CN104049155B - Electrical equipment detection line and detection method based on automatic guidance carrier vehicle - Google Patents
Electrical equipment detection line and detection method based on automatic guidance carrier vehicle Download PDFInfo
- Publication number
- CN104049155B CN104049155B CN201410056791.XA CN201410056791A CN104049155B CN 104049155 B CN104049155 B CN 104049155B CN 201410056791 A CN201410056791 A CN 201410056791A CN 104049155 B CN104049155 B CN 104049155B
- Authority
- CN
- China
- Prior art keywords
- test
- station
- central control
- automatic guided
- transport vehicle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Abstract
本发明公开了一种基于自动导引运输车的电力设备检测流水线及检测方法,其包括:一试验场地,所述试验场地内设置有多个试验工位和一中控室,各个试验工位布置有不同的试验仪器,中控室内设置有中控计算机,各个试验工位的试验仪器与中控计算机采用通讯方式连接;至少一台自动导引运输车,该自动导引运输车承载试验的电力设备试品,在中控室内的中控计算机控制下,按照一定的试验程序在各个试验工位之间进行运行,对自动导引运输车所承载的电力设备试品进行各项试验,各个试验工位的试验仪器所得到的试验数据采用通讯方式传回中控室内的中控计算机进行汇总。本发明相对于传统的电力设备传统试验方式检测效率更高,试验人员的劳动强度更小。
The invention discloses a power equipment detection assembly line and detection method based on an automatic guided transport vehicle. There are different test instruments, the central control room is equipped with a central control computer, and the test instruments at each test station are connected to the central control computer by means of communication; at least one automatic guided transport vehicle, which carries the power for the test The equipment samples, under the control of the central control computer in the central control room, run between each test station according to a certain test procedure, and conduct various tests on the power equipment samples carried by the automatic guided transport vehicle. The test data obtained by the test instruments at the station is sent back to the central control computer in the central control room by means of communication for summary. Compared with the traditional test method of traditional electric equipment, the detection efficiency of the present invention is higher, and the labor intensity of test personnel is smaller.
Description
技术领域technical field
本发明涉及电力设备检测技术领域,特别涉及一种基于自动导引运输车的电力设备检测流水线及检测方法。The invention relates to the technical field of electric equipment detection, in particular to an automatic guided transport vehicle-based electric equipment detection assembly line and detection method.
背景技术Background technique
参见图1至图8,生产线上用于搬运的自动导引运输车(AGV)具有大承载能力,同时重载下可实现直行、横行、斜行、任一曲线移动、零回转半径转动等全向移动能力。该自动导引运输车可以采用多种控制方式,例如有线控制、无线遥控控制以及工控机自动控制等,还可以选用多种定位方式进行定位,例如视频寻迹定位、IGPS定位以及磁钉寻迹定位。Referring to Figure 1 to Figure 8, the automatic guided vehicle (AGV) used for handling on the production line has a large load capacity, and at the same time it can realize full-scale travel such as straight travel, horizontal travel, oblique travel, any curved movement, and zero-turn radius rotation under heavy loads. ability to move. The automatic guided transport vehicle can adopt a variety of control methods, such as wired control, wireless remote control and industrial computer automatic control, etc., and can also choose a variety of positioning methods for positioning, such as video tracking positioning, IGPS positioning and magnetic nail tracking position.
目前电力设备传统试验方式是:人员或车辆携带测试仪器到现场或到仓库内对固定不动的电力设备进行各项检测,由于电力设备涉及多项性能检测,对于同一台电力设备,测试人员需要携带多种仪器,而且每完成一个试验项目就需要更换接线,才能满足不同试验项目的需求。此外在现场或者仓库的场地有限情况下,每当完成一个试品后就需要更换场地或者采用起重设备把试品调离,更换下一个试品,因此传统的试验模式不仅所需仪器设备繁多,接换线反复,仪器和设备需要人工和起重机搬运,测试过程劳动强度大,测试效率慢。而且各个试验项目所得到的数据需要人工输入到计算机中,通过计算机进行计算汇总,不仅数据录入方式会出现差错,而且效率也慢。At present, the traditional test method of power equipment is: personnel or vehicles carry test instruments to the site or to the warehouse to conduct various tests on fixed power equipment. Since power equipment involves multiple performance tests, for the same power equipment, testers need Carry a variety of instruments, and every time a test project is completed, the wiring needs to be replaced to meet the needs of different test projects. In addition, in the case of limited space on site or in the warehouse, it is necessary to change the site or use lifting equipment to remove the test product and replace the next test product every time a test product is completed. Therefore, the traditional test mode not only requires a lot of equipment , Connecting and changing lines repeatedly, instruments and equipment need manual and crane handling, the test process is labor-intensive and the test efficiency is slow. Moreover, the data obtained from each test project needs to be manually input into the computer, and the calculation and summary are performed by the computer. Not only will there be errors in the data entry method, but the efficiency is also slow.
为了提高试验效率,目前有些地方采用固定轨道式转载试品沿着预先铺设的轨道进行流转试验,其虽然提高了试验效率,降低了试验人员的劳动强度,但是其依然存在如下问题:1、轨道铺设工作量大,施工周期长,一般需要2到3个月;2、一旦出现一个故障点,会造成整个试验系统瘫痪;3、轨道一旦铺设好,对于一些新增的试验项目无法在原有试验系统的基础上进行升级,而且改造起来费用巨大,改造工期也长。In order to improve the test efficiency, some places currently use fixed track-type reprinted test samples to carry out flow tests along the pre-laid track. Although it improves the test efficiency and reduces the labor intensity of the test personnel, it still has the following problems: 1. Track The laying workload is heavy and the construction period is long, which generally takes 2 to 3 months; 2. Once a fault point occurs, the entire test system will be paralyzed; 3. Once the track is laid, some newly added test items cannot be tested in the original test. The system is upgraded on the basis of the system, and the cost of transformation is huge, and the transformation period is also long.
发明内容Contents of the invention
本发明所要解决的技术问题之一在于针对各种类型各种规格电力设备进行批量质量抽检的试验方法所存在的诸多技术问题而提供一种基于自动导引运输车的电力设备检测流水线。One of the technical problems to be solved by the present invention is to provide an automatic guided vehicle-based power equipment inspection line for many technical problems in the test method for batch quality sampling inspection of various types and specifications of power equipment.
本发明所要解决的技术问题之二在于提供一种基于自动导引运输车的电力设备检测方法。The second technical problem to be solved by the present invention is to provide a detection method for electrical equipment based on an automatic guided transport vehicle.
本发明所要解决的技术问题可以通过以下技术方案来实现:The technical problem to be solved by the present invention can be realized by the following technical solutions:
一种基于自动导引运输车的电力设备检测流水线,包括:A power equipment testing assembly line based on automatic guided transport vehicles, including:
一试验场地,所述试验场地内设置有多个试验工位和一中控室,各个试验工位布置有不同的试验仪器,中控室内设置有中控计算机,各个试验工位的试验仪器与中控室内的中控计算机之间采用通讯方式连接。A test site, in which a plurality of test stations and a central control room are arranged, each test station is equipped with different test instruments, the central control room is provided with a central control computer, and the test instruments of each test station are connected with the central control room. The central control computers in the control room are connected by means of communication.
至少一台自动导引运输车,该自动导引运输车承载被检电力设备试品,在中控室内的中控计算机控制下,按照一定的试验程序在各个试验工位之间进行运行,对自动导引运输车所承载的被检电力设备试品进行各项试验,各个试验工位的试验仪器将所得到的试验数据采用通讯方式传回中控室内的中控计算机进行汇总。At least one automatic guided transport vehicle, the automatic guided transport vehicle carries the tested electrical equipment test products, and under the control of the central control computer in the central control room, it runs between each test station according to a certain test procedure. The tested electrical equipment samples carried by the automatic guided transport vehicle carry out various tests, and the test instruments at each test station transmit the obtained test data back to the central control computer in the central control room for summary by means of communication.
在本发明的一个优选实施例中,所述通讯方式为通过有线通讯方式或无线通讯方式。In a preferred embodiment of the present invention, the communication method is a wired communication method or a wireless communication method.
在本发明的一个优选实施例中,在所述试验场地内还设置有一个电力设备试品待检工位和电力设备试品已检工位,所述电力设备试品待检工位和电力设备试品已检工位内设置有起重机,当自动导引运输车运行到该电力设备试品待检工位时,被检电力设备试品通过起重机吊装到自动导引运输车上,当自动导引运输车运行到该电力设备试品已检工位时,被检电力设备试品通过起重机吊离自动导引运输车。In a preferred embodiment of the present invention, a power equipment test product waiting station and a power equipment test product inspected station are also set in the test site, and the power equipment test product waiting station and power A crane is installed in the station where the equipment test product has been inspected. When the automatic guided transport vehicle runs to the station where the electric equipment test product is to be inspected, the tested electric equipment test product is hoisted to the automatic guided transport vehicle by the crane. When the guided transport vehicle runs to the position where the power equipment test product has been inspected, the tested power equipment test product is hoisted from the automatic guided transport vehicle by a crane.
在本发明的一个优选实施例中,所述各项试验至少包括电压比测量及联结组标号检定试验项目、绕组直流电阻测量试验项目、温升试验项目、短路阻抗及负载损耗试验项目、空载电流及空载损耗测量试验项目、有载分接开关试验项目、雷电全波冲击试验项目、绕组绝缘电阻试验项目、铁芯、夹件绝缘电阻试验项目、感应耐压试验项目、外施耐压试验项目、局部放电试验项目。In a preferred embodiment of the present invention, the various tests at least include voltage ratio measurement and connection group label verification test items, winding DC resistance measurement test items, temperature rise test items, short circuit impedance and load loss test items, no-load Current and no-load loss measurement test items, on-load tap-changer test items, lightning full-wave impact test items, winding insulation resistance test items, iron core, clip insulation resistance test items, induction withstand voltage test items, externally applied withstand voltage test items Test items, partial discharge test items.
在本发明的一个优选实施例中,所述电力设备至少包括电力变压器、电抗器、电压互感器、电流互感器、高压开关柜、断路器、组合电器、电缆分支箱、环网柜、柱上开关、隔离开关及接地开关、并联电容器成套装置,消弧线圈成套设备。In a preferred embodiment of the present invention, the power equipment includes at least power transformers, reactors, voltage transformers, current transformers, high-voltage switchgear, circuit breakers, combination appliances, cable branch boxes, ring network cabinets, pole-mounted Switches, isolating switches and grounding switches, complete sets of shunt capacitors, complete sets of arc suppression coils.
在本发明的一个优选实施例中,所述中控室设置在试验场地的一端,所述电力设备试品待检工位和电力设备试品已检工位设置试验场地的另一端;各个试验工位设置在中控室与电力设备试品待检工位和电力设备试品已检工位之间。In a preferred embodiment of the present invention, the central control room is set at one end of the test field, and the power equipment sample to-be-inspected station and the power equipment sample inspected station are set at the other end of the test field; The location is set between the central control room and the station where the power equipment sample is to be inspected and the station where the power equipment sample has been inspected.
在本发明的一个优选实施例中,所述试验工位和电力设备试品待检工位和电力设备试品已检工位分成两排平行设置,中间为运输通道。In a preferred embodiment of the present invention, the test station, the station for the power equipment sample to be inspected and the station for the power equipment sample to be inspected are arranged in parallel in two rows, with a transportation channel in the middle.
在本发明的一个优选实施例中,每一试验工位均包括一安全围栏,在所述安全围栏面向运输通道的一侧设置有设备出入闸门,所述设备出入闸门与中控室内的中控计算机控制连接;在所述完全围栏内的一侧设置有一接线提示屏,所述接线提示屏与所述中控室内的中控计算机信号连接;所述安全围栏内的中间位置设置有搁置区;各个试验工位通过检测通道连接,所述检测通道延伸进试验工位内的部分通过检测通道支撑架支撑在所述试验工位的上方;所述检测通道延伸进试验工位内的部分中设置有试验仪器和测试线切换装置,测试线切换装置与所述中控室内的中控计算机控制连接;在所述检测通道支撑架上安装有试验区域控制面板,所述试验区域控制面板与所述中控室内的中控计算机信号连接。In a preferred embodiment of the present invention, each test station includes a safety fence, and an equipment access gate is arranged on the side of the safety fence facing the transportation passage, and the equipment access gate is connected with the central control in the central control room. Computer control connection; a wiring prompt screen is provided on one side of the complete fence, and the wiring prompt screen is connected to the central control computer signal in the central control room; a shelving area is provided in the middle of the safety fence; Each test station is connected by a detection channel, and the part of the detection channel extending into the test station is supported above the test station by the detection channel support frame; the part of the detection channel extending into the test station is set There are test instruments and a test line switching device, and the test line switching device is connected to the central control computer in the central control room; a test area control panel is installed on the detection channel support frame, and the test area control panel is connected to the Central control computer signal connection in the central control room.
一种基于自动导引运输车的电力设备检测方法,包括如下步骤:A method for detecting electrical equipment based on an automatic guided transport vehicle, comprising the steps of:
1.被检电力设备试品的吊装步骤1. Hoisting steps of the tested electrical equipment samples
在该步骤中,被检电力设备试品吊装至电力设备试品待检工位或直接吊装在电力设备试品待检工位的试品托盘上;In this step, the power equipment sample to be inspected is hoisted to the power equipment sample waiting station or directly hoisted on the sample tray of the power equipment sample waiting station;
2.被检电力设备试品基本信息的录入步骤2. The steps of inputting the basic information of the tested electric equipment
2.1.工作人员用移动终端或固定终端新建或调用设备检测任务单,在设备检测任务单内录入被检电力设备试品的基本信息,然后采用通讯方式发送至中央控制室内的中控计算机中,中控计算机中的测控软件根据被试电力设备试品的类型和规格自动生成试验方案,然后通过通讯方式发送至所述移动终端或固定终端上,工作人员在所述移动终端或固定终端上根据试验实际需求选择试验项目,并保存最终的试验方案,生成该被试电力设备试品最终试验任务单,并通过通讯方式发送至中央控制室内的中控计算机中,同时打印出包含被试电力设备试品的类型、规格以及最终的试验方案的信息的标签;2.1. Staff use mobile terminals or fixed terminals to create or call equipment inspection task sheets, enter the basic information of the tested electrical equipment test products in the equipment inspection task sheets, and then send them to the central control computer in the central control room by means of communication. The measurement and control software in the central control computer automatically generates a test plan according to the type and specification of the power equipment to be tested, and then sends it to the mobile terminal or fixed terminal through communication. Select the test items according to the actual requirements of the test, save the final test plan, generate the final test task list of the tested power equipment sample, and send it to the central control computer in the central control room through communication, and print out the list containing the tested power equipment at the same time. A label with information on the type and specification of the test product and the final test protocol;
2.2.工作人员在电力设备试品待检工位内,将步骤2.1生成的标签粘贴在被试电力设备试品上;2.2. The staff paste the label generated in step 2.1 on the tested electric equipment in the station where the electric equipment is to be tested;
2.3.中央控制室内的中控计算机中根据测试任务,安排自动导引运输车服务器生成运输路径;自动导引运输车服务器采用通讯方式向自动导引运输车发送移动轨迹命令;2.3. According to the test tasks, the central control computer in the central control room arranges the automatic guided transport vehicle server to generate the transportation path; the automatic guided transport vehicle server uses communication to send movement trajectory commands to the automatic guided transport vehicle;
3.自动导引运输车运输被试电力设备试品运输至试验工位步骤3. The automatic guided transport vehicle transports the power equipment under test and transports the test product to the test station.
3.1.自动导引运输车运行至电力设备试品待检工位作为其起始位置;3.1. The automatic guided transport vehicle runs to the station where the power equipment test product is to be inspected as its starting position;
3.2.当试验开始时,电力设备试品待检工位内的被试电力设备试品被吊装至自动导引运输车上;或者自动导引运输车接收自动导引运输车服务器的运行指令,根据预先设置的轨迹移动至试品托盘下,自动导引运输车服务器给自动导引运输车发出举升指令,把装载有被试电力设备试品的试品托盘抬升至离地面而搁置在自动导引运输车上;3.2. When the test starts, the tested electrical equipment samples in the power equipment sample waiting station are hoisted onto the automatic guided transport vehicle; or the automatic guided transport vehicle receives the operation instructions from the automatic guided transport vehicle server, Move under the test product tray according to the preset trajectory, and the server of the automatic guided transport vehicle sends a lifting command to the automatic guided transport vehicle, and lifts the test product tray loaded with the tested electric equipment test product to the ground and puts it on the automatic on the guided transport vehicle;
3.3.执行完步骤3.2后,自动导引运输车服务器给自动导引运输车发出移动目标指令,自动导引运输车根据指令沿运行轨迹,将被试电力设备试品运输至某一试验工位内等待试验接线;或者执行完步骤3.2后,自动导引运输车服务器给自动导引运输车发出移动目标指令,自动导引运输车根据指令沿运行轨迹,将被试电力设备试品运输至某一试验工位内,在试验工位内,自动导引运输车的升降台降下试品托盘至试验工位中的试品托盘搁置区上等待接线,自动导引运输车撤出该试验工位在运输通道内待命或执行其它的试验任务;3.3. After step 3.2 is executed, the AGV server sends a moving target command to the AGV, and the AGV transports the power equipment under test to a test station along the running track according to the command. Wait for the test connection; or after step 3.2 is executed, the AGV server sends a moving target command to the AGV, and the AGV transports the power equipment under test to a certain location along the running track according to the command. In a test station, in the test station, the lifting platform of the automatic guided transport vehicle lowers the test product tray to the test product tray storage area in the test station to wait for wiring, and the automatic guided transport vehicle withdraws from the test station Stand by or perform other test tasks in the transportation channel;
4.被试电力试品的试验过程步骤4. The test process steps of the tested electrical test product
4.1.中央控制室内的中控计算机通过设置在所述某一试验工位内的固定读取设备或移动读取设备读取被试电力设备试品上的标签中的信息,确认该试验工位内的试验项目;确认后通过设置该试验工位内的接线提示显示屏显示试验接线图,并容许工作人员进入该试验工位内进行接线;4.1. The central control computer in the central control room reads the information in the label on the tested power equipment sample through the fixed reading device or mobile reading device installed in the test station, and confirms that the test station The test items in the test station; after confirmation, display the test wiring diagram by setting the wiring prompt display in the test station, and allow the staff to enter the test station for wiring;
4.2.工作人员进入该试验工位内后,中央控制室内的中控计算机控制该试验工位内的测试线切换装置会根据此次试验项目自动落下相关试验项目测试线,接线人员根据接线提示显示屏进行接线;4.2. After the staff enters the test station, the central control computer in the central control room controls the test line switching device in the test station to automatically drop the test line of the relevant test items according to the test items, and the wiring personnel display according to the wiring prompts. screen for wiring;
4.3.工作人员完成接线后,离开试验工位,并在按下该试验工位的试验区域控制面板上的“试验开始”确认按钮,中央控制室内的中控计算机确认信息后,中央控制室内的中控计算机中的测控软件根据预设的试验流程进行试验;4.3. After the staff completes the wiring, leave the test station, press the "test start" confirmation button on the control panel of the test area of the test station, and the central control computer in the central control room confirms the information. The measurement and control software in the central control computer conducts tests according to the preset test process;
4.4.当该试验工位的试验完成后,中央控制室内的中控计算机自动发出指令,通知工作人员该试验工位需要进行撤线,工作人员收到或看到指令后,进入该试验工位内,解除被试电力设备试品上的测试线;完成撤线后,工作人员离开该试验工位,并在该试验工位的试验区域控制面板上按下“试验结束”确认按钮,测试线切换装置自动收起复位;4.4. After the test of the test station is completed, the central control computer in the central control room will automatically issue an instruction to notify the staff that the test station needs to be withdrawn. After the staff receives or sees the instruction, enter the test station Inside, release the test line on the tested electrical equipment sample; after completing the line withdrawal, the staff leave the test station, and press the "test end" confirmation button on the test area control panel of the test station, the test line The switching device automatically retracts and resets;
4.5.当某一试验工位的试验完成后,中央控制室内的中控计算机通过自动导引运输车服务器给在该试验工位内的自动导引运输车发出下一步运行指令,自动导引运输车携带被试电力设备试品根据指令沿运行轨迹,将被试电力设备试品运输至下一试验工位内,重复上述步骤3.3至步骤4.4进行下一次试验;或者自动导引运输车携带被试电力设备试品根据指令沿运行轨迹,运行到电力设备试品已检工位内,在电力设备试品已检工位内将被试电力设备试品吊离自动导引运输车;或者中央控制室内的中控计算机通过自动导引运输车服务器给空闲的自动导引运输车发出指令,空闲的自动导引运输车收到指令后,沿运行轨迹运行到该试验工位内的试品托盘下方并将试品托盘举升到该空闲的自动导引运输车上,然后该空闲的自动导引运输车携带被试电力设备试品沿运行轨迹,将被试电力设备试品运输至下一试验工位内,重复上述步骤3.3至步骤4.4进行下一次试验;或者中央控制室内的中控计算机通过自动导引运输车服务器给空闲的自动导引运输车发出指令,空闲的自动导引运输车收到指令后,沿运行轨迹运行到该试验工位内的试品托盘下方并将试品托盘举升到该空闲的自动导引运输车上,然后该空闲的自动导引运输车携带被试电力设备试品沿运行轨迹,运行到电力设备试品已检工位内,在电力设备试品已检工位内将被试电力设备试品吊离自动导引运输车。4.5. When the test of a certain test station is completed, the central control computer in the central control room sends the next operation instruction to the automatic guided transport vehicle in the test station through the automatic guided transport vehicle server to automatically guide the transport The vehicle carries the tested electrical equipment sample along the running track according to the instructions, transports the tested electrical equipment sample to the next test station, repeats the above steps 3.3 to 4.4 for the next test; or the automatic guided transport vehicle carries the tested electrical equipment According to the instruction, the test product of electric equipment runs to the inspected station of the electric equipment sample along the running track, and lifts the tested electric equipment sample from the automatic guided transport vehicle in the inspected station of the electric equipment test product; or the central The central control computer in the control room sends instructions to the idle automatic guided vehicles through the automatic guided vehicles server, and after receiving the instructions, the idle automatic guided vehicles run along the running track to the test product tray in the test station and lift the test product tray onto the idle automatic guided transport vehicle, and then the idle automatic guided transport vehicle carries the tested power equipment test product along the running track, and transports the tested power equipment test product to the next In the test station, repeat the above steps 3.3 to 4.4 for the next test; or the central control computer in the central control room sends instructions to the idle AGV through the AGV server, and the idle AGV After receiving the instruction, run along the running track to the bottom of the test product tray in the test station and lift the test product tray onto the idle automatic guided transport vehicle, and then the idle automatic guided transport vehicle carries the test object The power equipment test product runs along the running track to the power equipment test product inspected station, and the power equipment test product under test is hoisted from the automatic guided transport vehicle in the power equipment test product inspected station.
由于采用了如上的技术方案,本发明将目前用于生产线的自动导引运输车应用到电力设备试验中,相对于传统的电力设备传统试验方式检测效率更高,试验人员的劳动强度更小。相对于轨道式电力设备试验流水线而言,具有试验场地建设工程量少、建设周期短的优点,当一个自动导引运输车发生故障时,其它的自动导引运输车可继续工作,不影响试验中心的运转。针对新增的试验项目,本发明具有升级快,费用低的优点。Due to the adoption of the above technical solution, the present invention applies the automatic guided transport vehicle currently used in the production line to the power equipment test. Compared with the traditional power equipment, the traditional test method has higher detection efficiency and less labor intensity for testers. Compared with the track-type power equipment test assembly line, it has the advantages of less construction work of the test site and a shorter construction period. When an automatic guided transport vehicle fails, other automatic guided transport vehicles can continue to work without affecting the test. The operation of the center. For newly added test items, the present invention has the advantages of fast upgrading and low cost.
附图说明Description of drawings
图1为自动导引运输车的正视图。Figure 1 is a front view of an automated guided transport vehicle.
图2为自动导引运输车的左视图。Figure 2 is a left side view of the automated guided transport vehicle.
图3为自动导引运输车的俯视图。Figure 3 is a top view of the automated guided transport vehicle.
图4为自动导引运输车的立体图。Fig. 4 is a perspective view of an automatic guided transport vehicle.
图5为自动导引运输车的直线运动轨迹示意图。Fig. 5 is a schematic diagram of the linear motion trajectory of the automatic guided transport vehicle.
图6为自动导引运输车的斜线运动轨迹示意图。Fig. 6 is a schematic diagram of the oblique movement trajectory of the automatic guided transport vehicle.
图7为自动导引运输车的任意曲线运动轨迹示意图。Fig. 7 is a schematic diagram of an arbitrary curved motion track of an automatic guided transport vehicle.
图8为自动导引运输车的零回转半径转动轨迹示意图。Fig. 8 is a schematic diagram of the zero turning radius turning track of the automatic guided transport vehicle.
图9为本发明的电力设备质量检测试验中心的试验场地布置示意图。Fig. 9 is a schematic diagram of the test site layout of the power equipment quality inspection test center of the present invention.
图10为本发明的电力设备质量检测试验中心中一个试验工位的结构示意图。Fig. 10 is a schematic structural diagram of a test station in the power equipment quality inspection test center of the present invention.
具体实施方式detailed description
以下结合附图和具体实施方式来进一步描述本发明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
参见图1至图8,本发明所使用的自动导引运输车200采用用于生产线上用于搬运的自动导引运输车(AGV)。Referring to FIG. 1 to FIG. 8 , the automatic guided vehicle 200 used in the present invention is an automatic guided vehicle (AGV) used for handling on a production line.
该自动导引运输车200的承载能力可以达到0-50t,同时重载下可实现直行、横行、斜行、任一曲线移动、零回转半径转动等全向移动能力。该自动导引运输车200可以采用多种控制方式,例如有线控制、无线遥控控制以及工控机自动控制等,还可以选用多种定位方式进行定位,例如视频寻迹定位、IGPS定位以及磁钉寻迹定位。因此该自动导引运输车200可以用以电力设备试验用。The automatic guided transport vehicle 200 has a carrying capacity of 0-50 tons, and can realize omnidirectional movement capabilities such as straight travel, horizontal travel, oblique travel, any curved movement, and zero-turn radius rotation under heavy loads. The automatic guided transport vehicle 200 can adopt a variety of control methods, such as wired control, wireless remote control, and industrial computer automatic control, etc., and can also choose a variety of positioning methods for positioning, such as video tracking positioning, IGPS positioning and magnetic nail positioning. trace positioning. Therefore, the automatic guided transport vehicle 200 can be used for electric equipment testing.
当自动导引运输车用于电力设备试验时,参见图9,建立一个试验场地100,配合该自动导引运输车200,可以形成一个无轨的电力设备试验流水线。When the automatic guided transport vehicle is used for the electric equipment test, referring to FIG. 9 , a test site 100 is established, and the automatic guided transport vehicle 200 can be used to form a trackless electric equipment test assembly line.
继续参见图9,在试验场地100设置八个试验工位101、102、103、104、105、106、107、一个中央控制室109、一个电力设备试品待检工位110和一个电力设备试品已检工位111,当然试验工位的数量还可以不限于八个,还可以根据需要增减。Continuing to refer to Fig. 9, eight test stations 101, 102, 103, 104, 105, 106, 107, a central control room 109, a station 110 for power equipment samples to be tested and a power equipment test station are set in the test site 100. The product inspection station 111, of course, the number of test stations can not be limited to eight, and can also be increased or decreased as required.
中央控控制室109设置在试验场地100的一端,电力设备试品待检工位110和电力设备试品已检工位111设置试验场地100的另一端;八个试验工位101、102、103、104、105、106、107、108分成两排设置在中央控控制室109与电力设备试品待检工位110和电力设备试品已检工位111之间。电力设备试品待检工位110和试验工位101、102、103、104为一排,电力设备试品已检工位111和试验工位105、106、107、108为另一排,两排试验工位之间为运输通道112。The central control control room 109 is set at one end of the test site 100, and the station 110 for power equipment samples to be inspected and the station 111 for power equipment test products to be inspected are set at the other end of the test site 100; eight test stations 101, 102, 103 , 104, 105, 106, 107, 108 are divided into two rows and arranged between the central control control room 109 and the station 110 for the power equipment sample to be inspected and the station 111 for the power equipment sample to be inspected. The station 110 for power equipment samples to be inspected and the test stations 101, 102, 103, 104 form a row, and the station 111 for power equipment samples to be inspected and the test stations 105, 106, 107, 108 form another row. There is a transport channel 112 between the rows of test stations.
八个试验工位101、102、103、104、105、106、107、108针对不同的试验项目布置有不同的试验仪器,例如针对电压比测量及联结组标号检定试验项目、绕组直流电阻测量试验项目、温升试验项目、短路阻抗及负载损耗试验项目、空载电流及空载损耗测量试验项目、有载分接开关试验项目,可以在试验工位101、102、106中的任一试验工位均布置有变比测试仪、三相直流电阻测试仪、三相试验电源、变压器参数测试仪、温度巡检仪、直流电阻测试仪、变压器参数测试仪、三相试验电源、有载分解开关测试仪;试验工位101、102、106所配置的试验仪器是相同的,这样设置的原因在于配电变压器检测工作量大,而且配电变压器的温升试验占用时间长(约10个小时)。配置三个相同的试验工位能够实现试验效率的大幅提高,工作人员进入到试验工位101、102、106后,只要进行一次接线,就能自动完成该试验工位的所有试验项目。The eight test stations 101, 102, 103, 104, 105, 106, 107, and 108 are equipped with different test instruments for different test items, such as voltage ratio measurement and connection group label verification test items, winding DC resistance measurement test test items, temperature rise test items, short-circuit impedance and load loss test items, no-load current and no-load loss measurement test items, and on-load tap-changer test items, can be used in any of the test stations 101, 102, and 106. There are transformation ratio tester, three-phase DC resistance tester, three-phase test power supply, transformer parameter tester, temperature inspection instrument, DC resistance tester, transformer parameter tester, three-phase test power supply, and on-load decomposition switch. Tester; the test instruments configured in the test stations 101, 102, and 106 are the same. The reason for this setting is that the detection workload of the distribution transformer is large, and the temperature rise test of the distribution transformer takes a long time (about 10 hours). . The configuration of three identical test stations can greatly improve the test efficiency. After the staff enters the test stations 101, 102, and 106, all the test items of the test stations can be automatically completed only by wiring once.
针对雷电全波冲击试验项目,可以在试验工位108设置冲击试验装置;工作人员进入到试验工位108后,只要进行一次接线,就能自动完成该试验工位的所有试验项目。For the lightning full-wave impact test items, an impact test device can be installed at the test station 108; after the staff enters the test station 108, all the test items of the test station can be automatically completed as long as one wiring is performed.
针对绕组绝缘电阻试验项目、铁芯、夹件绝缘电阻试验项目、感应耐压试验项目、外施耐压试验项目、局部放电试验项目,可以在试验工位107设置电子式绝缘电阻表、无局放变频电源、无局放试验变压器、无局放分压器、无局放变频电源、局放测试仪、无局放分压器(耦合电容),工作人员进入到试验工位107后,只要进行一次接线,就能自动完成该试验工位的所有试验项目。For the winding insulation resistance test items, iron core, clamp insulation resistance test items, induction withstand voltage test items, externally applied withstand voltage test items, and partial discharge test items, an electronic insulation resistance meter can be set at the test station 107. Frequency conversion power supply, no partial discharge test transformer, no partial discharge voltage divider, no partial discharge variable frequency power supply, partial discharge tester, no partial discharge voltage divider (coupling capacitor), after the staff enters the test station 107, as long as Once wiring is performed, all test items of the test station can be automatically completed.
总之上述试验场地100的规划原则是:被检电力设备试品数量多和试验项目多的试验工位安排在靠近电力设备试品已检工位111设置试验场地100的地方;将接线方式相类似的试验项目归在一个试验工位中,减少换线时间;将同一电力设备试品的多个试验项目集中在同一试验工位中,以减少电力设备试品的搬运时间;进行冲击试验和局放试验等高压试验的试验工位107设置屏蔽房内。In short, the planning principle of the above-mentioned test site 100 is: the test station with a large number of tested electric equipment samples and many test items is arranged in the place where the test site 100 is set up close to the inspected station 111 of the electric equipment test product; the wiring method is similar The test items are grouped in one test station to reduce the line change time; multiple test items of the same power equipment test product are concentrated in the same test station to reduce the handling time of the power equipment test product; The test station 107 for the high voltage test such as the discharge test is set in the shielding room.
为了使各个试验工位的试验数据能快速汇总,八个试验工位101、102、103、104、105、106、107、108所配置的试验仪器与中央控制室109内的中控计算机通过有线方式(如光纤通讯、电缆通讯等)或无线方式(Wifi、蓝牙等)通讯连接。这样各个试验工位的试验数据能快速汇总,避免人工输入所存在的差错率高,效率低的问题。In order to quickly summarize the test data of each test station, the test instruments configured in the eight test stations 101, 102, 103, 104, 105, 106, 107, and 108 are connected to the central control computer in the central control room 109 through wired Communication methods (such as optical fiber communication, cable communication, etc.) or wireless methods (Wifi, Bluetooth, etc.) communication connection. In this way, the test data of each test station can be quickly summarized, avoiding the problems of high error rate and low efficiency in manual input.
下面以试验工位101为例来详细说明各个试验工位的结构,参见图9,试验工位101包括一安全围栏101a,在安全围栏101a面向运输通道112的一侧设置有设备出入闸门101b,背向运输通道112的一侧设置有接线出入闸门101k,设备出入闸门101b和接线出入闸门101k与中央控制室109内的中控计算机控制连接。Take the test station 101 as an example below to describe the structure of each test station in detail. Referring to FIG. 9, the test station 101 includes a safety fence 101a, and the side of the safety fence 101a facing the transport passage 112 is provided with an equipment access gate 101b. The side facing away from the transportation channel 112 is provided with a wiring access gate 101k, and the equipment access gate 101b and the wiring access gate 101k are connected to the central control computer in the central control room 109 under control.
在完全围栏101a内的左侧设置有一接线提示屏101c,接线提示屏101c与中央控制室109内的中控计算机信号连接。A wiring prompt screen 101c is arranged on the left side in the complete fence 101a, and the wiring prompt screen 101c is connected with the central control computer in the central control room 109 by signal.
在安全围栏101a内的中间位置设置有试验区域101d,在试验区域101d内设置试品托盘搁置区101e,试验时,试品托盘101f搁置在该试品托盘搁置区101e上。A test area 101d is set in the middle of the safety fence 101a, and a sample tray rest area 101e is set in the test area 101d. During the test, the sample tray 101f is placed on the sample tray rest area 101e.
各个试验工位通过检测通道113连接,检测通道113延伸进试验工位101内的部分113a通过检测通道支撑架101g支撑在试验工位101的上方,检测通道113延伸进试验工位101内的部分113a中设置有试验仪器300和测试线切换装置310,测试线切换装置310与中央控制室109内的中控计算机控制连接;在检测通道支撑架101g上安装有试验区域控制面板101h,试验区域控制面板101h与中央控制室109内的中控计算机信号连接。Each test station is connected by a detection channel 113, and the part 113a of the detection channel 113 extending into the test station 101 is supported above the test station 101 by the detection channel support frame 101g, and the detection channel 113 extends into the part of the test station 101 113a is provided with a test instrument 300 and a test line switching device 310, and the test line switching device 310 is connected to the central control computer in the central control room 109; a test area control panel 101h is installed on the detection channel support frame 101g, and the test area control The panel 101h is signally connected to the central control computer in the central control room 109 .
本发明的核心是电力设备试品依靠一台自动导引运输车200(参见图1至图8)来承载,自动导引运输车200在中央控制室109内的中控计算机控制下,按照一定的试验程序在八个试验工位101、102、103、104、105、106、107、108之间进行运行,对自动导引运输车200所承载的电力设备试品进行各项试验。The core of the present invention is that the power equipment test product is carried by an automatic guided transport vehicle 200 (see Fig. 1 to Fig. 8), and the automatic guided transport vehicle 200 is controlled by the central control computer in the central control room The test program is run among the eight test stations 101, 102, 103, 104, 105, 106, 107, and 108, and various tests are performed on the power equipment samples carried by the automatic guided transport vehicle 200.
下面具体描述配电变压器的试验过程:The following describes the test process of the distribution transformer in detail:
1、配电变压器试品的吊装1. Hoisting of distribution transformer test products
载有配电变压器试品的卡车进入电力设备试品待检工位110,起重机将配电变压器试品吊装至电力设备试品待检工位110或直接吊装在电力设备试品待检工位110的试品托盘101f上。The truck carrying the distribution transformer test product enters the power equipment test product waiting station 110, and the crane lifts the distribution transformer test product to the power equipment test product waiting station 110 or directly hoists it at the power equipment test product waiting station 110 on the sample tray 101f.
2、配电变压器试品基本信息的录入2. Entry of basic information of distribution transformer test products
a、工作人员在电力设备试品待检工位110内,将二维码打印机生成的二维码贴纸粘贴在待检的配电变压器试品上。a. The staff paste the QR code sticker generated by the QR code printer on the distribution transformer test product to be inspected in the station 110 for the power equipment test product to be inspected.
b、工作人员用平板电脑新建或调用设备检测任务单,在设备检测任务单内录入待检配电变压器试品的基本信息,中央控制室109内的中控计算机中的测控软件根据配电变压器试品的类型自动生成试验方案,工作人员根据试验实际需求选择试验项目,并保存方案,生成该配电变压器试品最终试验任务单,并通过无线网络发送至中央控制室109内的中控计算机中。b. The staff use a tablet computer to create or call an equipment inspection task list, and enter the basic information of the distribution transformer test product to be inspected in the equipment inspection task list. The measurement and control software in the central control computer in the central control room 109 performs the distribution transformer The test plan is automatically generated according to the type of test product, and the staff selects the test items according to the actual needs of the test, and saves the plan, generates the final test task list of the distribution transformer test product, and sends it to the central control computer in the central control room 109 through the wireless network middle.
c、中央控制室109内的中控计算机中根据测试任务,安排自动导引运输车服务器生成运输路径。自动导引运输车服务器通过专用无线信号向自动导引运输车200发送移动轨迹命令。c. The central control computer in the central control room 109 arranges the automatic guided transport vehicle server to generate the transport route according to the test task. The AGV server sends a movement trajectory command to the AGV 200 through a dedicated wireless signal.
3、自动导引运输车200运输试品进行试验3. Automated guided transport vehicles 200 to transport test products for testing
a、自动导引运输车200的起始位置在电力设备试品待检工位110。a. The starting position of the automatic guided transport vehicle 200 is at the station 110 of the power equipment sample to be inspected.
b、当试验开始时,自动导引运输车200接收自动导引运输车服务器的运行指令,根据预先设置的轨迹移动至试品托盘101f下,自动导引运输车服务器给自动导引运输车200发出举升指令,把试品托盘101f抬升至离地面而搁置在自动导引运输车200上。b. When the test starts, the AGV 200 receives the operation instruction from the AGV server, moves to the test product tray 101f according to the preset trajectory, and the AGV server sends the AGV 200 A lifting command is issued to lift the sample tray 101f off the ground and place it on the automatic guided transport vehicle 200 .
c、自动导引运输车200举升试品托盘101f和配电变压器完毕后,自动导引运输车服务器给自动导引运输车200发出移动目标指令,自动导引运输车200根据指令沿运行轨迹,将配电变压器试品运输至试验工位101的安全围栏101a前。中央控制室109内的中控计算机发出指令打开试验工位101的设备出入闸门101b,自动导引运输车200进入试验工位101。自动导引运输车200的升降台降下试品托盘101f至试验区域101d的试品托盘搁置区101e,自动导引运输车200撤出试验工位101,自动导引运输车200在运输通道112内待命或执行其它的试验任务,试验工位101的设备出入闸门101b关闭。(试验工位101上方有警示灯,当试验工位101无试品时,显示绿色常亮,当有试品进入,等待接线时,警示灯绿色闪烁。)c. After the automatic guided transport vehicle 200 lifts the test product tray 101f and the distribution transformer, the automatic guided transport vehicle server sends a moving target instruction to the automatic guided transport vehicle 200, and the automatic guided transport vehicle 200 follows the instruction along the running track , transport the distribution transformer test sample to the safety fence 101a of the test station 101. The central control computer in the central control room 109 issues an instruction to open the equipment access gate 101b of the test station 101, and automatically guides the transport vehicle 200 into the test station 101. The lifting table of the automatic guided transport vehicle 200 lowers the test product tray 101f to the test product tray storage area 101e in the test area 101d, the automatic guided transport vehicle 200 withdraws from the test station 101, and the automatic guided transport vehicle 200 is in the transport channel 112 Standby or perform other test tasks, the equipment access gate 101b of the test station 101 is closed. (There is a warning light above the test station 101. When there is no test product at the test station 101, the green light is always on. When there is a test product entering and waiting for wiring, the warning light flashes green.)
4、试验过程4. Test process
a.读取二维码信息:在试验工位101的一侧安装有高清摄像头,当试品托盘101f到达试验位置后,中央控制室109内的中控计算机通过高清摄像头自动扫描二维码信息,确认在试验工位101内的试验项目。接线提示显示屏101c显示试验接线图,自动打开试验工位101内的接线出入闸门101k的闭锁。试验区域控制面板101h显示当前试验项目和提示接线人员可以进入安全围栏101a内接线。a. Read the two-dimensional code information: a high-definition camera is installed on one side of the test station 101. When the test product tray 101f reaches the test position, the central control computer in the central control room 109 automatically scans the two-dimensional code information through the high-definition camera , to confirm the test items in the test station 101. The wiring prompt display screen 101c displays the test wiring diagram, and automatically opens the lock of the wiring access gate 101k in the test station 101 . The test area control panel 101h displays the current test items and prompts the wiring personnel to enter the safety fence 101a for wiring.
b.试品接线:接线的工作人员在安全通道,发现试验工位101警示灯绿色闪烁时,手动打开接线出入闸门101k,进入试验工位101内接线。在试验工位101上方的测试线切换装置310会根据此次试验项目自动落下相关测试线,测试线具有明显的标识,接线人员根据接线提示显示屏进行接线。b. Test product wiring: When the wiring staff finds that the warning light of the test station 101 is flashing green in the safe passage, they manually open the wiring access gate 101k and enter the test station 101 for wiring. The test line switching device 310 above the test station 101 will automatically drop the relevant test lines according to the test items. The test lines have obvious signs, and the wiring personnel will perform wiring according to the wiring prompt display.
c.开始试验:接线人员完成接线后,离开试验工位101,手动关闭接线出入闸门101k,并在试验区域控制面板101h按下试验开始确认按钮。中央控制室109内的中控计算机检测接线出入闸门101k、设备出入闸门101b和试验区域控制面板101h的确认信息后,自动关闭接线出入闸门101k的闭锁装置,测控软件根据预设的试验流程进行试验,试验过程中警灯红色闪烁。c. Start the test: After the wiring personnel complete the wiring, they leave the test station 101, manually close the wiring access gate 101k, and press the test start confirmation button on the control panel 101h of the test area. After the central control computer in the central control room 109 detects the confirmation information of the wiring access gate 101k, the equipment access gate 101b and the test area control panel 101h, it automatically closes the locking device of the wiring access gate 101k, and the measurement and control software conducts the test according to the preset test process , the warning light flashes red during the test.
d.试品撤线:当试验工位101的试验完成后,自动打开接线出入闸门101k的闭锁装置,警示灯绿色闪烁,提示试验区域需要撤线。接线工作人员手动打开接线出入闸门101k进入试验区域,解除配电变压器试品测试线,接线工作人员撤离试验工位101,关闭接线出入闸门101k,并在试验区域控制面板101h按下试验结束确认按钮,测试线切换装置310自动收起复位。d. Test product withdrawal: After the test of the test station 101 is completed, the locking device of the wiring access gate 101k is automatically opened, and the warning light flashes green, indicating that the test area needs to be withdrawn. The wiring staff manually opens the wiring access gate 101k to enter the test area, releases the distribution transformer test product test line, the wiring staff evacuates the test station 101, closes the wiring access gate 101k, and presses the test end confirmation button on the test area control panel 101h , the test line switching device 310 is automatically retracted and reset.
e.更换试验区域:中央控制室109内的中控计算机根据任务单试验项目要求完成,发出指令给空闲的自动导引运输车200,移动至试验工位101的试品托盘101f下并举升,把配电变压器试品移动至试验工位107进行其余的试验项目。e. Replacement of the test area: the central control computer in the central control room 109 completes the test items according to the task list, and sends an instruction to the idle automatic guided transport vehicle 200 to move to the test station 101 under the test product tray 101f and lift it up. Move the distribution transformer test product to the test station 107 to carry out the rest of the test items.
f.试验区域的流程,重复a至e的步骤。f. For the flow of the test area, repeat steps a to e.
g.更换试验区域:中央控制室109内的中控计算机根据任务单试验项目要求完成,发出指令给空闲的自动导引运输车200,移动至试验工位107试品托盘下并举升,把配电变压器试品移动至试验工位108进行其余的试验项目。g. Replacing the test area: The central control computer in the central control room 109 completes the test items according to the task list, and sends an instruction to the idle automatic guided transport vehicle 200 to move to the test station 107 under the test product tray and lift it up. The electric transformer test product moves to the test station 108 to carry out the remaining test items.
h.试验区域的流程,重复a至e的步骤。h. For the flow of the test area, repeat steps a to e.
i.试验结束:当试品完成所有的试验项目后,自动导引运输车200把配电变压器试品移动至电力设备试品已检工位111,并放下试品托盘。中央控制室109内的中控计算机根据试验项目和试验数据自动给出试验报表并保存,并提示试验数据是否超差,提供相应的国标查询,方便工作人员做出判断。i. End of the test: when the test item has completed all the test items, the automatic guided transport vehicle 200 moves the distribution transformer test item to the inspection station 111 of the power equipment test item, and puts down the test item tray. The central control computer in the central control room 109 automatically provides and saves the test report according to the test items and test data, and prompts whether the test data is out of tolerance, and provides corresponding national standard inquiries to facilitate staff to make judgments.
5、配电变压器试品的卸载5. Unloading of distribution transformer test products
在电力设备试品已检工位111,工作人员利用起重机吊离试品至试品已检区。At the station 111 where the power equipment has been inspected, the staff uses a crane to lift the sample to the inspected area.
配电变压器试验项目以及各工位配置的检测仪器见表1See Table 1 for distribution transformer test items and testing instruments configured at each station
表1Table 1
注:试验区域101、102、106所配置的检测仪器是相同的,这么规划的原因在于配电变压器检测工作量大,而且配电变压器的温升试验占用时间长(约10小时)。Note: The detection instruments configured in test areas 101, 102, and 106 are the same. The reason for this planning is that the detection workload of distribution transformers is heavy, and the temperature rise test of distribution transformers takes a long time (about 10 hours).
规划三个相同配置试验区域能够实现检测效率的大幅提高。Planning three test areas with the same configuration can greatly improve the detection efficiency.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410056791.XA CN104049155B (en) | 2014-02-19 | 2014-02-19 | Electrical equipment detection line and detection method based on automatic guidance carrier vehicle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410056791.XA CN104049155B (en) | 2014-02-19 | 2014-02-19 | Electrical equipment detection line and detection method based on automatic guidance carrier vehicle |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104049155A CN104049155A (en) | 2014-09-17 |
CN104049155B true CN104049155B (en) | 2017-02-01 |
Family
ID=51502248
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410056791.XA Expired - Fee Related CN104049155B (en) | 2014-02-19 | 2014-02-19 | Electrical equipment detection line and detection method based on automatic guidance carrier vehicle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104049155B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104407297B (en) * | 2014-12-02 | 2017-08-04 | 上海电机系统节能工程技术研究中心有限公司 | A kind of Multi-station full-automatic motor stator comprehensive test device |
CN105486958A (en) * | 2016-01-13 | 2016-04-13 | 厦门理工学院 | Automatic test apparatus of switch cabinets |
CN106625669A (en) * | 2016-12-23 | 2017-05-10 | 广州市科腾智能装备股份有限公司 | All-directional moving visual robot system |
CN107622286A (en) * | 2017-08-21 | 2018-01-23 | 苏州华电电气股份有限公司 | The electric test product flexibility laboratory of distribution |
CN107918369A (en) * | 2017-11-28 | 2018-04-17 | 华翔翔能电气股份有限公司 | A kind of gas-filling cabinet assembly line docking location control system and method |
CN108873833B (en) * | 2018-06-08 | 2020-12-08 | 广州市远能物流自动化设备科技有限公司 | Movement control method of automatic guided transport vehicle and automatic guided transport vehicle |
CN110554258B (en) * | 2019-08-02 | 2022-06-07 | 广东电网有限责任公司广州供电局 | Lightning arrester and transformer detection system |
CN113447845B (en) * | 2021-06-17 | 2023-07-25 | 北京京能电力股份有限公司 | Electrical equipment maintenance method and system based on intelligent fence |
CN113504421B (en) * | 2021-06-23 | 2023-10-13 | 中国电子科技集团公司第三十八研究所 | Full-automatic aging method for electronic product |
CN115308586A (en) * | 2022-08-03 | 2022-11-08 | 西安高压电器研究院股份有限公司 | An intelligent device for insulation type test and its control method |
CN115339834A (en) * | 2022-09-19 | 2022-11-15 | 上海电气集团上海电机厂有限公司 | Intelligent circulation system of annular track |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5125783A (en) * | 1989-11-14 | 1992-06-30 | Fujitsu Limited | Automatic conveyance system |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3307189B2 (en) * | 1995-10-17 | 2002-07-24 | 安藤電気株式会社 | Automatic transfer method of burn-in board by automatic guided vehicle and burn-in test system |
JP5032170B2 (en) * | 2007-03-23 | 2012-09-26 | 東京エレクトロン株式会社 | Inspection device |
TWI452643B (en) * | 2006-05-11 | 2014-09-11 | Tokyo Electron Ltd | Inspection device and inspection method |
US7741837B2 (en) * | 2007-05-15 | 2010-06-22 | Tokyo Electron Limited | Probe apparatus |
JP5088167B2 (en) * | 2008-02-22 | 2012-12-05 | 東京エレクトロン株式会社 | PROBE DEVICE, PROBING METHOD, AND STORAGE MEDIUM |
CN102298135A (en) * | 2011-07-22 | 2011-12-28 | 浙江省电力公司 | Artificial verification system |
CN102955430A (en) * | 2012-11-08 | 2013-03-06 | 江苏省电力公司电力科学研究院 | Establishing method of full-automatic detecting system of electric energy meter based on emulation technique |
CN102955882B (en) * | 2012-11-08 | 2014-02-26 | 江苏省电力公司电力科学研究院 | Simulation system for automatic detection and simulation of ultra-large-scale smart energy meters |
CN204086412U (en) * | 2014-02-19 | 2015-01-07 | 上海思创电器设备有限公司 | A kind of electric device maintenance streamline based on automatical pilot transportation vehicle |
-
2014
- 2014-02-19 CN CN201410056791.XA patent/CN104049155B/en not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5125783A (en) * | 1989-11-14 | 1992-06-30 | Fujitsu Limited | Automatic conveyance system |
Also Published As
Publication number | Publication date |
---|---|
CN104049155A (en) | 2014-09-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104049155B (en) | Electrical equipment detection line and detection method based on automatic guidance carrier vehicle | |
CN103344895B (en) | Automatic verification system of low-voltage current transformer | |
CN104020434B (en) | Automatic calibrating system for metering low-voltage current transformer | |
CN103713221A (en) | Low-frequency transformer automatic comprehensive test machine based on GROOVY data collecting and analyzing system controlled by PLC | |
CN103969525A (en) | Flexible net-in quality detection system and method for electrical equipment | |
CN110286290A (en) | A transformer automatic wiring device | |
CN102582495A (en) | Vehicle-mounted comprehensive test system used for condition based maintenance for electrical equipment | |
CN204086412U (en) | A kind of electric device maintenance streamline based on automatical pilot transportation vehicle | |
CN104062520B (en) | A kind of application of automatical pilot transportation vehicle in electric device maintenance streamline | |
CN105842541A (en) | Rapid testing apparatus and testing method for large scale transformer's direct current resistance | |
CN105425189B (en) | Extra-high voltage transformer separate type verifies platform and its installation and checking method | |
WO2022198896A1 (en) | Current transformer composite error testing apparatus and method | |
CN116794588B (en) | Full-automatic wiring device and method for calibrating multi-path distribution network high-voltage current transformer | |
CN205581286U (en) | Portable current transformer examination laboratory | |
CN220064274U (en) | Semiconductor test system | |
CN204556675U (en) | The disposable termination in transformer test station | |
CN207867015U (en) | A kind of voltage transformer error electrification Compare System | |
CN102866320A (en) | Cable detecting method | |
CN116298729A (en) | Full-automatic high-voltage insulating glove withstand voltage test cabinet | |
CN208654305U (en) | Current Transformer Error Verification Equipment | |
CN116151593A (en) | Material detection system and medium based on multi-mode adaptive technology | |
CN103675587A (en) | Magnetic leakage field measuring type dry-type reactor on-line monitoring device and method | |
CN202748856U (en) | Substation operation inspection support system | |
CN115159010B (en) | Automatic production line of low-voltage switch cabinet | |
CN106353661A (en) | Lifting device for checking and detecting inventory power equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201012 Address after: 201322 Shanghai City, Pudong New Area Chuansha New Town Industrial Zone, Deer Park Deer Ji Road No. 91-3 Patentee after: SHANGHAI SICHUANG ELECTRIC EQUIPMENT Co.,Ltd. Patentee after: STATE GRID JIANGSU ELECTRIC POWER Research Institute Address before: 201322 Shanghai City, Pudong New Area Chuansha New Town Industrial Zone, Deer Park Deer Ji Road No. 91-3 Patentee before: SHANGHAI SICHUANG ELECTRIC EQUIPMENT Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170201 Termination date: 20210219 |