[go: up one dir, main page]

CN103628432B - Combined traffic guardrail - Google Patents

Combined traffic guardrail Download PDF

Info

Publication number
CN103628432B
CN103628432B CN201310539501.2A CN201310539501A CN103628432B CN 103628432 B CN103628432 B CN 103628432B CN 201310539501 A CN201310539501 A CN 201310539501A CN 103628432 B CN103628432 B CN 103628432B
Authority
CN
China
Prior art keywords
sheer pole
cross tube
column
montant
hollow body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310539501.2A
Other languages
Chinese (zh)
Other versions
CN103628432A (en
Inventor
李琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Transport Facilities Co ltd
Original Assignee
JIANGSU SUNTOP TRAFFIC EQUIPMENTS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SUNTOP TRAFFIC EQUIPMENTS Co Ltd filed Critical JIANGSU SUNTOP TRAFFIC EQUIPMENTS Co Ltd
Priority to CN201310539501.2A priority Critical patent/CN103628432B/en
Publication of CN103628432A publication Critical patent/CN103628432A/en
Application granted granted Critical
Publication of CN103628432B publication Critical patent/CN103628432B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a kind of combined traffic guardrail, including column, cross tube, sheer pole and montant;The two ends, left and right of described sheer pole are all connected with described column by stamping connection set;Described stamping connection set includes the second outer limited block outside the described hollow body lower surface of the first outer limited block outside the described hollow body upper surface of hollow body, setting, setting and is arranged on the inner limited block inside described hollow body lower surface;The cross section of the hollow body of described stamping connection set is identical with the cross sectional shape of described sheer pole and is sized for the insertion of described sheer pole;It is respectively equipped with at the lower surface two ends of described sheer pole and is suitable to the spacing hole that the inner limited block of described stamping connection set inserts.Sheer pole is connected with column by the present invention by stamping connection set, and sheer pole is fixed between two root posts by the outer limited block put by stamping connection, so substantially increases the connectivity robustness of sheer pole and column.

Description

Combined traffic guardrail
Technical field
The invention belongs to road traffic facility technical field, be specifically related to a kind of combined traffic guardrail.
Background technology
Chinese patent literature CN101265694A discloses a kind of jet printing type steel guard rail, including column, cross tube, sheer pole And montant, cross tube and sheer pole are all connected with column by adapter sleeve, each montant has two with the connected mode of upper and lower cross bar Kind: a kind of mode for welded part, its advantage is that processing is fast, efficiency is high, sound construction, and shortcoming is then transport, installs not Convenient;Another kind is the mode of plug-in type connecting element, and its advantage is the transport of each accessory, installs more convenient, and shortcoming is then not Firmly, easily come off.
As the improvement of above-mentioned deficiency, Chinese patent literature CN202108017U discloses a kind of clamp-connected steel guardrail, bag Including column, cross tube, sheer pole and montant, cross tube and sheer pole is the most all to be connected with column by adapter sleeve, each perpendicular The upper end of bar is connected with cross tube by shackle member, and the lower end of montant is connected with sheer pole by male member.Although this guardrail solves Insecure, hold caducous problem, but when mounted, need to be weldingly fixed in montant pipe, also shackle member and male member I.e. need charged installation, therefore, however it remains inconvenient shortcoming is installed.
All there are following 2 deficiencies in above two guardrail: (1) upper and lower cross bar is connected with column by adapter sleeve, a side This connected mode in face is the most insecure, easily comes off;On the other hand, this connected mode also results in column and highlights at cross tube Top, thus cause the sensation of numerous and complicated can to passerby and automobile driver.(2) reflective membrane is all attached on montant, So on the one hand, it is unfavorable for the visual angle of automobile driver, on the other hand too increases the usage amount of reflective membrane, cause cost relatively High.
As being partially improved of above-mentioned deficiency, Chinese patent literature CN102767146A discloses a kind of streamer guardrail, should Guardrail is on the one hand by increasing inner column in fence unit, and makes the top of inner column be positioned at the lower section of cross tube so that outer All guardrail heights between column are consistent, thus seem overall smooth;On the other hand by reflecting coating being arranged on upper horizontal stroke On bar, so that the unremitting continuous distributed of reflecting coating, not only improve the visual angle of automobile driver, decrease again coating Consumption, reduce production cost.This guardrail be by inner column, cross tube, sheer pole and montant are made single piece from And solve the problems referred to above, therefore, however it remains single piece transport, the shortcoming installing inconvenience.
Above-mentioned three kinds of guardrails are steel guard rail, so get rusty easily.
Summary of the invention
It is an object of the invention to solve the problems referred to above, it is provided that a kind of sheer pole is connected peace the most firm, on-the-spot with column Fill more convenient combined traffic guardrail.
The technical scheme realizing the object of the invention is: a kind of combined traffic guardrail, including column, cross tube, sheer pole And montant;The two ends, left and right of described cross tube are all connected with described column, and the two ends, left and right of described sheer pole are all vertical with described Post connects, and the two ends up and down of described montant are connected with described cross tube, sheer pole respectively;The two ends, left and right of described sheer pole are the most logical Cross stamping connection set to be connected with described column;Described stamping connection set includes table on the described hollow body of hollow body, setting The first outer limited block outside face, the second outer limited block outside the described hollow body lower surface of setting and be arranged on described Inner limited block inside hollow body lower surface;The cross section of the hollow body of described stamping connection set and the cross section of described sheer pole Shape is identical and is sized for the insertion of described sheer pole;It is respectively equipped with at the lower surface two ends of described sheer pole and is suitable to described punching press The spacing hole that the inner limited block of adapter sleeve inserts.
In order to make cross tube the most firm with the connection of column, the two ends, left and right of described cross tube are all by upright post cap and institute State column to connect;Described upright post cap includes the cap seat in lower section, cap above and between cap seat and cap Connecting portion;The cap seat of described upright post cap is provided with the first spiral shell for being fixedly attached on described column by described upright post cap Hole;The cross section of the cap of described upright post cap is identical with the cross sectional shape of described cross tube and is sized for the insertion of described cross tube; The connecting portion of described upright post cap is provided with for described cross tube is fixed the second screw being connected with described upright post cap.
Described cross tube is connected by a spring leaf and described upright post cap are fixing;Described spring leaf includes connecting portion and clamping Portion, the connecting portion of described spring leaf is provided with the 3rd screw;It is respectively equipped with draw-in groove at the lower surface two ends of described cross tube;Described By the second screw on the connecting portion of upright post cap and spring in the cap of the cross tube described upright post cap of insertion and by a screw The 3rd screw on the connecting portion of sheet is fixing to be connected, and in the draw-in groove of the described cross tube of Access Division insertion of spring leaf.
Reflecting coating and highly consistent it is equipped with on described cross tube and described upright post cap.
In order to make montant the most firm with the connection of upper sheer pole, stamping connector is all passed through at the two ends up and down of described montant It is connected with described cross tube, sheer pole;Described stamping connector includes body, to be arranged on described body one side described for inserting Internal projection in montant and be arranged on the outer lug of described body another side, described body is provided with through hole;Described cross tube Lower surface be provided be suitable to described stamping connector outer lug insert punching hole;The upper surface of described sheer pole is provided with and is suitable to The punching hole that the outer lug of described stamping connector is inserted.
In order to make montant firm further with the connection of upper sheer pole, the guardrail of the present invention also includes for by described montant It is fixedly connected on the fixation kit between described cross tube and sheer pole;Described fixation kit includes a steel pipe, a screw thread External member, a square external member and a trip bolt;The upper end of described steel pipe is welded and fixed with described square external member, and described The upper surface of square external member is adapted for insertion in the punching hole of described cross tube;The lower end of described steel pipe is provided with external screw thread;Described spiral shell The upper end of line external member is provided with the internal thread that the external screw thread with described steel pipe lower end adapts, the lower end of described thread complete set be provided with The internal thread that described trip bolt adapts.
In order to reduce regular maintenance cost, it is to avoid corrosion phenomena, the column of the guardrail of the present invention, cross tube, sheer pole with And montant is aluminum alloy material.
The present invention has positive effect: sheer pole is connected with column by (1) present invention by stamping connection set, by punching Sheer pole is fixed between two root posts by the outer limited block on pressure adapter sleeve, so substantially increases the company of sheer pole and column Connect fastness.(2) montant is connected with upper and lower cross bar by the present invention by stamping connector, so not only increases the jail of connection Solidity, and make in-site installation more convenient, it is fully achieved and installs without electricity.(3) present invention passes through fixation kit by two ends The montant of montant and centre is fixed between cross tube and sheer pole, increases the fastness connected so further, the suitableeest Should be in colliding the strongest occasion.(4) cross tube is connected with column by the present invention by upright post cap, on the one hand makes to connect jail Gu, on the other hand without charged installation, reduce the operation easier of erecting bed.(5) present invention passes through upright post cap by cross tube It is connected with column and also makes the highly consistent of whole guardrail, thus seem overall smooth, a kind of to passerby and automobile driver Visual experience smoothly;And by reflecting coating being arranged on cross tube and upright post cap, again so that reflecting coating without The continuous distributed being interrupted, not only improves the visual angle of automobile driver, decreases again the consumption of coating, reduce production cost. (6) guardrail of the present invention is aluminum alloy material, so after face coat is destroyed, corrosion phenomena will not occur, thus reduce Regular maintenance cost.(7) the guardrail finished product of the present invention is loose mail, and cost of transportation is relatively low, and in-site installation is without electrification, reduces The operation easier of erecting bed.
Accompanying drawing explanation
Fig. 1 is the structural representation of the combined traffic guardrail of embodiments of the invention 1;
Fig. 2 is the fractionation schematic diagram that in Fig. 1, montant is connected with cross tube, sheer pole;
Fig. 3 is the top view of montant in Fig. 2;
Fig. 4-1 is the front view of one stamping connector in lower section in Fig. 2;
Fig. 4-2 is the left view of Fig. 4-1;
Fig. 4-3 is the top view of Fig. 4-1;
Fig. 4-4 is the stereogram of one stamping connector in lower section in Fig. 2;
Fig. 5 is the connection diagram of the cross tube on a middle root post and right side in Fig. 1;
Fig. 6-1 is the sectional view of cross tube in Fig. 5;
Fig. 6-2 is the part isometric schematic diagram of cross tube in Fig. 5;
Fig. 7-1 is the structural representation of spring leaf in Fig. 5;
Fig. 7-2 is the top view of Fig. 7-1;
Fig. 8-1 is the partial sectional view being applicable to the upright post cap that both sides are all connected with cross tube;
Fig. 8-2 is the A-A direction view in Fig. 8-1;
Fig. 8-3 is the top view of Fig. 8-1;
Fig. 9-1 is to be applicable to while connecting the partial sectional view of the upright post cap of cross tube;
Fig. 9-2 is the B-B direction view in Fig. 9-1;
Fig. 9-3 is the top view of Fig. 9-1;
Figure 10 is the connection diagram of the sheer pole on a middle root post and right side in Fig. 1;
Figure 11-1 is the sectional view of sheer pole in Figure 10;
Figure 11-2 is the part isometric schematic diagram of sheer pole in Figure 10;
Figure 12-1 is the structural representation that the punching press in Figure 10 connects part set;
Figure 12-2 is the right view of Figure 12-1;
Figure 12-3 is the top view of Figure 12-2;
Figure 13 is the combined traffic guard bar structure schematic diagram of embodiments of the invention 2;
Figure 14 is one, leftmost side montant and cross tube, sheer pole connection diagram in Figure 13;
Figure 15 is the fractionation schematic diagram of montant in Figure 14, stamping connector, fixation kit;
Figure 16 is the C portion enlarged drawing in Figure 14.
Mark in above-mentioned accompanying drawing is as follows:
Column 1, cross tube 2, draw-in groove 2-1, sheer pole 3, spacing hole 3-1, montant 4;
Stamping connector 5, body 51, through hole 51-1, internal projection 52, outer lug 53;
Upright post cap 6, cap seat the 61, first screw 61-1, cap 62, connecting portion the 63, second screw 63-1, screw 64;
Stamping connection set 7, hollow body 71, first outer limited block the 72, second outer limited block 73, inner limited block 74;
Fixation kit 8, steel pipe 81, thread complete set 82, square external member 83, trip bolt 84;
Spring leaf 9, connecting portion the 91, the 3rd screw 91-1, Access Division 92;
Reflecting coating 100.
Detailed description of the invention
(embodiment 1)
Seeing Fig. 1, the present embodiment is as a example by two fence units, including three root posts 1, horizontal under two cross tubes 2, two Bar 3 and two groups of montants 4, often group montant all has seven.Column 1 includes two edge columns and a middle standing pillar.Column 1, Cross tube 2, sheer pole 3 and montant 4 are aluminum alloy material.Column 1, cross tube 2, sheer pole 3 and montant 4 are hollow Structure, its central post 1 is provided with and is suitable to the jack that sheer pole 3 inserts, is additionally provided with reinforcement in cross tube 2 and sheer pole 3.
Seeing Fig. 2 and Fig. 3, montant 4 uses the hollow-core construction with four through holes 42, and the two ends up and down of montant 4 are equal It is connected with cross tube 2, sheer pole 3 by stamping connector 5.
Seeing Fig. 4-1 to 4-4, stamping connector 5 includes body 51 and is separately positioned on the internal projection on body 51 two sides 52 and outer lug 53, body 51 is provided with through hole 51-1, and this through hole can be circular, it is also possible to for square, and the present embodiment is circle Shape.Four through holes 42 of montant 4 are suitable to the internal projection 52 of stamping connector 5 and are inserted.The lower surface of cross tube 2 is provided with and is suitable to One group of punching hole (quantity is identical with montant 4 quantity, is not drawn in figure) that the outer lug 53 of stamping connector 5 is inserted, sheer pole 3 Upper surface be again provided with being suitable to one group of punching hole (quantity and the montant 4 quantity phase that the outer lug 53 of stamping connector 5 is inserted With, figure is not drawn into).
During installation, the internal projection 52 of stamping connector 5 is inserted respectively in the through hole 42 at montant about 4 two ends, then will The outer lug 53 of the stamping connector 5 of bottom is inserted in the punching hole of sheer pole 3, then the evagination by the stamping connector 5 on top Rise in the punching hole of 53 insertion cross tubes 2.
Seeing Fig. 5, one end (other end is identical with this) of cross tube 2 is connected with column 1 by upright post cap 6 and spring leaf 9 Connect.Seeing Fig. 8-1 to 8-3, upright post cap 6 includes being positioned at cap seat 61, the cap 62 above of lower section and being positioned at cap seat 61 And the connecting portion 63 between cap 62.The cap seat 61 of upright post cap 6 is provided with for being fixedly attached on column 1 by upright post cap 6 First screw 61-1, the cross section of the cap 62 of upright post cap 6 is identical with the cross sectional shape of cross tube 2 and is sized for cross tube 2 and inserts Entering, the connecting portion 63 of upright post cap 6 is provided with for by fixing with upright post cap 6 for cross tube 2 the second screw 63-1 being connected.See figure 6-1 and 6-2, is respectively equipped with draw-in groove 2-1 at the lower surface two ends of cross tube 2.Seeing Fig. 7-1 and 7-2, spring leaf 9 includes connecting Portion 91 and Access Division 92, the connecting portion 91 of spring leaf 9 is provided with the 3rd screw 91-1.
Referring also to Fig. 5, during installation, first upright post cap 6 is placed on the upper end of column 1, and by the screw cap by upright post cap 6 Upright post cap 6 is fixed on column 1 by the first screw 61-1 on seat 61, and then one end of cross tube 2 inserts the cap of upright post cap 6 In lid 62 and by the screw 64 connecting portion 91 by the second screw 63-1 on the connecting portion 63 of upright post cap 6 and spring leaf 9 The 3rd screw 91-1 fixing connect, the Access Division 92 of spring leaf 9 is then inserted in the draw-in groove 2-1 of cross tube 2.
Participating in Fig. 1, reflecting coating 100 is arranged on cross tube 2 and upright post cap 6, so so that reflecting coating 100 Unremitting continuous distributed.And for only connecting the edge column of a cross tube, the structure of its upright post cap sees Fig. 9-1 to 9-3.
Seeing Figure 10, one end (other end is identical with this) of sheer pole 3 is connected with column 1 by stamping connection set 7.See Figure 12-1 to 12-3, stamping connection set 7 includes that first outside hollow body 71 upper surface of hollow body 71, setting is outer spacing Block 72, arrange hollow body 71 lower surface outside the second outer limited block 73 and be arranged on inside hollow body 71 lower surface Inner limited block 74.The cross section of hollow body 71 is identical with the cross sectional shape of sheer pole 3 and is sized for sheer pole 3 and inserts.Ginseng See Figure 11-1 and 11-2, be additionally provided with at the lower surface two ends of sheer pole 3 and be suitable to the limit that the inner limited block 74 of stamping connection set 7 inserts Position hole 3-1.
Still see Figure 10, during installation, one end of sheer pole 3 is inserted in the hollow body 71 of stamping connection set 7, and by interior limit In the spacing hole 3-1 of position block 74 lower surface that is placed in sheer pole 3 spacing fixing, then sheer pole 3 and stamping connection are overlapped 7 one Rise in the jack of insertion column 1, and be fixed in column 1 by the first outer limited block 72 and the second outer limited block 73.
(embodiment 2)
Seeing Figure 13~Figure 16, the guardrail of the present embodiment is substantially the same manner as Example 1, and difference is: two root posts 1 it Between montant 4 in, be positioned at two montants 4 at two ends and be positioned at the montant 4 of centre and be fixed on horizontal stroke by fixation kit 8 Between bar 2 and sheer pole 3.
Fixation kit 8 includes a steel pipe 82, square external member 83 of 81, thread complete set and a trip bolt 84。
Steel pipe 81 can be round steel pipe, it is also possible to for rectangular steel tube, the present embodiment is round steel pipe.
The upper end of steel pipe 81 is welded and fixed with square external member 83, and the upper surface of square external member 83 is adapted for insertion into cross tube 2 Punching hole in, the lower end of steel pipe 81 is provided with external screw thread, and the upper end of thread complete set 82 is provided with and the external screw thread phase of steel pipe 81 lower end Adapt to internal thread, the lower end of thread complete set 82 be provided with adapt with trip bolt 84 internal thread.
During installation, the punching hole of cross tube 2 lower surface is inserted in the upper end of the steel pipe 81 that upper end is welded with square external member 83 In, and rotate to an angle thus block fixing with the reinforcement in cross tube 2, then the lower end of steel pipe 81 is sequentially inserted into The stamping connector 5 of side, montant 4, the stamping connector 5 of lower section, then the internal thread with thread complete set 82 upper end is connected, then connects In the punching hole inserting sheer pole 3, and be connected with the internal thread of thread complete set 82 lower end by trip bolt 84, thus will be perpendicular Bar 4 is fixed between cross tube 2 and sheer pole 3.
By the montant 4 at two ends and the montant 4 of centre are fixedly connected between cross tube 2 and sheer pole 3, then can protect Demonstrate,prove the stability of whole fence unit structure.

Claims (2)

1. a combined traffic guardrail, including column (1), cross tube (2), sheer pole (3) and montant (4);Described upper horizontal stroke The two ends, left and right of bar (2) are all connected with described column (1), and the two ends, left and right of described sheer pole (3) are all with described column (1) even Connecing, the two ends up and down of described montant (4) are connected with described cross tube (2), sheer pole (3) respectively;It is characterized in that:
Also include the fixation kit for being fixedly connected between described cross tube (2) and sheer pole (3) by described montant (4) (8);Described fixation kit (8) includes a steel pipe (81), a thread complete set (82), a square external member (83) and one Trip bolt (84);The upper end of described steel pipe (81) is welded and fixed with described square external member (83), and described square external member (83) Upper surface be adapted for insertion in the punching hole of described cross tube (2);The lower end of described steel pipe (81) is provided with external screw thread;Described screw thread The upper end of external member (82) is provided with the internal thread that the external screw thread with described steel pipe (81) lower end adapts, described thread complete set (82) Lower end is provided with the internal thread adapted with described trip bolt (84);
The two ends, left and right of described sheer pole (3) are all connected with described column (1) by stamping connection set (7);
Described stamping connection set (7) includes first outside described hollow body (71) upper surface of hollow body (71), setting The second outer limited block (73) outside outer limited block (72), described hollow body (71) lower surface arranged and described in being arranged on Inner limited block (74) inside hollow body (71) lower surface;
The cross section of the hollow body (71) of described stamping connection set (7) is identical with the cross sectional shape of described sheer pole (3) and size Be suitable to described sheer pole (3) insert;
Be respectively equipped with at the lower surface two ends of described sheer pole (3) be suitable to described stamping connection set (7) inner limited block (74) insert The spacing hole (3-1) entered.
Combined traffic guardrail the most according to claim 1, it is characterised in that: described column (1), cross tube (2), lower horizontal stroke Bar (3) and montant (4) are aluminum alloy material.
CN201310539501.2A 2013-11-04 2013-11-04 Combined traffic guardrail Active CN103628432B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310539501.2A CN103628432B (en) 2013-11-04 2013-11-04 Combined traffic guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310539501.2A CN103628432B (en) 2013-11-04 2013-11-04 Combined traffic guardrail

Publications (2)

Publication Number Publication Date
CN103628432A CN103628432A (en) 2014-03-12
CN103628432B true CN103628432B (en) 2016-08-17

Family

ID=50209859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310539501.2A Active CN103628432B (en) 2013-11-04 2013-11-04 Combined traffic guardrail

Country Status (1)

Country Link
CN (1) CN103628432B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2128076A1 (en) * 1993-07-15 1995-01-16 Keiichiro Yamazaki Method for connecting inside-empty vertical and horizontal blocks of block-joining materials for the engineering and construction works and block-joining materials
JP3675614B2 (en) * 1997-08-12 2005-07-27 積水樹脂株式会社 Protective fence
JP3632441B2 (en) * 1998-05-27 2005-03-23 日本軽金属株式会社 Guard fence for vehicle
CN201512989U (en) * 2009-09-25 2010-06-23 陈发全 Fence structure
CN202108017U (en) * 2011-05-17 2012-01-11 李琳 Clamp-connected steel guardrail
CN202744947U (en) * 2012-07-24 2013-02-20 布雷尔利(北京)金属家居用品股份有限公司 Guard rail device

Also Published As

Publication number Publication date
CN103628432A (en) 2014-03-12

Similar Documents

Publication Publication Date Title
CN103556587B (en) Combined type guard bar
CN103628433B (en) combined road guardrail
CN103628431B (en) combined road traffic guardrail
CN103628432B (en) Combined traffic guardrail
CN202925917U (en) Finalized and standardized edge guardrail
CN202866311U (en) Construction stair protective barrier and veering connecting device
CN202681203U (en) Pentacle chair leg structure capable of being detached and installed
CN104196325A (en) Column for metal fence
CN204112854U (en) A kind of metal fence column
CN203113242U (en) Detachable traffic isolation fence
CN201377147Y (en) Assembly-type stair handrail with randomly-adjusted oblique angle
CN207846297U (en) A kind of portable traffic protective fence
CN212582521U (en) Quick pin-connected panel municipal administration rail guard
CN202806936U (en) Adjustable car end protective railing
CN201763050U (en) Fixing bracket for upright post of guardrail
CN204112850U (en) Metal fence column
CN205604841U (en) Railing
CN214573593U (en) Concatenation formula netted guardrail
CN204590785U (en) Novel fence cross rod connector
CN211549095U (en) Rail guard is used in road construction
CN210091682U (en) Billboard fixing device
CN204703063U (en) A kind of Bridge guardrail
CN102767146B (en) Streamer guardrail
CN203939291U (en) A kind of building engineering construction assembly type temporary construction fence
KR101103365B1 (en) Side bike holder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: Changshou District, Chongqing city Wei 401220 No. 13 Building 2 3 unit 1-1

Patentee after: JIANGSU SUNTOP TRAFFIC FACILITIES CO.,LTD.

Address before: 213023 B-07 block, Acacia Road, Bell Tower Development Zone, bell tower zone, bell tower, Changzhou, Jiangsu

Patentee before: JIANGSU SUNTOP TRAFFIC FACILITIES CO.,LTD.

CP02 Change in the address of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20181224

Address after: 225300 room 105, Pearl Road, Yongan Town, Yongan, Taizhou, Jiangsu

Patentee after: Gai Nannan

Address before: 102600 3 floor, 2 building, No. 4 Daxing District Garden Road, Beijing, 1 unit 317

Patentee before: BEIJING ZHITOUJIA INTELLECTUAL PROPERTY OPERATION CO.,LTD.

Effective date of registration: 20181224

Address after: 102600 3 floor, 2 building, No. 4 Daxing District Garden Road, Beijing, 1 unit 317

Patentee after: BEIJING ZHITOUJIA INTELLECTUAL PROPERTY OPERATION CO.,LTD.

Address before: 401220 3, unit 2, No. 13, Wei Gu Road, Changshou District, Chongqing, 1-1

Patentee before: JIANGSU SUNTOP TRAFFIC FACILITIES CO.,LTD.

TR01 Transfer of patent right
CP02 Change in the address of a patent holder

Address after: Suning global building, No.188, Guangzhou road, Huaqiao road street, Gulou District, Nanjing City, Jiangsu Province, 210029

Patentee after: Gai Nannan

Address before: 225300 Room 105, 108 Pearl Avenue, Yonganzhou Town, Gaogang District, Taizhou City, Jiangsu Province

Patentee before: Gai Nannan

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 241000 No. 3 Wuhu Road, three mountain Economic Development Zone, Anhui, China

Patentee after: Gai Nannan

Address before: Suning global building, No.188, Guangzhou road, Huaqiao road street, Gulou District, Nanjing City, Jiangsu Province, 210029

Patentee before: Gai Nannan

CP02 Change in the address of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20220303

Address after: 213002 No. 183, Hehai West Road, Xinbei District, Changzhou City, Jiangsu Province

Patentee after: CHANGZHOU TRANSPORT FACILITIES Co.,Ltd.

Address before: 241000 No.3, exi Road, Sanshan Economic Development Zone, Wuhu City, Anhui Province

Patentee before: Gai Nannan

TR01 Transfer of patent right