[go: up one dir, main page]

CN103879880A - Building material loading and unloading hanging fork - Google Patents

Building material loading and unloading hanging fork Download PDF

Info

Publication number
CN103879880A
CN103879880A CN201410060610.0A CN201410060610A CN103879880A CN 103879880 A CN103879880 A CN 103879880A CN 201410060610 A CN201410060610 A CN 201410060610A CN 103879880 A CN103879880 A CN 103879880A
Authority
CN
China
Prior art keywords
fork
horizontal
longitudinal
hanging
arms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410060610.0A
Other languages
Chinese (zh)
Other versions
CN103879880B (en
Inventor
陆玉权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group Holding Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410060610.0A priority Critical patent/CN103879880B/en
Publication of CN103879880A publication Critical patent/CN103879880A/en
Application granted granted Critical
Publication of CN103879880B publication Critical patent/CN103879880B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a building material loading and unloading hanging fork. The building material loading and unloading hanging fork is characterized by comprising two longitudinal hanging arms, wherein the upper ends of the two longitudinal hanging arms are connected with two horizontal hanging arms, respectively; the two horizontal hanging arms are connected through a horizontal hanging rod, the middle of the horizontal hanging rod is provided with a hook, and the lower parts of the two longitudinal hanging arms are connected with two inserting forks in a detachable manner, respectively; the horizontal hanging arms are provided with multiple dip angle regulating holes connected with one another, and the two ends of the horizontal hanging rods are inserted into the dip angle regulating holes of the two horizontal hanging arms to be connected with the two horizontal hanging arms, respectively; the longitudinal hanging arms are connected with the inserting forks through lock catches, each lock catch comprises an elbow spring bolt and a reverse buckle, the elbow spring bolts are arranged on the lower parts of the longitudinal hanging arms, and the reverse buckles are arranged on the side parts of the inserting forks; reinforcing ribs are connected with the two longitudinal hanging arms, and the two inserting forks are connected through a horizontal connecting rod. The hanging fork provided by the invention has the advantages that time and labor are saved in loading and unloading, the labor intensity is small, and the carrying efficiency is high.

Description

Fork is hung in a kind of building materials handling
Technical field
The present invention relates to a kind of hanging device, specifically fork is hung in a kind of handling of the building materials for solid kind.
Background technology
At present, solid building material is if the handling labor of the good brick of code is normally with manually completing, first by manually fragment of brick being placed in hanging basket, by crane handling to destination, then by manually that fragment of brick is good from code fetch in hanging basket.This mode fragment of brick is at random in the time putting into and take out hanging basket, the good fragment of brick of code cannot be shifted by the gross, and workman is wasted time and energy in the time of handling, and labour intensity is large, handling efficiency is low.
Summary of the invention
The object of the invention is for the deficiencies in the prior art, and provide a kind of and use manpower and material resources sparingly, building materials handling that handling efficiency is higher hang fork.
The object of the invention is to realize by following technical scheme:
Fork is hung in a kind of building materials handling, comprise two longitudinal booms, the upper end of two longitudinal booms is connected with two horizontal arms respectively, and two horizontal arms connect by horizontal hanger rod, the middle part of horizontal hanger rod is provided with suspension hook, and the bottom of two longitudinal booms is removably connected with two plug in forks respectively.
Described horizontal arm is provided with multiple connected tilt adjustment holes, and the two ends of horizontal hanger rod are inserted respectively in the tilt adjustment hole of two horizontal arms with horizontal arm and are connected.
Described longitudinal boom is connected by snap close with plug in fork, and snap close comprises elbow dead bolt and back-off, and elbow dead bolt is arranged on the bottom of longitudinal boom, and back-off is arranged on the sidepiece of plugging in fork.
Being provided with reinforced rib is connected with two longitudinal booms.
Plugging in fork for two connects by transverse link.
When use, plug in fork separated before this with longitudinal boom, first inserted a yard good fragment of brick bottom by plugging in fork, will plug in fork and fix with longitudinal boom, then adjust the position of horizontal hanger rod in tilt adjustment hole according to the weight of fragment of brick and position, adjust the equilibrium point that hangs fork,, behind destination, take out and plug in fork by crane handling, the good fragment of brick of code completes by the gross and shifts, without again piling up, time saving and energy saving when workman loads and unloads, labour intensity is little, handling efficiency is higher again.
The present invention is except the handling applicable to the good fragment of brick of code, and originally hanging fork can support the use with multiple lifting overhead hoist, is also applicable to the handling handling of the building materials of the solid kinds such as timber, stone material, metallic material, adapts to face width.
Brief description of the drawings
Fig. 1 is the structural representation of the embodiment of the present invention;
Fig. 2 is the construction profile schematic diagram of Fig. 1;
Fig. 3 is the another kind of structural representation of embodiment.
In figure, 1. horizontal arm 3. horizontal hanger rod 4. suspension hooks 5. of longitudinal boom 2. are plugged in fork 6. tilt adjustment hole 7. snap close 8. elbow dead bolt 9. back-off 10. reinforced rib 11. transverse links.
Detailed description of the invention
Below in conjunction with drawings and Examples, content of the present invention is further elaborated, but is not limitation of the invention.
Embodiment:
With reference to Fig. 1 Fig. 2, fork is hung in a kind of building materials handling, comprise two longitudinal booms 1, article two, the upper end of longitudinal boom 1 is connected with two horizontal arms 2 respectively, article two, horizontal arm 2 connects by horizontal hanger rod 3, the bottom that the middle part of horizontal hanger rod 3 is provided with 4, two longitudinal booms 1 of suspension hook is removably connected with two plug in forks 5 respectively.Two longitudinal booms 1 are set, and to make to hang the stationarity of fork better.
Described horizontal arm 2 is provided with multiple connected tilt adjustment holes 6, and the two ends of horizontal hanger rod 3 are inserted respectively in the tilt adjustment hole 6 of two horizontal arms 2 with horizontal arm 2 and are connected.
Described longitudinal boom 1 is connected by snap close 7 with plug in fork 5.
Figure 3 shows that the snap close of another kind of structure, comprise elbow dead bolt 8 and back-off 9, elbow dead bolt 8 is arranged on the bottom of longitudinal boom 1, and back-off 9 is arranged on the sidepiece of plugging in fork 5.
Be provided with reinforced rib 10 and be connected with two longitudinal booms 1, indeformable to keep hanging the global shape of fork.
Two plug in forks 5 connect by transverse link 11, make the bottom of plugging in fork 5 have supporting mass, and handling goods is more steady, and the while also facilitates with rope and will be bound with plugging in fork by handling thing, avoid handling process to be fallen by handling thing.
When use, plug in fork 5 separated before this with longitudinal boom 1, first insert by plugging in fork 5 the fragment of brick bottom that code is good, to plug in fork 5 and fix with longitudinal boom 1, then adjust the position of horizontal hanger rod 3 in tilt adjustment hole 6 according to the weight of fragment of brick and position, adjust the equilibrium point that hangs fork, by crane handling behind destination, take out and plug in fork 5, the good fragment of brick of code completes by the gross and shifts, without again piling up again.

Claims (5)

1. fork is hung in building materials handling, it is characterized in that: comprise two longitudinal booms, article two, the upper end of longitudinal boom is connected with two horizontal arms respectively, article two, horizontal arm connects by horizontal hanger rod, the middle part of horizontal hanger rod is provided with suspension hook, and the bottom of two longitudinal booms is removably connected with two plug in forks respectively.
2. fork is hung in building materials according to claim 1 handling, it is characterized in that: described horizontal arm is provided with multiple connected tilt adjustment holes, and the two ends of horizontal hanger rod are inserted respectively in the tilt adjustment hole of two horizontal arms and are connected with horizontal arm.
3. fork is hung in building materials handling according to claim 1, it is characterized in that: described longitudinal boom is connected by snap close with plug in fork, and snap close comprises elbow dead bolt and back-off, and elbow dead bolt is arranged on the bottom of longitudinal boom, and back-off is arranged on the sidepiece of plugging in fork.
4. fork is hung in building materials handling according to claim 1, it is characterized in that: be provided with reinforced rib and be connected with two longitudinal booms.
5. fork is hung in building materials handling according to claim 1, it is characterized in that: plug in fork for two and connect by transverse link.
CN201410060610.0A 2014-02-24 2014-02-24 Building material loading and unloading hanging fork Active CN103879880B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410060610.0A CN103879880B (en) 2014-02-24 2014-02-24 Building material loading and unloading hanging fork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410060610.0A CN103879880B (en) 2014-02-24 2014-02-24 Building material loading and unloading hanging fork

Publications (2)

Publication Number Publication Date
CN103879880A true CN103879880A (en) 2014-06-25
CN103879880B CN103879880B (en) 2017-05-24

Family

ID=50949060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410060610.0A Active CN103879880B (en) 2014-02-24 2014-02-24 Building material loading and unloading hanging fork

Country Status (1)

Country Link
CN (1) CN103879880B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110002335A (en) * 2019-03-20 2019-07-12 广州飞机维修工程有限公司 A kind of adjustable vertical lifting device of aircraft nose landing gear
CN116902749A (en) * 2023-09-12 2023-10-20 江苏春兰机械制造有限公司 Lifting equipment for split charging tray of engine

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1745839A (en) * 1927-06-07 1930-02-04 New York Brick Handling Corp Dumping fork
US2690926A (en) * 1952-06-18 1954-10-05 Gen Motors Corp Load hook
JPS51126666A (en) * 1975-04-28 1976-11-04 Tokuyama Kairiku Unsou Kk Loading and unloading equipment
US4256337A (en) * 1979-08-17 1981-03-17 Wappler Joachim H R Universal fork assembly
US20050226710A1 (en) * 2003-06-03 2005-10-13 Thomas Friedrich Lifting fork
US20060175850A1 (en) * 2002-09-06 2006-08-10 Hannu Mantsinen Lifting device
CN201395469Y (en) * 2009-05-11 2010-02-03 陈朝 Sling for palletized goods
KR20110011633U (en) * 2010-06-10 2011-12-16 장대진 Pallet transferring device
CN203345923U (en) * 2013-05-07 2013-12-18 中国北车集团大同电力机车有限责任公司 Hoisting device for large built-in component
CN203740865U (en) * 2014-02-24 2014-07-30 陆玉权 Lifting fork for loading and unloading of building materials

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1745839A (en) * 1927-06-07 1930-02-04 New York Brick Handling Corp Dumping fork
US2690926A (en) * 1952-06-18 1954-10-05 Gen Motors Corp Load hook
JPS51126666A (en) * 1975-04-28 1976-11-04 Tokuyama Kairiku Unsou Kk Loading and unloading equipment
US4256337A (en) * 1979-08-17 1981-03-17 Wappler Joachim H R Universal fork assembly
US20060175850A1 (en) * 2002-09-06 2006-08-10 Hannu Mantsinen Lifting device
US20050226710A1 (en) * 2003-06-03 2005-10-13 Thomas Friedrich Lifting fork
CN201395469Y (en) * 2009-05-11 2010-02-03 陈朝 Sling for palletized goods
KR20110011633U (en) * 2010-06-10 2011-12-16 장대진 Pallet transferring device
CN203345923U (en) * 2013-05-07 2013-12-18 中国北车集团大同电力机车有限责任公司 Hoisting device for large built-in component
CN203740865U (en) * 2014-02-24 2014-07-30 陆玉权 Lifting fork for loading and unloading of building materials

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110002335A (en) * 2019-03-20 2019-07-12 广州飞机维修工程有限公司 A kind of adjustable vertical lifting device of aircraft nose landing gear
CN116902749A (en) * 2023-09-12 2023-10-20 江苏春兰机械制造有限公司 Lifting equipment for split charging tray of engine

Also Published As

Publication number Publication date
CN103879880B (en) 2017-05-24

Similar Documents

Publication Publication Date Title
CN109095343A (en) Assembled hanger
CN103879880A (en) Building material loading and unloading hanging fork
CN103395689A (en) Horizontal hoisting clamp for wallboard
CN203740865U (en) Lifting fork for loading and unloading of building materials
CN204400421U (en) A kind of gallows frame adopting electromagnet
CN205132903U (en) Steel wire slings
CN209306818U (en) Cargo hoisting frame
CN203528519U (en) Steel bar conveying pushing frame
CN207142633U (en) A kind of suspender for carrier vehicle vehicle frame
CN205170159U (en) Can hang hoist that hangs in overhead traveling crane
CN204224072U (en) A kind of jumbo bag suspension bracket
CN204778669U (en) Fork truck davit that stretches out and draws back
CN203511699U (en) Customized trolley for delivering rectangular weight
CN208948679U (en) Assembled hanger
CN203754232U (en) Simple steel rail lifting tool
CN202897816U (en) Steel bar lifting hook
CN205662225U (en) Become a bundle semitrailer pterygoid lamina special lifting device
CN204197601U (en) Stirrup stores lifting frame
CN205472231U (en) Gallows is transported to aluminium bar
CN205397849U (en) Special assembled hoist of large -scale box -type substation
CN107140519B (en) A kind of suspender for carrier vehicle vehicle frame
CN203833462U (en) Crane lifting tool of steel plate
KR100797415B1 (en) Hook for transportation and installation
CN202657831U (en) Wire rod lifting device
CN203345920U (en) Multifunctional lifting hook

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Yu Xiaotong

Inventor after: Lu Biao

Inventor after: Wang Guifang

Inventor after: Xiong Shangbing

Inventor after: Li Ranlong

Inventor before: Lu Yuquan

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170410

Address after: 530000 the Guangxi Zhuang Autonomous Region XiXiangTang Nanning fraternity Road No. 45

Applicant after: GUANGXI CONSTRUCTION ENGINEERING GROUP UNITED CONSTRUCTION CO., LTD.

Address before: 541215 the Guangxi Zhuang Autonomous Region Lingchuan County of Guilin Qingshitan town rock village sheep Tamura No. 32

Applicant before: Lu Yuquan

GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 530000 Jiangong building, No.19 Pingle Avenue, Liangqing District, Nanning City, Guangxi Zhuang Autonomous Region

Patentee after: Guangxi Construction Engineering Group Holding Co., Ltd

Address before: 530000 the Guangxi Zhuang Autonomous Region XiXiangTang Nanning fraternity Road No. 45

Patentee before: GUANGXI CONSTRUCTION ENGINEERING GROUP UNITED CONSTRUCTION Co.,Ltd.