CN103928864A - The Method of Adjusting the Seams of Multiple Conductors with Electricity on 220kV-66kV Transmission Lines - Google Patents

The Method of Adjusting the Seams of Multiple Conductors with Electricity on 220kV-66kV Transmission Lines Download PDF

Info

Publication number
CN103928864A
CN103928864A CN201410139816.2A CN201410139816A CN103928864A CN 103928864 A CN103928864 A CN 103928864A CN 201410139816 A CN201410139816 A CN 201410139816A CN 103928864 A CN103928864 A CN 103928864A
Authority
CN
China
Prior art keywords
wire
coaster
tapered end
insulating
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410139816.2A
Other languages
Chinese (zh)
Other versions
CN103928864B (en
Inventor
张森
王峰
王东华
赵东洋
刘思汗
刘韦
董政
寿增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410139816.2A priority Critical patent/CN103928864B/en
Publication of CN103928864A publication Critical patent/CN103928864A/en
Application granted granted Critical
Publication of CN103928864B publication Critical patent/CN103928864B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本发明涉及220kV-66kV输电线路带电调整复导线线缝的方法,包括以下步骤:①塔上地电位人员将绝缘硬梯前端挡在导线压接管处位置,将绝缘硬梯后端用绝缘绳绑在铁塔塔身部位上;②等电位人员进入强电场;③带有滑车的卡线器安装在距导线压接管1.0米处,锁头滑车安装在二联板的工作眼上,将绝缘绳穿入锁头滑车,沿导线再穿入卡线器的滑车,沿导线的相反方向,在锁头滑车上锁头;④地电位人员使用绝缘杆把穿好的绝缘绳的牵引端穿入铁塔横担头上的滑车里,塔下使用绞磨拉紧绝缘绳使导线的张力转移到绝缘绳上;⑤等电位电工打开导线调整板调整导线的弛度。本发明适用于220kV-66kV所有绝缘形式的线路设备,具有相当高的广泛性。

The present invention relates to a method for adjusting the seam of multiple wires with electricity on a 220kV-66kV transmission line, which includes the following steps: ①The ground potential personnel on the tower block the front end of the insulating hard ladder at the position of the wire crimping pipe, and tie the back end of the insulating hard ladder with an insulating rope On the body of the iron tower; ②Equipotential personnel enter the strong electric field; ③The cable clamp with a pulley is installed at a distance of 1.0 meters from the wire crimping tube, and the lock block is installed on the working eye of the two-piece board, and the insulating rope is threaded Enter the lock block, and then pass through the wire clamp block along the wire, and lock the end on the lock block along the opposite direction of the wire; In the pulley on the shoulder, the winch mill is used under the tower to tighten the insulation rope to transfer the tension of the wire to the insulation rope; ⑤ The equipotential electrician opens the wire adjustment plate to adjust the slack of the wire. The invention is suitable for all insulation forms of line equipment of 220kV-66kV, and has quite high universality.

Description

220kV-66kV输电线路带电调整复导线线缝的方法The Method of Adjusting the Seams of Multiple Conductors with Electricity on 220kV-66kV Transmission Lines

技术领域 technical field

本发明涉及一种供220kV-66kV输电线路带电调整复导线线缝的方法。 The invention relates to a method for adjusting the seams of multi-conductor wires for electrification of 220kV-66kV transmission lines.

背景技术 Background technique

传统220kV-66kV输电线路带电调整复导线线缝作业,由于难度大,通常采取停电作业方法,这样大大降低了供电可靠性。  Traditional 220kV-66kV transmission lines live to adjust the multi-conductor seam operation, due to the difficulty, usually adopt the method of blackout operation, which greatly reduces the reliability of power supply. the

发明内容 Contents of the invention

本发明要解决的技术问题是提供一种220kV-66kV输电线路带电调整复导线线缝的方法,该方法可带电操作,有效解决复导线之间由于驰度不同而产生上下两根导线互相碰撞鞭击而损伤导线的问题。 The technical problem to be solved by the present invention is to provide a method for adjusting the seams of multiple conductors with electricity on a 220kV-66kV transmission line. The problem of damage to the wire due to impact.

为了解决现有技术存在的问题,本发明采用的技术方案是: In order to solve the problems existing in the prior art, the technical solution adopted in the present invention is:

220kV-66kV输电线路带电调整复导线线缝的方法,包括以下步骤: The method for adjusting the seams of multi-conductor conductors with electricity on 220kV-66kV transmission lines includes the following steps:

①塔上地电位人员将绝缘硬梯前端挡在导线压接管处位置,将绝缘硬梯后端用绝缘绳绑在铁塔塔身部位上使硬梯水平; ① The ground potential personnel on the tower block the front end of the insulating hard ladder at the position of the wire crimping pipe, and tie the back end of the insulating hard ladder to the body of the iron tower with an insulating rope to make the hard ladder horizontal;

②等电位人员穿屏蔽服携带带有滑车的卡线器、绝缘绳、锁头滑车、进入强电场; ②Equipotential personnel wear shielding suits and carry wire grippers with pulleys, insulating ropes, lock tackles, and enter strong electric fields;

③带有滑车的卡线器安装在距导线压接管1.0米处,锁头滑车安装在二联板的工作眼上,将绝缘绳穿入锁头滑车,沿导线再穿入卡线器的滑车,沿导线的相反方向,在锁头滑车上锁头; ③The clamping device with pulley is installed at 1.0 meters away from the wire crimping tube, and the lock block is installed on the working eye of the two-piece plate, and the insulating rope is passed into the lock block, and then inserted into the pulley of the wire clamping device along the wire , along the opposite direction of the wire, lock the head on the lock block;

④地电位人员使用绝缘杆把穿好的绝缘绳的牵引端穿入铁塔横担头上的滑车里,塔下使用绞磨拉紧绝缘绳使导线的张力转移到绝缘绳上; ④ Ground potential personnel use insulating rods to pass the leading end of the threaded insulating rope into the block on the iron tower cross-arm head, and use a winch under the tower to tighten the insulating rope so that the tension of the wire is transferred to the insulating rope;

⑤等电位电工打开导线调整板调整导线的弛度。 ⑤ The equipotential electrician opens the wire adjustment plate to adjust the slack of the wire.

所述的步骤③中,所述的复导线为上导线,所述的锁头滑车为锁头上扛滑车,锁头上扛滑车安装在二联板工作眼的上眼上,将绝缘绳穿入锁头上扛滑车,沿导线再穿入卡线器的滑车,沿上导线的相反方向,在锁头上扛滑车上锁头。 In the step ③, the double wire is the upper wire, and the lock tackle is the upper tackle on the lock, and the upper tackle on the lock is installed on the upper eye of the double plate working eye, and the insulating rope is passed through the upper eye. Put the pulley on the lock head, and then pass through the pulley of the wire clamp along the wire, and carry the pulley on the lock head to lock the end along the opposite direction of the upper wire.

所述的步骤③中,所述的复导线为下导线,所述的锁头滑车为锁头直角滑车,锁头直角滑车安装在二联板工作眼的下眼上,将绝缘绳穿入锁头直角滑车,沿导线再穿入卡线器的滑车,沿下导线的相反方向,在锁头直角滑车上锁头。 In the step ③, the double wire is the lower wire, and the lock block is a right-angle block. Head right-angle pulley, along the wire and then pass through the pulley of the wire clamp, along the opposite direction of the lower wire, lock the head on the lock right-angle pulley.

本发明所具有的优点与效果是: Advantage and effect that the present invention has are:

本发明220kV-66kV输电线路带电调整复导线线缝的方法,塔上地电位人员将绝缘硬梯前端挂在压接管外侧,后端用绝缘绳在铁塔塔身部位上使硬梯尽量水平,等电位人员携带滑车、卡线器、绝缘绳、锁头滑车进入强电场。将带有滑车的卡线器安装在距压接管1.0米处,锁头滑车安装在二联板的合适工作眼上将绝缘绳穿入锁头滑车,沿导线再穿入卡线器的滑车,沿导线的反方向,在锁头滑车上锁头。地电位人员把穿好绝缘绳的牵引端穿入铁塔横担头的滑车里,塔下使用绞磨拉紧绝缘绳,使导线的张力转移到绝缘绳上。等电位电工打开导线调整板并安装在合适的眼中。该方法使绝缘起重绳沿着二联板所需工作眼受力,本发明可带电操作减少停电次数、提高了工作随意性和供电可靠性,带电操作与停电操作所用的时间及体力消耗相差不多。并且有效解决复导线由于驰度不同而产生上下两根导线互相碰触鞭击而损伤导线。适用于220kV-66kV所有绝缘形式的线路设备,具有相当高的广泛性。 The method for adjusting the joints of multiple conductors with electricity on the 220kV-66kV transmission line of the present invention, the ground potential personnel on the tower hang the front end of the insulating hard ladder on the outside of the crimping pipe, and the rear end uses an insulating rope on the body of the iron tower to make the hard ladder as horizontal as possible, etc. Potential personnel carry pulleys, wire clamps, insulating ropes, and lock pulleys into the strong electric field. Install the wire clamp with a pulley at a distance of 1.0 meters from the crimping pipe, install the lock block on the suitable working eye of the two-joint plate, pass the insulating rope into the lock block, and then pass through the wire clamp into the pulley of the wire clamp. In the opposite direction of the wire, lock the end on the end block. The ground potential personnel put the leading end of the threaded insulating rope into the pulley of the iron tower cross-arm head, and use a twist mill under the tower to tighten the insulating rope so that the tension of the conductor is transferred to the insulating rope. The equipotentialist opens the wire adjustment plate and installs in the appropriate eye. The method makes the insulated hoisting rope bear force along the required working eye of the two-joint plate. The invention can reduce the number of power outages, improve the randomness of work and the reliability of power supply. almost. And it effectively solves the problem that the upper and lower wires touch each other and damage the wire due to the different latitude of the double wire. It is suitable for all insulation forms of line equipment from 220kV to 66kV, and has a very high versatility.

附图说明 Description of drawings

图1为220kV-66kV输电线路带电调整复导线线缝的方法中调整上导线的方法示意图; Fig. 1 is the schematic diagram of the method for adjusting the upper wire in the method for adjusting the seam of the double wire when the 220kV-66kV transmission line is charged;

图2为220kV-66kV输电线路带电调整复导线线缝的方法中调整下导线的方法示意图; Fig. 2 is the schematic diagram of the method for adjusting the lower wire in the method for adjusting the seam of the double wire when the 220kV-66kV transmission line is charged;

图3为锁头上扛滑车的结构示意图; Fig. 3 is the structural representation of carrying tackle on the lock head;

图4为锁头直角滑车的结构示意图。 Fig. 4 is a structural schematic diagram of the right-angle block of the lock head.

具体实施方式 Detailed ways

本发明220kV-66kV输电线路带电调整复导线线缝的方法,是利用锁头滑车,使绝缘绳沿着二联板所需工作眼受力,由于本方法需要对抗力,因此上下两根导线不能同时调整应分开进行。 The method for adjusting the seams of multiple wires with electricity in the 220kV-66kV transmission line of the present invention is to use the lock tackle to make the insulating rope bear the force along the required working eye of the two-piece board. Since this method requires resistance, the upper and lower wires cannot Simultaneous adjustments should be made separately.

实施例1: Example 1:

如图1所示,本实施例中调整的是复导线中的上导线。 As shown in FIG. 1 , what is adjusted in this embodiment is the upper conductor in the multiconductor conductor.

①塔上地电位人员将绝缘硬梯前端挡在导线压接管处位置,将绝缘硬梯后端用绝缘绳绑在铁塔塔身部位上使硬梯水平; ① The ground potential personnel on the tower block the front end of the insulating hard ladder at the position of the wire crimping pipe, and tie the back end of the insulating hard ladder to the body of the iron tower with an insulating rope to make the hard ladder horizontal;

②等电位人员穿屏蔽服携带带有滑车的三角卡线器1、绝缘绳6、锁头滑车进入强电场; ②Equipotential personnel wear shielding suits and carry a triangular cable clamp 1 with a pulley, an insulating rope 6, and a lock block to enter a strong electric field;

③带有滑车的三角卡线器1安装在与导线压接管7距离1.0米处,将锁头上扛滑车3安装在二联板4的工作眼上眼上,将绝缘绳6一端穿入锁头上扛滑车,沿上导线再穿入三角卡线器的滑车,沿上导线2的相反方向,将绝缘绳一端固定在锁头上扛滑车上; ③ Install the triangular cable clamp 1 with a pulley at a distance of 1.0 meters from the wire crimping tube 7, install the upper pulley 3 on the lock head on the upper eye of the second joint plate 4, and insert one end of the insulating rope 6 into the lock Carry the pulley on the head, pass through the pulley of the triangular wire clamp along the upper wire, and fix one end of the insulating rope on the pulley on the lock head along the opposite direction of the upper wire 2;

④地电位人员使用绝缘杆把穿好的绝缘绳6的牵引端穿入铁塔横担头上的滑车10里,塔下使用绞磨拉紧绝缘绳使导线的张力转移到绝缘绳上; ④ The ground potential personnel use the insulating rod to pass the leading end of the threaded insulating rope 6 into the pulley 10 on the iron tower cross-arm head, and use the winch under the tower to tighten the insulating rope so that the tension of the wire is transferred to the insulating rope;

⑤等电位电工打开导线调整板8并安装在合适的工作眼中以便调整导线的弛度。 ⑤ The equipotential electrician opens the wire adjustment plate 8 and installs it in a suitable working eye so as to adjust the slack of the wire.

如图3所示,本实施例中使用的锁头上扛滑车的结构如下:锁头上扛滑车,包括有滑轮31、防脱绳挡杆32和挂板33,滑轮31具有滑轮轴34,防脱绳挡杆32和绝缘绳锁头挂板33分别通过滑轮轴34连接在滑轮31的两端。 As shown in Figure 3, the structure of the tackle on the lock used in this embodiment is as follows: the tackle on the lock includes a pulley 31, an anti-off rope stopper bar 32 and a hanging plate 33, the pulley 31 has a pulley shaft 34, The anti-off rope retaining bar 32 and the insulating rope lock head hanging plate 33 are connected to the two ends of the pulley 31 by the pulley shaft 34 respectively.

实施例2: Example 2:

如图2所示,220kV-66kV输电线路带电调整复导线线缝的方法,包括以下步骤:本实施例中调整的是复导线中的下导线。 As shown in FIG. 2 , the method for adjusting the seams of double conductors with electricity on a 220kV-66kV transmission line includes the following steps: In this embodiment, the adjustment is the lower conductor of the double conductors.

步骤③带有滑车的三角卡线器1安装在与导线压接管7距离1.0米处,将锁头直角滑车5安装在二联板的工作眼下眼上,将绝缘绳一端穿入锁头直角滑车,沿下导线9再穿入三角卡线器的滑车,沿下导线的相反方向,将绝缘绳一端固定在锁头直角滑车上。其余步骤同实施例1。 Step 3) Install the triangular cable clamp 1 with a pulley at a distance of 1.0 meters from the wire crimping tube 7, install the lock right-angle pulley 5 on the lower eye of the double plate, and thread one end of the insulating rope into the lock right-angle pulley , along the lower wire 9 and then pass through the pulley of the triangular wire clamp, and fix one end of the insulating rope on the right-angle block of the lock head along the opposite direction of the lower wire. All the other steps are the same as in Example 1.

如图4所示,本实施例中使用的锁头直角滑车,包括有滑车41、挂板42和滑车挂点43,滑车挂点43整体呈直角形,滑车挂点43的一个直角边与滑车41相连,滑车挂点43的另一个直角边与挂板42相连。 As shown in Figure 4, the right-angled block of the lock used in the present embodiment includes a block 41, a hanging plate 42 and a block hanging point 43, and the block hanging point 43 is a right angle as a whole. 41 links to each other, and another right-angled side of tackle hanging point 43 links to each other with hanging plate 42.

Claims (3)

  1. The method of the multiple wire linear slit of the charged adjustment of 1.220kV-66kV transmission line, is characterized in that comprising the following steps:
    1. on tower, earth potential personnel will be insulated the front terminal block of hard ladder in position, pressure connecting pipe for lead wire place, and the hard terraced rear end of insulation is tied up and on steel tower tower body position, made hard terraced level with insulating cord;
    2. equipotential personnel wear screening clothing and carry fixing-line device, insulating cord, tapered end coaster with coaster, enter highfield;
    3. the fixing-line device with coaster is arranged on apart from 1.0 meters of of pressure connecting pipe for lead wire, and tapered end coaster is arranged on the work eye of duplex plate, and insulating cord is penetrated to tapered end coaster, penetrates the coaster of fixing-line device along wire again, along the rightabout of wire, and tapered end on tapered end coaster;
    4. earth potential librarian use insulating bar penetrates the traction end of the insulating cord of putting in the coaster on steel tower cross-arm head, uses the tight insulating cord of strand grain that the tension force of wire is transferred on insulating cord under tower;
    5. equipotential electrician opens wire and adjusts the sag that plate is adjusted wire.
  2. 2. the method for wire linear slit is answered in the charged adjustment of 220kV-66kV transmission line according to claim 1, in it is characterized in that described step 3., described multiple wire is upper conductor, described tapered end coaster is to shoulder coaster on tapered end, on tapered end, shouldering coaster, to be arranged on the upper eye of duplex plate work eye upper, and insulating cord is penetrated on tapered end and shoulders coaster, penetrates the coaster of fixing-line device along wire again, along the rightabout of upper conductor, on tapered end, shoulder tapered end on coaster.
  3. 3. the method for wire linear slit is answered in the charged adjustment of 220kV-66kV transmission line according to claim 1, in it is characterized in that described step 3., described multiple wire is lower wire, described tapered end coaster is tapered end right angle coaster, tapered end right angle coaster be arranged on lower of duplex plate work eye upper, insulating cord is penetrated to tapered end right angle coaster, along wire, penetrate again the coaster of fixing-line device, along the rightabout of lower wire, tapered end on tapered end right angle coaster.
CN201410139816.2A 2014-04-09 2014-04-09 220kV-66kV electric transmission line hot-line adjusts the method for multiple wire linear slit Active CN103928864B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410139816.2A CN103928864B (en) 2014-04-09 2014-04-09 220kV-66kV electric transmission line hot-line adjusts the method for multiple wire linear slit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410139816.2A CN103928864B (en) 2014-04-09 2014-04-09 220kV-66kV electric transmission line hot-line adjusts the method for multiple wire linear slit

Publications (2)

Publication Number Publication Date
CN103928864A true CN103928864A (en) 2014-07-16
CN103928864B CN103928864B (en) 2016-08-31

Family

ID=51146991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410139816.2A Active CN103928864B (en) 2014-04-09 2014-04-09 220kV-66kV electric transmission line hot-line adjusts the method for multiple wire linear slit

Country Status (1)

Country Link
CN (1) CN103928864B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108110678A (en) * 2018-02-09 2018-06-01 安徽送变电工程有限公司 A kind of bypass draft gear for soft rope
CN115036839A (en) * 2022-06-15 2022-09-09 国网河北省电力有限公司超高压分公司 Compact type pole tower side phase electric field inlet and outlet device and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202050218U (en) * 2011-04-29 2011-11-23 吉林省电力有限公司通化供电公司 Waving-prevention, adhesion-prevention and destruction-prevention system for high-voltage power transmission line
CN102361309A (en) * 2011-07-18 2012-02-22 邯郸供电公司 Conductor collision preventing method for bundled conductor
CN202159930U (en) * 2011-08-04 2012-03-07 辽宁省电力有限公司辽阳供电公司 Adjuster for compound conductor spacing of power transmission line
CN102780138A (en) * 2012-07-25 2012-11-14 辽宁省电力有限公司辽阳供电公司 66kV compound-lead double-head grounding wire
CN103346517A (en) * 2013-07-17 2013-10-09 国家电网公司 By-pass method of combined guide line of electric transmission line
CN103594976A (en) * 2013-11-25 2014-02-19 国家电网公司 Combined stringing tool used for line conductor stringing

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202050218U (en) * 2011-04-29 2011-11-23 吉林省电力有限公司通化供电公司 Waving-prevention, adhesion-prevention and destruction-prevention system for high-voltage power transmission line
CN102361309A (en) * 2011-07-18 2012-02-22 邯郸供电公司 Conductor collision preventing method for bundled conductor
CN202159930U (en) * 2011-08-04 2012-03-07 辽宁省电力有限公司辽阳供电公司 Adjuster for compound conductor spacing of power transmission line
CN102780138A (en) * 2012-07-25 2012-11-14 辽宁省电力有限公司辽阳供电公司 66kV compound-lead double-head grounding wire
CN103346517A (en) * 2013-07-17 2013-10-09 国家电网公司 By-pass method of combined guide line of electric transmission line
CN103594976A (en) * 2013-11-25 2014-02-19 国家电网公司 Combined stringing tool used for line conductor stringing

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
余诗俊: "220KV输电线路紧线施工技术的改进措施", 《江西电力》 *
梁河雷: "带电处理220kV垂直排列双分裂导线粘连方法", 《2012年供电企业带电作业技术研讨会论文集》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108110678A (en) * 2018-02-09 2018-06-01 安徽送变电工程有限公司 A kind of bypass draft gear for soft rope
CN115036839A (en) * 2022-06-15 2022-09-09 国网河北省电力有限公司超高压分公司 Compact type pole tower side phase electric field inlet and outlet device and method
CN115036839B (en) * 2022-06-15 2025-05-27 国网河北省电力有限公司超高压分公司 A compact tower side phase in and out electric field device and method

Also Published As

Publication number Publication date
CN103928864B (en) 2016-08-31

Similar Documents

Publication Publication Date Title
CN207638298U (en) A ground wire single connection double tension fittings string
CN204144479U (en) A kind of earth connection
CN103795005A (en) Special tool for dual protection of wire of strain tower
CN103928864B (en) 220kV-66kV electric transmission line hot-line adjusts the method for multiple wire linear slit
CN103887735A (en) Linear charged wire lifting device of electric transmission line
CN203787855U (en) A straight-line electrified wire lifting device for transmission lines
CN207163820U (en) A kind of cable production stretching-machine
CN103247972B (en) Wire tractor
CN204834927U (en) Transmission line live working divides streamline temporarily
CN205752621U (en) Distribution network live work line clip and lead wire dual function transmission rod
JP5146694B2 (en) High current cable
CN217656332U (en) Threading pipe for laying underground cable
CN105024312A (en) Steel wire rope cable net sleeve
CN105350927A (en) Convenient steel wire rope clip
CN103594971A (en) Method for replacing single-circuit wire of common-tower double-circuit lines
CN204289755U (en) The syndeton of flexible cable and overhead transmission line
CN203218791U (en) wire retractor
CN209562017U (en) A tight pulley block device
CN207530431U (en) Multiple-circuit on same tower tangent tower passes in and out equipotential insulating guide rail
CN207098086U (en) A kind of wire clamp for preventing wire dropout
CN206004211U (en) Replacement of 35‑110kV compression type line clamp tension single string insulator clamp
CN104698402A (en) Ribbon cable detection method for magnetic flux of open loop magnetic flux sensor
CN204012436U (en) Horizontally changing strain insulator string instrument
CN203398348U (en) Multifunctional grounding clamp applying to ground wire
CN204464767U (en) Special metering device for temporary electricity consumption that can be connected live

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant