[go: up one dir, main page]

CN103746316A - Device and method for replacing insulator string of straight corner tower in hot-line work mode - Google Patents

Device and method for replacing insulator string of straight corner tower in hot-line work mode Download PDF

Info

Publication number
CN103746316A
CN103746316A CN201410001305.4A CN201410001305A CN103746316A CN 103746316 A CN103746316 A CN 103746316A CN 201410001305 A CN201410001305 A CN 201410001305A CN 103746316 A CN103746316 A CN 103746316A
Authority
CN
China
Prior art keywords
insulator string
insulating
insulator
replaced
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410001305.4A
Other languages
Chinese (zh)
Other versions
CN103746316B (en
Inventor
崔艳东
张佰庆
白朴
李炎
童维占
褚洪雷
乔圣华
杨腾腾
仲彬
唐盼
刘庭
刘凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Jiangsu Electric Power Co Ltd
Maintenance Branch of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Jiangsu Electric Power Co Ltd
Maintenance Branch of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, State Grid Jiangsu Electric Power Co Ltd, Maintenance Branch of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410001305.4A priority Critical patent/CN103746316B/en
Publication of CN103746316A publication Critical patent/CN103746316A/en
Application granted granted Critical
Publication of CN103746316B publication Critical patent/CN103746316B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses a device and a method for replacing an insulator string of a straight corner tower in a hot-line work mode. The device comprises a replacement tool (1) which is used for fixing and transferring the load of an insulator string to be replaced. The device is characterized by also comprising an insulating cross arm (2), an insulating pulley block (3), a plurality of insulating hauling ropes (4) and an insulating basket (5). The method comprises the following steps: mounting the insulating cross arm (2) and the insulating pulley block (3); mounting the replacement tool (1); allowing the insulating hauling ropes (4) to penetrate through the insulating pulley block (3) and mounting the insulating basket (5); hauling the insulating hauling ropes (4) to ensure that the insulating basket (5) and an equal potential operator in the insulating basket (5) enter an equal potential, and the like. According to the device and the method for replacing the insulator string of the straight corner power in the hot-line work mode, which are disclosed by the invention, the device is simple in structure, reasonable in design, safe, reliable, free of influence from deflection of the insulator string and strong in university, and the device and the method are suitable for being widely popularized and applied.

Description

一种带电更换直线转角塔绝缘子串的装置及方法A device and method for live replacement of straight-line corner tower insulator strings

技术领域 technical field

本发明涉及一种带电更换直线转角塔绝缘子串的装置及方法,尤其涉及一种能够实现带电更换不同塔形的500kV线路直线转角塔绝缘子串的装置及方法,属于电力线路检修技术领域。 The invention relates to a device and method for live replacement of straight-line corner tower insulator strings, in particular to a device and method capable of live replacement of 500kV line straight-corner tower insulator strings of different tower shapes, belonging to the technical field of power line maintenance.

背景技术 Background technique

绝缘子是电力输送过程中不可缺少的电气元件,它主要用在输电线路杆塔上,主要用来承载导线的载荷以及保持导线与杆塔本身的电气绝缘。由于绝缘子长期在户外环境下工作,较易出现缺陷。由于直线转角塔导线偏转0°-20°,导致绝缘子串受到一个水平荷载,发生偏转,绝缘子的导线处挂点会越过横担的最远端,此时传统的直线塔作业方法中,塔上作业人员无法使用绳索将等电位作业人员和绝缘子牵引到导线处。 Insulators are an indispensable electrical component in the process of power transmission. They are mainly used on transmission line towers to carry the load of the wires and maintain electrical insulation between the wires and the tower itself. Since the insulator works in the outdoor environment for a long time, it is more prone to defects. Due to the deflection of the wires of the straight corner tower by 0°-20°, the insulator string is subjected to a horizontal load and deflects, and the hanging point of the wires of the insulators will cross the farthest end of the cross arm. At this time, in the traditional straight tower operation method, the tower Operators cannot use ropes to pull equipotential operators and insulators to conductors.

发明内容 Contents of the invention

本发明所要解决的技术问题是,提供一种无论直线转角塔导线偏转多大角度,均能够通过增加设置绝缘横担来达到利用绝缘牵引绳将等电位电工牵引至导线处的带电更换直线转角塔绝缘子串的装置及方法。 The technical problem to be solved by the present invention is to provide a live replacement straight corner tower insulator that can be used to pull the equipotential electrician to the wire by adding an insulating cross arm no matter how much the wire of the straight corner tower is deflected. String device and method.

为解决上述技术问题,本发明采用的技术方案为: In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is:

一种带电更换直线转角塔绝缘子串的装置,包括用于固定并转移待更换绝缘子串的荷载的更换工具,其特征在于:还包括绝缘横担、绝缘滑轮组、若干根绝缘牵引绳和绝缘吊篮,所述绝缘横担位于直线转角塔的横担末端,所述绝缘滑轮组包括滑轮和转向滑轮,所述滑轮位于所述绝缘横担的末端,所述转向滑轮位于所述直线转角塔上,所述绝缘牵引绳穿过所述转向滑轮和滑轮后连接所述绝缘吊篮。 A device for replacing the insulator string of a straight-line corner tower with electricity, including a replacement tool for fixing and transferring the load of the insulator string to be replaced, and is characterized in that it also includes an insulating cross arm, an insulating pulley block, several insulating traction ropes and an insulating hanging basket , the insulating cross arm is located at the cross arm end of the straight corner tower, the insulating pulley block includes a pulley and a diverting pulley, the pulley is located at the end of the insulating cross arm, and the diverting pulley is located on the straight corner tower, the The insulated traction rope is connected to the insulated hanging basket after passing through the diverting pulley and the pulley.

所述绝缘横担为一根长杆,所述绝缘横担水平设置且凸出于所述直线转角塔的横担,所述绝缘横担位于所述待更换绝缘子串下端悬挂点的上方。 The insulating cross-arm is a long rod, the insulating cross-arm is arranged horizontally and protrudes from the cross-arm of the straight corner tower, and the insulating cross-arm is located above the hanging point at the lower end of the insulator string to be replaced.

所述更换工具包括卡具、紧线丝杠、绝缘拉杆和用于托住待更换绝缘子串的绝缘托瓶架,所述卡具包括用于卡住所述待更换绝缘子串上端悬挂点的上卡具和用于卡住所述待更换绝缘子串下端悬挂点的下卡具,所述紧线丝杠连接所述上卡具和绝缘拉杆,所述绝缘拉杆还与所述下卡具固定连接,所述绝缘托瓶架上设置有牵引绳。 The replacement tool includes a fixture, a tightening screw, an insulating pull rod and an insulating bottle holder for holding the insulator string to be replaced, and the fixture includes an upper suspension point for clamping the upper end of the insulator string to be replaced. a clamp and a lower clamp for clamping the suspension point at the lower end of the insulator string to be replaced, the tightening screw is connected to the upper clamp and an insulating pull rod, and the insulating pull rod is also fixedly connected to the lower clamp , the insulating bottle holder is provided with a traction rope.

所述待更换绝缘子串下端悬挂点和所述的滑轮的连线与所述绝缘横担之间的角度为80~100°。 The angle between the suspension point at the lower end of the to-be-replaced insulator string and the pulley and the insulating cross-arm is 80° to 100°.

所述转向滑轮位于所述滑轮的右上方。  The deflection pulley is located on the upper right side of the pulley. the

使用所述的一种带电更换直线转角塔绝缘子串的装置来进行绝缘子串带点更换的一种带电更换直线转角塔绝缘子串的方法,其特征在于:依次包括以下步骤: A method for replacing the insulator strings of straight-line corner towers with electricity using the device for replacing the insulator strings of straight-line corner towers with electricity, which is characterized in that it includes the following steps in sequence:

步骤一:安装所述绝缘横担和绝缘滑轮组; Step 1: installing the insulating cross arm and insulating pulley block;

步骤二:安装所述更换工具,所述更换工具包括紧线丝杠和绝缘拉杆; Step 2: installing the replacement tool, which includes a tightening lead screw and an insulating pull rod;

步骤三:将所述绝缘牵引绳穿过所述绝缘滑轮组并安装所述绝缘吊篮; Step 3: passing the insulated traction rope through the insulated pulley block and installing the insulated hanging basket;

步骤四:牵引所述绝缘牵引绳使所述绝缘吊篮及其内的等电位电工进入等电位; Step 4: pull the insulated traction rope to make the insulated hanging basket and the equipotential electrician inside enter the equipotential;

步骤五:收紧所述紧线丝杠以转移所述待更换绝缘子串的荷载至所述绝缘拉杆; Step 5: Tighten the lead screw to transfer the load of the insulator string to be replaced to the insulating pull rod;

步骤六:转移所述待更换绝缘子串并安装新的绝缘子串; Step 6: Transfer the insulator string to be replaced and install a new insulator string;

步骤七:放松所述紧线丝杠并拆除所述更换工具。 Step 7: Loosen the tightening lead screw and remove the replacement tool.

所述等电位为与所述待更换绝缘子串下端悬挂点相水平的位置。 The equipotential is a position horizontal to the suspension point at the lower end of the insulator string to be replaced.

所述待更换绝缘子串的荷载为导线。 The load of the insulator string to be replaced is the wire.

所述步骤一前还包括检查个人安全用具步骤。 Before said step one, the step of checking personal safety appliances is also included.

所述步骤七后还包括清场及遗留物检查步骤。 After the step seven, it also includes the steps of clearing the site and inspecting the remnants.

本发明提供的一种带电更换直线转角塔绝缘子串的装置及方法,不受绝缘子串偏角的影响,通过绝缘横担延长绝缘牵引绳挂点的位置,保证了传递绝缘子串和使用绝缘吊篮进入等电位时,通过绝缘牵引绳能顺利牵引到位;另外,由于直线转角塔上电工采用滑轮组和绝缘横担牵引绳索,因此可以在远离横担的塔身上作业,操作位置较为安全。本发明提供的一种带电更换直线转角塔绝缘子串的装置及方法,结构简单,设计合理,安全可靠,不受绝缘子串偏角的影响,通用性强,适合广泛推广应用。 The invention provides a device and method for live replacement of the insulator strings of straight corner towers, which is not affected by the deflection angle of the insulator strings, and the position of the hanging point of the insulated traction rope is extended by the insulating cross arm, ensuring the transmission of the insulator strings and the use of the insulating basket When entering the equipotentiality, the insulated traction rope can be used to pull it in place smoothly; in addition, because the electrician on the straight corner tower uses a pulley block and an insulated cross-arm to draw the rope, it can work on the tower away from the cross-arm, and the operating position is relatively safe. The device and method for replacing insulator strings of straight-line corner towers with electricity provided by the present invention have simple structure, reasonable design, safety and reliability, are not affected by the deflection angle of insulator strings, have strong versatility, and are suitable for wide popularization and application.

附图说明 Description of drawings

图1为本发明的结构示意图; Fig. 1 is a structural representation of the present invention;

图2本发明进入等电位的结构示意图。 Fig. 2 is a schematic diagram of the structure of the present invention entering equipotentiality.

具体实施方式 Detailed ways

下面结合附图对本发明作更进一步的说明。 The present invention will be further described below in conjunction with the accompanying drawings.

如图1-2所示,一种带电更换直线转角塔绝缘子串的装置,包括用于固定并转移待更换绝缘子串的荷载的更换工具1,其特征在于:还包括绝缘横担2、绝缘滑轮组3、若干根绝缘牵引绳4和绝缘吊篮5,所述绝缘横担2位于直线转角塔的横担末端,所述绝缘滑轮组3包括滑轮31和转向滑轮32,所述滑轮31位于所述绝缘横担2的末端,所述转向滑轮32位于所述直线转角塔上,所述绝缘牵引绳4穿过所述转向滑轮32和滑轮31后连接所述绝缘吊篮5。 As shown in Figure 1-2, a device for replacing the insulator string of a straight corner tower with electricity, including a replacement tool 1 for fixing and transferring the load of the insulator string to be replaced, is characterized in that it also includes an insulating cross arm 2 and an insulating pulley block 3. Several insulated traction ropes 4 and insulated hanging baskets 5, the insulated cross arm 2 is located at the end of the cross arm of the straight corner tower, the insulated pulley block 3 includes a pulley 31 and a diverting pulley 32, and the pulley 31 is located at the end of the insulated cross arm. At the end of the cross arm 2, the diverting pulley 32 is located on the straight corner tower, and the insulated traction rope 4 passes through the diverting pulley 32 and the pulley 31 and connects to the insulating hanging basket 5.

所述绝缘横担2为一根长杆,所述绝缘横担2水平设置且凸出于所述直线转角塔的横担,所述绝缘横担2位于所述待更换绝缘子串6下端悬挂点的上方。 The insulating cross arm 2 is a long rod, the insulating cross arm 2 is arranged horizontally and protrudes from the cross arm of the straight corner tower, and the insulating cross arm 2 is located at the suspension point at the lower end of the to-be-replaced insulator string 6 above.

所述更换工具1包括卡具11、紧线丝杠12、绝缘拉杆13和用于托住待更换绝缘子串6的绝缘托瓶架14,所述卡具11包括用于卡住所述待更换绝缘子串6上端悬挂点的上卡具和用于卡住所述待更换绝缘子串6下端悬挂点的下卡具,所述紧线丝杠12连接所述上卡具和绝缘拉杆13,所述绝缘拉杆13还与所述下卡具固定连接,所述绝缘托瓶架14上设置有牵引绳。 The replacement tool 1 includes a clamp 11, a tightening screw 12, an insulating pull rod 13 and an insulating bottle holder 14 for supporting the insulator string 6 to be replaced, and the clamp 11 includes a clamp for clamping the string to be replaced. The upper fixture of the suspension point at the upper end of the insulator string 6 and the lower fixture for clamping the suspension point of the lower end of the insulator string 6 to be replaced, the tightening lead screw 12 is connected with the upper fixture and the insulating pull rod 13, the The insulating pull rod 13 is also fixedly connected with the lower fixture, and the insulating bottle holder 14 is provided with a traction rope.

所述待更换绝缘子串6下端悬挂点和所述的滑轮31的连线与所述绝缘横担2之间的角度为80~100°。 The angle between the suspension point at the lower end of the to-be-replaced insulator string 6 and the connecting line of the pulley 31 and the insulating cross-arm 2 is 80-100°.

所述转向滑轮32位于所述滑轮31的右上方。  The turning pulley 32 is located on the upper right of the pulley 31 . the

使用一种带电更换直线转角塔绝缘子串的装置来进行绝缘子串带点更换的一种带电更换直线转角塔绝缘子串的方法,其特征在于:依次包括以下步骤: A method for replacing the insulator strings of straight-line corner towers with electricity by using a device for replacing the insulator strings of straight-line corner towers with electricity, which is characterized in that it includes the following steps in sequence:

1、检查个人安全工具:正确佩带个人安全用具,由负责人检查监督,派专人对所需工具进行测量,检查; 1. Check personal safety tools: wear personal safety tools correctly, be inspected and supervised by the person in charge, and send special personnel to measure and check the required tools;

2、登塔:1号电工和2号电工携带绝缘传递绳登塔,在横担作业的适当位置将绝缘传递绳和绝缘滑车安装好并放下所述绝缘滑车至地面,紧接着3号电工及等电位电工登塔; 2. Climbing the tower: Electrician No. 1 and No. 2 carry the insulation transmission rope to climb the tower, install the insulation transmission rope and the insulation block at the appropriate position of the cross-arm operation and put down the insulation block to the ground, then the No. 3 electrician and Equipotential electrician climbing the tower;

3、传递工器具:地面电工将所述更换工具1、绝缘吊篮5、绝缘横担2、绝缘滑轮组3和绝缘牵引绳4装入绝缘滑车后,1号电工和2号电工将绝缘滑车拉上横担; 3. Transfer tools and equipment: After the ground electrician puts the replacement tool 1, insulating hanging basket 5, insulating cross arm 2, insulating pulley block 3 and insulating traction rope 4 into the insulating tackle, electrician No. 1 and electrician No. 2 pull the insulating tackle upper arm;

4、安装绝缘横担和绝缘滑轮组:塔上1号电工在横担末端安装好绝缘横担,使得绝缘横担的末尾的滑轮31与绝缘子导线处挂点基本处于垂直线上,同时在作业点上方的塔身上安装好所述转向滑轮32,方便塔上电工在安全位置通过绳索操控作业; 4. Install insulating cross-arm and insulating pulley block: Electrician No. 1 on the tower installs the insulating cross-arm at the end of the cross-arm, so that the pulley 31 at the end of the insulating cross-arm and the hanging point of the insulator wire are basically on the vertical line, and at the same time at the operating point The turning pulley 32 is installed on the tower body above, which is convenient for electricians on the tower to operate by ropes in a safe position;

5、组装所述更换工具1:1号电工和2号电工负责装所述紧线丝杠12、绝缘拉杆13和绝缘横担2,3号电工负责装所述绝缘吊篮5和绝缘托瓶架14; 5. Assemble the replacement tool 1: electrician No. 1 and electrician No. 2 are responsible for installing the tightening screw 12, insulating pull rod 13 and insulating cross arm 2, and electrician No. 3 is responsible for installing the insulating basket 5 and insulating support bottle Rack 14;

6、将所述绝缘牵引绳4穿过所述绝缘滑轮组3并安装所述绝缘吊篮5; 6. Pass the insulated traction rope 4 through the insulated pulley block 3 and install the insulated hanging basket 5;

7、等电位电工进入强电场:等电位电工在塔上电工的配合下利用所述绝缘吊篮5,通过所述绝缘横担2上的绝缘牵引绳4将绝缘吊篮5和等电位电工拉入强电场与导线等电位; 7. The equipotential electrician enters the strong electric field: the equipotential electrician uses the insulating basket 5 with the cooperation of the electrician on the tower, and pulls the insulating basket 5 and the equipotential electrician through the insulating traction rope 4 on the insulating cross arm 2 . Into a strong electric field and the same potential as the wire;

8、转移导线荷重:等电位电工将导线端的下卡具、绝缘拉杆13和绝缘托瓶架14安装好后,塔上1号电工和2号电工收紧所述紧线丝杠12将导线荷载转移至绝缘拉杆13,经检查无问题后等电位电工得到工作负责人同意后,推出弹簧销子摘开待更换绝缘子串6与导线连接碗头,并将待更换绝缘子串6脱离导线; 8. Transfer the wire load: After the equipotential electrician installs the lower clamp at the wire end, the insulating pull rod 13 and the insulating bottle holder 14, the No. 1 and No. 2 electricians on the tower tighten the tightening screw 12 to load the wire. Transfer to the insulating pull rod 13. After checking that there is no problem, the equipotential electrician pushes out the spring pin and removes the insulator string 6 to be replaced and connects the bowl head with the wire, and separates the insulator string 6 to be replaced from the wire after obtaining the consent of the person in charge of the work;

9、转移待更换绝缘子串6位置并更换新的绝缘子串:塔上电工通过所述绝缘横担2拉紧绝缘托瓶架14的牵引绳将待更换绝缘子6串拉至横担上,之后分解、更换新的绝缘子串; 9. Transfer the position of the insulator string 6 to be replaced and replace it with a new insulator string: the electrician on the tower pulls the 6 strings of insulators to be replaced to the cross arm by tightening the traction rope of the insulated bottle holder 14 through the insulating cross arm 2, and then disassembles it , replace the new insulator string;

10、安装新的绝缘子串并拆除更换工具1、绝缘横担2和绝缘滑轮组3:使用绝缘横担2上的绝缘牵引绳4将组装好的绝缘子串通过绝缘托瓶架14传至导线处,等电位电工将新的绝缘子串与导线连接,装上弹簧销子,经检查连接可靠,报告工作负责人;1号电工和2号电工得到负责人同意后,松开紧线丝杠12,拆除绝缘拉杆13、紧线丝杠12、绝缘托瓶架14、绝缘横担2、绝缘滑轮组3并传至地面,等电位电工在塔上电工的配合下利用绝缘吊篮5退出强电场,将拆除的工具传至地面; 10. Install a new insulator string and remove the replacement tool 1, insulating cross arm 2 and insulating pulley block 3: use the insulating traction rope 4 on the insulating cross arm 2 to pass the assembled insulator string to the wire through the insulating bottle holder 14, The equipotential electrician connects the new insulator string with the wire, installs the spring pin, checks that the connection is reliable, and reports to the person in charge of the work; after obtaining the consent of the person in charge, electrician No. 1 and electrician No. 2 loosen the tightening lead screw 12 and remove it. Insulated pull rod 13, tightening lead screw 12, insulating bottle holder 14, insulating cross arm 2, insulating pulley block 3 are transmitted to the ground, and the equipotential electrician uses the insulating basket 5 to withdraw from the strong electric field with the cooperation of the electrician on the tower, and removes the The tool is passed to the ground;

11、返回地面:检查导线上无遗留物后返回地面并清场。 11. Return to the ground: After checking that there is no residue on the wire, return to the ground and clear the field.

所述等电位为与所述待更换绝缘子串6下端悬挂点相水平的位置。 The equipotential is a position horizontal to the hanging point at the lower end of the insulator string 6 to be replaced.

所述待更换绝缘子串6的荷载为导线。 The load of the insulator string 6 to be replaced is a wire.

以上所述仅是本发明的优选实施方式,应当指出:对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。 The above is only a preferred embodiment of the present invention, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, and these improvements and modifications are also possible. It should be regarded as the protection scope of the present invention.

Claims (10)

1. the device of an electrified replacing linear angle tower insulator string, comprise the replacing instrument (1) for fixing and shift the load of insulator string to be replaced, it is characterized in that: also comprise insulator crossarm (2), insulating block group (3), some eradication edge pull ropes (4) and insulation hanging basket (5), described insulator crossarm (2) is positioned at the cross-arm end of straight-line angle tower, described insulating block group (3) comprises pulley (31) and angle pulley (32), described pulley (31) is positioned at the end of described insulator crossarm (2), described angle pulley (32) is positioned on described straight-line angle tower, described insulation pull rope (4) is through the rear described insulation hanging basket (5) that is connected of described angle pulley (32) and pulley (31).
2. the device of a kind of electrified replacing linear angle tower insulator string according to claim 1, it is characterized in that: described insulator crossarm (2) is a stock, described insulator crossarm (2) is horizontally disposed with and protrudes from the cross-arm of described straight-line angle tower, and described insulator crossarm (2) is positioned at the top of described insulator string to be replaced (6) lower end hitch point.
3. the device of a kind of electrified replacing linear angle tower insulator string according to claim 1, it is characterized in that: described replacing instrument (1) comprises jig (11), Wire tensioning screw (12), insulated tension pole (13) and for holding the insulating insulator bracket (14) of insulator string to be replaced (6), described jig (11) comprises upper jig for blocking described insulator string to be replaced (6) upper end hitch point and for blocking the lower jig of described insulator string to be replaced (6) lower end hitch point, described Wire tensioning screw (12) connects described upper jig and insulated tension pole (13), described insulated tension pole (13) is also fixedly connected with described lower jig, described insulating insulator bracket is provided with pull rope on (14).
4. the device of a kind of electrified replacing linear angle tower insulator string according to claim 1, is characterized in that: the angle between described insulator string to be replaced (6) lower end hitch point and line and the described insulator crossarm (2) of described pulley (31) is 80 ~ 100 °.
5. the device of a kind of electrified replacing linear angle tower insulator string according to claim 1, is characterized in that: described angle pulley (32) is positioned at the upper right side of described pulley (31).
6. the method for carrying out a kind of electrified replacing linear angle tower insulator string of insulator string band point replacing with the device of a kind of electrified replacing linear angle tower insulator string according to claim 1, is characterized in that: comprise the following steps successively:
Step 1: described insulator crossarm (2) and insulating block group (3) are installed;
Step 2: described replacing instrument (1) is installed, and described replacing instrument (1) comprises Wire tensioning screw (12) and insulated tension pole (13);
Step 3: described insulation pull rope (4) is passed to described insulating block group (3) and described insulation hanging basket (5) is installed;
Step 4: draw described insulation pull rope (4) and make described insulation hanging basket (5) and interior equipotential electrician thereof enter equipotential;
Step 5: tighten up described Wire tensioning screw (12) to shift the extremely described insulated tension pole (13) of load of described insulator string to be replaced (6);
Step 6: shift described insulator string to be replaced (6) and new insulator string is installed;
Step 7: loosen described Wire tensioning screw (12) and remove described replacing instrument (1).
7. the method for a kind of electrified replacing linear angle tower insulator string according to claim 6, is characterized in that: described equipotential is and the hitch point position of level mutually, described insulator string to be replaced (6) lower end.
8. the method for a kind of electrified replacing linear angle tower insulator string according to claim 6, is characterized in that: the load of described insulator string to be replaced (6) is wire.
9. the method for a kind of electrified replacing linear angle tower insulator string according to claim 6, is characterized in that: before described step 1, also comprise and check personal security's apparatus step.
10. the method for a kind of electrified replacing linear angle tower insulator string according to claim 6, is characterized in that: after described step 7, also comprise and clearing out a gathering place and legacy inspection step.
CN201410001305.4A 2014-01-02 2014-01-02 A device and method for live replacement of straight-line corner tower insulator strings Active CN103746316B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410001305.4A CN103746316B (en) 2014-01-02 2014-01-02 A device and method for live replacement of straight-line corner tower insulator strings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410001305.4A CN103746316B (en) 2014-01-02 2014-01-02 A device and method for live replacement of straight-line corner tower insulator strings

Publications (2)

Publication Number Publication Date
CN103746316A true CN103746316A (en) 2014-04-23
CN103746316B CN103746316B (en) 2016-03-02

Family

ID=50503321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410001305.4A Active CN103746316B (en) 2014-01-02 2014-01-02 A device and method for live replacement of straight-line corner tower insulator strings

Country Status (1)

Country Link
CN (1) CN103746316B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104143782A (en) * 2014-07-15 2014-11-12 中国南方电网有限责任公司超高压输电公司南宁局 Electrified replacement tool and method for +/-800 kV circuit strain insulator string
CN104283146A (en) * 2014-07-07 2015-01-14 中国南方电网有限责任公司超高压输电公司南宁局 Device and method for replacing insulator string
CN107123948A (en) * 2017-06-29 2017-09-01 国网河南省电力公司济源供电公司 One kind changes circuit weight sheet devices
CN111492548A (en) * 2017-12-18 2020-08-04 株式会社永木精机 Insulator separation construction method, and direction changing member, hoisting device on pole, insulator support member and fixing member for opposite pole used in the construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1048286A (en) * 1989-06-22 1991-01-02 西伯利亚科学研究院能源研究所 On charged overhead transmission line, change the method and apparatus of defectiveness porcelain insulator in the suspension insulator string
CN102136693A (en) * 2010-12-28 2011-07-27 中国南方电网有限责任公司超高压输电公司百色局 Method and device for realizing long-distance equal electric potential access of winch hanging basket guide rail
CN203690799U (en) * 2014-01-02 2014-07-02 国家电网公司 Device for replacing suspension angle tower insulator string in live state

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1048286A (en) * 1989-06-22 1991-01-02 西伯利亚科学研究院能源研究所 On charged overhead transmission line, change the method and apparatus of defectiveness porcelain insulator in the suspension insulator string
CN102136693A (en) * 2010-12-28 2011-07-27 中国南方电网有限责任公司超高压输电公司百色局 Method and device for realizing long-distance equal electric potential access of winch hanging basket guide rail
CN203690799U (en) * 2014-01-02 2014-07-02 国家电网公司 Device for replacing suspension angle tower insulator string in live state

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周银松等: "《2007云南电力技术论坛论文集》", 31 December 2007, article "500kV直线转角塔绝缘子串带电更换专用工具的研发", pages: 166-170 *
智润仓等: "带电更换500kV直线转角塔绝缘子串通用工具", 《山西电力》, no. 135, 31 October 2006 (2006-10-31), pages 27 - 28 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104283146A (en) * 2014-07-07 2015-01-14 中国南方电网有限责任公司超高压输电公司南宁局 Device and method for replacing insulator string
CN104283146B (en) * 2014-07-07 2017-01-04 中国南方电网有限责任公司超高压输电公司南宁局 A kind of device and method changing insulator chain
CN104143782A (en) * 2014-07-15 2014-11-12 中国南方电网有限责任公司超高压输电公司南宁局 Electrified replacement tool and method for +/-800 kV circuit strain insulator string
CN104143782B (en) * 2014-07-15 2016-08-24 中国南方电网有限责任公司超高压输电公司南宁局 The electrification replacing tool of one ± 800kV line tension insulator chain and method
CN107123948A (en) * 2017-06-29 2017-09-01 国网河南省电力公司济源供电公司 One kind changes circuit weight sheet devices
CN107123948B (en) * 2017-06-29 2018-12-21 国网河南省电力公司济源供电公司 A kind of replacement route weight sheet devices
CN111492548A (en) * 2017-12-18 2020-08-04 株式会社永木精机 Insulator separation construction method, and direction changing member, hoisting device on pole, insulator support member and fixing member for opposite pole used in the construction method

Also Published As

Publication number Publication date
CN103746316B (en) 2016-03-02

Similar Documents

Publication Publication Date Title
WO2016023141A1 (en) Process for live replacement of tension hard-tube bus-bar jumper insulator of +/- 800kv ultra-high-voltage dc transmission line
CN201263063Y (en) Tool for replacing straight-line simply connected double-string overhang insulator
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN103066526B (en) A kind of ground connection line method and separated earthing instrument for ultra-high-tension power transmission line
CN102185265B (en) Construction method for replacing cross arm of 35kV line linear rod
CN103746316B (en) A device and method for live replacement of straight-line corner tower insulator strings
CN103904444A (en) Power transmission line grounding wire horizontal installation device
CN104979776A (en) Method for entering equipotential level for tension support of UHV transmission line
CN103474909B (en) Drainage thread supports the method for expansion live-line replacing multiloop strain insulator string
CN103001141A (en) Method for mounting anti-waving spacers on 66-kilovolt power transmission hot-line
CN203690798U (en) Universal tool for replacing suspension angle tower insulator string
CN103887735A (en) Linear charged wire lifting device of electric transmission line
CN203690799U (en) Device for replacing suspension angle tower insulator string in live state
CN203787855U (en) A straight-line electrified wire lifting device for transmission lines
CN201247838Y (en) Buttjunction type uphill-free ground grounding wire capable of being picked and hanged
CN201584691U (en) Special tool for 220KV double-circuit common-tower line accessing tension-resistance high-pressure high-electric field
CN104218493B (en) ± 800kV UHVDC Transmission Lines live-line replacing strain hard tube mother's wire jumper insulator technique
CN103746317A (en) General tool for replacing insulator chains of straight-line angle tower
CN211701243U (en) Electrified defect eliminating device for jumper spacer
CN204290154U (en) A kind of replacing insulator under electrified specific purpose tool
CN103928864B (en) 220kV-66kV electric transmission line hot-line adjusts the method for multiple wire linear slit
CN104078878A (en) Wire lifting device for replacing insulator in live mode
CN201518397U (en) Tool for replacing line suspension insulation string in 220 KV circuit with charged line
CN203101566U (en) An auxiliary device used for a lightning arrester DC leakage current test
CN208401405U (en) 220kV conductors on quad bundled V-type replacing insulator string tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Co-patentee after: JIANGSU ELECTRIC POWER Co.

Patentee after: State Grid Corporation of China

Co-patentee after: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd. MAINTENANCE BRANCH

Co-patentee after: China Electric Power Research Institute

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Co-patentee before: JIANGSU ELECTRIC POWER Co.

Patentee before: State Grid Corporation of China

Co-patentee before: MAINTENANCE DIVISION OF STATE GRID JIANGSU ELECTRIC POWER Co.

Co-patentee before: China Electric Power Research Institute

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Co-patentee after: JIANGSU ELECTRIC POWER Co.

Patentee after: State Grid Corporation of China

Co-patentee after: MAINTENANCE DIVISION OF STATE GRID JIANGSU ELECTRIC POWER Co.

Co-patentee after: China Electric Power Research Institute

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Co-patentee before: JIANGSU ELECTRIC POWER Co.

Patentee before: State Grid Corporation of China

Co-patentee before: JIANGSU ELECTRIC POWER COMPANY MAINTENANCE BRANCH

Co-patentee before: China Electric Power Research Institute

CP01 Change in the name or title of a patent holder