CN103618253B - 铁塔作业转向组合装置 - Google Patents
铁塔作业转向组合装置 Download PDFInfo
- Publication number
- CN103618253B CN103618253B CN201310619156.3A CN201310619156A CN103618253B CN 103618253 B CN103618253 B CN 103618253B CN 201310619156 A CN201310619156 A CN 201310619156A CN 103618253 B CN103618253 B CN 103618253B
- Authority
- CN
- China
- Prior art keywords
- tower
- tower material
- plate
- hole
- fixture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310619156.3A CN103618253B (zh) | 2013-11-29 | 2013-11-29 | 铁塔作业转向组合装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310619156.3A CN103618253B (zh) | 2013-11-29 | 2013-11-29 | 铁塔作业转向组合装置 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103618253A CN103618253A (zh) | 2014-03-05 |
| CN103618253B true CN103618253B (zh) | 2016-07-06 |
Family
ID=50168956
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310619156.3A Active CN103618253B (zh) | 2013-11-29 | 2013-11-29 | 铁塔作业转向组合装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103618253B (zh) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108104708A (zh) * | 2017-12-29 | 2018-06-01 | 国网河北省电力有限公司衡水供电分公司 | 平梯末端固定组合工具 |
| CN113550644A (zh) * | 2021-07-26 | 2021-10-26 | 广东欲丰电器制造有限公司 | 一种铁塔作业转向组合装置 |
| CN117365143B (zh) * | 2023-10-19 | 2026-02-06 | 青岛豪迈兴利电力设备有限公司 | 一种铁塔施工安全生命防护装置 |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3266211A (en) * | 1963-08-19 | 1966-08-16 | Hughes Franklin | Method of erecting an electrical power transmission tower |
| SU887794A1 (ru) * | 1979-06-14 | 1981-12-07 | Центральный Научно-Исследовательский И Проектный Институт По Планировке И Застройке Сельских Населенных Мест И Жилищно-Гражданскому Строительству На Селе | Способ монтажа конструкций |
| JPH02114814A (ja) * | 1988-10-24 | 1990-04-26 | Chubu Electric Power Co Inc | 架設装置及びそれを使用する高効率送電線路 |
| JP2000129958A (ja) * | 1998-10-26 | 2000-05-09 | Mitsubishi Heavy Ind Ltd | 塔状構造体 |
| CN201635476U (zh) * | 2010-03-26 | 2010-11-17 | 四川电力送变电建设公司 | 铁塔组立施工夹具 |
| CN202194429U (zh) * | 2011-09-01 | 2012-04-18 | 北京市电力公司 | 转向平衡装置 |
| CN102923600A (zh) * | 2012-11-15 | 2013-02-13 | 河北省送变电公司 | 反向滑车固定装置 |
| CN202967898U (zh) * | 2012-11-12 | 2013-06-05 | 湖北省送变电工程公司 | 转向二联板 |
| CN203674616U (zh) * | 2013-11-29 | 2014-06-25 | 国家电网公司 | 铁塔作业转向组合装置 |
-
2013
- 2013-11-29 CN CN201310619156.3A patent/CN103618253B/zh active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3266211A (en) * | 1963-08-19 | 1966-08-16 | Hughes Franklin | Method of erecting an electrical power transmission tower |
| SU887794A1 (ru) * | 1979-06-14 | 1981-12-07 | Центральный Научно-Исследовательский И Проектный Институт По Планировке И Застройке Сельских Населенных Мест И Жилищно-Гражданскому Строительству На Селе | Способ монтажа конструкций |
| JPH02114814A (ja) * | 1988-10-24 | 1990-04-26 | Chubu Electric Power Co Inc | 架設装置及びそれを使用する高効率送電線路 |
| JP2000129958A (ja) * | 1998-10-26 | 2000-05-09 | Mitsubishi Heavy Ind Ltd | 塔状構造体 |
| CN201635476U (zh) * | 2010-03-26 | 2010-11-17 | 四川电力送变电建设公司 | 铁塔组立施工夹具 |
| CN202194429U (zh) * | 2011-09-01 | 2012-04-18 | 北京市电力公司 | 转向平衡装置 |
| CN202967898U (zh) * | 2012-11-12 | 2013-06-05 | 湖北省送变电工程公司 | 转向二联板 |
| CN102923600A (zh) * | 2012-11-15 | 2013-02-13 | 河北省送变电公司 | 反向滑车固定装置 |
| CN203674616U (zh) * | 2013-11-29 | 2014-06-25 | 国家电网公司 | 铁塔作业转向组合装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103618253A (zh) | 2014-03-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103015537B (zh) | 一种装配式钢结构体系的梁柱节点连接装置 | |
| CN103618253B (zh) | 铁塔作业转向组合装置 | |
| CN103072906B (zh) | 内爬式塔吊与建筑结构的连接装置及利用其的施工方法 | |
| CN105972021B (zh) | 用于钢结构连接的可单侧操作的连接装置及电动安装工具 | |
| CN203674616U (zh) | 铁塔作业转向组合装置 | |
| CN210368656U (zh) | 一种圆柱墩施工桥式脚手架升降平台附着抱箍装置 | |
| CN204738525U (zh) | 一种盘式脚手架的插头结构 | |
| CN103967042B (zh) | 一种框架柱护边角钢安装校正工具及其制作方法 | |
| CN203475690U (zh) | 钢梁对接连接板 | |
| CN105952738B (zh) | 一种用于钢结构连接的可单侧操作的连接装置及安装工具 | |
| CN206392639U (zh) | 风管穿墙套管预制平台 | |
| CN206174494U (zh) | 一种可固定临边防护栏杆的工具式连壁件 | |
| CN204126062U (zh) | 一种圆柱形刚性系杆封板连接节点结构 | |
| CN204882019U (zh) | 一种大型非圆截面产品振动试验夹具 | |
| CN207934434U (zh) | 钢管法兰盘周转式连墙拉结装置 | |
| CN204354093U (zh) | 一种万向固定装置 | |
| CN205823820U (zh) | 一种用于钢结构连接的可单侧操作的连接装置及安装工具 | |
| CN204662937U (zh) | 一种固定于钢结构梁的夹具 | |
| CN203936834U (zh) | 一种底脚螺栓可调扳手 | |
| CN207905108U (zh) | 一种三点固定式梁-柱装置 | |
| CN203767024U (zh) | 简易人孔洞护栏 | |
| CN203514838U (zh) | 一种多角度调节式临边防护栏杆 | |
| CN202882448U (zh) | 一种用于圆钢管桁架安装的临时固定装置 | |
| CN205772901U (zh) | 一种导电架 | |
| CN202212726U (zh) | 便捷式焊接工艺撑 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C41 | Transfer of patent application or patent right or utility model | ||
| CB03 | Change of inventor or designer information |
Inventor after: Xuan Guoli Inventor after: Liu Fengyu Inventor after: Zhang Xiaoping Inventor after: Si Yadong Inventor after: Sun Bin Inventor after: Liu Fengzhen Inventor after: Lu Junhai Inventor after: Zheng Guoyong Inventor after: Zhang Hongyu Inventor after: Cong Peixian Inventor after: Ma Conggan Inventor after: Cang Rui Inventor after: Yang Hongwei Inventor after: Zhao Lihua Inventor before: Zheng Guoyong Inventor before: Bai Chunyu Inventor before: Fu Changchun Inventor before: Jiang Ligong Inventor before: Shi Xiang |
|
| COR | Change of bibliographic data | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20160606 Address after: 122000 Chaoyang City Chaoyang District, Twin Towers, Liaoning, No. three, No. 13 Applicant after: Chaoyang Power Supply Company, State Grid Liaoning Electric Power Co., Ltd. Applicant after: State Grid Corporation of China Applicant after: State Grid Beijing Electric Power Company Applicant after: CHAOYANG SANBEI PROTECTION FOREST SYSTEM CONSTRUCTION MANAGEMENT STATION Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant before: State Grid Corporation of China Applicant before: Chaoyang Power Supply Company, State Grid Liaoning Electric Power Co., Ltd. |
|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |