[go: up one dir, main page]

CN103702379A - Method and device for switching carriers - Google Patents

Method and device for switching carriers Download PDF

Info

Publication number
CN103702379A
CN103702379A CN201310746577.2A CN201310746577A CN103702379A CN 103702379 A CN103702379 A CN 103702379A CN 201310746577 A CN201310746577 A CN 201310746577A CN 103702379 A CN103702379 A CN 103702379A
Authority
CN
China
Prior art keywords
carrier
backup
main
main carrier
base station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310746577.2A
Other languages
Chinese (zh)
Other versions
CN103702379B (en
Inventor
杜湧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201310746577.2A priority Critical patent/CN103702379B/en
Publication of CN103702379A publication Critical patent/CN103702379A/en
Application granted granted Critical
Publication of CN103702379B publication Critical patent/CN103702379B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides a method and a device for switching carriers. The method comprises the steps of starting a main carrier and a standby carrier, wherein the frequency spectrums of the main carrier and the standby carrier are both white frequency spectrums; indicating UE (User Equipment) which is accessed to the main carrier to be switched from the main carrier to the standby carrier when broadcasting interference on the main carrier is detected. According to the method and the device, provided by the invention, by simultaneously starting the main carrier and the standby carrier, the UE which is accessed to the main carrier can be indicated to be switched from the main carrier to the standby carrier when the broadcasting interference on the main carrier is detected, the situation that the main carrier is successfully switched to an interference-free carrier when being subjected to the broadcasting interference is ensured, and the business continuity is ensured.

Description

载波切换方法及装置Carrier switching method and device

技术领域technical field

本发明涉及一种频谱切换技术,尤其涉及一种认知无线电业务的载波切换方法及装置。The present invention relates to a spectrum switching technology, in particular to a carrier switching method and device for a cognitive radio service.

背景技术Background technique

近年来,随着广电信号逐渐数字化,大量的低频段处于空闲状态,而且频段比较宽,将空闲的电视广播频段称为“白频谱领域”,对于业界稀缺的长期演进(Long Term Evolution,LTE)频谱资源来说,白频谱是一个很好的频段,而且频段容易获取,有利于大幅提升接入带宽,但是白频谱领域的频段归属权为广电系统,白频谱部署非广电的系统必须要保证广电信号不受影响。In recent years, with the gradual digitalization of radio and television signals, a large number of low-frequency bands are idle, and the frequency bands are relatively wide. The idle TV broadcasting frequency bands are called "white spectrum fields". For the scarce long-term evolution (Long Term Evolution, LTE) In terms of spectrum resources, the white spectrum is a very good frequency band, and the frequency band is easy to obtain, which is conducive to greatly improving the access bandwidth. However, the ownership of the frequency band in the white spectrum field belongs to the broadcasting system, and the deployment of the white spectrum for non-broadcasting systems must ensure that the broadcasting Signals are not affected.

白频谱的应用必须使用认知无线电技术(Cognitive Radio,CR),认知无线电技术能够在宽频带上可靠地感知频谱环境,探测合法的授权用户(主用户)的出现,能自适应地占用即时可用的本地频谱,同时在整个通信过程中当遇到广电信号干扰时,原有的白频谱频段必须采取规避手段,切换到其他可用的载波上。The application of white spectrum must use cognitive radio technology (Cognitive Radio, CR). Cognitive radio technology can reliably sense the spectrum environment on a wide frequency band, detect the emergence of legal authorized users (primary users), and can adaptively occupy real-time The available local spectrum, and at the same time, when encountering radio and television signal interference during the entire communication process, the original white spectrum frequency band must take evasive measures and switch to other available carriers.

然而,在切换过程中,由于要对可用载波进行搜索、激活和配置等过程,导致切换时间过长,时常出现用户设备(User Equipment,UE)掉线问题,使业务发生中断。However, during the handover process, due to the process of searching, activating, and configuring available carriers, the handover time is too long, and the problem of user equipment (User Equipment, UE) disconnection often occurs, causing service interruption.

发明内容Contents of the invention

本发明实施例提供一种载波切换方法及装置,解决了主载波遇到广电干扰需要切换时,切换过程中业务发生中断的问题。The embodiment of the present invention provides a carrier switching method and device, which solves the problem of service interruption during the switching process when the main carrier encounters radio and television interference and needs to be switched.

第一方面,本发明实施例提供一种载波切换方法,包括:In a first aspect, an embodiment of the present invention provides a carrier switching method, including:

启用主载波和备用载波,所述主载波的频谱和所述备用载波的频谱均为白频谱;enabling the main carrier and the backup carrier, the spectrum of the main carrier and the spectrum of the backup carrier are white spectrum;

当在所述主载波上检测到广电干扰时,指示接入到所述主载波的用户设备UE从所述主载波切换到所述备用载波。When broadcasting interference is detected on the main carrier, instruct a user equipment UE that has accessed the main carrier to switch from the main carrier to the backup carrier.

在第一方面的第一种可能的实现方式中,所述启用主载波和备用载波之前,还包括:In a first possible implementation manner of the first aspect, before enabling the main carrier and the backup carrier, further includes:

从可用的白频谱中确定所述主载波的频谱和所述备用载波的频谱;determining the spectrum of the primary carrier and the spectrum of the backup carrier from available white spectrum;

对所述主载波和备用载波进行资源配置,其中,所述主载波和所述备用载波的空口承载参数和同步信息保持一致。Resource configuration is performed on the main carrier and the backup carrier, where air interface bearer parameters and synchronization information of the main carrier and the backup carrier are consistent.

根据第一方面的第一种可能的实现方式,在第二种可能的实现方式中,所述资源配置,包括下述配置中的至少一种:According to the first possible implementation manner of the first aspect, in a second possible implementation manner, the resource configuration includes at least one of the following configurations:

空口承载参数配置、载波同步信息配置、演进的通用陆地无线接入网的无线接入承载E-RAB提前建立参数配置、资源调度预先分配参数配置。Air interface bearer parameter configuration, carrier synchronization information configuration, radio access bearer E-RAB pre-establishment parameter configuration of the evolved universal terrestrial radio access network, resource scheduling pre-allocation parameter configuration.

结合第一个方面、第一个方面的第一种至第二种可能的实现方式的任意一种,在第一个方面的第三种可能的实现方式中,所述指示接入到所述主载波的所述UE从所述主载波切换到所述备用载波,包括:With reference to the first aspect, any one of the first to second possible implementations of the first aspect, in a third possible implementation of the first aspect, the indication is accessed in the The UE of the main carrier switches from the main carrier to the backup carrier, including:

降低所述主载波的发射功率,以使所述UE在检测到所述主载波上的信噪比降低时从所述主载波切换到所述备用载波;reducing the transmit power of the primary carrier, so that the UE switches from the primary carrier to the standby carrier when detecting a decrease in signal-to-noise ratio on the primary carrier;

或者,or,

向所述UE发送载波切换指令,以使所述UE根据所述载波切换指令从所述主载波切换到所述备用载波。Sending a carrier switching instruction to the UE, so that the UE switches from the primary carrier to the standby carrier according to the carrier switching instruction.

结合第一个方面、第一个方面的第一种至第三种可能的实现方式的任意一种,在第一个方面的第四种可能的实现方式中,所述启用主载波和备用载波,包括:In combination with the first aspect, any one of the first to third possible implementations of the first aspect, in the fourth possible implementation of the first aspect, the enabling of the main carrier and the backup carrier ,include:

启用所述主载波和备用载波,且所述主载波与所述备用载波均处于工作状态;activating the main carrier and the backup carrier, and both the main carrier and the backup carrier are in a working state;

或者,or,

启用所述主载波和备用载波,且所述主载波处于工作状态,所述备用载波处于冗余状态、节能状态或待激活状态。The main carrier and the backup carrier are enabled, and the main carrier is in a working state, and the backup carrier is in a redundant state, an energy-saving state, or a state to be activated.

根据第一方面的第四种可能的实现方式,在第五种可能的实现方式中,According to the fourth possible implementation of the first aspect, in the fifth possible implementation,

所述指示所述UE从所述主载波切换到所述备用载波之前,包括:Before instructing the UE to switch from the main carrier to the standby carrier, it includes:

当所述主载波处于工作状态,所述备用载波处于冗余状态、节能状态或待激活状态时,恢复所述备用载波到工作状态。When the main carrier is in the working state and the backup carrier is in the redundant state, the energy saving state or the state to be activated, restore the backup carrier to the working state.

结合第一个方面、第一个方面的第一种至第五种可能的实现方式的任意一种,在第一个方面的第六种可能的实现方式中,,所述指示接入到所述主载波的UE从所述主载波切换到所述备用载波之后,还包括:With reference to the first aspect and any one of the first to fifth possible implementations of the first aspect, in a sixth possible implementation of the first aspect, the indication is accessed to the After the UE of the primary carrier is switched from the primary carrier to the backup carrier, it also includes:

判断所述UE是否完成载波切换;judging whether the UE has completed carrier switching;

若完成,则释放所述主载波的资源,将所述备用载波设置为新的主载波,从可用的载波资源中重新选取一载波资源作为新的备用载波,对所述新的备用载波进行资源配置并启用所述新的备用载波。If completed, then release the resources of the primary carrier, set the backup carrier as a new primary carrier, reselect a carrier resource from the available carrier resources as a new backup carrier, and perform resource processing on the new backup carrier. Configuring and enabling the new backup carrier.

第二方面,本发明实施例提供一种基站,包括:In a second aspect, an embodiment of the present invention provides a base station, including:

启用模块,用于启用主载波和备用载波,所述主载波的频谱和备用载波的频谱均为白频谱。The activation module is used to activate the main carrier and the backup carrier, the spectrum of the main carrier and the spectrum of the backup carrier are both white spectrum.

检测模块,用于对所述主载波上的信号进行检测;A detection module, configured to detect the signal on the main carrier;

指示模块,用于当检测模块在所述主载波上检测到广电干扰时,指示所述UE从所述主载波切换到所述备用载波;An instructing module, configured to instruct the UE to switch from the main carrier to the backup carrier when the detection module detects broadcast interference on the main carrier;

在第二方面的第一种可能的实现方式中,所述基站还包括:In a first possible implementation manner of the second aspect, the base station further includes:

确定模块,用于在启用模块启用主载波和备用载波之前,从可用的白频谱中确定所述主载波的频谱和所述备用载波的频谱;A determination module, configured to determine the frequency spectrum of the main carrier and the frequency spectrum of the backup carrier from available white spectrum before the activation module activates the main carrier and the backup carrier;

配置模块,用于启用模块启用主载波和备用载波之前,对所述主载波和备用载波进行资源配置,其中,所述主载波和所述备用载波的空口承载参数和同步信息保持一致。The configuration module is configured to perform resource configuration on the main carrier and the backup carrier before the enabling module activates the main carrier and the backup carrier, wherein the air interface bearer parameters and synchronization information of the main carrier and the backup carrier are consistent.

根据第二方面的第一种可能的实现方式,在第二种可能的实现方式中,所述配置模块,用于下述配置中的至少一种:According to the first possible implementation manner of the second aspect, in the second possible implementation manner, the configuration module is used for at least one of the following configurations:

空口承载参数配置、载波同步信息配置、演进的通用陆地无线接入网的无线接入承载E-RAB提前建立参数配置、资源调度预先分配参数配置。Air interface bearer parameter configuration, carrier synchronization information configuration, radio access bearer E-RAB pre-establishment parameter configuration of the evolved universal terrestrial radio access network, resource scheduling pre-allocation parameter configuration.

结合第二个方面、第二个方面的第一种至第二种可能的实现方式的任意一种,在第二个方面的第三种可能的实现方式中,所述指示模块,具体用于:降低所述主载波的发射功率,以使所述UE在检测到所述主载波上的信噪比降低时从所述主载波切换到所述备用载波;In combination with the second aspect, any one of the first to second possible implementations of the second aspect, in a third possible implementation of the second aspect, the indication module is specifically used to : reducing the transmit power of the primary carrier, so that the UE switches from the primary carrier to the standby carrier when detecting a decrease in the signal-to-noise ratio on the primary carrier;

或者,or,

向所述UE发送载波切换指令,以使所述UE根据所述载波切换指令从所述主载波切换到所述备用载波。Sending a carrier switching instruction to the UE, so that the UE switches from the primary carrier to the standby carrier according to the carrier switching instruction.

结合第二个方面、第二个方面的第一种至第三种可能的实现方式的任意一种,在第二个方面的第四种可能的实现方式中,所述启用模块,具体用于:启用所述主载波和备用载波,且所述主载波与所述备用载波均处于工作状态;In combination with the second aspect, any one of the first to third possible implementations of the second aspect, in a fourth possible implementation of the second aspect, the enabling module is specifically used to : enabling the main carrier and the backup carrier, and both the main carrier and the backup carrier are in working state;

或者,or,

启用所述主载波和备用载波,且所述主载波处于工作状态,所述备用载波处于冗余状态、节能状态或待激活状态。The main carrier and the backup carrier are enabled, and the main carrier is in a working state, and the backup carrier is in a redundant state, an energy-saving state, or a state to be activated.

根据第二方面的第四种可能的实现方式,在第五种可能的实现方式中,还包括:According to the fourth possible implementation of the second aspect, the fifth possible implementation also includes:

恢复模块,用于在所述指示模块指示所述UE从所述主载波切换到所述备用载波之前,当所述主载波处于工作状态,所述备用载波处于冗余状态或节能状态时,恢复所述备用载波到工作状态。A recovery module, configured to recover when the main carrier is in a working state and the backup carrier is in a redundant state or an energy-saving state before the instructing module instructs the UE to switch from the main carrier to the backup carrier The backup carrier is in working state.

结合第二个方面、第二个方面的第一种至第五种可能的实现方式的任意一种,在第二个方面的第六种可能的实现方式中,还包括:In combination with the second aspect, any one of the first to fifth possible implementations of the second aspect, the sixth possible implementation of the second aspect further includes:

判断模块,用于判断所述UE是否完成载波切换;A judging module, configured to judge whether the UE has completed carrier switching;

释放模块,用于在所述判断模块判断所述UE完成载波切换后,释放所述主载波的资源;A release module, configured to release resources of the primary carrier after the judging module judges that the UE completes carrier switching;

设置模块,用于在所述判断模块判断所述UE完成载波切换后,将所述备用载波设置为新的主载波;A setting module, configured to set the backup carrier as a new primary carrier after the judging module judges that the UE completes carrier switching;

所述确定模块,进一步用于在所述判断模块判断所述UE完成载波切换后,从可用的载波资源中重新选取一载波资源作为新的备用载波;The determining module is further configured to reselect a carrier resource from available carrier resources as a new backup carrier after the judging module judges that the UE completes carrier switching;

所述配置模块,进一步用于对所述新的备用载波进行资源配置;The configuration module is further configured to configure resources for the new backup carrier;

所述启用模块,进一步用于启用所述新的备用载波。The enabling module is further configured to enable the new backup carrier.

第三方面,本发明实施例提供一种基站,包括:基带处理单元和与所述基带处理单元连接的第一射频处理单元和第二射频处理单元;In a third aspect, an embodiment of the present invention provides a base station, including: a baseband processing unit and a first radio frequency processing unit and a second radio frequency processing unit connected to the baseband processing unit;

所述基带处理单元,用于在所述第一射频单元上启用主载波并使用主载波与用户设备UE进行通信,在所述第二射频单元上启用备用载波,并且,当在所述主载波上检测到广电干扰时,指示所述UE从所述主载波切换到所述备用载波。The baseband processing unit is configured to enable a main carrier on the first radio frequency unit and use the main carrier to communicate with the user equipment UE, enable a backup carrier on the second radio frequency unit, and, when on the main carrier Instructing the UE to switch from the primary carrier to the standby carrier when broadcast interference is detected on the network.

在第三方面的第一种可能的实现方式中,所述基带处理单元,具体用于:In a first possible implementation manner of the third aspect, the baseband processing unit is specifically configured to:

在第一射频单元上启用主载波和第二射频单元上启用备用载波之前,从可用的白频谱中确定主载波的频谱和备用载波的频谱;Before enabling the main carrier on the first radio frequency unit and the standby carrier on the second radio frequency unit, determine the spectrum of the main carrier and the spectrum of the backup carrier from available white spectrum;

对所述主载波和备用载波进行资源配置,其中,所述主载波和所述备用载波的空口承载参数和同步信息保持一致。Resource configuration is performed on the main carrier and the backup carrier, where air interface bearer parameters and synchronization information of the main carrier and the backup carrier are consistent.

在第三方面的第二种可能的实现方式中,所述基带处理单元对所述主载波和备用载波进行资源配置,包括配置下述中的至少一种:In a second possible implementation manner of the third aspect, the baseband processing unit performs resource configuration on the main carrier and the backup carrier, including configuring at least one of the following:

空口承载参数配置、载波同步信息配置、演进的通用陆地无线接入网的无线接入承载E-RAB提前建立参数配置、资源调度预先分配参数配置。Air interface bearer parameter configuration, carrier synchronization information configuration, radio access bearer E-RAB pre-establishment parameter configuration of the evolved universal terrestrial radio access network, resource scheduling pre-allocation parameter configuration.

结合第三个方面、第三个方面的第一种至第二种可能的实现方式的任意一种,在第三个方面的第三种可能的实现方式中,所述基带处理单元,具体用于:降低第一射频处理单元上启用的所述主载波的发射功率,以使所述UE在检测到所述主载波上的信噪比降低时从第一射频处理单元上启用的所述主载波切换到第二射频处理单元上启用的所述备用载波;In combination with the third aspect, any one of the first to second possible implementations of the third aspect, in the third possible implementation of the third aspect, the baseband processing unit specifically uses In: reducing the transmit power of the main carrier enabled on the first radio frequency processing unit, so that the UE detects that the signal-to-noise ratio on the main carrier decreases The carrier is switched to the standby carrier enabled on the second radio frequency processing unit;

或者,or,

通过所述第一射频处理单元向所述UE发送载波切换指令,以使所述UE根据所述载波切换指令从第一射频处理单元上启用的所述主载波切换到第二射频处理单元上启用的所述备用载波。Sending a carrier switching instruction to the UE by the first radio frequency processing unit, so that the UE switches from the main carrier enabled on the first radio frequency processing unit to enabled on the second radio frequency processing unit according to the carrier switching instruction of the backup carrier.

结合第三个方面、第三个方面的第一种至第三种可能的实现方式的任意一种,在第三个方面的第四种可能的实现方式中,所述主载波与所述备用载波均处于工作状态;In combination with the third aspect, any one of the first to third possible implementations of the third aspect, in a fourth possible implementation of the third aspect, the main carrier and the standby Carriers are all in working condition;

或者,or,

所述主载波处于工作状态,所述备用载波处于以下三种中的任意一种:The main carrier is in working state, and the backup carrier is in any one of the following three types:

冗余状态、节能状态和待激活状态。Redundant state, energy-saving state and to-be-activated state.

结合第三个方面的第四种可能的实现方式的任意一种,在第三个方面的第五种可能的实现方式中,所述基带处理单元,还用于:当所述主载波处于工作状态,所述备用载波处于处于冗余状态、节能状态或待激活状态时,恢复所述备用载波到工作状态。In combination with any of the fourth possible implementation manners of the third aspect, in a fifth possible implementation manner of the third aspect, the baseband processing unit is further configured to: when the main carrier is working state, when the backup carrier is in a redundant state, an energy-saving state or a state to be activated, restore the backup carrier to a working state.

结合第三个方面、第三方面的第一种至第五种可能的实现方式的任意一种,在第三个方面的第六种可能的实现方式中,所述基带处理单元,还用于:In combination with the third aspect, any one of the first to fifth possible implementation manners of the third aspect, in a sixth possible implementation manner of the third aspect, the baseband processing unit is further configured to :

判断所述UE是否完成载波切换;judging whether the UE has completed carrier switching;

若完成,则释放第一射频处理单元上启用的所述主载波的资源,将所述备用载波设置为新的主载波,从可用的载波资源中重新选取一载波资源作为新的备用载波,对所述新的备用载波进行资源配置并在第一射频处理单元上启用所述新的备用载波。If completed, then release the resources of the main carrier enabled on the first radio frequency processing unit, set the backup carrier as a new main carrier, reselect a carrier resource from the available carrier resources as a new backup carrier, and Perform resource configuration on the new standby carrier and activate the new standby carrier on the first radio frequency processing unit.

本发明实施例提供的载波切换方法及装置,该方法通过同时启用主载波和备用载波,当在用户设备UE当前使用的主载波上检测到广电干扰时,指示所述UE从所述主载波切换到所述备用载波,保证了主载波遇到广电干扰时UE顺利切换到没有干扰的载波上,使业务连续性得到保障。The carrier switching method and device provided by the embodiments of the present invention, the method enables the main carrier and the backup carrier at the same time, and when broadcasting interference is detected on the main carrier currently used by the user equipment UE, the UE is instructed to switch from the main carrier The standby carrier ensures that when the main carrier encounters radio and television interference, the UE is smoothly handed over to a carrier without interference, so that service continuity is guaranteed.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作一简单地介绍,显而易见地,下面描述中的附图是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are some embodiments of the present invention. For those skilled in the art, other drawings can also be obtained according to these drawings without any creative effort.

图1为本发明载波切换方法实施例一的流程示意图;FIG. 1 is a schematic flowchart of Embodiment 1 of a carrier switching method according to the present invention;

图2为本发明载波切换方法实施例二的交互信令流程图;FIG. 2 is a flow chart of interactive signaling in Embodiment 2 of the carrier switching method of the present invention;

图3为本发明载波切换方法实施例三的交互信令流程图;FIG. 3 is a flow chart of interactive signaling in Embodiment 3 of the carrier switching method of the present invention;

图4为本发明基站实施例一的结构示意图;FIG. 4 is a schematic structural diagram of Embodiment 1 of a base station according to the present invention;

图5为本发明基站实施例二的结构示意图;FIG. 5 is a schematic structural diagram of Embodiment 2 of the base station of the present invention;

图6为本发明基站实施例三的结构示意图。FIG. 6 is a schematic structural diagram of Embodiment 3 of a base station according to the present invention.

具体实施方式Detailed ways

为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

图1为本发明载波切换方法实施例一的流程示意图。本实施例的执行主体为配置了频谱检测引擎(Spectrum Sensor Engine,SSE)的长期演进(LongTerm Evolution,LTE)基站,该基站可以通过软件和/或硬件实现,本实施例的方案应用在基站和UE之间,使UE从当前使用的载波快速地切换到备用载波。如图1所示,本实施例的方法包括:FIG. 1 is a schematic flowchart of Embodiment 1 of a carrier switching method according to the present invention. The execution subject of this embodiment is a long-term evolution (LongTerm Evolution, LTE) base station configured with a spectrum detection engine (Spectrum Sensor Engine, SSE). The base station can be implemented by software and/or hardware. The solution of this embodiment is applied to base stations and Between UEs, the UE can quickly switch from the currently used carrier to the standby carrier. As shown in Figure 1, the method of the present embodiment includes:

步骤101、启用主载波和备用载波,所述主载波的频谱和所述备用载波的频谱均为白频谱。Step 101, enabling a main carrier and a backup carrier, where the spectrum of the main carrier and the spectrum of the backup carrier are both white spectrum.

其中,所述启用主载波和备用载波之前,还包括:从可用的白频谱中确定所述主载波的频谱和所述备用载波的频谱;对所述主载波和备用载波进行资源配置,其中,所述主载波和所述备用载波的空口承载参数和同步信息保持一致。Wherein, before enabling the main carrier and the backup carrier, it also includes: determining the spectrum of the main carrier and the spectrum of the backup carrier from the available white spectrum; performing resource configuration on the main carrier and the backup carrier, wherein, The air interface bearer parameters and synchronization information of the main carrier and the standby carrier are consistent.

其中,对所述主载波和备用载波进行资源配置,可以包括:空口承载参数配置、载波同步信息配置、演进的通用陆地无线接入网的无线接入承载E-RAB提前建立参数配置、资源调度预先分配参数配置中的至少一种配置。Wherein, the resource configuration for the main carrier and the backup carrier may include: air interface bearer parameter configuration, carrier synchronization information configuration, radio access bearer E-RAB pre-establishment parameter configuration of the Evolved Universal Terrestrial Radio Access Network, resource scheduling At least one of the parameter configurations is preassigned.

具体的,所述启用主载波和备用载波,包括:启用所述主载波和备用载波,且所述主载波与所述备用载波均处于工作状态;或者,启用所述主载波和备用载波,且所述主载波处于工作状态,所述备用载波处于冗余状态、节能状态或待激活状态。Specifically, the activating the main carrier and the standby carrier includes: enabling the main carrier and the standby carrier, and both the main carrier and the standby carrier are in a working state; or, activating the main carrier and the standby carrier, and The primary carrier is in a working state, and the backup carrier is in a redundant state, an energy-saving state, or a state to be activated.

步骤102、当在所述主载波上检测到广电干扰时,指示接入到所述主载波的用户设备UE从所述主载波切换到所述备用载波。Step 102: Instruct user equipment UE connected to the main carrier to switch from the main carrier to the backup carrier when broadcasting interference is detected on the main carrier.

其中,所述指示接入到所述主载波的UE从所述主载波切换到所述备用载波,包括:降低所述主载波的发射功率,以使所述UE在检测到所述主载波上的信噪比降低时从所述主载波切换到所述备用载波;或者,向所述UE发送载波切换指令,以使所述UE根据所述载波切换指令从所述主载波切换到所述备用载波。Wherein, the instructing the UE accessing the primary carrier to switch from the primary carrier to the standby carrier includes: reducing the transmit power of the primary carrier, so that the UE detects that the primary carrier Switch from the primary carrier to the backup carrier when the signal-to-noise ratio of the signal-to-noise ratio decreases; or, send a carrier switching instruction to the UE, so that the UE switches from the primary carrier to the backup carrier according to the carrier switching instruction carrier.

其中,所述指示接入到所述主载波的UE从所述主载波切换到所述备用载波之前,包括:当所述主载波处于工作状态,所述备用载波处于冗余状态、节能状态或待激活状态时,恢复所述备用载波到工作状态。Wherein, before instructing the UE accessing the main carrier to switch from the main carrier to the standby carrier, it includes: when the main carrier is in the working state, the standby carrier is in the redundant state, the energy saving state or When the state is to be activated, restore the backup carrier to the working state.

其中,步骤102之后还包括:判断所述UE是否完成载波切换;若完成,则释放所述主载波的资源,将所述备用载波设置为新的主载波,从可用的载波资源中重新选取一载波资源作为新的备用载波,对所述新的备用载波进行资源配置并启用所述新的备用载波。Wherein, after step 102, it also includes: judging whether the UE has completed carrier switching; if completed, releasing the resources of the primary carrier, setting the backup carrier as a new primary carrier, and reselecting a carrier from available carrier resources. The carrier resource is used as a new backup carrier, resource configuration is performed on the new backup carrier and the new backup carrier is enabled.

本实施例中,通过基站配置的SSE在主载波上检测到了8MHz频宽的信号时,即表明主载波上有广电信号干扰,此时,当所述主载波与所述备用载波均处于工作状态时,基站通过降低发射功率和/或发送切换指令来指示UE从主载波切换到备用载波上;当所述主载波处于工作状态,所述备用载波处于冗余状态或节能状态时,基站需要将处于冗余状态或节能状态的备用载波恢复到正常发射功率,使备用载波处于工作状态,对于本实施例中启用的备用载波处于待激活状态的场景,基站需要首先激活备用载波,使备用载波处于工作状态,然后指示所述UE从所述主载波切换到所述备用载波。In this embodiment, when the SSE configured by the base station detects a signal with a bandwidth of 8MHz on the main carrier, it indicates that there is radio and television signal interference on the main carrier. At this time, when the main carrier and the backup carrier are both in the working state , the base station instructs the UE to switch from the main carrier to the backup carrier by reducing the transmit power and/or sending a switching instruction; when the main carrier is in the working state and the backup carrier is in the redundant state or the energy saving The standby carrier in the redundant state or energy-saving state returns to the normal transmission power, so that the standby carrier is in the working state. For the scenario where the standby carrier activated in this embodiment is in the waiting state, the base station needs to activate the standby carrier first, so that the standby carrier is in the active state. working state, and then instruct the UE to switch from the primary carrier to the standby carrier.

本发明实施例提供的载波切换方法,该方法通过同时启用主载波和备用载波,当在用户设备UE当前使用的主载波上检测到广电干扰时,指示所述UE从所述主载波切换到所述备用载波,保证了主载波遇到广电干扰时顺利切换到没有干扰的载波上,使业务连续性得到保障。The carrier switching method provided by the embodiment of the present invention, the method enables the main carrier and the backup carrier at the same time, and when broadcasting interference is detected on the main carrier currently used by the user equipment UE, the UE is instructed to switch from the main carrier to the selected carrier. The backup carrier mentioned above ensures that the main carrier is smoothly switched to a carrier without interference when it encounters radio and television interference, so that business continuity is guaranteed.

图2为本发明载波切换方法实施例二的交互信令流程图,如图2所述,本实施例的方法是结合上述实施例对应的交互实施例。具体的方法包括:FIG. 2 is a flow chart of interactive signaling in Embodiment 2 of the carrier switching method of the present invention. As shown in FIG. 2 , the method in this embodiment is an interactive embodiment corresponding to the combination of the foregoing embodiments. Specific methods include:

步骤201、基站启用主备载波。Step 201, the base station activates the active and standby carriers.

在本实施例中,基站在启用主备载波之前,基站从可用的白频谱中首先确定所述主载波的频谱和所述备用载波的频谱,并对所述主载波和备用载波进行资源配置,其中,所述主载波和所述备用载波的空口承载参数和同步信息保持一致。具体的资源配置可以包括空口承载参数配置、载波同步信息配置、演进的通用陆地无线接入网(Evolved Universal Terrestrial Radio AccessNetwork,E-UTRAN)的无线接入承载(E-UTRAN Radio Access Bearer,E-RAB)提前建立参数配置或资源调度预先分配参数配置,其中对备用载波的提前资源配置,可以提高载波切换时的切换速度。In this embodiment, before the base station activates the active and standby carriers, the base station first determines the frequency spectrum of the main carrier and the spectrum of the standby carrier from the available white spectrum, and configures resources for the main carrier and the standby carrier, Wherein, air interface bearer parameters and synchronization information of the main carrier and the standby carrier are consistent. Specific resource configuration may include air interface bearer parameter configuration, carrier synchronization information configuration, E-UTRAN Radio Access Bearer (E-UTRAN Radio Access Bearer, E-UTRAN) Evolved Universal Terrestrial Radio Access Network (E-UTRAN) RAB) establishes parameter configuration in advance or resource scheduling pre-allocation parameter configuration, wherein the resource configuration for the backup carrier in advance can improve the switching speed during carrier switching.

在本实施例中,启用所述主载波和备用载波,且所述主载波与所述备用载波可以均处于工作状态,按照正常的发射功率工作,且主载波与备用载波处于工作状态时,主备载波上都可以接入UE;或者,启用所述主载波和备用载波,且所述主载波处于工作状态,所述主载波上接入UE,而所述备用载波处于冗余状态、节能状态或待激活状态中的任意一种,且备用载波处于冗余状态、节能状态或待激活状态时,所述备用载波上不接入UE,其中当备用载波处于冗余状态时,备用载波的发射功率可以处于正常发射功率,也可以处于低功率状态,当备用载波处于节能状态时,备用载波的发射功率低于正常发射功率,当备用载波处于待激活状态时,备用载波的发射功率为零。In this embodiment, the main carrier and the backup carrier are activated, and the main carrier and the backup carrier can both be in the working state, work according to the normal transmission power, and when the main carrier and the backup carrier are in the working state, the main carrier UEs can be accessed on both the backup carrier; or, the main carrier and the backup carrier are activated, and the main carrier is in the working state, the UE is accessed on the main carrier, and the backup carrier is in the redundant state and energy-saving state or any one of the states to be activated, and when the backup carrier is in the redundant state, energy-saving state or the state to be activated, no UE is connected to the backup carrier, wherein when the backup carrier is in the redundant state, the transmission of the backup carrier The power can be in the normal transmission power or in the low power state. When the standby carrier is in the energy-saving state, the transmission power of the standby carrier is lower than the normal transmission power. When the standby carrier is in the state to be activated, the transmission power of the standby carrier is zero.

步骤202、UE搜索载波。Step 202, the UE searches for a carrier.

在本实施例中,UE入网后,开始搜索可用的载波。In this embodiment, after the UE accesses the network, it starts to search for available carriers.

步骤203、UE向基站发送载波接入请求。Step 203, the UE sends a carrier access request to the base station.

在本实施例中,当步骤202搜索到可用的载波后,UE向基站发送载波接入请求,请求基站确定UE当前应当接入的载波。In this embodiment, after searching for an available carrier in step 202, the UE sends a carrier access request to the base station, requesting the base station to determine the carrier that the UE should currently access.

步骤204、基站向UE发送载波接入响应。Step 204, the base station sends a carrier access response to the UE.

在本实施例中,基站根据载波接入请求,向UE发送载波接入响应,载波接入响应中包括了基站确定的UE当前应当接入的载波信息,其中当基站启用的主备载波都可以接入UE时,则基站确定UE当前应当接入的载波为主载波,或者基站确定UE当前应当接入的载波为备用载波,当基站确定UE当前应当接入的载波为主载波,则载波接入响应中还包括备用载波的信息,对应的,当基站确定UE当前应当接入的载波为备用载波,则载波接入响应中还包括主载波的信息,对于接入备用载波的UE而言,UE的备用载波即为主载波;当基站启用的主备载波只有主载波可以接入UE时,则基站确定UE当前应当接入的载波只能是主载波,此时,载波接入响应除了基站确定的UR当前应当接入的载波信息、即主载波信息,还包括备用载波的信息。In this embodiment, the base station sends a carrier access response to the UE according to the carrier access request, and the carrier access response includes the carrier information that the base station should currently access to the UE. When accessing the UE, the base station determines that the carrier that the UE should currently access is the primary carrier, or the base station determines that the carrier that the UE should currently access is the backup carrier. When the base station determines that the carrier that the UE should currently access is the primary carrier, the carrier access The input response also includes the information of the backup carrier. Correspondingly, when the base station determines that the carrier that the UE should currently access is the backup carrier, the carrier access response also includes the information of the main carrier. For the UE accessing the backup carrier, The standby carrier of the UE is the primary carrier; when only the primary carrier is enabled by the base station to access the UE, the base station determines that the carrier that the UE should currently access can only be the primary carrier. At this time, the carrier access response except the base station The determined carrier information that the UR should currently access, that is, information about the main carrier, also includes information about the backup carrier.

步骤205、UE完成载波接入。In step 205, the UE completes carrier access.

在本实施例中,UE根据基站发送的载波接入响应,接入相应的载波,并将作为备用的载波的信息进行存储。在本实施例中,UE接入的载波可以为主载波,也可以为备用载波。In this embodiment, the UE accesses the corresponding carrier according to the carrier access response sent by the base station, and stores the information of the backup carrier. In this embodiment, the carrier accessed by the UE may be a main carrier or a backup carrier.

步骤206、SSE向操作维护(Operation Maintenance,OM)系统上报干扰。Step 206, the SSE reports the interference to the Operation Maintenance (OM) system.

在本实施例中,SSE检测到主载波上有广电信号干扰时,向操作维护(Operation Maintenance,OM)系统上报干扰。In this embodiment, when the SSE detects radio and television signal interference on the main carrier, it reports the interference to an operation and maintenance (Operation Maintenance, OM) system.

步骤207、OM系统根据信号干扰消息,向基站发送切换指令。Step 207, the OM system sends a switching instruction to the base station according to the signal interference message.

步骤208、基站接收切换指令,降低主载波发射功率。Step 208, the base station receives the switching instruction, and reduces the transmit power of the main carrier.

在本实施例中,基站根据接收的切换指令,当启用的主备载波都处于工作状态,即主备载波上都接入UE,此时,基站降低主载波发射功率,用于指示接入主载波的UE开始切换;当基站启用主备用载波,且所述主载波处于工作状态,主载波上接入UE,而备用载波处于冗余状态、节能状态或待激活状态,且备用载波上不接入UE,此时,对于处于低功率冗余状态以及节能状体的备用载波,基站恢复备用载波到工作状态,即处于正常发射功率,可以接入UE,对于处于待激活状态的备用载波,基站对待激活载波进行激活,恢复备用载波到工作状态,然后基站降低主载波发射功率,指示接入主载波的UE开始切换操作。In this embodiment, according to the received handover instruction, when the enabled active and standby carriers are both in the working state, that is, both the active and standby carriers are connected to the UE, at this time, the base station reduces the transmit power of the main carrier to indicate access to the main carrier. The UE of the carrier starts to switch; when the base station activates the main carrier and the main carrier is in the working state, the UE is connected to the main carrier, and the backup carrier is in the redundant state, energy-saving state or to-be-activated state, and the backup carrier is not connected At this time, for the standby carrier in the low power redundancy state and energy-saving state, the base station restores the standby carrier to the working state, that is, it is in the normal transmission power, and can access the UE. For the standby carrier in the state to be activated, the base station Activate the carrier to be activated, restore the standby carrier to the working state, then the base station reduces the transmit power of the main carrier, and instructs the UE accessing the main carrier to start the handover operation.

步骤209、UE检测信号与干扰噪声比(Signal to Interference plus NoiseRatio,SINR)降低,搜索备用载波。Step 209, the UE detects that the Signal to Interference plus Noise Ratio (SINR) decreases, and searches for a backup carrier.

在本实施例中,接入主载波的UE检测到主载波上SINR降低,当主载波上的SINR小于预设的SINR门限值时,UE根据步骤205中保存的备用的载波信息搜索备用载波,并执行步骤2010,在本实施例中,预设的SINR门限值是根据UE首先向基站上报SINR,基站根据UE上报的SINR值确定一预设的SINR门限值,并将预设的SINR门限值发送给UE,当UE检测到当前的SINR小于预设的SINR门限值时,一方面开始搜索备用载波,另一方面开始向基站发送切换请求。In this embodiment, the UE accessing the main carrier detects that the SINR on the main carrier has decreased, and when the SINR on the main carrier is less than the preset SINR threshold value, the UE searches for the backup carrier according to the backup carrier information saved in step 205, And execute step 2010, in this embodiment, the preset SINR threshold value is based on the UE reporting the SINR first to the base station, the base station determines a preset SINR threshold value according to the SINR value reported by the UE, and uses the preset SINR threshold value The threshold value is sent to the UE. When the UE detects that the current SINR is lower than the preset SINR threshold value, it starts to search for the backup carrier on the one hand, and sends a handover request to the base station on the other hand.

步骤2010、UE向基站发送切换请求。Step 2010, the UE sends a handover request to the base station.

步骤2011、基站向UE发送切换请求响应。Step 2011, the base station sends a handover request response to the UE.

在本实施例中,基站根据切换请求,向UE发送允许切换的响应。In this embodiment, the base station sends a response allowing the handover to the UE according to the handover request.

步骤2012、UE从主载波切换到备用载波。Step 2012, the UE switches from the main carrier to the backup carrier.

在本实施例中,UE根据切换请求响应,从主载波切换到备用载波。In this embodiment, the UE switches from the primary carrier to the backup carrier according to the switching request response.

步骤2013、UE向基站发送切换完成消息。Step 2013, the UE sends a handover completion message to the base station.

步骤2014、基站释放主载波资源,将备用载波作为新的主载波。Step 2014, the base station releases the resources of the primary carrier, and uses the standby carrier as a new primary carrier.

本实施例中,基站接收到UE发送的切换完成消息时,基站便能获知到UE切换到了备用载波,此时,基站释放主载波资源,然后关闭主载波,将备用载波设置为新的主载波。In this embodiment, when the base station receives the handover completion message sent by the UE, the base station can know that the UE has switched to the standby carrier. At this time, the base station releases the resources of the primary carrier, then closes the primary carrier, and sets the secondary carrier as the new primary carrier. .

步骤2015、基站向OM系统发送切换完成的消息。Step 2015, the base station sends a handover completion message to the OM system.

在本实施例中,基站释放主载波资源后,向OM系统发送切换完成消息。In this embodiment, after the base station releases the main carrier resource, it sends a handover completion message to the OM system.

步骤2016、基站配置新的备用载波,并启用新的备用载波。Step 2016, the base station configures a new backup carrier, and activates the new backup carrier.

在本实施例中,基站完成载波切换之后,从可用的载波资源中重新选取一载波作为新的备用载波,并对新的备用载波进行配置,配置完成后,启用新的备用载波,新的备用载波可以处于工作状态、冗余状态、节能状态或待激活状态。In this embodiment, after the base station completes carrier switching, a carrier is reselected from the available carrier resources as a new backup carrier, and the new backup carrier is configured. After the configuration is completed, the new backup carrier is enabled, and the new backup carrier The carrier can be in working state, redundant state, energy-saving state or to-be-activated state.

本实施例中,当UE检测到主载波上信噪比SNR降低时,UE就会搜索基站启用的备用载波,其中备用载波是基站在启用主载波的同时被启用的,启用的备用载波处于工作状态、冗余状态或节能状态,备用载波的相关参数事先都已进行了配置,当UE搜索到备用载波时,可以快速地进行切换,很好地解决了现有技术中,由于主载波遇到广电干扰时,UE切换时间超过了系统切换保护间隔时间,从而引起UE掉线而业务不连续的问题。In this embodiment, when the UE detects that the signal-to-noise ratio (SNR) on the main carrier decreases, the UE will search for the backup carrier enabled by the base station, where the backup carrier is activated by the base station while the main carrier is enabled, and the activated backup carrier is in working mode. state, redundant state or energy-saving state, the relevant parameters of the backup carrier have been configured in advance, and when the UE searches for the backup carrier, it can quickly switch over, which solves the problem in the prior art that the main carrier encounters When radio and television interfere, the UE handover time exceeds the system handover guard interval time, which causes the problem of UE disconnection and service discontinuity.

图3为本发明载波切换方法实施例三的交互信令流程图,如图3所述,具体的方法包括:FIG. 3 is a flow chart of interactive signaling in Embodiment 3 of the carrier switching method of the present invention. As shown in FIG. 3 , the specific methods include:

步骤301~307:与上述实施例二的步骤201至207相同,请参照实施例二的步骤201至207的具体描述。Steps 301 to 307: are the same as steps 201 to 207 of the second embodiment above, please refer to the specific description of steps 201 to 207 of the second embodiment.

步骤308、基站启动载波切换。Step 308, the base station starts carrier switching.

在本实施例中,基站接收切换指令,启动载波切换,将处于低功率冗余状态以及节能状态的备用载波,基站恢复备用载波到工作状态,即处于正常发射功率,可以接入UE,对于处于待激活状态的备用载波,基站激活待激活载波,恢复备用载波到工作状态。对于处于工作状态的备用载波,基站接收到切换指令时,可以直接执行步骤309。In this embodiment, the base station receives the switching instruction, starts the carrier switching, and restores the standby carrier to the working state, that is, it is in the normal transmission power, and can access the UE for the standby carrier in the low-power redundancy state and the energy-saving state. For the standby carrier in the state of activation, the base station activates the carrier to be activated, and restores the standby carrier to the working state. For the standby carrier in the working state, when the base station receives the handover instruction, step 309 may be directly performed.

步骤309、基站向UE发送切换指令;Step 309, the base station sends a switching instruction to the UE;

在本实施例中,基站向UE发送切换指令,该切换指令中包括切换的备用载波频点信息。In this embodiment, the base station sends a handover instruction to the UE, and the handover instruction includes the frequency point information of the standby carrier to be handed over.

步骤3010、UE从主载波切换到备用载波;Step 3010, the UE switches from the main carrier to the standby carrier;

在本实施例中,UE根据切换指令,从主载波切换到备用载波。In this embodiment, the UE switches from the primary carrier to the standby carrier according to the switching instruction.

步骤3011、步骤3012、步骤3013和步骤3014与实施例二的步骤2013、步骤2014、步骤2015和步骤2016相同,可以参照实施例二,本实施例不再论述。Step 3011, step 3012, step 3013, and step 3014 are the same as step 2013, step 2014, step 2015, and step 2016 of the second embodiment, and reference may be made to the second embodiment, which will not be discussed again in this embodiment.

本实施例中,当UE接收到切换指令时,UE根据切换指令进行切换,其中备用载波是基站在启用主载波的同时被启用的,启用的备用载波处于工作状态、冗余状态或节能状态,备用载波的相关参数事先都已进行了配置,可以快速地进行切换,很好地解决了现有技术中,由于主载波遇到广电干扰时,UE切换时间超过了系统切换保护间隔时间,从而引起UE掉线而业务不连续的问题。In this embodiment, when the UE receives the handover instruction, the UE performs handover according to the handover instruction, wherein the backup carrier is activated by the base station while the main carrier is activated, and the activated backup carrier is in a working state, a redundant state, or an energy-saving state. The relevant parameters of the standby carrier have been configured in advance, which can be switched quickly, which solves the problem that in the prior art, when the main carrier encounters radio and television interference, the UE switching time exceeds the system switching guard interval, which causes The problem of service discontinuity due to UE disconnection.

图4为本发明基站实施例一的结构示意图。如图4所示,本实施例提供的基站40包括:启用模块401、检测模块402和指示模块403。FIG. 4 is a schematic structural diagram of Embodiment 1 of a base station according to the present invention. As shown in FIG. 4 , the base station 40 provided in this embodiment includes: an enabling module 401 , a detecting module 402 and an indicating module 403 .

其中,启用模块401,用于启用主载波和备用载波,所述主载波的频谱和所述备用载波的频谱均为白频谱。Wherein, the enabling module 401 is configured to activate a main carrier and a backup carrier, and the spectrum of the main carrier and the spectrum of the backup carrier are both white spectrum.

检测模块402,用于对用户设备UE当前使用的主载波上的信号进行检测;A detection module 402, configured to detect a signal on the main carrier currently used by the user equipment UE;

指示模块403,用于当检测模块402在所述主载波上检测到广电干扰时,指示接入到所述主载波的UE从所述主载波切换到所述备用载波。The instructing module 403 is configured to instruct a UE connected to the main carrier to switch from the main carrier to the backup carrier when the detection module 402 detects broadcast interference on the main carrier.

本实施例提供的基站,可以用于执行图1所示的方法实施例一的技术方案,其实现原理和技术效果类似,此处不再赘述。The base station provided in this embodiment can be used to implement the technical solution of the first method embodiment shown in FIG. 1 , and its implementation principle and technical effect are similar, and will not be repeated here.

图5为本发明基站实施例二的结构示意图。本实施例提供的基站40在图4实施例的基础上,还包括:FIG. 5 is a schematic structural diagram of Embodiment 2 of the base station of the present invention. The base station 40 provided in this embodiment further includes:

确定模块404,用于启用模块启用主载波和备用载波之前,从可用的白频谱中确定主载波的频谱和备用载波的频谱;The determination module 404 is used to determine the spectrum of the main carrier and the spectrum of the backup carrier from the available white spectrum before the activation module enables the main carrier and the backup carrier;

配置模块405,用于启用模块启用主载波和备用载波之前,对所述主载波和备用载波进行资源配置,其中,所述主载波和所述备用载波的空口承载参数和同步信息保持一致。The configuration module 405 is configured to perform resource configuration on the main carrier and the backup carrier before the enabling module activates the main carrier and the backup carrier, wherein the air interface bearer parameters and synchronization information of the main carrier and the backup carrier are consistent.

配置模块405具体用于下述配置的至少一种:空口承载参数配置、载波同步信息配置、无线接入承载E-RAB提前建立参数配置、资源调度预先分配参数配置。The configuration module 405 is specifically used for at least one of the following configurations: air interface bearer parameter configuration, carrier synchronization information configuration, radio access bearer E-RAB pre-establishment parameter configuration, resource scheduling pre-allocation parameter configuration.

可选地,指示模块403具体用于:降低所述主载波的发射功率,以使所述UE在检测到所述主载波上的信噪比降低时从所述主载波切换到所述备用载波;Optionally, the instructing module 403 is specifically configured to: reduce the transmit power of the primary carrier, so that the UE switches from the primary carrier to the standby carrier when detecting a decrease in the signal-to-noise ratio on the primary carrier ;

或者,or,

向所述UE发送载波切换指令,以使所述UE根据所述载波切换指令从所述主载波切换到所述备用载波。Sending a carrier switching instruction to the UE, so that the UE switches from the primary carrier to the standby carrier according to the carrier switching instruction.

可选地,启用模块401具体用于:启用所述主载波和备用载波,且所述主载波与所述备用载波均处于工作状态;Optionally, the activation module 401 is specifically configured to: activate the main carrier and the backup carrier, and both the main carrier and the backup carrier are in a working state;

或者,or,

启用所述主载波和备用载波,且所述主载波处于工作状态,所述备用载波以下三种中的任意一种:The primary carrier and backup carrier are activated, and the primary carrier is in working state, and the backup carrier is any one of the following three types:

冗余状态、节能状态和待激活状态。Redundant state, energy-saving state and to-be-activated state.

可选地,基站40还包括:Optionally, the base station 40 also includes:

恢复模块,用于在所述指示模块指示接入到所述主载波的UE从所述主载波切换到所述备用载波之前,当所述主载波处于工作状态,所述备用载波处于冗余状态、节能状态或待激活状态时,恢复所述备用载波到工作状态。A recovery module, configured to switch from the main carrier to the backup carrier when the main carrier is in the working state and the backup carrier is in the redundant state before the indication module instructs the UE connected to the main carrier to switch from the main carrier to the backup carrier , the energy-saving state or the state to be activated, restore the standby carrier to the working state.

可选地,基站40还包括:Optionally, the base station 40 also includes:

判断模块407,用于判断所述UE是否完成载波切换。A judging module 407, configured to judge whether the UE completes carrier switching.

释放模块408,用于在所述判断模块判断所述UE完成载波切换后,释放所述主载波的资源。The releasing module 408 is configured to release the resources of the primary carrier after the judging module judges that the UE completes carrier switching.

设置模409,用于在所述判断模块判断所述UE完成载波切换后,将所述备用载波设置为新的主载波。The setting module 409 is configured to set the backup carrier as a new primary carrier after the judging module judges that the UE completes carrier switching.

进一步地,所述确定模块404,还用于从可用的载波资源中重新选取一载波资源作为新的备用载波。Further, the determining module 404 is further configured to reselect a carrier resource from available carrier resources as a new backup carrier.

所述配置模块405还用于对所述新的备用载波进行资源配置。The configuration module 405 is also configured to configure resources for the new backup carrier.

所述启用模块401还用于启用所述新的备用载波。The enabling module 401 is also used for enabling the new backup carrier.

本实施例提供的基站,可以用于执行图1所示的方法实施例一的技术方案,其实现原理和技术效果类似,此处不再赘述。The base station provided in this embodiment can be used to implement the technical solution of the first method embodiment shown in FIG. 1 , and its implementation principle and technical effect are similar, and will not be repeated here.

图6为本发明基站实施例三的结构示意图。本实施例提供的基站50包括:FIG. 6 is a schematic structural diagram of Embodiment 3 of a base station according to the present invention. The base station 50 provided in this embodiment includes:

基带处理单元501和与基带处理单元501连接的第一射频处理单元502和第二射频处理单元503。A baseband processing unit 501 and a first radio frequency processing unit 502 and a second radio frequency processing unit 503 connected to the baseband processing unit 501 .

其中,基带处理单元501,用于在所述第一射频单元502上启用主载波并使用主载波与用户设备UE进行通信,在第二射频单元上503启用备用载波,并且,当在所述主载波上检测到广电干扰时,指示接入到所述主载波的UE从所述主载波切换到所述备用载波。Wherein, the baseband processing unit 501 is configured to enable a main carrier on the first radio frequency unit 502 and use the main carrier to communicate with the user equipment UE, enable a backup carrier 503 on the second radio frequency unit, and, when the main carrier is used on the main When radio and television interference is detected on the carrier, instruct the UE connected to the main carrier to switch from the main carrier to the backup carrier.

本实施例提供的基站,可以用于执行图1所示的方法实施例一的技术方案,其实现原理和技术效果类似,此处不再赘述。The base station provided in this embodiment can be used to implement the technical solution of the first method embodiment shown in FIG. 1 , and its implementation principle and technical effect are similar, and will not be repeated here.

在上述实施例的基础上,可选地,所述基带处理单元501,具体用于:On the basis of the foregoing embodiments, optionally, the baseband processing unit 501 is specifically configured to:

在第一射频单元502上启用主载波和第二射频单元503上启用备用载波之前,从可用的白频谱中确定主载波的频谱和备用载波的频谱,所述主载波与所述备用载波均处于工作状态;Before enabling the main carrier on the first radio frequency unit 502 and the standby carrier on the second radio frequency unit 503, determine the spectrum of the main carrier and the spectrum of the backup carrier from the available white spectrum, the main carrier and the backup carrier are both in working status;

或者,or,

所述主载波处于工作状态,所述备用载波处于冗余状态或节能状态。The primary carrier is in a working state, and the standby carrier is in a redundant state or an energy-saving state.

所述基带处理单元501对所述主载波和备用载波进行资源配置,其中,所述主载波和所述备用载波的空口承载参数和同步信息保持一致。所述基带处理单元对所述主载波和备用载波进行资源配置,包括配置下述中的至少一种:The baseband processing unit 501 performs resource configuration on the main carrier and the standby carrier, where air interface bearer parameters and synchronization information of the main carrier and the standby carrier are consistent. The baseband processing unit performs resource configuration on the main carrier and the backup carrier, including configuring at least one of the following:

空口承载参数配置、载波同步信息配置、无线接入承载E-RAB提前建立参数配置、资源调度预先分配参数配置。Air interface bearer parameter configuration, carrier synchronization information configuration, wireless access bearer E-RAB pre-establishment parameter configuration, resource scheduling pre-allocation parameter configuration.

可选地,所述基带处理单元501,具体用于:降低第一射频处理单元上启用的所述主载波的发射功率,以使所述UE在检测到所述主载波上的信噪比降低时从第一射频处理单元上启用的所述主载波切换到第二射频处理单元上启用的所述备用载波;Optionally, the baseband processing unit 501 is specifically configured to: reduce the transmit power of the main carrier enabled on the first radio frequency processing unit, so that the UE detects that the signal-to-noise ratio on the main carrier is reduced switch from the main carrier enabled on the first radio frequency processing unit to the backup carrier enabled on the second radio frequency processing unit;

或者,or,

通过所述第一射频处理单元向所述UE发送载波切换指令,以使所述UE根据所述载波切换指令从第一射频处理单元上启用的所述主载波切换到第二射频处理单元上启用的所述备用载波。Sending a carrier switching instruction to the UE by the first radio frequency processing unit, so that the UE switches from the main carrier enabled on the first radio frequency processing unit to enabled on the second radio frequency processing unit according to the carrier switching instruction of the backup carrier.

可选地,所述主载波与所述备用载波均处于工作状态;Optionally, both the main carrier and the backup carrier are in working state;

或者,or,

所述主载波处于工作状态,所述备用载波处于以下三种中的任意一种:The main carrier is in working state, and the backup carrier is in any one of the following three types:

冗余状态、节能状态和待激活状态。Redundant state, energy-saving state and to-be-activated state.

可选地,所述基带处理单元501,具体用于:当所述主载波处于工作状态,所述备用载波处于冗余状态、节能状态或待激活状态时,恢复所述备用载波到工作状态。Optionally, the baseband processing unit 501 is specifically configured to restore the standby carrier to the working state when the main carrier is in the working state and the standby carrier is in the redundant state, energy-saving state, or to-be-activated state.

可选地,所述基带处理单元501,具体用于:判断所述UE是否完成载波切换;Optionally, the baseband processing unit 501 is specifically configured to: determine whether the UE completes carrier switching;

若完成,则释放第一射频处理单元上启用的所述主载波的资源,将所述备用载波设置为新的主载波;If completed, release the resources of the main carrier enabled on the first radio frequency processing unit, and set the backup carrier as a new main carrier;

从可用的载波资源中重新选取一载波资源作为新的备用载波,对所述新的备用载波进行资源配置并在第一射频处理单元上启用所述新的备用载波。Reselecting a carrier resource from available carrier resources as a new backup carrier, performing resource configuration on the new backup carrier, and enabling the new backup carrier on the first radio frequency processing unit.

在本实施例中,所述基站50还包括:In this embodiment, the base station 50 further includes:

数据收发单元500和天线504,其中数据收发单元用于将UE数据与LTE系统的网络侧进行交互,天线504用于发送和接收主备载波上的数据。The data transceiving unit 500 and the antenna 504, wherein the data transceiving unit is used for interacting UE data with the network side of the LTE system, and the antenna 504 is used for sending and receiving data on the active and standby carriers.

本实施例提供的基站,可以用于执行图1所示的方法实施例一的技术方案,其实现原理和技术效果类似,此处不再赘述。The base station provided in this embodiment can be used to implement the technical solution of the first method embodiment shown in FIG. 1 , and its implementation principle and technical effect are similar, and will not be repeated here.

本领域普通技术人员可以理解:实现上述各方法实施例的全部或部分步骤可以通过程序指令相关的硬件来完成。前述的程序可以存储于一计算机可读取存储介质中。该程序在执行时,执行包括上述各方法实施例的步骤;而前述的存储介质包括:ROM、RAM、磁碟或者光盘等各种可以存储程序代码的介质。Those of ordinary skill in the art can understand that all or part of the steps for implementing the above method embodiments can be completed by program instructions and related hardware. The aforementioned program can be stored in a computer-readable storage medium. When the program is executed, it executes the steps including the above-mentioned method embodiments; and the aforementioned storage medium includes: ROM, RAM, magnetic disk or optical disk and other various media that can store program codes.

最后应说明的是:以上各实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述各实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的范围。Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present invention, rather than limiting them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: It is still possible to modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements for some or all of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the technical solutions of the various embodiments of the present invention. scope.

Claims (21)

1.一种载波切换方法,其特征在于,包括:1. A carrier switching method, characterized in that, comprising: 启用主载波和备用载波,所述主载波的频谱和所述备用载波的频谱均为白频谱;enabling the main carrier and the backup carrier, the spectrum of the main carrier and the spectrum of the backup carrier are white spectrum; 当在所述主载波上检测到广电干扰时,指示接入到所述主载波的用户设备UE从所述主载波切换到所述备用载波。When broadcasting interference is detected on the main carrier, instruct a user equipment UE that has accessed the main carrier to switch from the main carrier to the backup carrier. 2.根据权利要求1所述的方法,其特征在于,所述启用主载波和备用载波之前,还包括:2. The method according to claim 1, further comprising: before enabling the main carrier and the backup carrier: 从可用的白频谱中确定所述主载波的频谱和所述备用载波的频谱;determining the spectrum of the primary carrier and the spectrum of the backup carrier from available white spectrum; 对所述主载波和备用载波进行资源配置,其中,所述主载波和所述备用载波的空口承载参数和同步信息保持一致。Resource configuration is performed on the main carrier and the backup carrier, where air interface bearer parameters and synchronization information of the main carrier and the backup carrier are consistent. 3.根据权利要求2所述的方法,其特征在于,所述资源配置,包括下述配置中的至少一种:3. The method according to claim 2, wherein the resource configuration includes at least one of the following configurations: 空口承载参数配置、载波同步信息配置、演进的通用陆地无线接入网的无线接入承载E-RAB提前建立参数配置、资源调度预先分配参数配置。Air interface bearer parameter configuration, carrier synchronization information configuration, radio access bearer E-RAB pre-establishment parameter configuration of the evolved universal terrestrial radio access network, resource scheduling pre-allocation parameter configuration. 4.根据权利要求1~3中任一项所述的方法,其特征在于,所述指示接入到所述主载波的UE从所述主载波切换到所述备用载波,包括:4. The method according to any one of claims 1-3, wherein the instructing the UE accessing the primary carrier to switch from the primary carrier to the standby carrier comprises: 降低所述主载波的发射功率,以使所述UE在检测到所述主载波上的信噪比降低时从所述主载波切换到所述备用载波;reducing the transmit power of the primary carrier, so that the UE switches from the primary carrier to the standby carrier when detecting a decrease in signal-to-noise ratio on the primary carrier; 或者,or, 向所述UE发送载波切换指令,以使所述UE根据所述载波切换指令从所述主载波切换到所述备用载波。Sending a carrier switching instruction to the UE, so that the UE switches from the primary carrier to the standby carrier according to the carrier switching instruction. 5.根据权利要求1~4中任一项所述的方法,其特征在于,所述启用主载波和备用载波,包括:5. The method according to any one of claims 1-4, wherein the enabling of the main carrier and the backup carrier includes: 启用所述主载波和备用载波,且所述主载波与所述备用载波均处于工作状态;activating the main carrier and the backup carrier, and both the main carrier and the backup carrier are in a working state; 或者,or, 启用所述主载波和备用载波,且所述主载波处于工作状态,所述备用载波处于冗余状态、节能状态或待激活状态。The main carrier and the backup carrier are enabled, and the main carrier is in a working state, and the backup carrier is in a redundant state, an energy-saving state, or a state to be activated. 6.根据权利要求5所述的方法,其特征在于,所述指示接入到所述主载波的UE从所述主载波切换到所述备用载波之前,包括:6. The method according to claim 5, wherein before instructing the UE accessing the main carrier to switch from the main carrier to the standby carrier, the step comprises: 当所述主载波处于工作状态,所述备用载波处于冗余状态、节能状态或待激活状态时,恢复所述备用载波到工作状态。When the main carrier is in the working state and the backup carrier is in the redundant state, the energy saving state or the state to be activated, restore the backup carrier to the working state. 7.根据权利要求1~6中任一项所述的方法,其特征在于,所述指示接入到所述主载波的UE从所述主载波切换到所述备用载波之后,还包括:7. The method according to any one of claims 1-6, characterized in that, after the UE that instructs to access the main carrier switches from the main carrier to the standby carrier, further comprising: 判断所述UE是否完成载波切换;judging whether the UE has completed carrier switching; 若完成,则释放所述主载波的资源,将所述备用载波设置为新的主载波,从可用的载波资源中重新选取一载波资源作为新的备用载波,对所述新的备用载波进行资源配置并启用所述新的备用载波。If completed, then release the resources of the primary carrier, set the backup carrier as a new primary carrier, reselect a carrier resource from the available carrier resources as a new backup carrier, and perform resource processing on the new backup carrier. Configuring and enabling the new backup carrier. 8.一种基站,其特征在于,包括:8. A base station, characterized in that, comprising: 启用模块,用于启用主载波和备用载波,所述主载波的频谱和所述备用载波的频谱均为白频谱。The activation module is used to activate the main carrier and the backup carrier, the spectrum of the main carrier and the spectrum of the backup carrier are both white spectrum. 检测模块,用于对所述主载波上的信号进行检测;A detection module, configured to detect the signal on the main carrier; 指示模块,用于当检测模块在所述主载波上检测到广电干扰时,指示接入到所述主载波的UE从所述主载波切换到所述备用载波。An instructing module, configured to instruct a UE connected to the main carrier to switch from the main carrier to the backup carrier when the detection module detects broadcast interference on the main carrier. 9.根据权利要求8所述的基站,其特征在于,所述基站还包括:9. The base station according to claim 8, wherein the base station further comprises: 确定模块,用于在启用模块启用主载波和备用载波之前,从可用的白频谱中确定所述主载波的频谱和所述备用载波的频谱;A determination module, configured to determine the frequency spectrum of the main carrier and the frequency spectrum of the backup carrier from available white spectrum before the activation module activates the main carrier and the backup carrier; 配置模块,用于启用模块启用主载波和备用载波之前,对所述主载波和备用载波进行资源配置,其中,所述主载波和所述备用载波的空口承载参数和同步信息保持一致。The configuration module is configured to perform resource configuration on the main carrier and the backup carrier before the enabling module activates the main carrier and the backup carrier, wherein the air interface bearer parameters and synchronization information of the main carrier and the backup carrier are consistent. 10.根据权利要求9所述的基站,其特征在于,所述配置模块,用于下述配置中的至少一种:10. The base station according to claim 9, wherein the configuration module is used for at least one of the following configurations: 空口承载参数配置、载波同步信息配置、演进的通用陆地无线接入网的无线接入承载E-RAB提前建立参数配置、资源调度预先分配参数配置。Air interface bearer parameter configuration, carrier synchronization information configuration, radio access bearer E-RAB pre-establishment parameter configuration of the evolved universal terrestrial radio access network, resource scheduling pre-allocation parameter configuration. 11.根据权利要求8-10所述的基站,其特征在于,所述指示模块,具体用于:降低所述主载波的发射功率,以使所述UE在检测到所述主载波上的信噪比降低时从所述主载波切换到所述备用载波;11. The base station according to claims 8-10, wherein the indication module is specifically configured to: reduce the transmit power of the main carrier, so that the UE detects the signal on the main carrier switching from the main carrier to the backup carrier when the noise ratio is reduced; 或者,or, 向所述UE发送载波切换指令,以使所述UE根据所述载波切换指令从所述主载波切换到所述备用载波。Sending a carrier switching instruction to the UE, so that the UE switches from the primary carrier to the standby carrier according to the carrier switching instruction. 12.根据权利要求8-11所述的基站,其特征在于,所述启用模块,具体用于:启用所述主载波和备用载波,且所述主载波与所述备用载波均处于工作状态;12. The base station according to claims 8-11, wherein the activation module is specifically configured to: activate the main carrier and the backup carrier, and both the main carrier and the backup carrier are in a working state; 或者,or, 启用所述主载波和备用载波,且所述主载波处于工作状态,所述备用载波处于冗余状态、节能状态或待激活状态。The main carrier and the backup carrier are enabled, and the main carrier is in a working state, and the backup carrier is in a redundant state, an energy-saving state, or a state to be activated. 13.根据权利要求12所述的基站,其特征在于,还包括:13. The base station according to claim 12, further comprising: 恢复模块,用于在所述指示模块指示接入到所述主载波的UE从所述主载波切换到所述备用载波之前,当所述主载波处于工作状态,所述备用载波处于冗余状态、节能状态或待激活状态时,恢复所述备用载波到工作状态。A recovery module, configured to switch from the main carrier to the backup carrier when the main carrier is in the working state and the backup carrier is in the redundant state before the indication module instructs the UE connected to the main carrier to switch , the energy-saving state or the state to be activated, restore the standby carrier to the working state. 14.根据权利要求8-13所述的基站,其特征在于,所述基站还包括:14. The base station according to claims 8-13, further comprising: 判断模块,用于判断所述UE是否完成载波切换;A judging module, configured to judge whether the UE has completed carrier switching; 释放模块,用于在所述判断模块判断所述UE完成载波切换后,释放所述主载波的资源;A release module, configured to release resources of the primary carrier after the judging module judges that the UE completes carrier switching; 设置模块,用于在所述判断模块判断所述UE完成载波切换后,将所述备用载波设置为新的主载波;A setting module, configured to set the backup carrier as a new primary carrier after the judging module judges that the UE completes carrier switching; 所述确定模块,进一步用于在所述判断模块判断所述UE完成载波切换后,从可用的载波资源中重新选取一载波资源作为新的备用载波;The determining module is further configured to reselect a carrier resource from available carrier resources as a new backup carrier after the judging module judges that the UE completes carrier switching; 所述配置模块,进一步用于对所述新的备用载波进行资源配置;The configuration module is further configured to configure resources for the new backup carrier; 所述启用模块,进一步用于启用所述新的备用载波。The enabling module is further configured to enable the new backup carrier. 15.一种基站,其特征在于,包括:基带处理单元和与所述基带处理单元连接的第一射频处理单元和第二射频处理单元;15. A base station, comprising: a baseband processing unit and a first radio frequency processing unit and a second radio frequency processing unit connected to the baseband processing unit; 所述基带处理单元,用于在所述第一射频单元上启用主载波并使用主载波与用户设备UE进行通信,在所述第二射频单元上启用备用载波,并且,当在所述主载波上检测到广电干扰时,指示接入到所述主载波的UE从所述主载波切换到所述备用载波。The baseband processing unit is configured to enable a main carrier on the first radio frequency unit and use the main carrier to communicate with the user equipment UE, enable a backup carrier on the second radio frequency unit, and, when on the main carrier When radio and television interference is detected on the Internet, the UE that has accessed the main carrier is instructed to switch from the main carrier to the backup carrier. 16.根据权利要求15所述的基站,其特征在于,所述基带处理单元,具体用于:16. The base station according to claim 15, wherein the baseband processing unit is specifically used for: 在第一射频单元上启用主载波和第二射频单元上启用备用载波之前,从可用的白频谱中确定主载波的频谱和备用载波的频谱;Before enabling the main carrier on the first radio frequency unit and the standby carrier on the second radio frequency unit, determine the spectrum of the main carrier and the spectrum of the backup carrier from available white spectrum; 对所述主载波和备用载波进行资源配置,其中,所述主载波和所述备用载波的空口承载参数和同步信息保持一致。Resource configuration is performed on the main carrier and the backup carrier, where air interface bearer parameters and synchronization information of the main carrier and the backup carrier are consistent. 17.根据权利要求15所述的基站,其特征在于,所述基带处理单元对所述主载波和备用载波进行资源配置,包括配置下述中的至少一种:17. The base station according to claim 15, wherein the baseband processing unit configures resources for the primary carrier and the backup carrier, including configuring at least one of the following: 空口承载参数配置、载波同步信息配置、演进的通用陆地无线接入网的无线接入承载E-RAB提前建立参数配置、资源调度预先分配参数配置。Air interface bearer parameter configuration, carrier synchronization information configuration, E-RAB wireless access bearer E-RAB pre-establishment parameter configuration, resource scheduling pre-allocation parameter configuration. 18.根据权利要求15-17任一所述的基站,其特征在于,所述基带处理单元,具体用于:降低第一射频处理单元上启用的所述主载波的发射功率,以使所述UE在检测到所述主载波上的信噪比降低时从第一射频处理单元上启用的所述主载波切换到第二射频处理单元上启用的所述备用载波;18. The base station according to any one of claims 15-17, wherein the baseband processing unit is specifically configured to: reduce the transmit power of the main carrier enabled on the first radio frequency processing unit, so that the The UE switches from the main carrier enabled on the first radio frequency processing unit to the backup carrier enabled on the second radio frequency processing unit when detecting that the signal-to-noise ratio on the main carrier decreases; 或者,or, 通过所述第一射频处理单元向所述UE发送载波切换指令,以使所述UE根据所述载波切换指令从第一射频处理单元上启用的所述主载波切换到第二射频处理单元上启用的所述备用载波。Sending a carrier switching instruction to the UE through the first radio frequency processing unit, so that the UE switches from the main carrier enabled on the first radio frequency processing unit to enabled on the second radio frequency processing unit according to the carrier switching instruction of the backup carrier. 19.根据权利要求15-18任一所述的基站,其特征在于:19. The base station according to any one of claims 15-18, characterized in that: 所述主载波与所述备用载波均处于工作状态;Both the main carrier and the backup carrier are in working state; 或者,or, 所述主载波处于工作状态,所述备用载波处于冗余状态、节能状态或待激活状态。The primary carrier is in a working state, and the standby carrier is in a redundant state, an energy-saving state, or a state to be activated. 20.根据权利要求19所述的基站,其特征在于,所述基带处理单元具体用于:当所述主载波处于工作状态,所述备用载波处于处于冗余状态、节能状态或待激活状态时,恢复所述备用载波到工作状态。20. The base station according to claim 19, wherein the baseband processing unit is specifically configured to: when the main carrier is in a working state and the backup carrier is in a redundant state, an energy-saving state or a state to be activated , restore the backup carrier to the working state. 21.根据权利要求15-20任一所述的基站,其特征在于,所述基带处理单元,还用于:21. The base station according to any one of claims 15-20, wherein the baseband processing unit is further configured to: 判断所述UE是否完成载波切换;judging whether the UE has completed carrier switching; 若完成,则释放第一射频处理单元上启用的所述主载波的资源,将所述备用载波设置为新的主载波,从可用的载波资源中重新选取一载波资源作为新的备用载波,对所述新的备用载波进行资源配置并在第一射频处理单元上启用所述新的备用载波。If completed, release the resources of the main carrier enabled on the first radio frequency processing unit, set the backup carrier as a new main carrier, reselect a carrier resource from the available carrier resources as a new backup carrier, and Perform resource configuration on the new standby carrier and activate the new standby carrier on the first radio frequency processing unit.
CN201310746577.2A 2013-12-30 2013-12-30 Carrier switch method and device Active CN103702379B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310746577.2A CN103702379B (en) 2013-12-30 2013-12-30 Carrier switch method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310746577.2A CN103702379B (en) 2013-12-30 2013-12-30 Carrier switch method and device

Publications (2)

Publication Number Publication Date
CN103702379A true CN103702379A (en) 2014-04-02
CN103702379B CN103702379B (en) 2018-03-16

Family

ID=50363751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310746577.2A Active CN103702379B (en) 2013-12-30 2013-12-30 Carrier switch method and device

Country Status (1)

Country Link
CN (1) CN103702379B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105722099A (en) * 2016-04-08 2016-06-29 江苏中科羿链通信技术有限公司 Anti-interference accessing method for wireless chain network
CN107078758A (en) * 2014-10-02 2017-08-18 At&T知识产权部有限合伙公司 Method and apparatus for providing fault tolerance for communication signals over a power line distribution network
CN107710822A (en) * 2015-12-15 2018-02-16 广东欧珀移动通信有限公司 Method, terminal and the base station that carrier wave redirects
CN109152016A (en) * 2017-06-16 2019-01-04 华为技术有限公司 A kind of communication means and device
CN109889740A (en) * 2019-03-26 2019-06-14 深圳市海拓达电子技术有限公司 A New Type of Intelligent RF Switcher
WO2021036694A1 (en) * 2019-08-29 2021-03-04 Qualcomm Incorporated Configuring guard intervals for multiple uplink carriers

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6038444A (en) * 1994-08-19 2000-03-14 Trimble Navigation Limited Method and apparatus for advising cellphone users of possible actions to avoid dropped calls
CN101222376A (en) * 2007-01-09 2008-07-16 华为技术有限公司 Method, system and base station for interference detection and discrimination
CN102457856A (en) * 2010-10-15 2012-05-16 电信科学技术研究院 Method, device and system for realizing frequency point moving based on CR
CN102833796A (en) * 2011-06-17 2012-12-19 电信科学技术研究院 Method for informing frequency range switching, method and device for switching frequency range, and system
CN103477678A (en) * 2011-04-15 2013-12-25 瑞萨移动公司 LTE carrier aggregation configuration on TV white space bands

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6038444A (en) * 1994-08-19 2000-03-14 Trimble Navigation Limited Method and apparatus for advising cellphone users of possible actions to avoid dropped calls
CN101222376A (en) * 2007-01-09 2008-07-16 华为技术有限公司 Method, system and base station for interference detection and discrimination
CN102457856A (en) * 2010-10-15 2012-05-16 电信科学技术研究院 Method, device and system for realizing frequency point moving based on CR
CN103477678A (en) * 2011-04-15 2013-12-25 瑞萨移动公司 LTE carrier aggregation configuration on TV white space bands
CN102833796A (en) * 2011-06-17 2012-12-19 电信科学技术研究院 Method for informing frequency range switching, method and device for switching frequency range, and system

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107078758A (en) * 2014-10-02 2017-08-18 At&T知识产权部有限合伙公司 Method and apparatus for providing fault tolerance for communication signals over a power line distribution network
CN107710822A (en) * 2015-12-15 2018-02-16 广东欧珀移动通信有限公司 Method, terminal and the base station that carrier wave redirects
US10849039B2 (en) 2015-12-15 2020-11-24 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Carrier switching method, terminal and base station
CN107710822B (en) * 2015-12-15 2022-03-15 Oppo广东移动通信有限公司 Carrier hopping method, terminal and base station
US11470530B2 (en) 2015-12-15 2022-10-11 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Carrier switching method, terminal and base station
CN105722099A (en) * 2016-04-08 2016-06-29 江苏中科羿链通信技术有限公司 Anti-interference accessing method for wireless chain network
CN105722099B (en) * 2016-04-08 2019-04-02 江苏中科羿链通信技术有限公司 The anti-interference cut-in method of wireless chain-shaped network
CN109152016A (en) * 2017-06-16 2019-01-04 华为技术有限公司 A kind of communication means and device
US11277785B2 (en) 2017-06-16 2022-03-15 Huawei Technologies Co., Ltd. Communication method and apparatus
CN109152016B (en) * 2017-06-16 2022-04-05 华为技术有限公司 Communication method and device
CN109889740A (en) * 2019-03-26 2019-06-14 深圳市海拓达电子技术有限公司 A New Type of Intelligent RF Switcher
WO2021036694A1 (en) * 2019-08-29 2021-03-04 Qualcomm Incorporated Configuring guard intervals for multiple uplink carriers

Also Published As

Publication number Publication date
CN103702379B (en) 2018-03-16

Similar Documents

Publication Publication Date Title
CN103220704B (en) Method and apparatus for measurement enhancement in wireless communication system
CN103702379B (en) Carrier switch method and device
US9414274B2 (en) Method and apparatus for performing handover in a wireless communication system
US9635585B2 (en) Energy saving method, system and device for base station
CN102238701B (en) Equipment and the method for automatic SIM card selection is carried out according to network environment
US10057800B2 (en) Apparatuses and methods for user equipment (UE)-initiated connection and resource release
US10412687B2 (en) Systems and methods for cable and WLAN coexistence
CN104703267B (en) The terminal communicating method and device of a kind of power saving
US9743361B2 (en) Network access method, device, and system for detecting interference and reducing interference between interfering channels
EP2852217B1 (en) Service indication message reporting method, device and system
CN105264941A (en) Measurement configuration method, identification and measurement methods, macro base station and ue
CN103702376B (en) A kind of UE is redirected to method, system and the UE of express network
CN103906153A (en) Base station dormancy method based on energy saving and equipment
JP2019506804A (en) Hybrid solution for network controlled handover and UE autonomous handover
US20150230144A1 (en) Method of Handover in Device to Device Communication, Base Station and Communication System
WO2013104144A1 (en) Method and apparatus for controlling wireless resources
CN103313334A (en) Wireless communication method and base station controller
CN103385021B (en) Data distribution method and device, network side device and terminal
CN103686942A (en) Data transmission method and multi-mode user terminal
CN116506926A (en) Signal transmitting method, signal receiving method, configuration transmitting method and related equipment
CN104662965B (en) WLAN state reporting methods, apparatus and system
CN105263159B (en) The report method and device of MDT measurement reports
CN103813422B (en) A kind of control method of small base station, equipment and system
WO2024208219A1 (en) Method and device for processing sidelink consistent listen before talk failure, and terminal and medium
CN117119541A (en) Terminal network connection processing method, terminal and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant