[go: up one dir, main page]

CN104018811B - A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method - Google Patents

A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method Download PDF

Info

Publication number
CN104018811B
CN104018811B CN201410226724.8A CN201410226724A CN104018811B CN 104018811 B CN104018811 B CN 104018811B CN 201410226724 A CN201410226724 A CN 201410226724A CN 104018811 B CN104018811 B CN 104018811B
Authority
CN
China
Prior art keywords
slag
annular
slag forming
led
drilling machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410226724.8A
Other languages
Chinese (zh)
Other versions
CN104018811A (en
Inventor
赵林
张佐鑫
卢晓辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Group Mining Co Ltd
Original Assignee
Angang Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Group Mining Co Ltd filed Critical Angang Group Mining Co Ltd
Priority to CN201410226724.8A priority Critical patent/CN104018811B/en
Publication of CN104018811A publication Critical patent/CN104018811A/en
Application granted granted Critical
Publication of CN104018811B publication Critical patent/CN104018811B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The present invention relates to a kind of upright opening drill hole of drilling machine operation lead slag forming device and lead slag forming method, annular lead slag pipe, be uniformly arranged on annular and lead the bracing frame of slag pipe bottom, be uniformly arranged on annular and lead the handle on slag pipe top and formed.The upright opening drill hole of drilling machine operation adopting the present invention is led the carrying out of slag forming device and is led slag forming, after rig operation, directly form the short slag muck of a ring annular groove, can specification formed slag muck, effectively prevent stone soil slag drop back boring in affect blast hole depth, simultaneously facilitate discharge rainwater, instead of heap operation of manually skimming, effectively reduce labor strength, improve the working performance of rig.

Description

一种垂直孔钻机钻孔作业导渣成型装置及导渣成型方法A slag guide forming device and a slag guide forming method for drilling operations of a vertical hole drilling rig

技术领域 technical field

本发明涉及一种垂直孔钻机钻孔作业技术领域,尤其是涉及一种垂直孔钻机钻孔作业导渣成型装置及导渣成型方法。 The invention relates to the technical field of drilling operation of a vertical hole drilling rig, in particular to a slag guiding forming device and a slag guiding forming method for drilling a vertical hole drilling rig.

背景技术 Background technique

在牙轮钻机钻孔作业之后,以钻孔为中心周边形成一个约高为0.5米、直径为1.5米的圆形石土渣堆,为了防止石土渣掉落回钻孔内影响炮孔深度和雨水大量进入炮孔,以往采取人工扒渣堆,降低渣堆高度并开辟引水槽和留有2-4个排水孔,形象称为蚁穴扒渣法。这种方法的缺点是增加职工的工作量,同时又影响钻机的作业效率。 After the drilling operation of the roller cone drilling rig, a circular rock-soil mound with a height of 0.5 meters and a diameter of 1.5 meters is formed around the drill hole. In the past, a large amount of rainwater and rainwater entered the blast hole. In the past, manual slag removal was used to reduce the height of the slag pile and open water diversion tanks and leave 2-4 drainage holes. The image is called ant nest slag removal method. The shortcoming of this method is to increase the worker's workload, influences the working efficiency of drilling rig again simultaneously.

发明内容 Contents of the invention

本发明的目的是提供一种在垂直孔钻机钻孔作业过程中可形成规范的渣堆,有效防止石土渣掉落回钻孔内,影响炮孔深度,降低工人劳动强度,提高钻机的作业效率的垂直孔钻机导渣成型装置。 The purpose of the present invention is to provide a standard slag pile that can be formed during the drilling operation of a vertical hole drilling rig, effectively preventing the stone and soil slag from falling back into the drilling hole, affecting the depth of the blast hole, reducing the labor intensity of workers, and improving the operation of the drilling rig. Efficient vertical hole drilling slag guide forming device.

本发明的另一个目的是提供一种采用垂直孔钻机导渣成型装置进行导渣成型的方法。 Another object of the present invention is to provide a method for forming slag using a slag guiding forming device of a vertical hole drilling machine.

本发明的目的是通过下述技术方案来实现的: The purpose of the present invention is achieved through the following technical solutions:

本发明的一种垂直孔钻机钻孔作业导渣成型装置,由环形导渣管,均匀设置在环形导渣管下部的支撑架,均匀设置在环形导渣管上部的提手所组成。 A slag guide forming device for drilling operation of a vertical hole drilling rig of the present invention is composed of an annular slag guide pipe, a support frame evenly arranged at the lower part of the annular slag guide pipe, and a handle evenly arranged at the upper part of the annular slag guide pipe.

所述的支撑架为三个支撑架。 The support frame is three support frames.

在所述的提手为三个提手,在所述的提手上还设有起落链,所述的起落链与升降装置相连接。 There are three handles on the handles, and a lifting chain is also arranged on the handles, and the lifting chains are connected with the lifting device.

本发明的一种垂直孔钻机钻孔作业导渣成型装置的导渣成型方法,其特征在于,包括下列步骤: A slag guide forming method of a slag guide forming device for a vertical hole drilling machine drilling operation according to the present invention is characterized in that it comprises the following steps:

1)将起落链一端连接在提手上,另一端与启动与升降装置相连接,启动升降装置,放下垂直孔钻机钻孔作业导渣成型装置的环形导渣管,使三个支撑架平稳接触地面, 1) Connect one end of the lifting chain to the handle, and the other end to the starting and lifting device, start the lifting device, and put down the ring-shaped slag guide pipe of the slag guide forming device for the drilling operation of the vertical hole drilling rig, so that the three support frames are in smooth contact. ground,

2)钻机开始作业,在钻机作业过程中从炮孔向上喷溅的石土渣在环形导渣管和支撑架的作用下进行导渣成型, 2) The drilling rig starts to work, and the rock and earth slag sprayed upward from the blasthole during the drilling rig operation is formed by the guide slag under the action of the ring-shaped slag guide pipe and the support frame,

3)钻机作业完成后通过起落链提起环形导渣管,从而形成一圈环形凹槽并带有导水槽的渣堆,完成导渣成型作业。 3) After the drilling rig operation is completed, the ring-shaped slag guide pipe is lifted by the lifting chain, thereby forming a ring-shaped groove and a slag pile with a water guide groove to complete the slag guide forming operation.

本发明的优点是: The advantages of the present invention are:

本发明结构简单,制作操作容易,维护清理方便,钻机作业之时,在本发明的牙轮钻机钻孔作业导渣成型装置的环形导渣管的作用下形成一圈带环形凹槽的低矮渣堆,而由于支撑架的设置在渣堆上还形成了导水槽,可规范形成的渣堆,有效防止石土渣掉落回钻孔内影响炮孔深度,三个支撑架使渣椎形成导水槽,便于排出雨水,取代了人工扒渣堆作业,有效降低工人劳动强度,提高了钻机的作业效率。 The present invention is simple in structure, easy to manufacture and operate, and convenient to maintain and clean. When the drilling rig is operating, under the action of the annular slag guide pipe of the drilling operation slag guide forming device of the roller cone drilling rig of the present invention, a circle of low-profile slag guide pipes with annular grooves is formed. The slag pile, and because the support frame is set on the slag pile, a water guide groove is also formed, which can regulate the formed slag pile, effectively preventing the stone and soil slag from falling back into the drill hole and affecting the depth of the blast hole. The three support frames make the slag vertebra form The water guide groove facilitates the drainage of rainwater, replaces the manual slag removal operation, effectively reduces the labor intensity of workers, and improves the operating efficiency of the drilling rig.

附图说明 Description of drawings

图1为本发明的结构示意图。 Fig. 1 is a structural schematic diagram of the present invention.

图2为图1的俯视图。 FIG. 2 is a top view of FIG. 1 .

具体实施方式 detailed description

下面结合附图进一步说明本发明的具体实施方式。 The specific implementation manner of the present invention will be further described below in conjunction with the accompanying drawings.

如图1所示,本发明的一种牙轮钻机钻孔作业导渣成型装置,由环形导渣管2,均匀设置在环形导渣管2下部的支撑架1,均匀设置在环形导渣管2上部的牵引链条提手3以及与牵引链条提手3连接的牵引链条4所组成,所述的牵引链条4与钻机后观察孔升降油缸相连接。环形导渣管2的设置,可在渣堆成型时形成一个带环形凹槽的规范渣堆; As shown in Fig. 1, a kind of slag guide forming device for drilling operation of a roller cone drilling rig of the present invention consists of an annular slag guide pipe 2, a support frame 1 evenly arranged at the bottom of the ring slag guide pipe 2, and evenly arranged on the ring slag guide pipe 2. 2 The traction chain handle 3 on the upper part and the traction chain 4 connected with the traction chain handle 3 are formed, and the traction chain 4 is connected with the lifting cylinder of the observation hole behind the drilling machine. The setting of the annular slag guide pipe 2 can form a standard slag pile with an annular groove when the slag pile is formed;

本发明所述的支撑架1为三个支撑架。 The support frame 1 described in the present invention is three support frames.

本发明所述的牵引链条提手3为三个牵引链条提手,解决了在放置或提出时的稳定性和准确性。 The traction chain handle 3 of the present invention is three traction chain handles, which solves the stability and accuracy when placing or proposing.

本发明一种采用牙轮钻机钻孔作业导渣成型装置的导渣成型方法,其特征在于,包括下列步骤: The present invention is a slag guide forming method using a slag guide forming device for drilling operations of a roller cone drilling rig, which is characterized in that it comprises the following steps:

1)将起落链4一端连接在提手3上,另一端与启动与升降装置相连接,启动升降装置,落下垂直孔钻机钻孔作业导渣成型装置的环形导渣管,使三个支撑架平稳接触地面, 1) Connect one end of the lifting chain 4 to the handle 3, and connect the other end to the starting and lifting device, start the lifting device, and drop the annular slag guide pipe of the slag guide forming device for the drilling operation of the vertical hole drilling rig, so that the three support frames touch the ground smoothly,

2)钻机开始作业,在钻机作业过程中从炮孔向上喷溅的石土渣在环形导渣管和支撑架的作用下进行导渣成型, 2) The drilling rig starts to work, and the rock and earth slag sprayed upward from the blasthole during the drilling rig operation is formed by the guide slag under the action of the ring-shaped slag guide pipe and the support frame,

3)钻机作业完成后通过起落链提起环形导渣管,从而形成一圈环形凹槽并带有导水槽的渣堆,完成导渣成型作业。 3) After the drilling rig operation is completed, the ring-shaped slag guide pipe is lifted by the lifting chain, thereby forming a ring-shaped groove and a slag pile with a water guide groove to complete the slag guide forming operation.

本发明结构简单,操作容易,维护清理方便,在钻机作业之后,直接形成一圈环形凹槽的低矮渣堆,可规范形成的渣堆,有效防止石土渣掉落回钻孔内影响炮孔深度,同时便于排出雨水,取代了人工扒渣堆作业,有效降低工人劳动强度,提高了钻机的作业效率。 The invention has the advantages of simple structure, easy operation, and convenient maintenance and cleaning. After the drilling rig is operated, a low slag pile with a circle of annular grooves is directly formed, which can standardize the formed slag pile, and effectively prevent stone and soil slag from falling back into the drill hole and affecting the blasting. At the same time, it is convenient to discharge rainwater, which replaces the manual slag removal operation, effectively reduces the labor intensity of workers, and improves the operating efficiency of the drilling rig.

Claims (3)

1. slag forming device is led in a upright opening drill hole of drilling machine operation, it is characterised in that is led slag pipe by annular, is uniformly arranged on annular and leads the bracing frame of slag pipe bottom, is uniformly arranged on annular and leads the handle on slag pipe top and formed;
Being three handles at described handle, be additionally provided with the chain that rises and falls on described handle, the described chain that rises and falls is connected with lowering or hoisting gear.
2. slag forming device is led in upright opening drill hole of drilling machine operation according to claim 1, it is characterised in that described bracing frame is three bracing frames.
3. what slag forming device was led in the upright opening drill hole of drilling machine operation described in a claim 1 leads slag forming method, it is characterised in that comprise the following steps:
1) chain one end of rising and falling is connected on handle, and the other end is connected with lowering or hoisting gear with starting, startup lowering or hoisting gear, puts down upright opening drill hole of drilling machine operation and leads the annular of slag forming device and lead slag pipe, makes three bracing frames steadily contact ground,
2) rig starts operation, carries out leading slag forming under the effect that annular leads slag pipe and bracing frame from the stone soil slag of big gun hole upwards splash in rig operation process,
3) rig operation is mentioned annular led slag pipe by the chain that rises and falls after completing, thus forming a ring annular groove the slag muck with guiding gutter, completes to lead slag forming operation.
CN201410226724.8A 2014-05-27 2014-05-27 A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method Active CN104018811B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410226724.8A CN104018811B (en) 2014-05-27 2014-05-27 A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410226724.8A CN104018811B (en) 2014-05-27 2014-05-27 A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method

Publications (2)

Publication Number Publication Date
CN104018811A CN104018811A (en) 2014-09-03
CN104018811B true CN104018811B (en) 2016-07-06

Family

ID=51435772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410226724.8A Active CN104018811B (en) 2014-05-27 2014-05-27 A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method

Country Status (1)

Country Link
CN (1) CN104018811B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2150323Y (en) * 1992-12-23 1993-12-22 唐山钢铁(集团)公司 Slag bridge for gear wheel drilling machine
CN2789718Y (en) * 2005-03-28 2006-06-21 刘万华 Mine blasting hole broken bits fending conic bucket
CN202165011U (en) * 2011-07-28 2012-03-14 华北电网有限公司 Combined type digging drill machine
CN202611746U (en) * 2012-06-17 2012-12-19 鞍钢集团矿业公司 Dust collecting cover for down-the-hole drill
CN202810670U (en) * 2012-09-19 2013-03-20 鞍钢集团矿业公司 Air-type slag stopping device of drilling machine
CN203867525U (en) * 2014-05-27 2014-10-08 鞍钢集团矿业公司 Slag guiding forming device for drilling conducted by vertical-hole drilling rig

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002088511A1 (en) * 2001-04-26 2002-11-07 Furukawa Co., Ltd. Step tube rod, and drilling machine
SG190875A1 (en) * 2010-12-17 2013-07-31 Exxonmobil Upstream Res Co Method for automatic control and positioning of autonomous downhole tools

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2150323Y (en) * 1992-12-23 1993-12-22 唐山钢铁(集团)公司 Slag bridge for gear wheel drilling machine
CN2789718Y (en) * 2005-03-28 2006-06-21 刘万华 Mine blasting hole broken bits fending conic bucket
CN202165011U (en) * 2011-07-28 2012-03-14 华北电网有限公司 Combined type digging drill machine
CN202611746U (en) * 2012-06-17 2012-12-19 鞍钢集团矿业公司 Dust collecting cover for down-the-hole drill
CN202810670U (en) * 2012-09-19 2013-03-20 鞍钢集团矿业公司 Air-type slag stopping device of drilling machine
CN203867525U (en) * 2014-05-27 2014-10-08 鞍钢集团矿业公司 Slag guiding forming device for drilling conducted by vertical-hole drilling rig

Also Published As

Publication number Publication date
CN104018811A (en) 2014-09-03

Similar Documents

Publication Publication Date Title
CN106596176B (en) Water and soil integrated sampling method
CN207974103U (en) The isolating device of cast-in-situ bored pile pile crown
CN105003200B (en) Rig and its boring method
CN207920524U (en) Shaft tower capital construction digging apparatus
CN100491650C (en) Construction method of double-casing vacuum deep well point dewatering
CN107083932A (en) Drilling cleaning circulation equipment and installation method of steel pipe columns in pilot tunnels
CN107120058A (en) It is a kind of to be used for gravelly soil, the pore-forming grouting method of viscous soil horizon
CN104196015B (en) A kind of construction method of long auger guncreting pile emptying aperture
CN103797935A (en) Orchard trenching fertilizer applicator twist drill
CN104018811B (en) A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method
CN203867525U (en) Slag guiding forming device for drilling conducted by vertical-hole drilling rig
CN106593398A (en) Press-in type isolation well-building method
CN201025049Y (en) An anchor withdrawal lock device for coal mine mining roadway
CN104389525A (en) Liftable working platform at front end of pile frame and operation method thereof
CN204418180U (en) A kind of hydraulic pressure plays a machine
CN204326089U (en) A kind of structure for foundation ditch Yield rainfall relation
CN203856001U (en) Excavation system for foundation pits
CN204252123U (en) Prestressed reinforced concrete pipe pile prevention Zhuan Xintu mechanism
CN203675574U (en) Spiral drill of orchard trenching fertilizer applicator
CN206986892U (en) Detain tubular type pile extractor
CN205393122U (en) Interior residual belt cleaning device of back drilling rod pulls out of hole
CN205370486U (en) Draw a sediment section of thick bamboo
CN107083773A (en) Detain tubular type pile extractor
CN203729310U (en) Tool for preventing soil collapse of bar pits
CN105714826A (en) Prestressed concrete pipe pile core hole cleaning device and operation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 114001 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong

Patentee after: Anshan Iron and Steel Group Mining Co., Ltd.

Address before: 114001 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong

Patentee before: Anshan Iron & Steel Group Mining Co., Ltd.