CN103790564B - Hot-dry rock fracturing high-pressure recovery-ratio-increasing laboratory simulation device - Google Patents
Hot-dry rock fracturing high-pressure recovery-ratio-increasing laboratory simulation device Download PDFInfo
- Publication number
- CN103790564B CN103790564B CN201410012026.8A CN201410012026A CN103790564B CN 103790564 B CN103790564 B CN 103790564B CN 201410012026 A CN201410012026 A CN 201410012026A CN 103790564 B CN103790564 B CN 103790564B
- Authority
- CN
- China
- Prior art keywords
- pressure
- fracturing
- hydraulic
- proppant
- chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
本发明提供了一种干热岩压裂高压提采实验室模拟装置。该装置包括压裂液注入系统、支撑剂注入系统、高压气体增压注入系统、压裂主体、环压施加系统、高压管阀件;支撑剂注入系统包括支撑剂间接注入和固化;高压气体增压注入系统包括气体增压和气体间接注入;压裂主体包括样品压裂仓和样品环压腔;压裂仓包括三维固定支撑和三维液压系统;三维液压系统包括液压滑动腔和液压活动塞;样品环压腔包括环压腔钢板和胶套,胶套与钢板之间存有空腔,注入液体实现压力包裹作用。本发明采用分体模块组合结构,保证了压裂样品的原样不动而进行精确的进行支撑剂注入,高压气体注入置换繁衍,提高采收率。具有结构新颖,安全耐用的特点。
The invention provides a laboratory simulation device for hot dry rock fracturing high-pressure extraction. The device includes a fracturing fluid injection system, a proppant injection system, a high-pressure gas booster injection system, a fracturing body, a ring pressure application system, and a high-pressure pipe valve; the proppant injection system includes indirect injection and solidification of the proppant; The pressure injection system includes gas pressurization and gas indirect injection; the fracturing main body includes the sample fracturing chamber and the sample ring pressure chamber; the fracturing chamber includes a three-dimensional fixed support and a three-dimensional hydraulic system; the three-dimensional hydraulic system includes a hydraulic sliding chamber and a hydraulic movable plug; The sample ring pressure chamber includes a ring pressure chamber steel plate and a rubber sleeve. There is a cavity between the rubber sleeve and the steel plate, and liquid is injected to realize the pressure wrapping effect. The invention adopts the combined structure of split modules, which ensures that the fracturing samples are kept intact and the proppant is injected accurately, and the high-pressure gas is injected for replacement and multiplication, so as to improve the recovery rate. It has the characteristics of novel structure, safety and durability.
Description
技术领域technical field
本发明涉及一种干热岩压裂高压提高采收率实验室模拟装置,特别是关于干热岩原位压裂后的和换热驱替置换模拟试验装置,具体涉及一种干热岩压裂高压提高采收率实验室模拟装置。The invention relates to a laboratory simulation device for hot dry rock fracturing high-pressure enhanced oil recovery, in particular to a simulation test device for hot dry rock fracturing and heat exchange displacement replacement simulation test device, in particular to a hot dry rock fracturing High pressure enhanced oil recovery laboratory simulation device.
背景技术Background technique
目前,占有较大比例的干热岩资源的开发利用力度较小,面对目前能源日益紧张,尤其资源严重短缺的情况下,开采巨大的热能资源的同时,提高热能资源的采收率,提高热能资源的综合利用效率尤其重要。At present, the development and utilization of hot dry rock resources, which account for a large proportion, are relatively small. In the face of the current energy shortage, especially the serious shortage of resources, it is necessary to increase the recovery rate of thermal energy resources while exploiting huge thermal energy resources. The comprehensive utilization efficiency of thermal energy resources is particularly important.
干热岩资源探明储量相当于石油、天然气和煤炭能力的30倍左右。因此,需要一种压裂开采装置能对储集层压裂破坏机理、延生规律进行原位不动的研究,更准确的反应实际情况,以提升对以上问题的深入认识,以便使该项技术得到更广泛的推广应用。The proven reserves of hot dry rock resources are equivalent to about 30 times the capacity of oil, natural gas and coal. Therefore, there is a need for a fracturing production device that can conduct in-situ research on the failure mechanism and extension law of reservoir fracturing, and more accurately reflect the actual situation, so as to improve the in-depth understanding of the above problems, so that this technology be more widely applied.
目前,国内水力压裂方面的设备用于煤层压裂方面较多,地层岩石压裂采油也有,多用于致裂、对裂缝系进行研究,研究手段也从目测绘制到涂料、荧光等,但是偏重于对压裂后的测试研究,未进行压裂后的注采和提高采收率研究,未对热能开采率进行进一步的研究,以达到客观评价开采效率。At present, domestic hydraulic fracturing equipment is mostly used for coal seam fracturing, and formation rock fracturing for oil recovery, mostly used for fracturing and research on fracture systems. The research methods also range from visual drawing to paint, fluorescence, etc. As for the post-fracturing testing and research, no post-fracturing injection-production and enhanced recovery studies have been carried out, and no further research on thermal energy recovery rate has been conducted to achieve an objective evaluation of recovery efficiency.
发明内容Contents of the invention
发明目的:为解决上述问题,本发明提供了一种干热岩压裂高压提高采收率实验室模拟装置。Purpose of the invention: In order to solve the above problems, the present invention provides a laboratory simulation device for high-pressure EOR laboratory simulation of hot dry rock fracturing.
技术方案:为达到上述目的,本发明采用如下技术方案:Technical scheme: in order to achieve the above object, the present invention adopts following technical scheme:
一种干热岩压裂高压提高采收率实验室模拟装置,包括压裂液注入系统、支撑剂注入系统、高压气体增压注入系统、压裂主体、环压施加系统、高压管阀件;所述支撑剂注入系统包括支撑剂间接注入和固化;所述高压气体增压注入系统包括气体增压和气体间接注入;所述压裂主体包括样品压裂仓和样品环压腔;所述样品压裂仓包括三维固定支撑和三维液压系统;所述三维液压系统包括液压滑动腔和液压活动塞;所述样品环压腔包括环压腔钢板和胶套,胶套与钢板之间存有空腔,注入液体实现压力包裹作用;压裂液注入和环压施加均通过高压管线和高压控制组件相连来实现。A high-pressure EOR laboratory simulation device for hot dry rock fracturing, including a fracturing fluid injection system, a proppant injection system, a high-pressure gas pressurized injection system, a fracturing main body, a ring pressure application system, and a high-pressure pipe valve; The proppant injection system includes proppant indirect injection and solidification; the high-pressure gas pressurization injection system includes gas pressurization and gas indirect injection; the fracturing main body includes a sample fracturing chamber and a sample ring pressure chamber; the sample The fracturing chamber includes a three-dimensional fixed support and a three-dimensional hydraulic system; the three-dimensional hydraulic system includes a hydraulic sliding chamber and a hydraulic movable plug; the sample ring pressure chamber includes a ring pressure chamber steel plate and a rubber sleeve, and there is a gap between the rubber sleeve and the steel plate. The cavity is injected with liquid to achieve pressure wrapping; the injection of fracturing fluid and the application of ring pressure are both realized through the connection of high-pressure pipelines and high-pressure control components.
作为优选,样品压裂仓采用三维固定支撑和三维液压活动支撑。Preferably, the sample fracturing chamber adopts three-dimensional fixed support and three-dimensional hydraulic movable support.
作为优选,液压活动塞采用优质四氟材料。As a preference, the hydraulic movable plug is made of high-quality tetrafluoroethylene material.
作为优选,环压的建立通过外置钢板和胶套相连产生的空腔。Preferably, the ring pressure is established through the cavity formed by the connection of the outer steel plate and the rubber sleeve.
作为优选,环压的建立通过外置钢板和胶套相连产生的空腔,通过对空腔的施压来实现对模型本体外围的包裹。Preferably, the ring pressure is established through the cavity formed by the connection of the outer steel plate and the rubber sleeve, and the wrapping of the periphery of the model body is achieved by applying pressure to the cavity.
作为优选,压裂液、换热置换液、高压注采液、支撑剂液、围压的作业均通过高压阀门和管线相连,并通过它们的共同作业,协调启闭,实现压裂、增压注入、高温高压环境模拟、并与相关联压力、温度、监测仪表相连。As a preference, the operations of fracturing fluid, heat exchange fluid, high-pressure injection fluid, proppant fluid, and confining pressure are all connected through high-pressure valves and pipelines, and through their joint operations, they coordinate opening and closing to realize fracturing and pressurization. Injection, high temperature and high pressure environment simulation, and connected with associated pressure, temperature, and monitoring instruments.
有益效果:在热注采的同时,通过现有技术实现热能的最大额度采收,并通过高压气体的钻透繁衍功能,极大限度的提高热采收率,在同等开采条件下,降低开采成本。Beneficial effects: At the same time of thermal injection production, the maximum recovery of thermal energy can be realized through the existing technology, and the drilling and reproduction function of high-pressure gas can greatly improve the thermal recovery rate, and reduce the production rate under the same mining conditions. cost.
附图说明Description of drawings
图1为本发明干热岩压裂高压提高采收率实验室模拟装置流程图。Fig. 1 is a flowchart of a laboratory simulation device for high-pressure enhanced oil recovery in hot dry rock fracturing according to the present invention.
具体实施方式detailed description
实施例:Example:
如图1所述的一种干热岩压裂高压提高采收率实验室模拟装置,包括压裂液注入系统、支撑剂注入系统、高压气体增压注入系统、压裂主体、环压施加系统、高压管阀件;所述支撑剂注入系统包括支撑剂间接注入和固化;所述高压气体增压注入系统包括气体增压和气体间接注入;所述压裂主体包括样品压裂仓和样品环压腔;所述压裂仓包括三维固定支撑和三维液压系统;所述三维液压系统包括液压滑动腔和液压活动塞;所述样品环压腔包括环压腔钢板和胶套,胶套与钢板之间存有空腔,注入液体实现压力包裹作用;所述压裂液注入和环压施加均通过高压管线和高压控制组件相连来实现。A laboratory simulation device for high-pressure EOR laboratory simulation of hot dry rock fracturing as shown in Figure 1, including a fracturing fluid injection system, a proppant injection system, a high-pressure gas pressurized injection system, a fracturing main body, and a ring pressure application system , high-pressure pipe valve parts; the proppant injection system includes proppant indirect injection and solidification; the high-pressure gas pressurized injection system includes gas pressurization and gas indirect injection; the fracturing main body includes a sample fracturing chamber and a sample ring pressure chamber; the fracturing chamber includes a three-dimensional fixed support and a three-dimensional hydraulic system; the three-dimensional hydraulic system includes a hydraulic sliding chamber and a hydraulic movable plug; the sample ring pressure chamber includes a ring pressure chamber steel plate and a rubber sleeve, and the rubber sleeve and the steel plate There is a cavity between them, and the fluid is injected to realize the pressure wrapping effect; the injection of the fracturing fluid and the application of the ring pressure are both realized by connecting the high-pressure pipeline and the high-pressure control component.
如图1所示,高压压裂泵1、压裂液容器2、支撑剂注入容器3、气体增压容器4、气体增压容器5、气体增压泵6、模型过程数据测量7、液压控制器8、液压伺服系统9、模型主体10、环压施加系统11、系统压力控制和采收12、混合器13。As shown in Figure 1, high-pressure fracturing pump 1, fracturing fluid container 2, proppant injection container 3, gas booster container 4, gas booster container 5, gas booster pump 6, model process data measurement 7, hydraulic control Device 8, hydraulic servo system 9, model main body 10, ring pressure application system 11, system pressure control and recovery 12, mixer 13.
本发明的干热岩压裂高压提高采收率实验室模拟装置,包括由压裂泵及换向系统组成的压裂动力系统,压裂液经由阀门,通过液压塞上的通孔注入样品。在此之前,必须通过液压控制器8调整液压伺服系统9在样品三维方向上的施加。压裂压力通过传感器得到。压裂后,保持施加力不变,对整体外围进行环压模块施加,并通过环压泵注入环压,环压压力为换热压力的1.1-1.2倍。同时,通过系统压力控制和采收12对系统进行压力稳定控制,控制压力设定后,则进行换热提高采收率实验。换热试采流体(或支撑剂)由支撑剂注入容器3经由管路注入样品,经模型主体10的加热装置对换热试采流体(或支撑剂)进行高温模拟(老化作用),高压气体经由气体增压容器4、5,通过气体增压泵6的增压作用,形成高压,经由混合器13进入模型主体10进行充分置换繁衍,形成高温高压环境,通过压裂液容器2再次注入开采液,进行大流量快速换热,实现对样品的热开采和提高热采收率。The hot dry rock fracturing high-pressure EOR laboratory simulation device of the present invention includes a fracturing power system composed of a fracturing pump and a reversing system. The fracturing fluid is injected into a sample through a through hole on a hydraulic plug through a valve. Prior to this, the application of the hydraulic servo system 9 in the three-dimensional direction of the sample must be adjusted by the hydraulic controller 8 . Fracturing pressure is obtained through sensors. After fracturing, keep the applied force constant, apply the ring pressure module to the overall periphery, and inject the ring pressure through the ring pressure pump, and the ring pressure is 1.1-1.2 times the heat exchange pressure. At the same time, the pressure stability control of the system is carried out through the system pressure control and recovery 12. After the control pressure is set, the heat exchange enhanced oil recovery experiment is carried out. The heat exchange test production fluid (or proppant) is injected into the sample from the proppant injection container 3 through the pipeline, and the heat exchange test production fluid (or proppant) is subjected to high temperature simulation (aging effect) through the heating device of the model main body 10, and the high pressure gas Through the gas booster containers 4 and 5, the gas booster pump 6 boosts the pressure to form a high pressure, enters the model body 10 through the mixer 13 for full replacement and multiplication, forms a high temperature and high pressure environment, and injects into the mining area again through the fracturing fluid container 2 Liquid, large flow rate and rapid heat exchange, realize thermal recovery of samples and increase thermal recovery rate.
上述模拟系统装置中,模型三相施力可根据需要进行调节,并根据施力活动面位移量进行垫片的选用。In the above-mentioned simulation system device, the three-phase applied force of the model can be adjusted according to the needs, and the gasket is selected according to the displacement of the active surface of the applied force.
使用本发明模拟系统装置进行换热置换实验时,实验结束后需缓慢释放压力,降低温度后,方可拆卸实验组件。When using the simulation system device of the present invention for heat exchange and displacement experiments, the pressure must be released slowly after the experiment is over, and the experimental components can only be disassembled after the temperature is lowered.
实验完毕后,对模型本体内侧、阀门、容器等进行清洗,清洗液通过管线阀门、放空,重复进行2-3次清理,进入下一个实验。After the experiment is completed, clean the inside of the model body, valves, containers, etc., and the cleaning liquid passes through the pipeline valves, vents, and repeats the cleaning 2-3 times before entering the next experiment.
以上所述仅是本发明的优选实施方式,应当指出:对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above is only a preferred embodiment of the present invention, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, and these improvements and modifications are also possible. It should be regarded as the protection scope of the present invention.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410012026.8A CN103790564B (en) | 2014-01-11 | 2014-01-11 | Hot-dry rock fracturing high-pressure recovery-ratio-increasing laboratory simulation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410012026.8A CN103790564B (en) | 2014-01-11 | 2014-01-11 | Hot-dry rock fracturing high-pressure recovery-ratio-increasing laboratory simulation device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103790564A CN103790564A (en) | 2014-05-14 |
CN103790564B true CN103790564B (en) | 2017-04-12 |
Family
ID=50666576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410012026.8A Expired - Fee Related CN103790564B (en) | 2014-01-11 | 2014-01-11 | Hot-dry rock fracturing high-pressure recovery-ratio-increasing laboratory simulation device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103790564B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105823795A (en) * | 2016-06-07 | 2016-08-03 | 吉林大学 | Large-size flow guide pool hot dry rock fracture heat exchange device |
CN107014974B (en) * | 2016-11-28 | 2019-05-21 | 中国石油大学(华东) | Imitative experimental appliance for enhanced geothermal system and the method for testing enhanced geothermal system reservoir thermal energy recovery rate using it |
CN107893652A (en) * | 2017-09-30 | 2018-04-10 | 中国石油大学(华东) | The hydraulic fracturing analogue experiment installation and method of the enhanced geothermal system of hot dry rock |
CN107905778A (en) * | 2017-10-19 | 2018-04-13 | 中国石油大学(华东) | Supercritical CO2The enhanced geothermal system experimental provision of fluid fracturing and method |
CN111173485B (en) * | 2018-11-12 | 2021-09-21 | 中国石油化工股份有限公司 | Method for increasing hot dry rock heat storage transformation volume |
CN110656918B (en) * | 2019-10-23 | 2021-07-02 | 中国石油集团川庆钻探工程有限公司 | Multi-scale crack two-phase flow simulation evaluation method |
CN112213253B (en) * | 2020-09-17 | 2023-06-23 | 中国石油天然气股份有限公司 | High-temperature high-pressure multilayer single-particle aging device and method for polymeric propping agent |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101864948A (en) * | 2010-06-04 | 2010-10-20 | 海安县石油科研仪器有限公司 | Fracturing acidification working solution dynamic filtration loss instrument |
CN103266888A (en) * | 2013-05-21 | 2013-08-28 | 中国石油大学(华东) | System and method for visualization fracturing simulation experiment |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010017557A1 (en) * | 2008-08-08 | 2010-02-11 | Altarock Energy, Inc. | Method for testing an engineered geothermal system using one stimulated well |
-
2014
- 2014-01-11 CN CN201410012026.8A patent/CN103790564B/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101864948A (en) * | 2010-06-04 | 2010-10-20 | 海安县石油科研仪器有限公司 | Fracturing acidification working solution dynamic filtration loss instrument |
CN103266888A (en) * | 2013-05-21 | 2013-08-28 | 中国石油大学(华东) | System and method for visualization fracturing simulation experiment |
Non-Patent Citations (1)
Title |
---|
二氧化碳在干热岩中换热及固化的数值模拟;宋阳等;《工程热物理学报》;20131031;第34卷(第10期);第1902-1905页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103790564A (en) | 2014-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103790564B (en) | Hot-dry rock fracturing high-pressure recovery-ratio-increasing laboratory simulation device | |
CN103790580B (en) | A kind of hot dry rock pressure break original position local heat transfer chamber analog system device | |
CN101985875B (en) | Hydraulic pulse-assisted reservoir chemical remedial treatment experiment device and method | |
CN102031955B (en) | Ultrasonic-assisted reservoir stratum chemical blockage removal experimental facility and experimental method | |
CN102778554B (en) | Experimental device for improving permeability of shale gas storage layer in supercritical CO2 fracturing process | |
CN101975052B (en) | Dualistic superposed wave reinforced oil displacing experiment device and experiment method | |
CN103206210B (en) | Experimental apparatus for exploiting natural gas hydrate reservoir by means of thermal fluid fracturing | |
CN203787002U (en) | Gas injection displacement coal seam gas physical similarity simulation experiment platform | |
CN106289988B (en) | Supercritical carbon dioxide rock fracture pilot system | |
CN104747187A (en) | Simulation experimenting device and method for high-temperature and high-pressure reinforced well wall drilling fluid | |
CN104373106A (en) | Experimental method and experimental system of gas sealing performance of underground packer | |
CN102536305A (en) | Method for increasing permeability of inert gas and extracting gas | |
CN102979510B (en) | Coal seam water injection displacement gas effect simulated experiment system | |
CN104360021A (en) | Testing device for simulating exploitation of natural gas hydrate from deep-sea energy soil | |
CN103306665A (en) | Testing device for geological storage of carbon dioxide in coal seams | |
CN107576763B (en) | Experimental device and method for promoting coalbed methane extraction using ultrasonic waves and high-temperature CO2 | |
CN106153442A (en) | Sealing device for the test of rock fracture multi-scenarios method effect down cut | |
CN103953332A (en) | Experimental device and experimental method for simulating dynamic leakage and leaking stoppage of drilling fluid | |
CN106872651A (en) | The experimental rig and analogy method of a kind of enhanced underground heat exploitation simulation | |
CN202903786U (en) | Shearing box applicable to rock-joint shearing and seepage coupling test | |
CN105845010A (en) | Underground rock forming simulation device | |
CN107560993A (en) | Coal-bed methane seepage experimental provision and method under ul-trasonic irradiation | |
CN110857943B (en) | Experimental device for be used to induced crack leaking stoppage simulation evaluation | |
CN108398334B (en) | Experimental device and experimental method for freezing and thawing cycle by combining liquid nitrogen with far infrared heat radiation | |
CN104407111A (en) | Physical similarity simulation method for gas-injection displacement coal seam gas |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: NANTONG HUAXING PETROLEUM INSTRUMENT CO., LTD. Free format text: FORMER OWNER: JILIN UNIVERSITY Effective date: 20140716 Owner name: JILIN UNIVERSITY Free format text: FORMER OWNER: NANTONG HUAXING PETROLEUM INSTRUMENT CO., LTD. Effective date: 20140716 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 226000 NANTONG, JIANGSU PROVINCE TO: 130012 CHANGCHUN, JILIN PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20140716 Address after: 130012 Changchun Qianjin Street, Jilin, No. 2699 Applicant after: Jilin University Applicant after: Nantong Huaxing Petroleum Instrument Co., Ltd. Address before: 226000, No. 18, new road, Haian Development Zone, Haian County, Nantong, Jiangsu Applicant before: Nantong Huaxing Petroleum Instrument Co., Ltd. Applicant before: Jilin University |
|
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Yanjun Inventor after: Li Zhengwei Inventor after: Guo Liangliang Inventor after: Hu Zhongjun Inventor after: Yu Ziwang Inventor after: Gao Ping Inventor after: Zhang Qing Inventor after: Xu Tianfu Inventor after: Tang Shengrong Inventor before: Qian Wei Inventor before: Tang Shengrong Inventor before: Zhang Yanjun Inventor before: Li Zhengwei Inventor before: Guo Liangliang Inventor before: Hu Zhongjun Inventor before: Yu Ziwang Inventor before: Gao Ping Inventor before: Zhang Qing Inventor before: Xu Tianfu |
|
CB03 | Change of inventor or designer information |
Inventor after: Zhang Yanjun Inventor after: Tang Shengrong Inventor after: Li Jianming Inventor after: Li Zhengwei Inventor after: Guo Liangliang Inventor after: Hu Zhongjun Inventor after: Yu Ziwang Inventor after: Gao Ping Inventor after: Zhang Qing Inventor after: Xu Tianfu Inventor before: Zhang Yanjun Inventor before: Li Zhengwei Inventor before: Guo Liangliang Inventor before: Hu Zhongjun Inventor before: Yu Ziwang Inventor before: Gao Ping Inventor before: Zhang Qing Inventor before: Xu Tianfu Inventor before: Tang Shengrong |
|
COR | Change of bibliographic data | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Yanjun Inventor after: Tang Shengrong Inventor after: Zhang Jianing Inventor after: Li Zhengwei Inventor after: Guo Liangliang Inventor after: Hu Zhongjun Inventor after: Yu Ziwang Inventor after: Gao Ping Inventor after: Zhang Qing Inventor after: Xu Tianfu Inventor before: Zhang Yanjun Inventor before: Tang Shengrong Inventor before: Li Jianming Inventor before: Li Zhengwei Inventor before: Guo Liangliang Inventor before: Hu Zhongjun Inventor before: Yu Ziwang Inventor before: Gao Ping Inventor before: Zhang Qing Inventor before: Xu Tianfu |
|
COR | Change of bibliographic data | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170412 Termination date: 20190111 |