事故很可能就是因为太阳磁暴造成关键变压器零序电流动保护作而导致。In fact, there is a deep layer of permafrost in the northern part of Canada, and the electrical conductivity of the permafrost is extremely low. The impact current of the magnetic storm must be transferred to the southern region to find a discharge point. Well, then this is the biggest victim point. Therefore, it can be inferred that the blackouts in Canada and North America in 1984 were probably caused by the zero-sequence current flow protection of key transformers caused by solar magnetic storms.
在上述分析中,中性点的接地方式成为问题的关键。正是由于变压器高、低压侧的中性点通过接地网连接到一起,才造成大电网的接地网产生了金属性互联。对于直流输电线路来说,当发生单级运行时,其中一极为架空线,另一极则是接地网。由于接地网与周围土壤存在着梯度电压,电流便在接地网与周围土壤中流动,如果这种直流电流走廊与变电站较近,则大的直流电流必然流入变电站的接地网,并经交流线路继续向远处扩散。我国首条直流输电线路的调试报告中也报道了这一现象。有论文曾报道粤岭核电站直流输电系统单级运行时该厂主变噪声大增,中性点电流达30A。实际上,核电站由于接地网设计标准高、又紧靠大海,因此,接地效果自然很好,自然就导致电网中的部分直流成分经过该点流向大地。中性点电流流过变压器绕组的直接现象是变压器噪声加大。直流电流流经变压器,轻者噪声增大,缩短变压器寿命,重者破坏绕组绝缘,造成重大事故。In the above analysis, the grounding method of the neutral point becomes the key to the problem. It is precisely because the neutral points of the high and low voltage sides of the transformer are connected together through the grounding grid that the grounding grid of the large power grid has a metallic interconnection. For DC transmission lines, when single-stage operation occurs, one pole is the overhead line and the other pole is the ground grid. Because there is a gradient voltage between the grounding grid and the surrounding soil, the current flows in the grounding grid and the surrounding soil. If this DC current corridor is close to the substation, a large DC current must flow into the grounding grid of the substation and continue through the AC line. spread far. This phenomenon was also reported in the commissioning report of my country's first DC transmission line. Some papers have reported that when the DC transmission system of Yueling Nuclear Power Station is in single-stage operation, the noise of the main transformer of the plant increases greatly, and the neutral point current reaches 30A. In fact, due to the high design standard of the grounding grid of nuclear power plants and close proximity to the sea, the grounding effect is naturally good, which naturally causes part of the DC component in the power grid to flow to the ground through this point. The direct phenomenon of the neutral point current flowing through the transformer winding is that the transformer noise increases. The DC current flows through the transformer, which will increase the noise and shorten the life of the transformer, or damage the winding insulation and cause major accidents.
因此,以上分析说明,直接接地交流电网的主变压器中性点的接地方式在太阳磁暴灾害、直流输电单级运行时以及核弹爆炸时对电网的负面作用方面扮演了重要角色。本发明就是针对以上问题提出的一个解决办法。Therefore, the above analysis shows that the grounding method of the neutral point of the main transformer of the directly grounded AC power grid plays an important role in the solar magnetic storm disaster, the single-stage operation of DC power transmission, and the negative effects on the power grid when the nuclear bomb explodes. The present invention is exactly a solution that proposes at the above problems.
发明内容Contents of the invention
本发明为了解决上述问题,提出了一种防止太阳磁暴、核脉冲对电网危害的方法,该方法通过将目前交流同步电网中的变压器中性点与发电厂或变电站的公共接地网直接相连的方式改为独立接地的方式,阻断了地磁感应电流(GIC)的金属性连接通道,因而使地磁感应电流局部吸收,避免了GIC集中到一处释放而造成破坏的危险。In order to solve the above problems, the present invention proposes a method for preventing solar magnetic storms and nuclear pulses from harming the power grid. The method directly connects the neutral point of the transformer in the current AC synchronous power grid with the public grounding grid of the power plant or substation Changing to an independent grounding method blocks the metallic connection channel of the geomagnetic induction current (GIC), thus allowing the geomagnetic induction current to be absorbed locally, avoiding the danger of damage caused by the concentrated release of the GIC.
为了实现上述目的,本发明采用如下技术方案:In order to achieve the above object, the present invention adopts the following technical solutions:
一种防止太阳磁暴、核脉冲对电网危害的方法,包括以下步骤:A method for preventing solar magnetic storms and nuclear pulses from harming power grids, comprising the following steps:
1)发电厂电网侧输电线路中性点的接地网独立于全厂接地网,且与全厂地网保持距离;1) The grounding grid at the neutral point of the transmission line on the power grid side of the power plant is independent of the grounding grid of the whole plant, and keeps a distance from the grounding grid of the whole plant;
2)变电站主变压器两侧需要中性点接地的,其接地网保证各自独立,且保持距离。2) If the neutral point grounding is required on both sides of the main transformer of the substation, the grounding grids shall be independent and keep a distance.
所述步骤(1)中,其具体方法为:发电厂电网侧输电线路中性点的接地网独立于全厂接地网,是埋设于土壤中的独立接地体,且与电厂公共接地网没有金属连接,二者距离为10米以上,且独立接地体的特性参数符合目前国家标准。In the step (1), the specific method is: the grounding grid at the neutral point of the power grid side transmission line of the power plant is independent of the grounding grid of the whole plant, and is an independent grounding body buried in the soil, and there is no metal connection with the public grounding grid of the power plant. Connection, the distance between the two is more than 10 meters, and the characteristic parameters of the independent grounding body meet the current national standards.
所述步骤(2),其具体方法为:变电站主变压器两侧需要中性点接地的,其接地网各自独立,且二者均为埋设于土壤中的独立接地体,二者之间距离为10米以上。Described step (2), its specific method is: the two sides of substation main transformer need neutral point grounding, its grounding network is independent respectively, and both are the independent grounding bodies buried in the soil, the distance between the two is More than 10 meters.
本发明的工作原理为:将整个电网由一个大金属体分割为一段的孤立金属体,一个地域内电网上的非周期冲击电流就再也不会扩散到其余地区,因此也就不会形成全局性大电流,也就没有了冲击电流的危害。The working principle of the present invention is: divide the entire power grid from a large metal body into a section of isolated metal body, the non-periodic impact current on the power grid in one region will never spread to other regions, so it will not form a global Sexual large current, there is no harm of inrush current.
本发明的有益效果为:The beneficial effects of the present invention are:
1.本发明提出的交流同步电网通过中性点接地网互连而构成了一个大金属导体的观点解释了地磁感应电流大范围流动的原因,也解释了直流输电线路单极运行对交流电网严重影响的原因。1. The viewpoint that the AC synchronous power grid proposed by the present invention constitutes a large metal conductor through the interconnection of the neutral point grounding grid explains the reason why the geomagnetic induction current flows in a large range, and also explains that the unipolar operation of the DC transmission line is serious to the AC power grid The cause of the impact.
2.采用本发明提出的中性点接地网独立的方法解决了地磁感应电流在电网中通过地网—架空线(或电缆)而大范围扩散的难题;2. The independent method of the neutral point grounding grid proposed by the present invention has solved the difficult problem that the geomagnetic induction current spreads in a large scale by the ground grid-overhead wire (or cable) in the power grid;
3.采用本发明提出的中性点接地网独立的方法减轻了直流单极运行对交流电网的影响3. The independent method of the neutral point grounding grid proposed by the present invention reduces the impact of DC unipolar operation on the AC grid
附图说明Description of drawings
图1为本发明输电线路各环节中性点独立接地示意图;Fig. 1 is the independent grounding diagram of the neutral point of each link of the transmission line of the present invention;
图2为本发明输电线路各环节中性点非独立接地示意图;Fig. 2 is a schematic diagram of non-independent grounding of the neutral point of each link of the transmission line of the present invention;
图3为本发明磁暴感应电流通过主变中性点连接而传播的举例说明示意图。Fig. 3 is a schematic illustration illustrating the propagation of the magnetic storm induced current through the neutral point connection of the main transformer in the present invention.
其中,1、发电机;2、升压变压器;3、输电线路;4、变电站主变压器。Among them, 1. Generator; 2. Step-up transformer; 3. Transmission line; 4. Main transformer of substation.
具体实施方式:detailed description:
下面结合附图与实施例对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
目前,国内外电网中性点接地方式采用图2所示方式。按照这种连接方式,一个同步电网中的线路、主变压器绕组、金属接地网、各发电站主变压器绕组、发电站接地网均是连接在一起的。也就是说,整个电网实际上是一个金属导体,当有太阳离子冲击某地区电网时,这种正电位、非周期、直流性的电荷必然向电网这个大金属体上的其余部分扩散,而哪个地方的土壤导电率高、扩散快,哪个地方的中性点电流就大,因此,接地效果最好的地方中性点电流最大,受害也最严重。从我国目前电站和电源分布来看,靠近海边的核电站、电站、以及地下有金属矿床的地点,中性点电流最大。因此,还可用通过检测中性点电流的方法绘制出全国范围内的金属矿藏分布。为探矿领域提供了一种新方法。At present, the neutral point grounding method of domestic and foreign power grids adopts the method shown in Figure 2. According to this connection method, the lines in a synchronous power grid, the main transformer winding, the metal grounding grid, the main transformer windings of each power station, and the grounding grid of the power station are all connected together. That is to say, the entire power grid is actually a metal conductor. When solar ions hit the power grid in a certain area, this positive potential, non-periodic, and DC charge must spread to the rest of the large metal body of the power grid, and which Where the soil has high electrical conductivity and fast diffusion, the neutral point current will be large wherever the grounding effect is. Therefore, the neutral point current is the largest in the place with the best grounding effect, and the damage is also the most serious. Judging from the current distribution of power stations and power sources in my country, the neutral point current is the largest in nuclear power plants, power stations near the sea, and places with underground metal deposits. Therefore, the distribution of metal deposits across the country can also be drawn by detecting the neutral point current. A new method is provided for the field of prospecting.
根据我们的研究成果,山东莱芜电厂三期工程1000MW机组的主变压器中性点接地网正按我们提供方案,按照图1所示方式进行改造,包括发电机1、升压变压器2、输电线路3和变电站主变压器4。图1所示的接地网改造方案一旦全部完成,则整个电网就由一个大金属体分割为一段的孤立金属体,一个地域内电网上的非周期冲击电流就再也不会扩散到其余地区,因此也就不会形成全局性大电流,也就没有了冲击电流的危害。According to our research results, the neutral point grounding network of the main transformer of the 1000MW unit of the third phase project of Shandong Laiwu Power Plant is being transformed according to the scheme shown in Figure 1, including generator 1, step-up transformer 2, and transmission line 3 and substation main transformer4. Once the grounding grid transformation scheme shown in Figure 1 is completed, the entire power grid will be divided into a section of isolated metal bodies by a large metal body, and the non-periodic impulse current on the power grid in one area will never spread to other areas. Therefore, a global large current will not be formed, and there will be no harm of inrush current.
如果说太阳磁暴是一种自然灾害无法预知,那么,如果未来发生核战争,一颗小小的核弹爆炸产生的离子冲击完全可以击垮目前电网,如果采取本发明所提供的方法,可以最大限度地将危害限制在很小的范围内,而不至于长生长距离、大面积的浪涌。因此,本方法具有重大的现实意义。If the solar magnetic storm is a kind of natural disaster unpredictable, then, if there is a nuclear war in the future, the ion shock produced by a small nuclear bomb explosion can completely knock down the current power grid. To limit the damage to a small range, so as not to cause long-distance and large-area surges. Therefore, this method has great practical significance.
以下可以结合图1对分发明提出的方法做进一步说明。The method proposed by the sub-invention can be further described below in conjunction with FIG. 1 .
如图1所示,其中,G0为发电厂的公共接地网,G1为发电厂升压站主变压器电网侧中性点独立接地网,G2和G3分别为变电站高低两侧中性点接地网,当然,根据现有标准,如果低压侧为110kV以下则不需要中性点接地。图1中只画出了升压站变压器Z相铁芯接G0,实际上是三相铁芯都接G0。在图1中,G0、G1、G2、G3各自为独立接地网,G0、G1虽然临近,但由于土壤相隔,电气上可以认为已互不影响。因此,电网与发电厂没有了任何金属性直接连接。中间输电线路在采取了G1和G2的独立中性点接地网后,中间线路本身也与两端的其他电站没有了金属连接,输电线路成了一个个电气孤岛,也就彻底割断了地磁感应电流在电网中的传播通道。As shown in Figure 1, G0 is the public grounding network of the power plant, G1 is the neutral point independent grounding network of the main transformer grid side of the power plant step-up station, G2 and G3 are the neutral point grounding network on both sides of the substation, respectively, Of course, according to existing standards, if the low-voltage side is below 110kV, the neutral point does not need to be grounded. In Figure 1, only the Z-phase iron core of the step-up station transformer is connected to G0, but in fact, all three-phase iron cores are connected to G0. In Figure 1, G0, G1, G2, and G3 are independent grounding grids. Although G0 and G1 are close to each other, they can be considered to have no influence on each other electrically due to the separation of soil. Therefore, there is no direct metallic connection between the grid and the power plant. After adopting the independent neutral point grounding network of G1 and G2 in the intermediate transmission line, the intermediate line itself has no metal connection with other power stations at both ends, and the transmission line becomes an electrical island, which completely cuts off the geomagnetic induction current. Propagation channels in the grid.
相反,如图2所示,目前的中性点接地方式。从图2可以看到,变电站的接地网G1和发电厂的接地网G0是金属连接的。因此,来自于变电站左侧的GIC便可以直达电厂的接地网。这也解释了为什么核电站中性点电流大的原因。因为靠近大海的核电站接地网的对地电阻远比内陆变电站的对地电阻要小。On the contrary, as shown in Figure 2, the current neutral point grounding method. It can be seen from Figure 2 that the grounding grid G1 of the substation and the grounding grid G0 of the power plant are connected by metal. Therefore, the GIC from the left side of the substation can go directly to the ground grid of the power plant. This also explains why the neutral point current of nuclear power plants is large. Because the grounding resistance of the nuclear power plant grounding grid near the sea is much smaller than that of the inland substation.
如图3所示,磁暴感应电流传播原理,图3将三相线路简化为一个等效零序回路,圆圈代表变压器,500kV环路代表一个典型的省级主网骨架,G1~G4代表了环网上的四个关键联络点的变电站主接地网,g1、g2代表了A处发电厂一条220联络线两头的中性点接地网,g3、g4代表了B处的一条220kV负荷线路两端的变压器中性点接地网。根据目前的接地标准,G1~G4实际上是金属连接的,不仅如此,由于G1和g1也是相连的,G3和g3也是相连的,因此,A点的接地网g2和B点的接地网g4是相连的,因此,整个网上的中性点电流可以经G1~G4以及g1~g4流向大地。但由于各地接地网所处的地质条件不同,中性点电流不可能在八个接地网上平均分布,而对地电阻最小的接地网处其电流必然最大,对地电阻越小,其流经的电流便越大,越是磁暴电流的受害者。As shown in Figure 3, the principle of magnetic storm induced current propagation. Figure 3 simplifies the three-phase line into an equivalent zero-sequence loop. The main grounding network of the substation at the four key contact points on the network, g1 and g2 represent the neutral point grounding network at both ends of a 220 tie line in the power plant at A, and g3 and g4 represent the transformers at both ends of a 220kV load line at B Sex point ground grid. According to the current grounding standard, G1~G4 are actually connected by metal, not only that, because G1 and g1 are also connected, and G3 and g3 are also connected, so the grounding grid g2 at point A and the grounding grid g4 at point B are connected, therefore, the neutral point current on the entire network can flow to the ground through G1~G4 and g1~g4. However, due to the different geological conditions of the grounding grids in various places, the neutral point current cannot be evenly distributed on the eight grounding grids, and the current at the grounding grid with the smallest resistance to the ground must be the largest, and the smaller the resistance to the ground, the more current it flows through. The greater the current, the more the victim of the magnetic storm current.
上述虽然结合附图对本发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,所属领域技术人员应该明白,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。Although the specific implementation of the present invention has been described above in conjunction with the accompanying drawings, it does not limit the protection scope of the present invention. Those skilled in the art should understand that on the basis of the technical solution of the present invention, those skilled in the art do not need to pay creative work Various modifications or variations that can be made are still within the protection scope of the present invention.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410220125.5A CN104064964B (en) | 2014-05-22 | 2014-05-22 | A kind of method preventing magnetic storm, core pulse from electrical network being endangered |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410220125.5A CN104064964B (en) | 2014-05-22 | 2014-05-22 | A kind of method preventing magnetic storm, core pulse from electrical network being endangered |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104064964A CN104064964A (en) | 2014-09-24 |
CN104064964B true CN104064964B (en) | 2016-08-17 |
Family
ID=51552554
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410220125.5A Active CN104064964B (en) | 2014-05-22 | 2014-05-22 | A kind of method preventing magnetic storm, core pulse from electrical network being endangered |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104064964B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106159927A (en) * | 2016-07-13 | 2016-11-23 | 郭富丽 | A kind of eliminate the magnetic storm method to electric network influencing |
CZ309130B6 (en) * | 2021-03-24 | 2022-02-16 | DrSc. Mayer Daniel prof. Ing. | Method of protecting electrical system power transformers the against the effects of rapid variations of the anomalous geomagnetic field or magnetic storm and equipment for this method of protecting electrical system power transformers |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2950484A (en) * | 1983-06-24 | 1985-06-13 | Madison Farm Structures | Grounding system for electrical distribution system |
CN101383500A (en) * | 2008-07-03 | 2009-03-11 | 上海市电力公司超高压输变电公司 | Method for suppressing neutral point DC magnetic biasing by single grounding network |
CN101710697A (en) * | 2009-11-17 | 2010-05-19 | 江苏省电力试验研究院有限公司 | Device and method for inhibiting direct current of neutral point of transformer |
CN201829945U (en) * | 2010-10-26 | 2011-05-11 | 沈阳工业大学 | Transformer direct-current magnetic biasing compensating device with reactive compensation function |
CN103439565A (en) * | 2013-09-04 | 2013-12-11 | 博爱县电业公司 | Calculation method for DC magnetic bias current flowing into transformer of high-voltage DC power transmission system |
-
2014
- 2014-05-22 CN CN201410220125.5A patent/CN104064964B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2950484A (en) * | 1983-06-24 | 1985-06-13 | Madison Farm Structures | Grounding system for electrical distribution system |
CN101383500A (en) * | 2008-07-03 | 2009-03-11 | 上海市电力公司超高压输变电公司 | Method for suppressing neutral point DC magnetic biasing by single grounding network |
CN101710697A (en) * | 2009-11-17 | 2010-05-19 | 江苏省电力试验研究院有限公司 | Device and method for inhibiting direct current of neutral point of transformer |
CN201829945U (en) * | 2010-10-26 | 2011-05-11 | 沈阳工业大学 | Transformer direct-current magnetic biasing compensating device with reactive compensation function |
CN103439565A (en) * | 2013-09-04 | 2013-12-11 | 博爱县电业公司 | Calculation method for DC magnetic bias current flowing into transformer of high-voltage DC power transmission system |
Non-Patent Citations (1)
Title |
---|
一种抑制变压器直流偏磁现象的新方法;冯远程;《变压器》;20090831;第46卷(第8期);第17-20页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104064964A (en) | 2014-09-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104967033B (en) | A kind of transformer station's earth-current restraining device and its suppressing method | |
CN104064964B (en) | A kind of method preventing magnetic storm, core pulse from electrical network being endangered | |
Zhang et al. | A mitigation method based on the principle of GIC-even distribution in whole power grids | |
Hamzehbahmani et al. | Earthing requirements for HVDC systems | |
CN205178493U (en) | Modular neutal point earthing composite control device | |
CN204597473U (en) | The indoor 7 grades of lightning-protection systems of a kind of network center machine room | |
CN203367747U (en) | High-efficient safe lightning protection system | |
Tian et al. | Simulating calculations of transient voltages and insulation coordination on 500 kV AC XLPE submarine cable line | |
CN105048437A (en) | Combined neutral point grounding integrated control device | |
Fang et al. | Study on lightning overvoltage and commutation failure in UHV AC/DC hybrid system | |
CN103337821A (en) | Overvoltage protection and insulation cooperation design method for direct-current ice melting system | |
Grobbelaar et al. | External lightning protection and earthing to reduce stress on spds within electrical equipment in photovoltaic plants | |
Dawalibi et al. | Mitigation of transformer saturation due to neutral HVDC currents | |
CN110265988A (en) | A device for balancing grid current to ground | |
Tavares et al. | Analysis of an isolated half-wavelength transmission line submitted to switching maneuvers | |
CN203632182U (en) | Lightning protection device of 20kV overhead line | |
Foumani et al. | Improvement of grounding system in wind farms regarding the permissible potentials | |
D'Orazio et al. | Analysis of the application of LLPDs on a MV feeder of E-Distribuzione | |
CN102904243A (en) | Neutral point disperse grounding type two-terminal direct current bipolar transmission system | |
Huang et al. | Assessment of lightning backflash outage rate of quadruple-circuit transmission lines due to subsequent strokes | |
Ren et al. | Study on Lightning inrush overvoltage of 500 kV GIL-GIS Hydropower Station | |
Xu et al. | Study on the capacity of sheath-protecting surge arrester at a 230 kV cable end | |
Shaofeng et al. | Analysis of the operational effect of 500kV line zinc oxide arrester | |
Wang et al. | Lightning on transmission lines hazards and prevention measures | |
Tong | Research and application of active lightning protection technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |