CN103835518A - Shaped splicable protective shed - Google Patents
Shaped splicable protective shed Download PDFInfo
- Publication number
- CN103835518A CN103835518A CN201410072336.9A CN201410072336A CN103835518A CN 103835518 A CN103835518 A CN 103835518A CN 201410072336 A CN201410072336 A CN 201410072336A CN 103835518 A CN103835518 A CN 103835518A
- Authority
- CN
- China
- Prior art keywords
- secondary beam
- girder
- load
- beams
- tie
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000001681 protective effect Effects 0.000 title abstract 5
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 15
- 239000010959 steel Substances 0.000 claims abstract description 15
- 239000002131 composite material Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 2
- 230000002633 protecting effect Effects 0.000 abstract description 2
- 238000009415 formwork Methods 0.000 abstract 1
- 239000000463 material Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The invention discloses a shaped splicable protective shed. The shaped splicable protective shed comprises at least four load-bearing columns, girders are erected at the upper ends of the load-bearing columns, connection beams are arranged between the upper portions of the load-bearing columns and end portions of the girders, a plurality of bottom-layer beams are erected among the girders, a plurality of stand columns are arranged on the girders and the connection beams, a plurality of middle-layer beams and a plurality of upper-layer beams are erected on the middle sections and the upper ends of the stand columns, and color steel plates, wooden formworks and protective plates are paved on the bottom-layer beams, the middle-layer beams and the upper-layer beams respectively. The shaped splicable protective shed has the advantages of simplicity in splicing, short construction period, good protecting effect, safety and reliability.
Description
Technical field
The present invention relates to a kind of regularization assemble type protection canopy.
Technical background
Building site conventionally need to be set up a large amount of interim lightly constructed and simply equipped buildings and be stayed and have a rest or deposit constructional materials for chore boy, but that common lightly constructed and simply equipped building is built speed is slow, a large amount of manpower and materials are expended, also caused the waste of material, and protection effect is not good, cannot tackle the drop impact of thing of building site high level.
Summary of the invention
Technical problem to be solved by this invention is just to provide a kind of regularization assemble type protection canopy, and assembled simple and convenient, the speed of building is fast, has three-layer protection structure, and protection effect is well safer.
For solving the problems of the technologies described above, the present invention adopts following technical scheme:
Regularization assemble type protection canopy, comprise at least four load-bearing pillars, girder is set up in described load-bearing pillar upper end, described load-bearing pillar top and end of main beam are provided with tie-beam, between described girder, set up some foundation level beams, on described girder and tie-beam, be respectively equipped with some root posts, some middle level secondary beams and upper strata secondary beam are set up respectively in each interlude of described column and upper end, on described bottom secondary beam, middle level secondary beam and upper strata secondary beam, are equipped with respectively color steel, wooden form and protected apron.
Preferably, to be respectively equipped with anchor ear fastening in connection with locating to be connected described girder and bottom secondary beam and column and the junction of middle level secondary beam, upper strata secondary beam.
Preferably, described load-bearing pillar and girder, tie-beam, girder is connected by right-angle coupler respectively with column with tie-beam and bottom secondary beam.
Preferably, described color steel is provided with some middle standing pillars, and described middle standing pillar is connected with middle level secondary beam and upper strata secondary beam is connected.
Preferably, described protected apron is color-steel composite board.
The present invention adopts technique scheme, by setting up on load-bearing pillar on girder and load-bearing pillar and girder, tie-beam is set, thereby formation supporting frame, on girder and column, set up respectively bottom secondary beam, middle level secondary beam and upper strata secondary beam, assembled simple, can greatly shorten construction period, form three-layer protection structure and be equipped with respectively color steel, wooden form and protected apron on bottom secondary beam, middle level secondary beam and upper strata secondary beam, can effectively tackle the drop impact of thing of building site high level, make protection canopy better protecting effect, more safe and reliable.
Brief description of the drawings
Below in conjunction with the drawings and specific embodiments, the present invention is described further:
Fig. 1 is structural representation of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is elaborated.
As shown in Figure 1, the present invention includes at least four load-bearing pillars 1, girder 2 is set up in described load-bearing pillar upper end, described load-bearing pillar top and end of main beam are provided with tie-beam 3, between described girder, set up some foundation level beams 4, on described girder and tie-beam, be respectively equipped with some root posts 6, some middle level secondary beams 7 and upper strata secondary beam 8 are set up respectively in each interlude of described column and upper end, are equipped with respectively color steel 5, wooden form 9 and protected apron 10 on described bottom secondary beam, middle level secondary beam and upper strata secondary beam.It is fastening in connection with locating to be connected that described girder 2 and bottom secondary beam 4 and column 6 and the junction of middle level secondary beam 7, upper strata secondary beam 8 are respectively equipped with anchor ear.Described load-bearing pillar 1 and girder 2, tie-beam 3, girder is connected by right-angle coupler respectively with column 6 with tie-beam 3 and bottom secondary beam 4.Described protected apron 10 is color-steel composite board.Described color steel 5 is provided with some middle standing pillars 11, and described middle standing pillar is connected with middle level secondary beam 7 and upper end is connected with upper strata secondary beam 8.
A kind of embodiment of the present invention: adopt 1, two girder 2 of four load-bearing pillars and four tie-beams 3, its concrete installation steps are:
1) first use the screw of M12 × 30 to connect load-bearing pillar 1 and girder 2;
2) use the screw of M12 × 70 that four tie-beams 3 are connected with girder with load-bearing pillar respectively;
3) on girder, set up the bottom secondary beam 4 of some 6 meters long, then use the screw of anchor ear and M10 × 100 that bottom secondary beam 4 and girder 2 are fixed;
4) on bottom secondary beam, lay color steel 5, adopt the laying of parallel long edge direction and every color steel to overlap, coincidence length is not less than 3cm, bears down on one with the lumps of wood in color steel top;
5) by 2 meters of spacing, column 6 is installed respectively on girder and tie-beam, and column 6 lower ends and girder, tie-beam is fixed with right-angle coupler;
6) set up the middle level secondary beam 7 of some 6 meters long apart from 600mm place, bottom at column, and secondary beam two ends, middle level and column are fixed with right-angle coupler;
7) by spacing 2 meter ampere dress middle standing pillars, middle standing pillar bottom pad is located on color steel, and with right-angle coupler, middle standing pillar and middle level secondary beam 7 intersections is fixed, and completely spreads wooden form 9 on middle level secondary beam 7;
8) the upper strata secondary beam 8 of some 6 meters long is installed in column and middle standing pillar upper end, and secondary beam two ends, upper strata and column and middle standing pillar is fixed with right-angle coupler to the backplate 10 of setting up defences on secondary beam upper berth, upper strata.
Just preferred embodiment of the present invention is described above, but can not be interpreted as it is limitations on claims.The present invention is not only confined to above embodiment, and its concrete structure allows to change, and those skilled in the art can make according to the present invention various changes and distortion, only otherwise depart from spirit of the present invention, all belongs to the defined scope of claims of the present invention.
Claims (5)
1. regularization assemble type protection canopy, it is characterized in that: comprise at least four load-bearing pillars (1), girder (2) is set up in described load-bearing pillar upper end, described load-bearing pillar top and end of main beam are provided with tie-beam (3), between described girder, set up some foundation level beams (4), on described girder and tie-beam, be respectively equipped with some root posts (6), some middle level secondary beams (7) and upper strata secondary beam (8) are set up respectively in each interlude of described column and upper end, described bottom secondary beam, on middle level secondary beam and upper strata secondary beam, be equipped with respectively color steel (5), wooden form (9) and protected apron (10).
2. regularization assemble type protection canopy according to claim 1, is characterized in that: it is fastening in connection with locating to be connected that described girder (2) and bottom secondary beam (4) and column (6) and the junction of middle level secondary beam (7), upper strata secondary beam (8) are respectively equipped with anchor ear.
3. regularization assemble type protection canopy according to claim 1, it is characterized in that: described load-bearing pillar (1) and girder (2), tie-beam (3), girder is connected by right-angle coupler respectively with column (6) with tie-beam (3) and bottom secondary beam (4).
4. regularization assemble type protection canopy according to claim 1, is characterized in that: described color steel (5) is provided with some middle standing pillars (11), and described middle standing pillar is connected with middle level secondary beam (7) and upper strata secondary beam (8) is connected.
5. regularization assemble type protection canopy according to claim 1, is characterized in that: described protected apron (10) is color-steel composite board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410072336.9A CN103835518A (en) | 2014-02-28 | 2014-02-28 | Shaped splicable protective shed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410072336.9A CN103835518A (en) | 2014-02-28 | 2014-02-28 | Shaped splicable protective shed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103835518A true CN103835518A (en) | 2014-06-04 |
Family
ID=50799378
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410072336.9A Pending CN103835518A (en) | 2014-02-28 | 2014-02-28 | Shaped splicable protective shed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103835518A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109025336A (en) * | 2018-08-09 | 2018-12-18 | 李竑靓 | A kind of safety protection device for building construction and its construction method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0216261A (en) * | 1988-07-05 | 1990-01-19 | Sekisui House Ltd | Falling-down-proof temporary handrail at opening section of stair hall or the like |
DE20108086U1 (en) * | 2001-05-13 | 2001-08-09 | Probst, Bernd, 96317 Kronach | Covered walkway |
DE10108086A1 (en) * | 2000-02-22 | 2001-09-13 | Yamamoto Kogaku | safety goggles |
CN102174856A (en) * | 2011-03-23 | 2011-09-07 | 中天建设集团有限公司 | Finalized rebar machining shed |
CN202431011U (en) * | 2012-01-16 | 2012-09-12 | 中国建筑一局(集团)有限公司 | Reusable tool type bolting reinforcing steel bar processing shed for construction site |
CN202755678U (en) * | 2012-08-07 | 2013-02-27 | 中建三局建设工程股份有限公司 | Shape steel secure channel with temporary storage yard function |
CN203257118U (en) * | 2013-06-05 | 2013-10-30 | 江苏省苏中建设集团股份有限公司 | Constructional engineering safety protection rebar protective shed |
CN203701627U (en) * | 2014-02-28 | 2014-07-09 | 中天建设集团有限公司 | Shaped spliceable protective shed |
-
2014
- 2014-02-28 CN CN201410072336.9A patent/CN103835518A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0216261A (en) * | 1988-07-05 | 1990-01-19 | Sekisui House Ltd | Falling-down-proof temporary handrail at opening section of stair hall or the like |
DE10108086A1 (en) * | 2000-02-22 | 2001-09-13 | Yamamoto Kogaku | safety goggles |
DE20108086U1 (en) * | 2001-05-13 | 2001-08-09 | Probst, Bernd, 96317 Kronach | Covered walkway |
CN102174856A (en) * | 2011-03-23 | 2011-09-07 | 中天建设集团有限公司 | Finalized rebar machining shed |
CN202431011U (en) * | 2012-01-16 | 2012-09-12 | 中国建筑一局(集团)有限公司 | Reusable tool type bolting reinforcing steel bar processing shed for construction site |
CN202755678U (en) * | 2012-08-07 | 2013-02-27 | 中建三局建设工程股份有限公司 | Shape steel secure channel with temporary storage yard function |
CN203257118U (en) * | 2013-06-05 | 2013-10-30 | 江苏省苏中建设集团股份有限公司 | Constructional engineering safety protection rebar protective shed |
CN203701627U (en) * | 2014-02-28 | 2014-07-09 | 中天建设集团有限公司 | Shaped spliceable protective shed |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109025336A (en) * | 2018-08-09 | 2018-12-18 | 李竑靓 | A kind of safety protection device for building construction and its construction method |
CN109025336B (en) * | 2018-08-09 | 2020-12-01 | 江苏杰辰五金制品有限公司 | Building construction safety protection device and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204126230U (en) | Assembly scaffold unit | |
CN207091919U (en) | A kind of cast-in-situ box girder door opening formula supporting construction | |
CN104213717B (en) | Multi-storey building integration transformation method of construction | |
CN104818772A (en) | Large-span long-cantilever connection structure and construction technique | |
CN104234447B (en) | Deep foundation ditch tool-type hangs stair | |
CN203808249U (en) | Column stirrup cage assembly for beam-column joint core region | |
CN205000463U (en) | Long cantilever disjunctor structure of large -span | |
CN104775572B (en) | A kind of railroad platform prefabricated canopy plate of prestressing force | |
CN204551491U (en) | A kind of side slope protection greening structure | |
CN203701627U (en) | Shaped spliceable protective shed | |
CN103578346B (en) | A kind of simply supported girder bridge teaching simulation structure | |
CN202369930U (en) | Door opening type bearing framed bent device for multiplayer concrete box girder | |
CN103835518A (en) | Shaped splicable protective shed | |
CN204983711U (en) | Standardized escape way | |
CN204059420U (en) | Late poured band support structure | |
CN107299596B (en) | Concrete support trestle plate lower supporting beam template system and construction method thereof | |
CN203755165U (en) | Bracket structure for steel pipe pile | |
CN105162033A (en) | Mechanized self-lifting portal crossing frame | |
CN205445125U (en) | Execute i -shaped assembled enclosure fast | |
CN103835512A (en) | Shaped splicable protective shed mounting method | |
CN203429557U (en) | Anchor pole back beam applied to underpass bridge jacking construction | |
CN203531349U (en) | Novel high-bearing easily-dismantled overhanging type scaffold | |
CN204959794U (en) | Field word roof beam pile cap and flat slab floor structure system | |
CN214939173U (en) | Assembled temporary construction passageway capable of being circulated | |
CN202851012U (en) | Supporting steel arch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140604 |