[go: up one dir, main page]

CN103967436A - Underwater wellhead mud line hanger - Google Patents

Underwater wellhead mud line hanger Download PDF

Info

Publication number
CN103967436A
CN103967436A CN201410209320.8A CN201410209320A CN103967436A CN 103967436 A CN103967436 A CN 103967436A CN 201410209320 A CN201410209320 A CN 201410209320A CN 103967436 A CN103967436 A CN 103967436A
Authority
CN
China
Prior art keywords
casing hanger
ring
hanger
assembly
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410209320.8A
Other languages
Chinese (zh)
Inventor
殷舜时
殷绎如
常和林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jinshi Science & Technology Co Ltd
Original Assignee
Jiangsu Jinshi Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jinshi Science & Technology Co Ltd filed Critical Jiangsu Jinshi Science & Technology Co Ltd
Priority to CN201410209320.8A priority Critical patent/CN103967436A/en
Publication of CN103967436A publication Critical patent/CN103967436A/en
Pending legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses an underwater wellhead mud line hanger. The mud line hanger comprises a 20' guide pipe sit-hung joint (3), a 13.3/8' casing pipe hanger assembly (2), a 9.5/8' casing hanger assembly (1) and 20' guide pipes (4). The two 20' guide pipes (4) are connected through the 20' guide pipe sit-hung joint (3), the 13.3/8' casing pipe hanger assembly (2) is installed in the 20' guide pipe sit-hung joint (3), the 9.5/8' casing hanger assembly (1) is installed on the 13.3/8' casing pipe hanger assembly (2), and then the mud line hanger is formed. The mud line hanger is simple in structure, safe and reliable in sealing, stable in connection mode and long in service life.

Description

Underwater well head mudline hanger
Technical field
The present invention relates to underwater well head, be specifically related to a kind of underwater well head mudline hanger.
Background technology
As everyone knows, China is always in starting state aspect the development and Application of ocean subsea equipment at present, and it is blank that mudline hanger still belongs at home.For this reason, analyze and research and make great efforts exploitation and belong to mud line wellhead assembly under the ocean water of China's independent intellectual property right and seem very important.Mud line suspension equipment belongs to a kind of particular requirement device in underwater well head, is applicable to phytal zone, coastal waters.When with seat bottom type drilling rig or the drilling well of platform mode, use mud line equipment to ensure drilling well, abandoned well and the tieback with respect to platform or underwater completion.
Summary of the invention
The object of the invention is to: a kind of underwater well head mudline hanger is provided, and this mud line suspension arrangement is simple in structure, and sealingly secure is reliable, and connecting mode is firm, long service life.
The scheme of technical solution problem of the present invention is: this mudline hanger comprises: 20 " conduit is sat hanging joint, 13.3/8 " casing hanger assembly, 9.5/8 " casing hanger assembly and 20 " conduit, two 20 " conduit is by 20 " conduits are sat hanging joint and are connected, 13.3/8 " casing hanger assembly is arranged on 20 " conduit is sat in hanging joint, on 9.5/8 " casing hanger assembly is arranged on 13.3/8 " casing hanger assembly, form mudline hanger, wherein, 20 " to sit hanging joint be Butt Joint to conduit, is that 13.3/8 " casing hanger assembly provides bearing surface with 45 ° of shoulders of carrying, 13.3/8 " casing hanger assembly is by 13.3/8 " casing hanger body, support ring and jump ring form, 13.3/8 " top of casing hanger body is sent into and is promoted screw thread and tieback and promote screw thread with hanger, while being connected for tie back tool with 5 ° of metal sealing taperings on hanger top, realize metal sealing, the support ring with circulation port supports 13.3/8 " casing hanger assembly is sat and hung over 20 " catheter interior, circulation port in drilling process for mud provides circulation canal, 9.5/8 " casing hanger assembly is by 9.5/8 " casing hanger body, elastic ring back-up ring, elastic ring, discharge ring and load-carrying ring composition, 9.5/8 " on casing hanger body with circulating opening, 9.5/8 " top of casing hanger body is sent into and is promoted screw thread and tieback lifting screw thread with hanger, while being connected for tie back tool with 5 ° of metal sealing taperings on hanger top, realize metal sealing, mud circulation while jointly providing mud circulation passage for drilling well with the circulating opening on mud circulation groove and casing hanger body on elastic ring back-up ring, elastic ring is for 9.5/8, and " seat of casing hanger body is hung, " casing hanger body is sat and is suspended to a rear locking positioning to discharge ring 9.5/8.
The present invention has the following advantages:
1, employing sleeve pipe hangs at seabed mud line face, has filled up domestic blank, and adopts sealing and hanger separate structure, after realization well cementation, seals again, and hanger sealing is more reliable, and is convenient to hanger maintenance in the future, has reduced the cost of oil exploitation.
2, the upper end of 13.3/8 " casing hanger body and 9.5/8 " casing hanger body is designed with two trapezoidal boxes that rotation direction is contrary, left-handed box is used for matching with landing sub and realizes the function of sending into of hanger, dextrorotation box is used for matching with tieback sub and realizes the tieback function of sleeve pipe, convenience quick for installation.
3,9.5/8 " the flexible baffle ring of casing hanger assembly band, on this baffle ring, with mud circulation groove, for well cementation circulation time provides circulation canal, and this baffle ring can play the effect of righting hanger in installation process, makes hanger more be conducive to sit and is suspended to position.
4,9.5/8 " casing hanger assembly is with elastic ring, and during through less latus rectum, this ring can shrink, while having crossed less latus rectum, can automatically spring open, and also 90 ° of the seat hanging platform of elastic ring shoulders, load-carrying properties are better.
5, the top of 13.3/8 " casing hanger assembly and 9.5/8 " casing hanger assembly is designed with metal sealing position, in the time matching with tie back tool joint, on 5 ° of conical surfaces, forms metal sealing effect, and relies on rubber seal auxiliary seal; Meanwhile, top and the bottom of the tie back tool joint coordinating with it are all designed with metal sealing position, have realized bidirectional metal sealing, for well head provides maximum pressure integrality, safe and reliable.
Brief description of the drawings
Fig. 1 is structural representation of the present invention.
" casing hanger assembly, 2,13.3/8 " casing hanger assembly, 3,20 in figure: 1,9.5/8 " conduit is sat hanging joint; 4,20 " conduit, 5,45 ° of shoulders, 6,13.3/8 " casing hanger body; 7 support rings, and 8, jump ring, 9,9.5/8 " casing hanger body, 10, elastic ring back-up ring, 11, elastic ring, 12, discharge ring, 13 load-carrying rings, 14,13.3/8 " sleeve pipe, 15,9.5/8 " sleeve pipe.
Detailed description of the invention
As shown in Figure 1, this mudline hanger comprises: 20 " conduit is sat hanging joint 3,13.3/8 " casing hanger assembly 2,9.5/8 " casing hanger assembly 1 and 20 " conduit 4, two 20 " conduit 4 is by 20 " conduits are sat hanging joint 3 and are connected, 13.3/8 " casing hanger assembly 2 is arranged on 20 " conduit is sat in hanging joint 3, on 9.5/8 " casing hanger assembly 1 is arranged on 13.3/8 " casing hanger assembly 2, form mudline hanger, wherein, 20 " to sit hanging joint 3 be Butt Joint to conduit, is that 13.3/8 " casing hanger assembly 2 provides bearing surface with carrying 45 ° of shoulders 5, 13.3/8 " casing hanger 2 assemblies are by 13.3/8 " casing hanger body 6, support ring 7 and jump ring 8 form, 13.3/8 " top of casing hanger body 6 is sent into and is promoted screw thread and tieback and promote screw thread with hanger, while being connected for tie back tool with 5 ° of metal sealing taperings on hanger body top, realize metal sealing, the support ring 7 with circulation port supports 13.3/8 " casing hanger assembly 2 is sat and hung over 20 " conduit 4 inside, circulation port in drilling process for mud provides circulation canal, 9.5/8 " casing hanger assembly 1 is by 9.5/8 " casing hanger body 9, elastic ring back-up ring 10, elastic ring 11, discharging ring 12 and load-carrying ring 13 forms, 9.5/8 " on casing hanger body 9 with circulating opening, 9.5/8 " top of casing hanger body 9 is sent into and is promoted screw thread and tieback lifting screw thread with hanger, while being connected for tie back tool with 5 ° of metal sealing taperings on hanger body top, realize metal sealing, mud circulation while jointly providing mud circulation passage for drilling well with the circulating opening on mud circulation groove and casing hanger body on elastic ring back-up ring 10, elastic ring 11 is for 9.5/8, and " seat of casing hanger body 9 is hung, " casing hanger body 9 is sat and is suspended to a rear locking positioning to discharge ring 12 9.5/8.
20 " conduit 4 is fixed under water by digging into mode; Be lowered to 13.3/8 " sleeve pipe 14; be threaded connection 13.3/8 by 13.3/8 " tie back tool is by 13.3/8 " casing hanger assembly 2 " on sleeve pipe, utilize the circulation well cementation of 13.3/8 " circulation port of the bracing ring of casing hanger assembly 2 realizes 13.3/8 " sleeve pipe 14; Be lowered to 9.5/8 " sleeve pipe 15 is threaded connection 9.5/8 by 9.5/8 " tie back tool is by 9.5/8 " casing hanger assembly 1 " on sleeve pipe 15, realize 9.5/8 " the circulation well cementation of sleeve pipe; After circulation well cementation finishes, use 13.3/8 " cleaning means and 9.5/8 " cleaning means respectively casing hanger, pipe inner wall to be cleaned; When interim abandoned well; fetch and deliver instrument by interim abandoned well corrosion-proof joint and send into 13.3/8 " interim abandoned well corrosion-proof joint or 9.5/8 " interim abandoned well corrosion-proof joint, and be connected respectively in 13.3/8 " casing hanger and 9.5/8 " casing hanger and protect hanger by screw thread.

Claims (1)

1. underwater well head mudline hanger, this mudline hanger comprises: 20 " conduit is sat hanging joint (3), 13.3/8 " casing hanger assembly (2), 9.5/8 " casing hanger assembly (1) and 20 " conduit (4), two 20 " conduit (4) is by 20 " conduits are sat hanging joint (3) and are connected, 13.3/8 " casing hanger assembly (2) is arranged on 20 " conduit is sat in hanging joint (3), 9.5/8 " casing hanger assembly (1) is arranged on 13.3/8 " casing hanger assembly (2) is upper, forms mudline hanger, it is characterized in that: wherein, 20 that " it be Butt Joint that conduit is sat hanging joint (3), and " casing hanger assembly (2) provides bearing surface with to carry 45 ° of shoulders (5) be 13.3/8, 13.3/8 " casing hanger (2) assembly is by 13.3/8 " casing hanger body (6), support ring (7) and jump ring (8) form, 13.3/8 " top of casing hanger body (6) is sent into and is promoted screw thread and tieback and promote screw thread with hanger, while being connected for tie back tool with 5 ° of metal sealing taperings on hanger body top, realize metal sealing, the support ring (7) with circulation port supports 13.3/8 " casing hanger assembly (2) is sat and hung over 20 " conduit (4) inside, circulation port in drilling process for mud provides circulation canal, 9.5/8 " casing hanger assembly (1) is by 9.5/8 " casing hanger body (9), elastic ring back-up ring (10), elastic ring (11), discharge ring (12) and load-carrying ring (13) composition, 9.5/8 " casing hanger body (9) is upper with circulating opening, 9.5/8 " top of casing hanger body (9) is sent into and is promoted screw thread and tieback lifting screw thread with hanger, while being connected for tie back tool with 5 ° of metal sealing taperings on hanger body top, realize metal sealing, mud circulation when elastic ring back-up ring (10) above provides mud circulation passage for drilling well jointly with the circulating opening on mud circulation groove and casing hanger body, elastic ring (11) is for 9.5/8, and " seat of casing hanger body (9) is hung, " casing hanger body (9) is sat and is suspended to a rear locking positioning to discharge ring (12) 9.5/8.
CN201410209320.8A 2014-05-19 2014-05-19 Underwater wellhead mud line hanger Pending CN103967436A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410209320.8A CN103967436A (en) 2014-05-19 2014-05-19 Underwater wellhead mud line hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410209320.8A CN103967436A (en) 2014-05-19 2014-05-19 Underwater wellhead mud line hanger

Publications (1)

Publication Number Publication Date
CN103967436A true CN103967436A (en) 2014-08-06

Family

ID=51237394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410209320.8A Pending CN103967436A (en) 2014-05-19 2014-05-19 Underwater wellhead mud line hanger

Country Status (1)

Country Link
CN (1) CN103967436A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989314A (en) * 2015-06-12 2015-10-21 美钻能源科技(上海)有限公司 Underwater mud line Christmas tree and installation method thereof
CN107313736A (en) * 2017-06-14 2017-11-03 山东科瑞井控系统制造有限公司 A kind of new casing head body bottom portion attachment means
CN109488239A (en) * 2019-01-16 2019-03-19 上海霞为石油设备技术服务有限公司 Underwater well head casing hanger and seal assembly one way running tool and method
CN112727377A (en) * 2021-01-08 2021-04-30 西安交通大学 Sandstone heat storage three-throw geothermal well body structure and construction method
RU216817U1 (en) * 2022-12-28 2023-03-02 Дмитрий Александрович Березкин Bottom casing hanger
CN119507842A (en) * 2025-01-20 2025-02-25 威飞海洋装备制造有限公司 A casing mudline suspension system and its delivery method and use method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3974875A (en) * 1971-01-04 1976-08-17 Mcevoy Oilfield Equipment Co. Underwater well completion method and apparatus
US4577686A (en) * 1984-04-26 1986-03-25 Vetco Offshore, Inc. Mudline support hanger assembly
EP0261909A2 (en) * 1986-09-23 1988-03-30 Plexus Ocean Systems Limited Casing hanger systems
CN1860282A (en) * 2003-08-08 2006-11-08 澳洲澳德赛能源有限公司 Method of suspending, completing and working over a well
CN101769146A (en) * 2009-12-30 2010-07-07 中国石油天然气集团公司 Metal-to-metal sealing tieback connector
CN202706978U (en) * 2012-07-27 2013-01-30 李鹏飞 Multistage casing head

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3974875A (en) * 1971-01-04 1976-08-17 Mcevoy Oilfield Equipment Co. Underwater well completion method and apparatus
US4577686A (en) * 1984-04-26 1986-03-25 Vetco Offshore, Inc. Mudline support hanger assembly
EP0261909A2 (en) * 1986-09-23 1988-03-30 Plexus Ocean Systems Limited Casing hanger systems
CN1860282A (en) * 2003-08-08 2006-11-08 澳洲澳德赛能源有限公司 Method of suspending, completing and working over a well
CN101769146A (en) * 2009-12-30 2010-07-07 中国石油天然气集团公司 Metal-to-metal sealing tieback connector
CN202706978U (en) * 2012-07-27 2013-01-30 李鹏飞 Multistage casing head

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989314A (en) * 2015-06-12 2015-10-21 美钻能源科技(上海)有限公司 Underwater mud line Christmas tree and installation method thereof
CN104989314B (en) * 2015-06-12 2017-10-20 美钻能源科技(上海)有限公司 Mud line production tree and its installation method under water
CN107313736A (en) * 2017-06-14 2017-11-03 山东科瑞井控系统制造有限公司 A kind of new casing head body bottom portion attachment means
CN107313736B (en) * 2017-06-14 2023-06-27 威飞海洋装备制造有限公司 Novel casing head body bottom connecting device
CN109488239A (en) * 2019-01-16 2019-03-19 上海霞为石油设备技术服务有限公司 Underwater well head casing hanger and seal assembly one way running tool and method
CN112727377A (en) * 2021-01-08 2021-04-30 西安交通大学 Sandstone heat storage three-throw geothermal well body structure and construction method
RU216817U1 (en) * 2022-12-28 2023-03-02 Дмитрий Александрович Березкин Bottom casing hanger
CN119507842A (en) * 2025-01-20 2025-02-25 威飞海洋装备制造有限公司 A casing mudline suspension system and its delivery method and use method

Similar Documents

Publication Publication Date Title
US2988144A (en) Method and apparatus for drilling and completing underwater well bores
CN103967436A (en) Underwater wellhead mud line hanger
CN104763333B (en) A kind of well system and boring method based on subsea pump pressure control
CN201963231U (en) Subsea mud suction system for realizing riser-free mud recovery drilling
CN202108443U (en) Underwater well head placing tool applied to well drilling in ocean deepwater
NO20150570A1 (en) Remote controlled well completion equipment
CN110359843A (en) A kind of suction anchor formula surface layer shaft building device being suitable for deep water exploitation of gas hydrates
CN204532152U (en) One is surged the built-in slips of pressure-bearing
CN203905883U (en) Metal sealing device used for underwater well head
CN204532070U (en) A kind of well system based on subsea pump pressure control
CN107933843A (en) FDPSO based on separable inner cupola formula anchoring system
CN102410004A (en) Subsea wellhead riser return joint
CN103158837B (en) A kind of seabed mooring positioning device lifting drilling well for no marine riser seabed mud
CN102900405A (en) Tieback assembly for marine underground wellhead
CN206429196U (en) A kind of ultra-deep-water is with the cased device of brill
CN202493220U (en) Drilling tool joint for connecting down-well liquid level monitoring instrument
CN108086924B (en) A kind of method that deepwater drilling platform suspension marine riser moves well location
CN202000892U (en) Multi-functional deep-water undersea pump drilling system
CN214660048U (en) Simple underwater oil gas exploitation wellhead
CN204754801U (en) Underwater drilling marine riser connects
CN206071475U (en) Adjustable wellhead sealing suspension device
CN203905884U (en) Base for two-in-one drilling technology
CN201778733U (en) Hydraulic penetration device between subsea production tree and tubing hanger
CN201778757U (en) Internal production tree cap of subsea production tree
CN202900061U (en) Novel casing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140806

WD01 Invention patent application deemed withdrawn after publication