CN103939043A - Method for dealing with clogging of thin tube well - Google Patents

Method for dealing with clogging of thin tube well Download PDF

Info

Publication number
CN103939043A
CN103939043A CN201410029151.XA CN201410029151A CN103939043A CN 103939043 A CN103939043 A CN 103939043A CN 201410029151 A CN201410029151 A CN 201410029151A CN 103939043 A CN103939043 A CN 103939043A
Authority
CN
China
Prior art keywords
steel pipe
coating steel
well
silting
tubule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410029151.XA
Other languages
Chinese (zh)
Inventor
翟宇
张志军
郭晓茜
王俊丹
李德明
张红旭
吴晓燕
张文晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410029151.XA priority Critical patent/CN103939043A/en
Publication of CN103939043A publication Critical patent/CN103939043A/en
Pending legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention provides a method for dealing with clogging of a thin tube well. An air compressor, a winch, a pressure air pipe, galvanized steel pipes, seamless water outlet steel pipes and a grappling and fishing device are needed in the method. The method for dealing with clogging of the thin tube well mainly comprises the steps of water injection, galvanized steel pipe connection, connection ventilation and stone grabbing. According to the method, the structure is simple, operation is convenient, only a small number of workers are needed to complete the work, labor output is effectively lowered, and efficiency is improved at the same time. As is known in practical operation, clogging substances in a well with the depth of about 30 m can be discharged in about 8 h through the method, and compared with a common method, the clogging substances can be discharged more thoroughly.

Description

A kind of method of repairing tubule well silting
Technical field
The present invention relates to tubule well field, is a kind of method of repairing tubule well silting specifically.
Background technology
Wet well is adopted the largest source that water is existing drinking water, but existing wet well is because caliber is less, so easily produce the problem of silting while not using for a long time, the relevant treatment of tubule well silting bothers very much, once can not get processing timely, its silting can get more and more, and finally may cause wet well to be destroyed, and causes damage.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, the method for repairing tubule well silting with a kind of is provided, solve existing tubule well and process the more difficult problem of silting.
The present invention solves the problems of the technologies described above by the following technical solutions:
Repair a method for tubule well silting, it will use following equipment: air compressor, hoist engine, pressure airduct, coating steel pipe, seamless water outlet steel pipe, grab the equipment of dragging for.
The present invention mainly realizes the reparation to tubule well silting by following steps:
1, water filling: first make its deposit soft to water filling in the tubule well of silting;
2, connect coating steel pipe: according to the degree of depth of deposit, connect coating steel pipe, the coating steel pipe of bottommost is made as 45 degree end faces, between coating steel pipe, by pipe collar, is connected, and by hoist engine, the coating steel pipe connecting is put into tubule well;
3, connect and ventilate: by pressure airduct, connect the top of air compressor machine and coating steel pipe, air compressor machine carries out air feed from small to large, and deposit is overflowed from well head along current;
4, capture stone: while running into larger stone or silting thing, the available equipment of dragging for of grabbing catches stone or silting thing again and operates.
The tubule well that surpasses 150mm for the mouth of pipe, can select the mode that adopts seamless steel pipe to coordinate: the side at coating steel pipe arranges seamless steel pipe simultaneously, and the bottom of coating steel pipe leads to the bottom of seamless steel pipe.
The present invention is simple in structure, easy to operate, in the process of work, only need a small amount of personnel to complete, effectively saved manpower output, improved efficiency simultaneously, known through actual operation, the well of 30 meters of left and right of the degree of depth adopts the present invention only to need can discharge silting about 8 hours, more thorough to the discharge of silting thing also more common method.
The specific embodiment
Embodiment 1
Somewhere a bite tubule well, 35 meters of well depths, diameter is 100mm, the silting time grows and silting place is positioned on the water surface, according to exploration, in silting thing, may contain the foreign material such as stone.
Adopt following steps to operate:
1, water filling: adopt water pump to pour water in the well of silting, the amount of injected water, for flooding silting thing, is soaked after a hour, and inner deposit becomes soft;
2, connect coating steel pipe: coating steel pipe is connected successively, and a joint coating steel pipe end of foot is made as 45 degree cross sections, and other coating steel pipe is connected by pipe collar, with hoist engine, coating steel pipe is put into well, connects coating steel pipe while putting;
3, connect and ventilate: after coating steel pipe end inserts soft deposit, at the top of coating steel pipe Bonding pressure airduct, the other end of pressure airduct is connected to air compressor, then opening air compressor blows, just initiation pressure, roughly at 0.2MPa, increases pressure, gradually along with the increase of ventilation time, deposit and water soft in well flow out along the gap between coating steel pipe outside and the borehole wall, continue coating steel pipe to insert when ventilating downwards;
4, capture stone: when running into stone or other foreign material, coating steel pipe can not continue down deep time, with hoist engine, coating steel pipe is taken out, and adopt and to grab the equipment of dragging for and put into thin well stone or foreign material are caught, then continue to adopt coating steel pipe blow and arrange silt.
As calculated, this well completes removing total time from starting working to is 8.2 hours, and the mode that adopts two staff to cooperatively interact in the process of work completes.
Embodiment 2
Somewhere a bite tubule well, 35 meters of well depths, diameter is 100mm, silting place is positioned at underwater, according to exploration, in silting thing, may contain the foreign material such as stone.
Adopt following steps to operate:
1, connect coating steel pipe: coating steel pipe is connected successively, and a joint coating steel pipe end of foot is made as 45 degree cross sections, and other coating steel pipe is connected by pipe collar, with hoist engine, coating steel pipe is put into well, connects coating steel pipe while putting;
2, connect and ventilate: after coating steel pipe end inserts soft deposit, at the top of coating steel pipe Bonding pressure airduct, the other end of pressure airduct is connected to air compressor, then opening air compressor blows, just initiation pressure, roughly at 0.2MPa, increases pressure, gradually along with the increase of ventilation time, deposit and water soft in well flow out along the gap between coating steel pipe outside and the borehole wall, continue coating steel pipe to insert when ventilating downwards;
3, capture stone: when running into stone or other foreign material, coating steel pipe can not continue down deep time, with hoist engine, coating steel pipe is taken out, and adopt and to grab the equipment of dragging for and put into thin well stone or foreign material are caught, then continue to adopt coating steel pipe blow and arrange silt.
As calculated, this well completes removing total time from starting working to is 7.3 hours, and the mode that adopts two staff to cooperatively interact in the process of work completes.
Embodiment 3
Somewhere a bite tubule well, 35 meters of well depths, diameter is 180mm, the silting time grows and silting place is positioned on the water surface, according to exploration, in silting thing, may contain the foreign material such as stone.
Adopt following steps to operate:
1, water filling: adopt water pump to pour water in the well of silting, the amount of injected water, for flooding silting thing, is soaked after a hour, and inner deposit becomes soft;
2, connect coating steel pipe and seamless steel pipe: coating steel pipe is connected respectively successively with seamless steel pipe, the slightly larger in diameter of seamless steel pipe is in the diameter of coating steel pipe, one joint coating steel pipe end of foot is made as 45 degree cross sections, other coating steel pipe is connected by pipe collar, with hoist engine, coating steel pipe and seamless steel pipe are synchronously put into well, while putting, connect coating steel pipe;
3, connect and ventilate: until coating steel pipe and seamless steel pipe end, insert after soft deposit, at the top of coating steel pipe Bonding pressure airduct, the other end of pressure airduct is connected to air compressor, then opening air compressor blows, just initiation pressure, roughly at 0.2MPa, increases pressure, gradually along with the increase of ventilation time, in well, soft deposit and water flows out along seamless steel pipe, continues coating steel pipe and seamless steel pipe to insert when ventilating downwards;
4, capture stone: when running into stone or other foreign material, coating steel pipe and seamless steel pipe can not continue down deep time, with hoist engine, both are taken out, and adopt and to grab the equipment of dragging for and put into thin well stone or foreign material are caught, then continue to adopt said method blow and arrange silt.
As calculated, this well completes removing total time from starting working to is 8.6 hours, and the mode that adopts two staff to cooperatively interact in the process of work completes.

Claims (3)

1. repair a method for tubule well silting, it will use following equipment: air compressor, hoist engine, pressure airduct, coating steel pipe, seamless water outlet steel pipe, grab the equipment of dragging for.
2. according to a kind of method of repairing tubule well silting described in claims 1, it is characterized in that: adopt following scheme to operate:
1) water filling: first make its deposit soft to water filling in the tubule well of silting;
2) connect coating steel pipe: according to the degree of depth of deposit, connect coating steel pipe, the coating steel pipe of bottommost is made as 45 degree end faces, between coating steel pipe, by pipe collar, is connected, and by hoist engine, the coating steel pipe connecting is put into tubule well;
3) connect and ventilate: by pressure airduct, connect the top of air compressor machine and coating steel pipe, air compressor machine carries out air feed from small to large, and deposit is overflowed from well head along current;
4) capture stone: while running into larger stone or silting thing, the available equipment of dragging for of grabbing catches stone or silting thing again and operates.
3. according to a kind of method of repairing tubule well silting described in claims 1, it is characterized in that: the tubule well that surpasses 150mm for the mouth of pipe, can select the mode that adopts seamless steel pipe to coordinate: the side at coating steel pipe arranges seamless steel pipe simultaneously, the bottom of coating steel pipe leads to the bottom of seamless steel pipe.
CN201410029151.XA 2014-01-22 2014-01-22 Method for dealing with clogging of thin tube well Pending CN103939043A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410029151.XA CN103939043A (en) 2014-01-22 2014-01-22 Method for dealing with clogging of thin tube well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410029151.XA CN103939043A (en) 2014-01-22 2014-01-22 Method for dealing with clogging of thin tube well

Publications (1)

Publication Number Publication Date
CN103939043A true CN103939043A (en) 2014-07-23

Family

ID=51186889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410029151.XA Pending CN103939043A (en) 2014-01-22 2014-01-22 Method for dealing with clogging of thin tube well

Country Status (1)

Country Link
CN (1) CN103939043A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3920090A (en) * 1975-02-26 1975-11-18 Dresser Ind Control method and apparatus for pressure, vacuum or pressure-vacuum circulation in drilling system
CN2292122Y (en) * 1997-01-23 1998-09-23 曲书增 Soil-shifting cleaner for pipe well
CN2389177Y (en) * 1999-08-20 2000-07-26 孙成志 Pneumatic jet-flow water repairing equipment for faulty water source well
CN2677594Y (en) * 2003-12-29 2005-02-09 大庆石油管理局 Hollow sand washer
CN1587634A (en) * 2004-08-18 2005-03-02 中国石油天然气集团公司 Compressed air circulation sand cleaning process and matching device
CN2934554Y (en) * 2006-04-19 2007-08-15 中油特种车辆有限公司 Water well operation vehicle
CN201305870Y (en) * 2008-11-25 2009-09-09 宁洪存 Sand and stone remover for deep wells

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3920090A (en) * 1975-02-26 1975-11-18 Dresser Ind Control method and apparatus for pressure, vacuum or pressure-vacuum circulation in drilling system
CN2292122Y (en) * 1997-01-23 1998-09-23 曲书增 Soil-shifting cleaner for pipe well
CN2389177Y (en) * 1999-08-20 2000-07-26 孙成志 Pneumatic jet-flow water repairing equipment for faulty water source well
CN2677594Y (en) * 2003-12-29 2005-02-09 大庆石油管理局 Hollow sand washer
CN1587634A (en) * 2004-08-18 2005-03-02 中国石油天然气集团公司 Compressed air circulation sand cleaning process and matching device
CN2934554Y (en) * 2006-04-19 2007-08-15 中油特种车辆有限公司 Water well operation vehicle
CN201305870Y (en) * 2008-11-25 2009-09-09 宁洪存 Sand and stone remover for deep wells

Similar Documents

Publication Publication Date Title
CN103382817B (en) Coal mine bottom plate anchoring anti-blocking drill rod
CN203008860U (en) Sleeve paraffin removal device
CN204492725U (en) Marine discarded pile pipe device for excising
CN205243557U (en) A big gun hole negative pressure drainage device for opencut rock burst is broken
CN205153113U (en) Clear away device of interior debris of drainage pipe
CN204402406U (en) A kind of down-hole coal bed mash gas pumping drilling prosthetic device
CN103939043A (en) Method for dealing with clogging of thin tube well
CN206015112U (en) Sodium hypochlorite electrolysis bath automatic pickling device
CN104060640A (en) Dredger-used blockage-proof special mud discharging steel pipe and sewage discharging and dredging treating method of dredger
CN204475356U (en) Subway station open-cut foundation ditch precipitation well water reutilization system
CN103590618B (en) A kind of equipment for the grouting reparation of in-service concrete electric pole minute crack and method
CN204307897U (en) A kind of mud recoil pipeline cleaning plant of solid controlling system
CN103711119B (en) A kind of pneumatic anti-settling circulating system of drilled pile mud and using method
CN218817280U (en) Water pressure trash-cleaning pump
CN110847339A (en) A directional dredging device for drainage pipes
CN205297646U (en) Automatic water discharging device of gas drainage pipe remote control
CN203867500U (en) Pile foundation rapid borehole cleaning machine
CN206512720U (en) Wind sand rifle rushes hair device
CN207863017U (en) Multifunctional river channel dredging Environmental protection cutter peculiar to vessel
CN112796322A (en) Pile core drawing pipe and pile core drawing method using same
CN208564476U (en) Remove the device of motor-pumped well silt
CN206752621U (en) A kind of efficient emergency drainage device
CN204018318U (en) Residue extraction pipeline dredging system
CN204456278U (en) More than 55KW high-power high voltage centrifugal water pump remote multiple-limb discharge pressure water system
CN204104545U (en) The fish pond tube drawing drainage arrangement of saving water and energy

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140723

WD01 Invention patent application deemed withdrawn after publication