CN103867264B - High temperature cleaning plant, purification system and the purification method of diesel engine vent gas purification - Google Patents

High temperature cleaning plant, purification system and the purification method of diesel engine vent gas purification Download PDF

Info

Publication number
CN103867264B
CN103867264B CN201410095823.7A CN201410095823A CN103867264B CN 103867264 B CN103867264 B CN 103867264B CN 201410095823 A CN201410095823 A CN 201410095823A CN 103867264 B CN103867264 B CN 103867264B
Authority
CN
China
Prior art keywords
heating
working chamber
high temperature
igniter
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410095823.7A
Other languages
Chinese (zh)
Other versions
CN103867264A (en
Inventor
张志明
沈书华
童靖
陈伟
吴欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU XIELAN ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Original Assignee
HANGZHOU XIELAN ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU XIELAN ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd filed Critical HANGZHOU XIELAN ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Priority to CN201410095823.7A priority Critical patent/CN103867264B/en
Publication of CN103867264A publication Critical patent/CN103867264A/en
Application granted granted Critical
Publication of CN103867264B publication Critical patent/CN103867264B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Exhaust Gas After Treatment (AREA)

Abstract

The present invention relates to a kind of diesel engine vent gas to purify heat riser, purification system and purification method, the heat riser, including working chamber and heating chamber, the outlet of working chamber is fixedly connected with the import of heating chamber, the working chamber side is fixed with air hose, the fuel switching mechanism for liquid diesel to be converted into high-pressure gaseous diesel oil is fixed on the inside of working chamber end cap, it is also fixed in the cavity wall of the nozzle opening front end of fuel switching mechanism for the igniter that high-pressure gaseous is diesel oil ignited in the working chamber, the high temperature guiding mechanism for mixing diesel engine vent gas and the high-temperature gas of the diesel oil ignited formation of high-pressure gaseous is fixed with inside the outlet end of the heating chamber.Present invention utilizes individual igniter and heating sources, burn more abundant, cleaning effect is more stable, the gas temperature for keeping particle cleaning required of spiral shape high temperature guiding mechanism is uniformly spread, burning can also be kept more abundant, to promote cleaning effect using the remnant oxygen in exhaust gas.

Description

High temperature cleaning plant, purification system and the purification method of diesel engine vent gas purification
Technical field
The present invention relates to a kind of high temperature cleaning plant, purification system and purification methods for vehicle tai-gas clean-up, more Body says, it be related to it is a kind of can under various changeable complex working conditions, to the poisonous and harmful substance in diesel engine vent gas carry out from Dynamic cleaning, reaches high temperature cleaning plant, purification system and the purification method of national emission standard.
Background technique
Currently, diesel engine vent gas processing technique relates generally to following technology: selective catalytic reduction (SCR), granule capturing The scale of the multiple technologies such as device, these technologies, various degrees promotes problem:
Selective catalytic reduction (SCR) technology: being diesel vehicle upgrading IV discharge standard of state using the urea tank of SCR technology One of the technology of middle comparative maturity.But exhaust gas cleaner will normally play a role, and need periodically to give diesel vehicle addition urea, one Aspect use cost increases, in addition, urea addition is inconvenient, and in the case where lacking supervision, if user is to save money private From dismounting, then IV discharge standard of state also becomes empty talk;Still more, if IV vehicle of state using after-treatment system cannot timing Urea is added, the pollution caused by air is even greater than the vehicle of III standard of state.In addition, during processing, if started The temperature of machine exhaust pipe is lower than catalytic reductive conditions temperature, will cause the secondary pollution of exhaust instead.
DPF is the exhaust gas from diesel vehicle administration way of international mature, and DPF is exactly diesel vehicle grain catcher, phase after installation When in can at least collect 95% particulate matter to " N95 " mask, this trap conservative estimation on diesel vehicle band.DPF is caught It needs to clear up the pollutant of trapping after collection exhaust pollutant, manner of cleaning up generally has passive regeneration (cleaning) and active again It is raw, it is limited to the development of regeneration techniques, at present based on passive regeneration, passive regeneration mode needs artificial regular dismounting to get off with high Pressure air is blown or high temperature furnace burns cleaning, fairly cumbersome.Current initiative regeneration mode in order to guarantee by DPF trap particulate matter It can be cleared up completely, the redox temperature of particulate matter to be made to be reduced to 450 degree or so by 600~650 degree, and this is needed constantly Specialist additive is added to realize, therefore the initiative regeneration mode is there are system complex, use cost is high and working service is inconvenient Etc. the factor for being unfavorable for promoting.
Date of publication on May 15th, 2013, the Chinese invention patent of publication No. CN103104317A disclose a kind of diesel oil hair Motivation exhaust aftertreatment and temperature-rising method, the heat riser have following deficiency: 1, high temperature ignition head is located at heat-conduction part The reliability of tail end, igniting is poor;2, there is still a need for additives to be just able to achieve actively again for the processing system constituted with the heat riser Raw, higher operating costs easily causes secondary pollution;3, the heat riser is set to exhaust pipe center, causes exhaust resistance big, easily leads Cause exhaust unsmooth;4, heat riser maintenance, replacement disassembly trouble.
Summary of the invention
It is an object of the invention to solve the deficiencies in the prior art, a kind of structurally reasonable, igniting high reliablity, maintenance are provided Simple diesel engine vent gas high temperature cleaning plant is dismantled in replacement.
It is another object of the present invention to provide one kind to be not necessarily to additive, realizes the pollutant trapped to grain catcher Carry out the diesel engine vent gas purification system and purification method automatically cleared up in real time.
The technical solution adopted by the present invention to solve the technical problems is:
For the high temperature cleaning plant of diesel engine vent gas purification, including working chamber and heating chamber, the outlet of working chamber and liter The import of warm chamber is fixedly connected, and the working chamber side is fixed with tracheae, is fixed in working chamber for by liquid diesel It is converted into the fuel switching mechanism of high-pressure gaseous diesel oil, the chamber of the nozzle opening front end of fuel switching mechanism is located in the working chamber It is also fixed on wall for the igniter that high-pressure gaseous is diesel oil ignited, is fixed with use inside the outlet end of the heating chamber In the high temperature guiding mechanism being oriented to the high-temperature gas of the diesel oil ignited formation of high-pressure gaseous.Liquid diesel is converted by fuel Mechanism is converted into high-pressure gaseous diesel oil, the present invention in order to solve the problems, such as heat riser igniting poor reliability in the prior art, An igniter, the contact surface of the igniter and gas mixture is individually fixedly installed in the nozzle opening front end of fuel switching mechanism Product is big, and high reliablity of lighting a fire, the high-temperature gas after ignition can be mixed preferably after high temperature guiding mechanism, high In addition the more uniform temperature of wet body can also make full use of the remnant oxygen in exhaust gas, keep high-temperature gas burning more abundant, with Further increase the temperature of high-temperature gas.
In short, the reliability of igniting is substantially increased present invention utilizes individual igniter and heating source, it is spiral High temperature guiding mechanism keeps high-temperature gas burning more abundant, and cleaning effect is more stable, makes in the diesel engine vent gas being captured Gas temperature needed for particulate matter cleaning is uniformly spread, moreover it is possible to and using the remnant oxygen in exhaust gas, keep burning more abundant, thus Promote cleaning effect.
Preferably, the working chamber is located at the outside of heating chamber, the junction formation angle of working chamber and heating chamber, institute The degree for stating angle is 27~67 °.Working chamber is placed in the outside of heating chamber, and the fuel switching mechanism in working chamber is also located in bavin The outside of oil machine exhaust pipe greatly reduces the exhaust resistance of diesel engine, and working chamber and heating chamber are in 27-67 ° of acute angle, Enter heating chamber along Diesel Engine Exhaust Pipe discharge directions after igniting by the high-pressure gaseous diesel oil that working chamber sprays, avoids straight It connects collision and causes to influence cleaning effect to air-flow larger interference.
Preferably, the inside of the working chamber and heating chamber junction is also fixed along the direction that working chamber cavity wall extends and is set There is flow-stopping plate.The effect of flow-stopping plate is the adverse effect avoided when diesel engine vent gas impact in front end works to igniter.
Preferably, the tracheae is fixed at the outside of working chamber end cap, the fuel switching mechanism fixed setting In the inside of working chamber end cap, end cap and the cavity wall of working chamber are detachably connected.The present invention is holding fuel switching mechanism assembly It covers, end cap and cavity wall are detachably connected by modes such as pipe screw threads, and installation, maintenance, replacement are high-efficient.
Preferably, the fuel switching mechanism include oil inlet pipe, heating source, upper end cover, with close under nozzle opening Sealing end covers, and forms cavity between upper and lower end cover, and wherein the heating part of heating source is set in the cavity, the length of heating part Degree is less than the length of cavity, and the outside of heating part is socketed with heat carrier, and the heat carrier is by heat carrier ontology and several cooling fins It constitutes, wherein heat carrier is integrally formed by heat carrier ontology and several cooling fins, and thermal conducting sleeve is equipped with outside heat carrier, described to lead Be additionally provided with heat insulator between thermal sleeve and upper and lower end cover, the oil outlet of the oil inlet pipe pass through upper end cover or under it is close Sealing end lid enters in cavity, the junction sealing of oil inlet pipe and upper end cover or lower end cover.Heating source of the invention is only Heating function is played, heating source is sealed in the cavity that upper and lower end cover is formed, and one end of heating source is fixed, the other end For free end, assembly, disassembly convenient for heat carrier, heat carrier structure is simple, easy to process, and assembly, removal efficiency are high.
Preferably, the igniter and heating source are made of heating part, fixing seat and conducting wire, the heating part is by nitrogen SiClx barred body and spiral shape heating wire are constituted, and spiral shape heating wire is located inside silicon nitride barred body, and spiral shape heating wire uses tungsten Silk or molybdenum filament, the heating part are fixedly connected with fixing seat, and the conducting wire passes through fixing seat and connect with heating part.
Preferably, the fixing seat is equipped with external screw thread, threaded assembling stand, institute are fixed in the cavity wall of working chamber Igniter is stated to connect by the matching thread of fixing seat and assembling stand;The end cap of working chamber is equipped with threaded pilot hole, institute Heating source is stated to connect by the matching thread of fixing seat and pilot hole.Use dismountable connection type such as screw thread, installation, dimension Easy to operate when shield, disassembly, work efficiency is high.
Preferably, the igniter is by igniter shell, heating bar, thermal conducting sleeve, heat storage, heat insulator, sealed end Lid and conducting wire composition, one end of the heating bar are placed in igniter shell, are fixed by thermal conducting sleeve and igniter shell, institute Heat storage to be stated to be located in igniter shell and be socketed with heating bar, heat insulator is fixed between heat storage and igniter shell, Igniter shell is sealed by end cover, and the conducting wire passes through end cover and heat storage is connect with heating bar, such to ignite Device structure system another unique design of the invention can save energy consumption under the premise of guaranteeing the ignition results of igniter, because Can be by the accumulation of heat of heating bar rear end for the heat storage of design, thermal losses is few, when heating bar head temperature is not achieved a little When fiery temperature, the heat of heat storage accumulation can be rapidly transferred to front end by heating bar, and avoid makes to send out by power supply power supply merely Hot pin reaches the deficiency of firing temperature.
Preferably, the heating bar is made of silicon nitride barred body and spiral shape heating wire, spiral shape heating wire is located at nitrogen Inside SiClx barred body, spiral shape heating wire uses tungsten wire or molybdenum filament.
Preferably, the diameter of the nozzle opening of the fuel switching mechanism is 0.6~1.2mm.
Preferably, the high temperature guiding mechanism is twist.
For the purification system of diesel engine vent gas purification, including oil supply mechanism, gas supply mechanism, control module, granule capturing Device and high temperature cleaning plant of the invention, the oil supply mechanism are connected to the oil inlet pipe of fuel switching mechanism, the gas supply mechanism Be connected to tracheae, the import of the high temperature cleaning plant is fixedly connected with Diesel Engine Exhaust Pipe, the outlet of high temperature cleaning plant with The import of grain catcher is fixedly connected, and the oil supply mechanism, gas supply mechanism, heating source and igniter pass through data line and control The connection of molding block.
Above-mentioned purification system for diesel engine vent gas purification method it is as follows: diesel engine vent gas purification system need to The particulate matter of grain trap trapping when being cleared up automatically: closure switch, and power supply is to the heating source in fuel switching mechanism Power supply, heating source are located at the heat carrier in fuel switching mechanism to it after being powered and conduct heat, and heat carrier stores high temperature heat; Power supply is powered to igniter, and gas supply mechanism injects air into working chamber by tracheae, and control module controls the oil of oil supply mechanism Pump is opened, and is recovered the oil from engine oil return pipe, by oil inlet pipe, diesel oil is transported in fuel switching mechanism, is converted by fuel Liquid diesel is converted high-pressure gaseous diesel oil by mechanism, and high-pressure gaseous diesel oil sprays rapidly from the nozzle opening of fuel switching mechanism Out, it is mixed with the air in working chamber, when the mixture of gaseous diesel and air is sent into igniter position, igniter is by oil gas Mixture instantaneous ignition, the gas mixture being ignited push to high temperature guiding mechanism by gas supply mechanism, due to diesel engine itself Exhaust Pressure and gas mixture itself impulse force superposition, by making gas mixture reach steering when high temperature guiding mechanism Mixed purpose, meanwhile, in turning to mixed process, gas mixture is also reached most using oxygen remaining in diesel engine vent gas Good combustion efficiency uniformly rises to reach heating cavity temperature, and then uniformly increase temperature in grain catcher, makes to gather Particulate matter in grain catcher is oxidized reduction completely, reaches the mesh that the particulate matter of grain catcher trapping is cleared up completely , until work terminates.
The beneficial effects of the present invention are:
1, original initiative regeneration mode needs to be added additive in the diesel oil of diesel oil tank, and the present invention can will be sent out The redox temperature precise elevation of poisonous and harmful substance also can to required temperature spot to abandon additive in motivation tail gas Cleaning completely, reaches national emission standard, reduces use cost.
2, fuel switching mechanism is mounted in working chamber, and it is unsmooth to avoid engine exhaust.
3, gas temperature needed for the spiralization design of high temperature guiding mechanism makes particle cleaning is uniformly spread, moreover it is possible to be utilized useless Remnant oxygen in gas keeps burning more abundant, to promote cleaning effect.
4, since individual igniter and heating source is utilized, Each performs its own functions, and high reliablity of lighting a fire is burnt more abundant, Cleaning effect is more stable.
5, working chamber end cap and device for igniting use the mounting means of pipe screw thread, so that entire cleaning plant installation, disassembly, dimension It repairs very easy.
6, the present invention is not influenced by the diesels equipment applying working condition such as diesel vehicle and ambient temperature, highly stable general The pollution particulate matter of grain trap trapping is cleared up completely.
Detailed description of the invention
Fig. 1: structural schematic diagram of the embodiment of the present invention 1 for the high temperature cleaning plant of diesel engine vent gas purification.
The structural schematic diagram of working chamber in Fig. 2: Fig. 1.
The structural schematic diagram of igniter and heating source in Fig. 3: Fig. 2.
The assembling schematic diagram of heating source and heat carrier in Fig. 4: Fig. 2.
The structural schematic diagram of fuel switching mechanism in Fig. 5: Fig. 2.
The assembling schematic diagram of fuel switching mechanism in Fig. 6: Fig. 2.
The assembling schematic diagram of igniter in Fig. 7: Fig. 2.
Fig. 8: structural schematic diagram of the embodiment of the present invention 2 for the high temperature cleaning plant of diesel engine vent gas purification.
The structural schematic diagram of igniter in Fig. 9: Fig. 8.
Figure 10: the diesel engine vent gas purification system schematic diagram of the embodiment of the present invention 3.
Wherein: 1, working chamber, 11, fuel switching mechanism, 111, oil inlet pipe, 112, heating source, 113, upper end cover, 114, lower end cover, 115, calandria, 116, thermal conducting sleeve, 117, heat insulator, 12, igniter, 121, igniter shell, 122, heating bar, 123, thermal conducting sleeve, 124, heat storage, 125, heat insulator, 126, end cover, 2, heating chamber, 21, high temperature leads To mechanism, 22, flow-stopping plate, 3, tracheae, 4, oil supply mechanism, 5, gas supply mechanism, 6, control module.
Specific embodiment
The present invention is described further with reference to the accompanying drawings and examples.Although the present invention will in conjunction with preferred embodiment into Row description, it should be understood that these verbal descriptions, only describe the simple text of mentality of designing of the present invention, be not offered as this hair It is bright to be limited in the verbal description and above-described embodiment, on the contrary, any combination without departing from mentality of designing of the present invention, increase and Modification, fall within the protection scope of the present invention, the present invention by cover may include have appended claims limit this hair Alternative, modified and equivalent in bright range.
Referring to shown in Fig. 1 to Figure 10, the high temperature cleaning plant presented here for diesel engine vent gas purification, purification system General application type: diesel vehicle, non-rice habitats diesel vehicle, diesel-driven generator of national emission standard etc. is not achieved in discharge, and cooperation is caught Storage object: grain catcher etc., however, it should be appreciated that present invention may also apply to the exhaust particulate object of other exhaust emissions equipment is clear Reason.
The function of various pieces of the invention is illustrated first below:
Working chamber 1
Major function: it is lighted after the diesel oil of injection is converted to high-pressure gaseous diesel oil by fuel switching mechanism 11, by point High-temperature mixed gas after combustion is discharged into heating chamber 2.
Main inner mechanisms: fuel switching mechanism 11, igniter 12.
The major function of fuel switching mechanism 11: being heated heat carrier 115 by heating source 112, and heat carrier 115 is by introducing Liquid diesel heating, diesel oil expand rapidly in the cavity of the closed formation of upper and lower end cover by high temperature action, are converted into height Gaseous diesel is pressed, due to rapid spatial expansion, generates high pressure, gaseous diesel is sprayed from nozzle opening rapidly.
The main member of fuel switching mechanism 11: heating source 112, upper end cover 113 have the lower end cover of nozzle opening 114, closed cavity is formed between upper and lower end cover, one end of heating source 112 and upper end cover 113 are fixed, the other end For free end, heat carrier 115 is socketed on heating source 112 by the free end, is equipped with thermal conducting sleeve outside heat carrier 115 116, heat insulator 117 made of heat-barrier material are additionally provided between thermal conducting sleeve 116 and upper and lower end cover.
Igniter 12:
Major function: it is individually that high-temperature gas is diesel oil ignited, to improve the temperature for being discharged into gas in heating chamber 2.
The heating part (or heating bar) of igniter 12 is by silicon nitride high temperature sintering system at silicon nitride is a kind of superhard Substance itself has the characteristics that anti-oxidant, high thermal efficiency when wear-resistant, high temperature.And it can also resist cooling thermal impact, in air In be heated to 1000 DEG C or more, quick refrigeration sharply heats again, will not fragmentation.
Heat up chamber 2:
Major function: the high temperature and high pressure gas that working chamber 1 is discharged into makes to heat up by spiral shape high temperature guiding mechanism 21 Temperature in chamber 2 is uniformly distributed, and using the remnant oxygen in exhaust gas, keeps the gaseous diesel burning of injection more abundant, wherein The effect of flow-stopping plate 22 is the adverse effect avoided when diesel engine vent gas impact in front end works to igniter.
Primary structure: spiral shape high temperature guiding mechanism 21, flow-stopping plate 22 are mounted on working chamber 1 and heating 2 junction of chamber.
Oil supply mechanism 4
Major function: taking oil from diesel engine oil return pipe, is transported in fuel switching mechanism 11.
Gas supply mechanism 5
Major function: for the oxygen supply of working chamber 1.
Control module 6
Major function: distributive value, injected gas volume and time are automatically controlled.
Embodiment 1
As shown in figs. 1-7, the high temperature cleaning plant for diesel engine vent gas purification of the invention, including working chamber 1 and liter Warm chamber 2, the working chamber 1 are located at the outside of heating chamber 2, the side import welding of the outlet of working chamber 1 and the chamber 2 that heats up, welding Place forms angle, and the degree of the angle is 27~67 °, and the present embodiment uses 45 °, and the inside of weld is along 1 cavity wall of working chamber The direction of extension is also welded with flow-stopping plate 22, and flange, peace on the outside of the end cap of working chamber 1 are equipped in the opening at 2 both ends of chamber of heating up Equipped with tracheae 3, inside is equipped with fuel switching mechanism 11, is connected between end cap and cavity wall by pipe screw thread, the fuel conversion Mechanism 11 includes oil inlet pipe 111, heating source 112, upper end cover 113, the lower end cover 114 with nozzle opening, upper and lower sealing Cavity is formed between end cap, wherein the heating part of heating source 112 is located in the cavity, and the length of heating part is less than the length of cavity Degree, the outside of heating part are socketed with heat carrier 115, and the heat carrier 115 is integrally formed by heat carrier ontology and several cooling fins, 115 external mounting of heat carrier has thermal conducting sleeve 116, and there are also by thermal insulating material between the thermal conducting sleeve 116 and upper and lower end cover Expect the heat insulator 117 being process, the oil outlet of the oil inlet pipe 111 passes through lower end cover 114 and enters in cavity, oil inlet end It is fixed on the end cap of working chamber 1, the junction of oil inlet pipe 111 and lower end cover 114 seals, the cavity wall in nozzle opening front end On be equipped with inside the outlet end for the chamber 2 that heats up for the igniter 12 that high-pressure gaseous is diesel oil ignited and be equipped with for by diesel oil The high temperature guiding mechanism 21 of tail gas and the mixing of the high-temperature gas of the diesel oil ignited formation of high-pressure gaseous.
In the present embodiment the aperture of nozzle opening be 0.6-1.2mm, high temperature guiding mechanism 21 twist, the igniter 12 It is made of with heating source 112 heating part, fixing seat and conducting wire, the heating part is by silicon nitride barred body and spiral shape heating wire structure At spiral shape heating wire is located inside silicon nitride barred body, and spiral shape heating wire uses tungsten wire, and the heating part and fixing seat are solid Fixed, conducting wire passes through fixing seat and connect with heating part, and the fixing seat is equipped with external screw thread, and band spiral shell is welded in the cavity wall of working chamber 1 The assembling stand of line, the igniter 12 are connected by the matching thread of fixing seat and assembling stand;It is machined on the end cap of working chamber 1 Threaded pilot hole, the heating source 112 are connected by the matching thread of fixing seat and pilot hole.
Embodiment 2
As Figure 8-9, another kind of the invention is used for the high temperature cleaning plant of diesel engine vent gas purification, basic structure With embodiment 1, be a difference in that: the construction of igniter 12 is further improved, and the igniter 12 is by igniter shell 121, hair Hot pin 122, thermal conducting sleeve 123, heat storage 124, heat insulator 125, end cover 126 and conducting wire composition, 122 sticks of the fever One end is placed in igniter shell 121, and fixed by thermal conducting sleeve 123 and igniter shell 121, the heat storage 124 is located at Be socketed in igniter shell 121 and with heating bar 122, heat insulator 125 be fixed at heat storage 124 and igniter shell 121 it Between, igniter shell 121 is sealed by end cover 126, and the conducting wire passes through end cover 126 and heat storage 124 and fever Stick 122 connects, and the heating bar 122 of the present embodiment is also made of silicon nitride barred body and spiral shape heating wire, spiral shape heating wire position Inside silicon nitride barred body, spiral shape heating wire uses molybdenum filament.
In the present embodiment the aperture of nozzle opening be 0.6-1.2mm, high temperature guiding mechanism 21 twist, the igniter 12 Igniter shell 121 be equipped with external screw thread, threaded assembling stand is welded in the cavity wall of working chamber 1, the igniter 12 is logical Igniter shell 121 is crossed to connect with the matching thread of assembling stand.
Embodiment 3
As shown in Figure 10, the purification system for diesel engine vent gas purification, including oil supply mechanism 4, gas supply mechanism 5, control High temperature cleaning plant described in module 6, grain catcher and embodiment 1, the oil inlet of the oil supply mechanism 4 and fuel switching mechanism 11 Pipe 111 is connected to, and the gas supply mechanism 5 is connected to tracheae 3, the import of the high temperature cleaning plant and the fixed company of Diesel Engine Exhaust Pipe It connects, the outlet of high temperature cleaning plant is fixedly connected with the import of grain catcher, the oil supply mechanism 4, gas supply mechanism 5, heat supply Body 112 and igniter 12 are connect by data line with control module 6.
Embodiment 4
The method that purification system described in embodiment 3 is used for diesel engine vent gas purification, the purification method are as follows: in diesel oil When tail gas purification system needs the particulate matter trapped to grain catcher to be cleared up automatically: closure switch, power supply is to being located at Heating source 112 in fuel switching mechanism 11 is powered, and heating source 112 is located at thermally conductive in fuel switching mechanism 11 to it after being powered Body 115 conducts heat, and heat carrier 115 stores high temperature heat;Power supply to igniter 12 be powered, gas supply mechanism 5 by tracheae 3 to Air is injected in working chamber 1, the oil pump that control module 6 controls oil supply mechanism 4 is opened, recovers the oil, pass through from engine oil return pipe Diesel oil is transported in fuel switching mechanism 11 by oil inlet pipe 111, converts high pressure gas for liquid diesel by fuel switching mechanism 11 State diesel oil, high-pressure gaseous diesel oil spray rapidly from the nozzle opening of fuel switching mechanism 11, mix with the air in working chamber 1, When the mixture of gaseous diesel and air is sent into 12 position of igniter, igniter 12 is by gas mixture instantaneous ignition, by point The gas mixture of combustion pushes to high temperature guiding mechanism 21 by gas supply mechanism 5, due to the Exhaust Pressure and oil gas of diesel engine itself The impulse force of mixture itself is superimposed, by making gas mixture achieve the purpose that turn to mixing when high temperature guiding mechanism 21, together When, in turning to mixed process, gas mixture also reaches best combustion effect using oxygen remaining in diesel engine vent gas, Uniformly rise to reach temperature in heating chamber 2, and then uniformly increase grain catcher (DPF) inner temperature, makes to accumulate in Particulate matter in grain trap (DPF) is oxidized reduction completely, and the particulate matter for reaching the trapping of (DPF) grain catcher is cleared up completely Purpose, until work terminate.

Claims (8)

1. the high temperature cleaning plant of diesel engine vent gas purification, it is characterised in that: including working chamber (1) and heating chamber (2), working chamber (1) outlet is fixedly connected with the import of heating chamber (2), and working chamber (1) side is fixed with tracheae (3), working chamber (1) Inside be fixed with the fuel switching mechanism (11) for liquid diesel to be converted into high-pressure gaseous diesel oil, the working chamber (1) it is also fixed in the cavity wall of the nozzle opening front end of fuel switching mechanism (11) for high-pressure gaseous is diesel oil ignited in Igniter (12), heating chamber (2) is used to connect and be fixed with inside outlet end of grain catcher import for height The high temperature guiding mechanism (21) that the high-temperature gas of the diesel oil ignited formation of state of calming the anger is oriented to;The high temperature guiding mechanism (21) is in Spiral shape;The gas mixture being ignited is pushed to high temperature guiding mechanism (21) by tracheae (3) by gas supply mechanism;The work Chamber (1) is located at the outside of heating chamber (2), the junction formation angle of working chamber (1) and heating chamber (2), the degree of the angle It is 27 ~ 67 °;The working chamber (1) and the inside of heating chamber (2) junction are also solid along the direction that working chamber (1) cavity wall extends Surely flow-stopping plate (22) are equipped with;The tracheae (3) is fixed at the outside of working chamber (1) end cap, the fuel switching mechanism (11) it is fixed at the inside of working chamber (1) end cap, the end cap of working chamber (1) is detachably connected with cavity wall;The fuel turns Structure (11) of changing planes includes oil inlet pipe (111), heating source (112), upper end cover (113), the lower end cover with nozzle opening (114), cavity is formed between upper and lower end cover, wherein the heating part of heating source (112) is set in the cavity, heating part Outside be socketed with heat carrier (115), the heat carrier (115) is made of heat carrier ontology and several cooling fins, heat carrier (115) external to be equipped with thermal conducting sleeve (116), heat insulator is additionally provided between the thermal conducting sleeve (116) and upper and lower end cover (117), the oil outlet of the oil inlet pipe (111) passes through upper end cover (113) or lower end cover (114) enters in cavity, Oil inlet pipe (111) and upper end cover (113) or the junction of lower end cover (114) seal.
2. the high temperature cleaning plant of diesel engine vent gas purification according to claim 1, it is characterised in that: the igniter (12) it is made of with heating source (112) heating part, fixing seat and conducting wire, the heating part is sent out by silicon nitride barred body and spiral shape Heated filament is constituted, and spiral shape heating wire is located inside silicon nitride barred body, and spiral shape heating wire uses tungsten wire or molybdenum filament.
3. the high temperature cleaning plant of diesel engine vent gas purification according to claim 2, it is characterised in that: the fixing seat is set There is external screw thread, threaded assembling stand is fixed in the cavity wall of working chamber (1), the igniter (12) passes through fixing seat and dress Matching thread connection with seat;The end cap of working chamber (1) is equipped with threaded pilot hole, and the heating source (112) passes through solid The connection of the matching thread of reservation and pilot hole.
4. the high temperature cleaning plant of diesel engine vent gas purification according to claim 1, it is characterised in that: the igniter (12) by igniter shell (121), heating bar (122), thermal conducting sleeve (123), heat storage (124), heat insulator (125), sealing End cap (126) and conducting wire composition, one end of the heating bar are placed in igniter shell (121), pass through thermal conducting sleeve (123) Fixed with igniter shell (121), the heat storage (124) is located in igniter shell (121) and covers with heating bar (122) It connects, heat insulator (125) is fixed between heat storage (124) and igniter shell (121), and igniter shell (121) passes through close Sealing end lid (126) sealing.
5. the high temperature cleaning plant of diesel engine vent gas purification according to claim 4, it is characterised in that: the heating bar (122) it is made of silicon nitride barred body and spiral shape heating wire, spiral shape heating wire is located inside silicon nitride barred body, spiral shape fever Silk uses tungsten wire or molybdenum filament.
6. the high temperature cleaning plant of the purification of diesel engine vent gas described according to claim 1 or 2 or 3, it is characterised in that: institute The diameter for stating the nozzle opening of fuel switching mechanism (11) is 0.6 ~ 1.2mm.
7. the purification system for diesel engine vent gas purification, it is characterised in that: including oil supply mechanism (4), gas supply mechanism (5), control High temperature cleaning plant described in molding block (6), grain catcher and claim 1 to 6 any one, the oil supply mechanism (4) It is connected to the oil inlet pipe (111) of fuel switching mechanism, the gas supply mechanism (5) is connected to tracheae (3), the high temperature cleaning plant Import be fixedly connected with Diesel Engine Exhaust Pipe, the outlet of high temperature cleaning plant is fixedly connected with the import of grain catcher, institute Oil supply mechanism (4), gas supply mechanism (5), heating source (112), igniter (12) is stated to connect by data line and control module (6) It connects.
8. a kind of method that purification system as claimed in claim 7 is used for diesel engine vent gas purification, which is characterized in that the purification Method is as follows: when diesel engine vent gas purification system needs the particulate matter trapped to grain catcher to be cleared up automatically: closure Switch, power supply are located at after being powered to it to heating source (112) power supply being located in fuel switching mechanism (11), heating source (112) Heat carrier (115) in fuel switching mechanism (11) conducts heat, and heat carrier (115) stores high temperature heat;Power supply is to igniting Device (12) is powered, and gas supply mechanism (5) injects air into working chamber (1) by tracheae (3), and control module (6) is controlled for oil machine The oil pump of structure (4) is opened, and recovers the oil from engine oil return pipe, by oil inlet pipe (111), diesel oil is transported to fuel switching mechanism (11) in, high-pressure gaseous diesel oil is converted by liquid diesel by fuel switching mechanism (11), high-pressure gaseous diesel oil is converted from fuel It sprays rapidly, is mixed with the air in working chamber (1), when the mixture of gaseous diesel and air in the nozzle opening of mechanism (11) When being sent into igniter (12) position, igniter (12) is by gas mixture instantaneous ignition, and the high-temperature gas being ignited is by air feeder Structure (5) pushes to high temperature guiding mechanism (21), since the impulse force of the Exhaust Pressure and high-temperature gas itself of diesel engine itself is superimposed, By making gas mixture achieve the purpose that turn to mixing when high temperature guiding mechanism (21), while in turning to mixed process, High-temperature gas reaches best combustion effect using oxygen remaining in diesel engine vent gas, so that it is equal to reach heating chamber (2) interior temperature Even rising, and then uniformly increase temperature in grain catcher, make to accumulate in the particulate matter in grain catcher and is oxidized completely Reduction achievees the purpose that the particulate matter of grain catcher trapping is cleared up completely, until work terminates.
CN201410095823.7A 2014-03-17 2014-03-17 High temperature cleaning plant, purification system and the purification method of diesel engine vent gas purification Expired - Fee Related CN103867264B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410095823.7A CN103867264B (en) 2014-03-17 2014-03-17 High temperature cleaning plant, purification system and the purification method of diesel engine vent gas purification

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410095823.7A CN103867264B (en) 2014-03-17 2014-03-17 High temperature cleaning plant, purification system and the purification method of diesel engine vent gas purification

Publications (2)

Publication Number Publication Date
CN103867264A CN103867264A (en) 2014-06-18
CN103867264B true CN103867264B (en) 2019-01-08

Family

ID=50906212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410095823.7A Expired - Fee Related CN103867264B (en) 2014-03-17 2014-03-17 High temperature cleaning plant, purification system and the purification method of diesel engine vent gas purification

Country Status (1)

Country Link
CN (1) CN103867264B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE538308C2 (en) * 2014-09-03 2016-05-10 Scania Cv Ab Device for injecting a reducing agent into exhaust gases
US9828897B2 (en) * 2015-04-30 2017-11-28 Faurecia Emissions Control Technologies Usa, Llc Mixer for a vehicle exhaust system
CN104912631B (en) * 2015-06-06 2018-02-02 杭州携蓝环保科技有限公司 A kind of active regeneration system of diesel particulate filter
CN104912630B (en) * 2015-06-06 2017-07-14 杭州携蓝环保科技有限公司 The active regeneration device and active regeneration system of a kind of diesel particulate filter
CN112682148B (en) * 2020-12-28 2021-12-14 江苏星光发电设备有限公司 Intelligent purifying equipment with automatic cleaning function for diesel engine

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5771683A (en) * 1995-08-30 1998-06-30 Southwest Research Institute Active porous medium aftertreatment control system
CN103104318A (en) * 2012-12-12 2013-05-15 贵州黄帝车辆净化器有限公司 Heating bar specially used for diesel engine exhaust aftertreatment device and function distribution of heating bar
CN103502589A (en) * 2011-03-09 2014-01-08 株式会社久保田 Engine exhaust treatment device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19504183A1 (en) * 1995-02-09 1996-08-14 Eberspaecher J Diesel engine particle filter regenerating burner
CN203783698U (en) * 2014-03-17 2014-08-20 杭州携蓝环保科技有限公司 High-temperature cleaning plant and purification system for tail gas purification of diesel engine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5771683A (en) * 1995-08-30 1998-06-30 Southwest Research Institute Active porous medium aftertreatment control system
CN103502589A (en) * 2011-03-09 2014-01-08 株式会社久保田 Engine exhaust treatment device
CN103104318A (en) * 2012-12-12 2013-05-15 贵州黄帝车辆净化器有限公司 Heating bar specially used for diesel engine exhaust aftertreatment device and function distribution of heating bar

Also Published As

Publication number Publication date
CN103867264A (en) 2014-06-18

Similar Documents

Publication Publication Date Title
CN103867264B (en) High temperature cleaning plant, purification system and the purification method of diesel engine vent gas purification
JP4393858B2 (en) Auxiliary equipment for exhaust aftertreatment equipment
CN105026712A (en) Burner with air-assisted fuel nozzle and vaporizing ignition system
CN105008685A (en) Exhaust treatment burner and mixer system
CN105051339A (en) Exhaust aftertreatment burner with preheated combustion air
CN104912631B (en) A kind of active regeneration system of diesel particulate filter
CN105026713A (en) Ion sensor with decoking heater
CN102353033B (en) High-temperature high-pressure combustion system for supercritical compound heat carrier generator
CN204804905U (en) Initiative regenerating unit and initiative regeneration system of diesel particulate filter
CN110273731A (en) A kind of burner meeting grain catcher DPF worst cold case highly efficient regeneration
CN103104317B (en) Diesel engine exhaust after-treatment heating-up device and heating-up method
CN203783698U (en) High-temperature cleaning plant and purification system for tail gas purification of diesel engine
CN203285515U (en) Preheating temperature increasing device for diesel engine exhaust aftertreatment device
CN203362271U (en) Preheating temperature increaser of diesel engine exhaust aftertreatment device
CN103104321B (en) Diesel engine exhaust reprocessing heat riser and temperature-rising method
CN203201628U (en) Diesel engine exhaust aftertreatment device heater
CN210801172U (en) Flat dispersion flame low NOx coal gas heat accumulation burner
CN201000110Y (en) Novel ignition device of household gas stove
CN204984547U (en) Initiative regeneration system of diesel particulate filter
CN211230585U (en) Burner capable of achieving efficient regeneration of DPF of particulate filter under low-temperature working condition
CN203201626U (en) Diesel engine exhaust aftertreatment device heater
CN104912630A (en) Active regeneration system of diesel particulate filter and active regeneration system
CN103104320B (en) Diesel engine exhaust aftertreatment device pre-heater and heating method
CN103104315B (en) Diesel engine exhaust aftertreatment device heater and heating method
CN103104316B (en) Diesel engine exhaust after-treatment device preheating heating-up device and heating-up method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190108