CN103821366B - Clear water concrete metope grooved stereo wood pattern decoration construction method - Google Patents
Clear water concrete metope grooved stereo wood pattern decoration construction method Download PDFInfo
- Publication number
- CN103821366B CN103821366B CN201410079690.4A CN201410079690A CN103821366B CN 103821366 B CN103821366 B CN 103821366B CN 201410079690 A CN201410079690 A CN 201410079690A CN 103821366 B CN103821366 B CN 103821366B
- Authority
- CN
- China
- Prior art keywords
- convex surface
- concrete
- batten
- surface batten
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 abstract description 22
- 230000000694 effects Effects 0.000 abstract description 18
- 239000002023 wood Substances 0.000 abstract description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 14
- 238000005034 decoration Methods 0.000 abstract description 12
- 238000000034 method Methods 0.000 abstract description 7
- 229910000831 Steel Inorganic materials 0.000 abstract description 6
- 239000000463 material Substances 0.000 abstract description 6
- 239000010959 steel Substances 0.000 abstract description 6
- 230000007547 defect Effects 0.000 abstract description 3
- 238000012545 processing Methods 0.000 abstract description 3
- 239000007787 solid Substances 0.000 abstract description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 10
- 235000017491 Bambusa tulda Nutrition 0.000 description 10
- 241001330002 Bambuseae Species 0.000 description 10
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 10
- 239000011425 bamboo Substances 0.000 description 10
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 5
- 239000004568 cement Substances 0.000 description 4
- 239000011083 cement mortar Substances 0.000 description 4
- 208000004141 microcephaly Diseases 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 229910052742 iron Inorganic materials 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 230000008447 perception Effects 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- 235000018783 Dacrycarpus dacrydioides Nutrition 0.000 description 2
- 240000007320 Pinus strobus Species 0.000 description 2
- 235000008578 Pinus strobus Nutrition 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 239000003638 chemical reducing agent Substances 0.000 description 2
- 239000011521 glass Substances 0.000 description 2
- 239000003292 glue Substances 0.000 description 2
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 2
- 210000001699 lower leg Anatomy 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000011017 operating method Methods 0.000 description 2
- 239000002994 raw material Substances 0.000 description 2
- 229910001220 stainless steel Inorganic materials 0.000 description 2
- 239000010935 stainless steel Substances 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 239000003223 protective agent Substances 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
Landscapes
- Finishing Walls (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Clear water concrete metope grooved stereo wood pattern decoration construction method, comprising: the construction of exterior wall work plane, external scaffolding sets up, external mold backsight model sheetinstallat, Wooden Pattern Making are installed, wall steel bar makes colligation, inner side template is installed, concreting and form removable and defect processing.By fixing convex surface batten on large form, after concrete placings completes form removal, just form concavo-convex orderly decorative effect, thus fully demonstrate the feature of wood grain clear water concrete metope.Wood grain solid grain is clear, has concave-convex sense, and uniform color is consistent, can not do any repairing or toning, template can be reused, after application under the prerequisite meeting decorative effect, save decoration process, save the energy and resource, reduction of erection time and minimizing labour drop into, and can reduce the environment pollution of finishing material, simple to operate, detachably reuse, more can be cost-saving, accelerating construction progress.
Description
Technical field
The present invention relates to the on-site disposal techniques of IPC International Classification of Patents E04G template or building auxiliary equipment application and constructional materials, especially clear water concrete metope grooved stereo wood pattern decoration construction method.
Background technology
In known technology, clear-water concrete (As-castFinishConcrete/BareConcrete) is also known as ornamental concrete; Gain the name because it has decorative effect.It belongs to one-time cast-forming; do not do any external decoration; the natural surface effect of direct employing cast-in-situ concrete is as facing; therefore ordinary concrete is different from; surfacing is smooth, uniform color, corner angle clearly demarcated, without clashing and breaking and pollution; just be coated with one deck or two-layer transparent protective agent on surface, seem very natural, solemnly.For ease of possessing decoration for vertical face effect at building structure body making simultaneously, need to carry out base treatment, make clear-water concrete by building wall; Can the limited requirement meeting people's aesthetic of part after clear-water concrete engineering completes, relatively save time, save material and construction period, but but can not meet the requirements at the higher level of people in aesthetic.The original requirement of engineering of clear-water concrete sometimes building decoration engineering needs secondary decoration often more consuming time, work consuming, consumptive material, and be unfavorable for duration, quality, cost control, later maintenance is costly.
Chinese patent application CN102561678A discloses a kind of construction method with graining dry concrete wall, described construction method comprises the following steps: extract wood grain effect from log, and utilize the wood grain effect of described extraction to cut out the punching block with wood grain effect; The high-density plate of wood grain effect is become to have with the described steel mold pressing with wood grain effect; The high-density plate described in utilization with wood grain effect builds dry concrete wall as template.
Summary of the invention
The object of this invention is to provide a kind of clear water concrete metope grooved stereo wood pattern decoration construction method, while meeting facade three-dimensional decorative effect, economize on resources, save the duration with artificial.
Object of the present invention will be realized by following technical measures: construction technology process comprises: the construction of exterior wall work plane, external scaffolding sets up, external mold backsight model sheetinstallat, Wooden Pattern Making are installed, wall steel bar makes colligation, inner side template is installed, concreting and form removable and defect processing.
Especially, construction method operating procedure is as follows:
1. the construction of exterior wall work plane and support system are arranged;
Outside the building side is apart within the scope of 4m outside body of wall, is hardened in place, for the use setting up outer support scaffold, simultaneously for ensureing the stable of the horizontal direction of concrete external scaffolding, when concrete cushion is built, outside distance base plate, 1.5m, 3m position arranges Φ 20mm " Ω " type earth anchor, earth anchor is 2m along wall direction spacing, simultaneously by scaffold bottom cross bar and earth anchorage; Skin tilts with certain gradient, therefore body of wall need by the scaffold shared of body of wall both sides perpendicular to wall direction component from focusing on, and inclined side supports and bears pressure, and opposite side supports and bears tensile stress, wall outer side sets up four row's scaffolds, and full hall scaffold is set up in inner side;
2. wooden model liner plate construction;
Outboard template adopts piecemeal to make, and once mounting is to top; First utilize lateral crus hand cradle to support, setting up spacing is the position that the cross bar of 1.2m controls to serve as a contrast mould different level place; Keel select 50mm × 100mm × 4000mm high quality white pine side, keel first can control steel pipe by iron wire and gradient and carry out temporary fixed, then piecemeal installs wooden model lining mould, the backsight mirror board that backsight mirror board selects 1220mm × 2440mm × 18mm thick, adopt two-sided tape to seal between template and template when backsight mirror board is installed, ensure form joint not spillage; Once prop up by building top mark height during the construction of backsight mirror board and be set to top, by well can ensure the gradient of body of wall with upper type; For ensureing that convex surface batten is unlikely to distortion under concrete lateral pressure, therefore select the trapezoid convex batten being easy to the demoulding, get the interval of its diameter at 8-10cm as raw material, convex surface batten should not be greater than 2.5m at this length of an interval degree; Concrete convex surface batten concentric reducer place cross section specification can be selected by finishing requirements;
3. wooden model typesetting;
Parallel with cornice for ensureing the gradient of wooden model, therefore exterior sheathing once must prop up and be set to design elevation, then carries out the typesetting of convex surface batten, snap the line from top to bottom; For ensureing convex surface batten spacing decile, when convex surface batten is spelled processed, answer major part to connect major part, microcephaly meets microcephaly, and joint location should stagger mutually simultaneously, and the spacing between bamboo mould is slowly changed, thus ensures the perception after convex surface batten line concrete formation;
4. wooden model is installed;
After the typesetting of convex surface batten completes, just can carry out the nail system of convex surface batten from bottom to top, convex surface batten adopts the air nail of 30mm to fix according to the spacing of 30mm at convex surface batten lower edges, suitably should encrypt air nail spacing in termination, convex surface batten both sides; Because convex surface batten adopts manual manufacture to form, therefore between convex surface batten and backsight mirror board template, there is gap more or less, for ensureing that concrete does not enter between convex surface batten and backsight mirror board, clear glass glue between convex surface batten and backsight mirror board, is adopted to seal; The joint of convex surface batten, suitably revises with planing tool simultaneously, thus ensures the smoothly straight of joint; When the gradation of body of wall concrete is built, convex surface batten line template construct Altitude control should be built more than height 80 ~ 100cm place in concrete gradation, as the foundation of upper strata convex surface batten typesetting nail system.
Especially, on backsight mirror board, evenly convex surface batten is fixed at interval in the same way, and convex surface batten cross section is trapezoidal.
Especially, wooden form detail treatment way;
(1) external corner way: external corner adopts the way of indent, and external corner adopts 50mm × 50mm flitch to seal outward, and after form removal, every side is recessed into the minimum place 5cm of wall section;
(2) door and window hole way: because skin cornice is with certain gradient, therefore the outer eaves of window opening is parallel with building cornice, in window opening, eaves and horizontal plane keep level, and the stainless steel simultaneously arranging 10mm × 20mm at the outer cornice of the window opening lines that drip do and drip.
Especially, select high-quality PPR water service pipe, the mode reinforcing template of inner sleeve Screw arbor with nut at both-ends.
Especially, the backsight mirror board of 1220mm × 2440mm × 18mm is adopted to be mixed with lining mould, then on backsight mirror board, typesetting snap the line is carried out from top to bottom, follow closely the trapezoid cross section convex surface batten that length processed is about about 3m from the bottom up again, lining mould is fixed by Φ 12mm split bolt and inner side of outer wall template drawknot.
Especially, the longest in the longitudinal direction bar shaped bamboo mould end continued access by 3m of convex surface batten is the die adapter of 8cm or 10cm diameter bamboo, and convex surface batten is fixed on the thick backsight mirror board of 18mm with air nail cross-under.
Especially, the bamboo mould of convex surface batten to be outer rim be circular section.
Especially, concrete is built, is vibrated and maintenance operations main points:
1. during concreting, the time of strict control concreting in lifts, the cement mortar that when ensureing that upper strata is built, lower floor is attached to bamboo die face does not also have initial set, wooden form in addition for preventing cement paste from polluting more than constuction joint, should block this position wooden model temporarily, and after concreting completes, remove the cement paste being attached to wooden model surface in time;
2. concrete vibrating selects the dither that vibrations frequency is high, amplitude is less, when cement mortar thin layer appears in concrete surface, when concrete surface stops overflowing bubble, can stop vibrating.
Advantage of the present invention and effect: by fixing convex surface batten on large form, after concrete placings completes form removal, just form concavo-convex orderly decorative ornament effect, thus fully demonstrate the feature of wood grain clear water concrete metope.Wood grain solid grain is clear, has concave-convex sense, and uniform color is consistent, can not do any repairing or toning, template can be reused, after application under the prerequisite meeting decorative effect, save decoration process, save the energy and resource, reduction of erection time and minimizing labour drop into, and can reduce the environment pollution of finishing material, simple to operate, detachably reuse, more can be cost-saving, accelerating construction progress.
Accompanying drawing explanation
Fig. 1 is the construction technology process schematic diagram in the present invention
Fig. 2 is template typesetting sectional schematic diagram in the embodiment of the present invention 1
Fig. 3 is template front schematic view in the embodiment of the present invention 2
Fig. 4 is template typesetting sectional schematic diagram in the embodiment of the present invention 2
Reference numeral comprises: backsight mirror board 1, convex surface batten 2, air nail 3.
Detailed description of the invention
Below in conjunction with drawings and Examples, the invention will be further described.
As shown in Figure 1: the construction technology process in the present invention comprises: the construction of exterior wall work plane, external scaffolding sets up, external mold backsight model sheetinstallat, Wooden Pattern Making are installed, wall steel bar makes colligation, inner side template is installed, concreting and form removable and defect processing.
Embodiment 1:
In the present embodiment, construction method operating procedure is as follows:
1. the construction of exterior wall work plane and support system are arranged;
Outside the building side is apart within the scope of 4m outside body of wall, is hardened in place, for the use setting up outer support scaffold, simultaneously for ensureing the stable of the horizontal direction of concrete external scaffolding, when concrete cushion is built, outside distance base plate, 1.5m, 3m position arranges Φ 20mm " Ω " type earth anchor, earth anchor is 2m along wall direction spacing, simultaneously by scaffold bottom cross bar and earth anchorage; Skin tilts with certain gradient, therefore body of wall need by the scaffold shared of body of wall both sides perpendicular to wall direction component from focusing on, and inclined side supports and bears pressure, and opposite side supports and bears tensile stress, wall outer side sets up four row's scaffolds, and full hall scaffold is set up in inner side;
2. wooden model liner plate construction;
Outboard template adopts piecemeal to make, and once mounting is to top; First utilize lateral crus hand cradle to support, setting up spacing is the position that the cross bar of 1.2m controls to serve as a contrast mould different level place; Keel select 50mm × 100mm × 4000mm high quality white pine side, keel first can control steel pipe by iron wire and gradient and carry out temporary fixed, then piecemeal installs wooden model lining mould, the backsight mirror board 1 that backsight mirror board 1 selects 1220mm × 2440mm × 18mm thick, adopt two-sided tape to seal between template and template when backsight mirror board 1 is installed, ensure form joint not spillage; Once prop up by building top mark height when backsight mirror board 1 is constructed and be set to top, by well can ensure the gradient of body of wall with upper type; For ensureing that convex surface batten 2 is unlikely to distortion under concrete lateral pressure, therefore select the trapezoid convex batten 2 being easy to the demoulding, get the interval of its diameter at 8-10cm as raw material, convex surface batten 2 should not be greater than 2.5m at this length of an interval degree; Concrete convex surface batten 2 concentric reducer place cross section specification can be selected by finishing requirements;
3. wooden model typesetting;
Parallel with cornice for ensureing the gradient of wooden model, therefore exterior sheathing once must prop up and be set to design elevation, then carries out the typesetting of convex surface batten 2, snap the line from top to bottom; For ensureing convex surface batten 2 spacing decile, when convex surface batten 2 is spelled processed, answer major part to connect major part, microcephaly meets microcephaly, and joint location should stagger mutually simultaneously, and the spacing between bamboo mould is slowly changed, thus ensures the perception after convex surface batten 2 line concrete formation;
4. wooden model is installed;
After convex surface batten 2 typesetting completes, just can carry out the nail system of convex surface batten 2 from bottom to top, convex surface batten 2 adopts the air nail 3 of 30mm to fix according to the spacing of 30mm at convex surface batten 2 lower edges, suitably should encrypt air nail 3 spacing in termination, convex surface batten 2 both sides; Because convex surface batten 2 adopts manual manufacture to form, therefore between convex surface batten 2 and backsight mirror board 1 template, there is gap more or less, for ensureing that concrete does not enter between convex surface batten 2 and backsight mirror board 1, clear glass glue between convex surface batten 2 and backsight mirror board 1, is adopted to seal; The joint of convex surface batten 2, suitably revises with planing tool simultaneously, thus ensures the smoothly straight of joint; When the gradation of body of wall concrete is built, convex surface batten 2 line template construct Altitude control should be built more than height 80 ~ 100cm place in concrete gradation, as the foundation of upper strata convex surface batten 2 typesetting nail system.
In aforementioned, as shown in Figure 2, on backsight mirror board 1, evenly convex surface batten 2 is fixed at interval in the same way, and convex surface batten 2 cross section is trapezoidal; The wide 80-100mm of convex surface batten 2 end face, adjacent two convex surface batten 2 base spacing 15-30mm.
In the embodiment of the present invention, wooden form detail treatment way;
(1) external corner way: external corner adopts the way of indent, and external corner adopts 50mm × 50mm flitch to seal outward, and after form removal, every side is recessed into the minimum place 5cm of wall section;
(2) door and window hole way: because skin cornice is with certain gradient, therefore the outer eaves of window opening is parallel with building cornice, in window opening, eaves and horizontal plane keep level, and the stainless steel simultaneously arranging 10mm × 20mm at the outer cornice of the window opening lines that drip do and drip.
In the embodiment of the present invention, split bolt is installed;
Engineering exterior wall is dry concrete wall, for ensure backsight mirror board 1 form removable time, the surface finish of template and the arrangement of screw hole attractive in appearance, orderly, therefore high-quality PPR water service pipe is selected at scene, the mode reinforcing template of inner sleeve Screw arbor with nut at both-ends.
The embodiment of the present invention is according to the height of skin, the backsight mirror board 1 of 1220mm × 2440mm × 18mm is adopted to be mixed with lining mould, then on backsight mirror board 1, typesetting snap the line is carried out from top to bottom, follow closely the trapezoid cross section convex surface batten 2 that length processed is about about 3m from the bottom up again, lining mould is fixed by Φ 12mm split bolt and inner side of outer wall template drawknot, whole template system forms reliable and stable support system by outer and inner tube scaffold, complete after form removal until concrete placings, just form the decorative effect of batten line clear water concrete wall.
Embodiment of the present invention principle is, external wall adopts wood grain clear water concrete facing, select the convex surface batten 2 of trapezoid cross section, be fixed in backsight mirror board 1 template and be made into wood grain templet, the gap of indwelling 1.5 ~ 3cm between convex surface batten 2, after concrete placings completes, surface of wall forms concavo-convex orderly decorative effect, start the beginning of decoration concrete, save a large amount of decoration time, artificial, material.
Embodiment 2:
As shown in Figure 3, the longest in the longitudinal direction bar shaped bamboo mould end continued access by 3m of convex surface batten 2 is the die adapter of 8cm or 10cm diameter bamboo, and convex surface batten 2 is fixed on the thick backsight mirror board 1 of 18mm with air nail 3 cross-under.
As shown in Figure 4, convex surface batten 2 for outer rim be the bamboo mould of circular section.
In embodiments of the present invention, concrete is built, is vibrated and maintenance operations main points:
1. during concreting, the time of strict control concreting in lifts, the cement mortar that when ensureing that upper strata is built, lower floor is attached to bamboo die face does not also have initial set, wooden form in addition for preventing cement paste from polluting more than constuction joint, should block this position wooden model temporarily, and after concreting completes, remove the cement paste being attached to wooden model surface in time;
2. concrete vibrating selects the dither that vibrations frequency is high, amplitude is less, when cement mortar thin layer appears in concrete surface, when concrete surface stops overflowing bubble, can stop vibrating.
In embodiments of the present invention, reinforcing steel bars of wallboards making, binding method:
Concrete cover cushion block can adopt standard plastic cushion block, and cushion block color should be consistent with concrete color, guarantees architectural design effect; When installing cushion block, it is the neat unification of position to draw logical line to ensure; Return rust for preventing reinforced bar binding wire and affect concrete perception, ornamental concrete reinforcing bar binding should adopt galvanized iron wire, can prevent returning rust phenomenon and occur.
Claims (7)
1. clear water concrete metope grooved stereo wood pattern decoration construction method, it is characterized in that, construction technology process comprises: the construction of exterior wall work plane, external scaffolding sets up, external mold backsight model sheetinstallat, Wooden Pattern Making are installed, wall steel bar makes colligation, inner side template is installed, concreting and form removable and defect processing; Construction method operating procedure is as follows:
1. the construction of exterior wall work plane and support system are arranged;
Outside the building side is apart within the scope of 4m outside body of wall, is hardened in place, for the use setting up outer support scaffold, simultaneously for ensureing the stable of the horizontal direction of concrete external scaffolding, when concrete cushion is built, outside distance base plate, 1.5m, 3m position arranges Φ 20mm " Ω " type earth anchor, earth anchor is 2m along wall direction spacing, simultaneously by scaffold bottom cross bar and earth anchorage; Skin tilts with certain gradient, therefore body of wall need by the scaffold shared of body of wall both sides perpendicular to wall direction component from focusing on, and inclined side supports and bears pressure, and opposite side supports and bears tensile stress, wall outer side sets up four row's scaffolds, and full hall scaffold is set up in inner side;
2. wooden model liner plate construction;
Outboard template adopts piecemeal to make, and once mounting is to top; First utilize lateral crus hand cradle to support, setting up spacing is the position that the cross bar of 1.2m controls to serve as a contrast mould different level place; Keel select 50mm × 100mm × 4000mm high quality white pine side, keel first can control steel pipe by iron wire and gradient and carry out temporary fixed, then piecemeal installs wooden model lining mould, the backsight mirror board (1) that backsight mirror board (1) selects 1220mm × 2440mm × 18mm thick, adopt two-sided tape to seal between template and template when backsight mirror board (1) is installed, ensure form joint not spillage; Once prop up by building top mark height during backsight mirror board (1) construction and be set to top, by well can ensure the gradient of body of wall with upper type; For ensureing that convex surface batten (2) is unlikely to distortion under concrete lateral pressure, therefore the trapezoid convex batten (2) being easy to the demoulding is selected, get the interval of its diameter at 8-10cm as raw material, convex surface batten (2) should not be greater than 2.5m at this length of an interval degree; Concrete convex surface batten (2) concentric reducer place cross section specification can be selected by finishing requirements;
3. wooden model typesetting;
Parallel with cornice for ensureing the gradient of wooden model, therefore exterior sheathing once must prop up and be set to design elevation, then carries out the typesetting of convex surface batten (2), snap the line from top to bottom; For ensureing convex surface batten (2) spacing decile, when convex surface batten (2) is spelled processed, major part is answered to connect major part, microcephaly meets microcephaly, joint location should stagger mutually simultaneously, spacing between bamboo mould is slowly changed, thus ensures the perception after convex surface batten (2) line concrete formation;
4. wooden model is installed;
After convex surface batten (2) typesetting completes, just the nail system of convex surface batten (2) can be carried out from bottom to top, convex surface batten (2) adopts the air nail (3) of 30mm to fix according to the spacing of 30mm at convex surface batten (2) lower edges, suitably should encrypt air nail (3) spacing in convex surface batten (2) termination, both sides; Because convex surface batten (2) adopts manual manufacture to form, therefore between convex surface batten (2) and backsight mirror board (1) template, there is gap more or less, for ensureing that concrete does not enter between convex surface batten (2) and backsight mirror board (1), between convex surface batten (2) and backsight mirror board (1), clear glass glue is adopted to seal; The joint of convex surface batten (2), suitably revises with planing tool simultaneously, thus ensures the smoothly straight of joint; When the gradation of body of wall concrete is built, convex surface batten (2) line template construct Altitude control should be built more than height 80 ~ 100cm place in concrete gradation, as the foundation of upper strata convex surface batten (2) typesetting nail system.
2. clear water concrete metope grooved stereo wood pattern decoration construction method as claimed in claim 1, is characterized in that, convex surface batten (2) is fixed at the upper even interval in the same way of backsight mirror board (1), and convex surface batten (2) cross section is trapezoidal.
3. clear water concrete metope grooved stereo wood pattern decoration construction method as claimed in claim 2, is characterized in that, convex surface batten (2) for outer rim be the bamboo mould of circular section.
4. clear water concrete metope grooved stereo wood pattern decoration construction method as claimed in claim 3, it is characterized in that, the longest in the longitudinal direction bar shaped bamboo mould end continued access by 3m of convex surface batten (2) is the die adapter of 8cm or 10cm diameter bamboo, and convex surface batten (2) is fixed on the thick backsight mirror board (1) of 18mm with air nail (3) cross-under.
5. clear water concrete metope grooved stereo wood pattern decoration construction method as claimed in claim 2, is characterized in that, wooden form detail treatment way;
(1) external corner way: external corner adopts the way of indent, and external corner adopts 50mm × 50mm flitch to seal outward, and after form removal, every side is recessed into the minimum place 5cm of wall section;
(2) door and window hole way: because skin cornice is with certain gradient, therefore the outer eaves of window opening is parallel with building cornice, in window opening, eaves and horizontal plane keep level, and the stainless steel simultaneously arranging 10mm × 20mm at the outer cornice of the window opening lines that drip do and drip.
6. clear water concrete metope grooved stereo wood pattern decoration construction method as claimed in claim 2, it is characterized in that, the backsight mirror board (1) of 1220mm × 2440mm × 18mm is adopted to be mixed with lining mould, then on backsight mirror board (1), typesetting snap the line is carried out from top to bottom, follow closely trapezoid cross section convex surface batten (2) of length 3m processed more from the bottom up, lining mould is fixed by Φ 12mm split bolt and inner side of outer wall template drawknot.
7. clear water concrete metope grooved stereo wood pattern decoration construction method as claimed in claim 2, is characterized in that, concrete is built, vibrates and maintenance operations main points:
1. during concreting, the time of strict control concreting in lifts, the cement mortar that when ensureing that upper strata is built, lower floor is attached to bamboo die face does not also have initial set, wooden form in addition for preventing cement paste from polluting more than constuction joint, should block this position wooden model temporarily, and after concreting completes, remove the cement paste being attached to wooden model surface in time;
2. concrete vibrating selects the dither that vibrations frequency is high, amplitude is less, when cement mortar thin layer appears in concrete surface, when concrete surface stops overflowing bubble, can stop vibrating.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410079690.4A CN103821366B (en) | 2014-03-03 | 2014-03-03 | Clear water concrete metope grooved stereo wood pattern decoration construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410079690.4A CN103821366B (en) | 2014-03-03 | 2014-03-03 | Clear water concrete metope grooved stereo wood pattern decoration construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103821366A CN103821366A (en) | 2014-05-28 |
CN103821366B true CN103821366B (en) | 2016-02-10 |
Family
ID=50756631
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410079690.4A Expired - Fee Related CN103821366B (en) | 2014-03-03 | 2014-03-03 | Clear water concrete metope grooved stereo wood pattern decoration construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103821366B (en) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104234413B (en) * | 2014-09-17 | 2016-04-20 | 深圳市建业建筑工程有限公司 | A kind of production method of Ascast finish concrete template with wood grain |
CN105256996B (en) * | 2015-09-16 | 2017-12-15 | 中冶东北建设(沈阳)工程技术有限公司 | Tilting cone tube-in-tube structure Bark mark manages exposed concrete construction method |
CN105275200B (en) * | 2015-11-17 | 2017-05-03 | 甘肃第七建设集团股份有限公司 | Construction method of strip-texture decorating surface as-cast finish concrete template |
CN105544963A (en) * | 2015-12-16 | 2016-05-04 | 中国建筑第二工程局有限公司 | Wood grain veneer fair-faced concrete formwork and construction method thereof |
CN105563617A (en) * | 2015-12-18 | 2016-05-11 | 谢亿民工程科技(常州)有限公司 | Manufacturing method of concrete board through flexible formwork with decorative patterns |
CN106381999A (en) * | 2016-08-31 | 2017-02-08 | 中铁十六局集团城市建设发展有限公司 | Fair-faced concrete wall intaglio character die plate construction method |
CN109537878A (en) * | 2018-12-17 | 2019-03-29 | 北京古达建筑工程有限公司 | A kind of building mould and decorative architecture construction method |
CN109868923B (en) * | 2019-03-11 | 2021-01-05 | 深圳市建工集团股份有限公司 | Construction method of bare concrete of loose-spliced wood formwork |
CN111188406A (en) * | 2019-12-30 | 2020-05-22 | 湖南省第五工程有限公司 | Construction method of tree growth ring texture fair-faced concrete |
CN111706069A (en) * | 2020-06-23 | 2020-09-25 | 中国五冶集团有限公司 | Bamboo grain fair-faced concrete construction method |
CN113006135A (en) * | 2021-03-01 | 2021-06-22 | 上海送变电工程有限公司 | Construction method of bare concrete for underground transformer substation |
CN113982251B (en) * | 2021-11-01 | 2022-11-29 | 浙江视野建设集团有限公司 | Bare concrete wall mold with wood grains and bare concrete wall construction process |
CN114718315A (en) * | 2022-04-15 | 2022-07-08 | 中建一局集团第三建筑有限公司 | Construction process for wrapping thin bare concrete outside ultrahigh steel pipe column |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0208529B1 (en) * | 1985-07-05 | 1991-04-17 | High Tech Homes, Inc. | Reinforced-concrete building structures |
CN101649649A (en) * | 2008-08-12 | 2010-02-17 | 何建国 | One-time forming construction process for concrete building structures and decoration |
CN101956458A (en) * | 2010-11-05 | 2011-01-26 | 中国建筑第八工程局有限公司 | Construction method of overlong and superhigh single-side fair-faced concrete wall |
CN102561678A (en) * | 2012-01-12 | 2012-07-11 | 中国建筑第八工程局有限公司 | Construction method of fair-faced concrete wall with wood grain finish |
-
2014
- 2014-03-03 CN CN201410079690.4A patent/CN103821366B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0208529B1 (en) * | 1985-07-05 | 1991-04-17 | High Tech Homes, Inc. | Reinforced-concrete building structures |
CN101649649A (en) * | 2008-08-12 | 2010-02-17 | 何建国 | One-time forming construction process for concrete building structures and decoration |
CN101956458A (en) * | 2010-11-05 | 2011-01-26 | 中国建筑第八工程局有限公司 | Construction method of overlong and superhigh single-side fair-faced concrete wall |
CN102561678A (en) * | 2012-01-12 | 2012-07-11 | 中国建筑第八工程局有限公司 | Construction method of fair-faced concrete wall with wood grain finish |
Also Published As
Publication number | Publication date |
---|---|
CN103821366A (en) | 2014-05-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103821366B (en) | Clear water concrete metope grooved stereo wood pattern decoration construction method | |
CN101818527B (en) | Assembled integral shear wall structure system and construction method thereof | |
CN104675124B (en) | A kind of prefabricated Niche type construction technology of Separate Home electronic box hole to be provided | |
CN101818539A (en) | Assembled integral building and construction method thereof | |
CN101025052A (en) | Cast-in-situ clear-water concrete viewing platform form board and its construction method | |
CN110306832B (en) | Construction method for integral migration of artistic clear water wall of historical building | |
CN101831986A (en) | Precast composite outer insulated wall plate and manufacturing method thereof | |
CN104712086B (en) | Assembled type concrete hollow composite floor slab and manufacturing method thereof | |
CN202265937U (en) | Decorative roman column structure | |
CN113882562A (en) | Construction method of special-shaped double-sided wood grain fair-faced concrete wall | |
CN106381999A (en) | Fair-faced concrete wall intaglio character die plate construction method | |
CN1325734C (en) | Composite thermal insulation concrete wall and its assembled template | |
CN113700157A (en) | Concrete constructional column supporting method for roof post-cast strip | |
CN107630531A8 (en) | Large-cantilever bare concrete stair and construction method thereof | |
CN110863590A (en) | Mold device for manufacturing + type cavity concrete module and using method thereof | |
CN103470038B (en) | Concrete one-step forming process of building appearance moulding and main structure | |
CN204983661U (en) | Light steel is framed greatly, integrative -in -place mould support system is decorated in protection that keeps warm | |
CN102561607A (en) | Reverse construction method of reversely nailed wood rafter roof boarding of concrete eave of pseudo-classic architecture | |
CN109184210A (en) | A kind of 3D printing decorative model template construction technique | |
KR101646527B1 (en) | The construction and civil engineering and construction methods that integrally formed stone | |
CN104612343A (en) | Method for constructing extruded polystyrene board molding of building outer wall | |
CN110331795B (en) | Reverse construction method for arch coupon structure | |
CN104164972A (en) | Cast-in-place concrete archaistic wall construction method | |
CN112982879A (en) | Facing concrete construction structure and construction method | |
CN206205455U (en) | A kind of construction centre mounted type pours leveling unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160210 Termination date: 20190303 |
|
CF01 | Termination of patent right due to non-payment of annual fee |