CN103821091B - 梁桥梁体纵向偏位后的纠偏复位方法 - Google Patents
梁桥梁体纵向偏位后的纠偏复位方法 Download PDFInfo
- Publication number
- CN103821091B CN103821091B CN201410068583.1A CN201410068583A CN103821091B CN 103821091 B CN103821091 B CN 103821091B CN 201410068583 A CN201410068583 A CN 201410068583A CN 103821091 B CN103821091 B CN 103821091B
- Authority
- CN
- China
- Prior art keywords
- normal
- beam body
- correction
- bridge
- lift
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract 5
- 238000007596 consolidation process Methods 0.000 claims abstract 11
- 238000006243 chemical reaction Methods 0.000 claims abstract 7
- 230000010485 coping Effects 0.000 claims abstract 5
- 102000006495 integrins Human genes 0.000 claims abstract 2
- 108010044426 integrins Proteins 0.000 claims abstract 2
- 229910000831 Steel Inorganic materials 0.000 claims 5
- 239000010959 steel Substances 0.000 claims 5
- 238000005260 corrosion Methods 0.000 claims 4
- 230000007797 corrosion Effects 0.000 claims 4
- 238000003466 welding Methods 0.000 claims 3
- 230000008030 elimination Effects 0.000 claims 1
- 238000003379 elimination reaction Methods 0.000 claims 1
- 239000004519 grease Substances 0.000 claims 1
- 229920001296 polysiloxane Polymers 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract 2
- 230000005540 biological transmission Effects 0.000 abstract 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410068583.1A CN103821091B (zh) | 2014-02-27 | 2014-02-27 | 梁桥梁体纵向偏位后的纠偏复位方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410068583.1A CN103821091B (zh) | 2014-02-27 | 2014-02-27 | 梁桥梁体纵向偏位后的纠偏复位方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103821091A CN103821091A (zh) | 2014-05-28 |
CN103821091B true CN103821091B (zh) | 2015-12-30 |
Family
ID=50756359
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410068583.1A Expired - Fee Related CN103821091B (zh) | 2014-02-27 | 2014-02-27 | 梁桥梁体纵向偏位后的纠偏复位方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103821091B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108221646A (zh) * | 2018-01-03 | 2018-06-29 | 魏志峰 | 公路桥梁施工中能纠偏和加固的桥墩 |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104612064B (zh) * | 2015-02-09 | 2016-03-30 | 中核华泰建设有限公司 | 桥梁墩柱纠偏装置 |
CN104947606A (zh) * | 2015-05-26 | 2015-09-30 | 上海同罡建筑工程有限公司 | 桥梁上部结构的纠偏方法 |
CN105862610A (zh) * | 2016-06-03 | 2016-08-17 | 昆山市轨道交通投资发展有限公司 | 一种软土地区城市轨道交通高架结构的纠偏结构及方法 |
CN106381817A (zh) * | 2016-10-28 | 2017-02-08 | 柳州欧维姆工程有限公司 | 用于旧桥纠偏复位的自平衡式水平纠偏装置及其施工方法 |
CN106758830A (zh) * | 2016-12-12 | 2017-05-31 | 中建钢构有限公司 | 一种桥梁横向调节装置 |
CN110331676B (zh) * | 2019-07-22 | 2021-08-17 | 湖南聚创建筑科技有限公司 | 一种桩柱式柔性桥墩纠偏施工装置及其施工方法 |
CN111979933B (zh) * | 2020-09-14 | 2024-08-23 | 长沙市公路桥梁建设有限责任公司 | 一种桥梁纠偏的弹性限位器及具有自动纠偏功能的桥梁 |
CN112813852B (zh) * | 2021-01-05 | 2022-09-09 | 四川省公路规划勘察设计研究院有限公司 | 一种在役桥梁桥面沉陷的修复加固方法 |
CN113152288B (zh) * | 2021-04-01 | 2022-06-21 | 中交第二航务工程局有限公司 | 用于梁体纵向顶推复位装置及其顶推施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030079073A (ko) * | 2002-04-01 | 2003-10-10 | 조영철 | 교량의 상부구조물 인상방법 및 그 장치 |
JP2004124617A (ja) * | 2002-10-07 | 2004-04-22 | Oriental Construction Co Ltd | 既設支承装置の支承交換工法および支承装置 |
CN101230561A (zh) * | 2008-02-04 | 2008-07-30 | 杭州市市政工程集团有限公司 | 一种单根立柱桥墩纠偏的方法 |
KR20090092973A (ko) * | 2008-02-28 | 2009-09-02 | 김승규 | 기존 교량의 보수, 보강시 지반에 설치되는 강재말뚝의압입방법 및 장치 |
CN202108004U (zh) * | 2011-05-27 | 2012-01-11 | 长沙理工大学 | 箱梁底板带翼缘的连续梁桥顶推导向纠偏系统 |
CN102966051A (zh) * | 2012-12-12 | 2013-03-13 | 重庆桥都桥梁技术有限公司 | 桥梁墩柱纠偏复位装置 |
-
2014
- 2014-02-27 CN CN201410068583.1A patent/CN103821091B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030079073A (ko) * | 2002-04-01 | 2003-10-10 | 조영철 | 교량의 상부구조물 인상방법 및 그 장치 |
JP2004124617A (ja) * | 2002-10-07 | 2004-04-22 | Oriental Construction Co Ltd | 既設支承装置の支承交換工法および支承装置 |
CN101230561A (zh) * | 2008-02-04 | 2008-07-30 | 杭州市市政工程集团有限公司 | 一种单根立柱桥墩纠偏的方法 |
KR20090092973A (ko) * | 2008-02-28 | 2009-09-02 | 김승규 | 기존 교량의 보수, 보강시 지반에 설치되는 강재말뚝의압입방법 및 장치 |
CN202108004U (zh) * | 2011-05-27 | 2012-01-11 | 长沙理工大学 | 箱梁底板带翼缘的连续梁桥顶推导向纠偏系统 |
CN102966051A (zh) * | 2012-12-12 | 2013-03-13 | 重庆桥都桥梁技术有限公司 | 桥梁墩柱纠偏复位装置 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108221646A (zh) * | 2018-01-03 | 2018-06-29 | 魏志峰 | 公路桥梁施工中能纠偏和加固的桥墩 |
Also Published As
Publication number | Publication date |
---|---|
CN103821091A (zh) | 2014-05-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103821091B (zh) | 梁桥梁体纵向偏位后的纠偏复位方法 | |
CN103821092B (zh) | 梁桥梁体横向偏位后的纠偏复位方法 | |
CN103821090B (zh) | 桥墩倾斜后的纠偏复位方法 | |
CN103266573B (zh) | 自锚式悬索桥钢箱梁单向单点三滑道同步顶推施工方法 | |
CN101818481B (zh) | 应用滚排滑道进行桥梁顶推施工的装置及其施工方法 | |
CN102733316B (zh) | 一种小半径平曲线桥整体同步旋转顶升施工方法 | |
CN105568853A (zh) | 大跨度钢砼组合桁架梁侧位横移、落梁的施工方法 | |
CN109610849A (zh) | 一种大跨度高空连廊桁架的施工方法 | |
CN103437300A (zh) | 墩顶钢梁无墩旁托架架设双悬臂的施工方法 | |
CN103821376A (zh) | 单层网壳结构高空斜轨累积滑移施工工法 | |
CN105544398A (zh) | 一种水平力自平衡式八字重型高空支架系统及其安装方法 | |
CN106522101A (zh) | 一种斜拉桥超长无索梁段的施工方法 | |
CN103866693A (zh) | 一种钢筋混凝土系杆拱桥拱肋的安装方法及吊装辅桥 | |
CN105369891A (zh) | 一种不同长度大跨度桁架组成的连廊施工控制方法 | |
CN109267498A (zh) | 一种桥梁主塔横撑施工方法 | |
CN113123232A (zh) | 一种拼宽桥刚性拼接接头结构 | |
CN104805769A (zh) | 一种自平衡弧形梁现浇支架及其施工方法 | |
CN106284675A (zh) | 一种对称双连跨柱面网壳结构整体滑移施工辅助装置及施工方法 | |
CN103205526A (zh) | 大型转炉设备顶推安装法 | |
CN101324054A (zh) | 桥梁节段梁临时墩的顶推就位施工方法 | |
CN106536825B (zh) | 桥梁施工方法及桥梁结构 | |
CN208039306U (zh) | 一种新建地铁线车站与既有车站的施工联通体系 | |
CN204780622U (zh) | 一种主梁0#块施工托架 | |
CN105155418A (zh) | 一种桥梁平移的施工方法 | |
CN104947600A (zh) | 顶推施工平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Pan Zhenghua Inventor after: Sheng Yanzheng Inventor after: Xiang Zhongfu Inventor after: Qin Shuang Inventor after: Liu Qianlin Inventor after: He Hang Inventor after: Yang Xianquan Inventor after: Yan Changqing Inventor after: Cheng Weijun Inventor after: Yang Fan Inventor after: Tong Qiqiang Inventor after: Zhang Chang Inventor after: Wang Hao Inventor after: Zhang Wenming Inventor before: Pan Zhenghua Inventor before: He Hang Inventor before: Yang Xianquan Inventor before: Yan Changqing Inventor before: Cheng Weijun Inventor before: Tong Qiqiang Inventor before: Zhang Chang Inventor before: Wang Hao Inventor before: Zhang Wenming Inventor before: Sheng Yanzheng |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: PAN ZHENGHUA YANG XIANQUAN YAN CHANGQING CHENG WEIJUN TONG QIQIANG ZHANG CHANG WANG HAO ZHANG WENMING SHENG YANZHENG HE HANG TO: PAN ZHENGHUA YANG XIANQUAN YAN CHANGQING CHENG WEIJUN YANG FAN TONG QIQIANG ZHANG CHANG WANG HAO ZHANG WENMING SHENG YANZHENG XIANG ZHONGFU QIN SHUANG LIU QIANLIN HE HANG |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151230 Termination date: 20170227 |
|
CF01 | Termination of patent right due to non-payment of annual fee |