CN103590767A - Front handle structure of pipe twisting machine shell body - Google Patents

Front handle structure of pipe twisting machine shell body Download PDF

Info

Publication number
CN103590767A
CN103590767A CN201310574620.1A CN201310574620A CN103590767A CN 103590767 A CN103590767 A CN 103590767A CN 201310574620 A CN201310574620 A CN 201310574620A CN 103590767 A CN103590767 A CN 103590767A
Authority
CN
China
Prior art keywords
arm
main body
connector
twisting machine
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310574620.1A
Other languages
Chinese (zh)
Inventor
苏刚
姚风雷
鲍新毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Geotec Geological Equipment Co Ltd
Original Assignee
Wuxi Geotec Geological Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Geotec Geological Equipment Co Ltd filed Critical Wuxi Geotec Geological Equipment Co Ltd
Priority to CN201310574620.1A priority Critical patent/CN103590767A/en
Publication of CN103590767A publication Critical patent/CN103590767A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Mechanical Control Devices (AREA)

Abstract

The invention discloses a front handle structure of a pipe twisting machine shell body. The front handle structure comprises a first U-shaped component and a second U-shaped component, and the first U-shaped component and the second U-shaped component are perpendicular and share an arm. The first U-shaped component is composed of a first body, a first arm, a second arm, a first connecting piece and a second connecting piece, the first arm and the second arm are connected with the two ends of the first body, the first connecting piece is connected to the end portion of the first arm, and the second connecting piece is connected to the end portion of the second arm. The second U-shaped component is composed of a second body, the first arm, a third arm, the first connecting piece and a third connecting piece, the first arm and the third arm are connected with the two ends of the second body, the first connecting piece is connected to the end portion of the first arm, and the third connecting piece is connected to the end portion of the third arm. The first body is perpendicular to the second body. The first arm, the second arm and the third arm are parallel. The planes where the first connecting piece, the second connecting piece and the third connecting piece are located are parallel to the plane where the first body is located and the plane where the second body is located. According to the front handle structure, when workers move the pipe twisting machine shell body on the ground, a handle parallel to the ground or a handle perpendicular to the ground can be selected to be held, and the operation is more convenient.

Description

Twisting machine housing front handlebar structure
Technical field
The present invention relates to drilling project twisting machine, relate in particular to a kind of front handlebar structure of housing of twisting machine.
Background technology
Twisting machine is the mill auxiliaries supporting with spindle-type drill, when geological drilling drilling, for replacing manpower unloading drilling rod or drilling tool, to realize the mechanization of unloading drilling rod or drilling tool, alleviates labor strength, improves lifting work efficiency.As shown in Figure 1, be provided with for the operation front handlebar 2 of controlling on the housing 1 of twisting machine, existing front handlebar is all single U-shaped patterns, holds this kind of front handlebar on the ground when mobile twisting machine housing, and workman's operation is not very convenient.
Summary of the invention
For the existing above-mentioned defect of existing twisting machine housing front handlebar structure, applicant, through Improvement, provides another kind of easy to operate twisting machine housing front handlebar structure.
Technical scheme of the present invention is as follows:
A housing front handlebar structure, comprises the first U-shaped assembly and the second U-shaped assembly, and described the first U-shaped assembly and the second U-shaped assembly are perpendicular, and shares an arm.
Its further technical scheme is: described the first U-shaped assembly is comprised of the first main body, the first arm that is connected to the first main body two ends and the second arm, the first connector that is connected to the first arm end, the second connector that is connected to the second arm end; Described the second U-shaped assembly is comprised of the second main body, the first arm that is connected to the second main body two ends and the 3rd arm, the first connector that is connected to the first arm end, the 3rd connector that is connected to the 3rd arm end; Described the first main body and the second main body are perpendicular; Described the first arm, the second arm and the 3rd arm parallel; Described the first connector, the second connector and the 3rd connector place plane and the first main body and the second main body place plane parallel.
Useful technique effect of the present invention is:
The present invention is combined into by the handle of 2 U-shaped patterns, and during mobile twisting machine housing, workman can optionally grip handle parallel to the ground or handle perpendicular to the ground, operates more convenient on the ground.
Advantage of the present invention will provide in specific embodiment description partly below, and part will become obviously from the following description, or recognize by practice of the present invention.
Accompanying drawing explanation
Fig. 1 is the installation site schematic diagram of existing twisting machine housing front handlebar on twisting machine housing.
Fig. 2 is the structural representation of existing twisting machine housing front handlebar.
Fig. 3 is the installation site schematic diagram of the present invention on twisting machine housing.
Fig. 4 is structural representation of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described further.
As shown in Figure 2, the present invention includes the first U-shaped assembly and the second U-shaped assembly, the first U-shaped assembly and the second U-shaped assembly are perpendicular, and share an arm.As shown in Figure 3, the first U-shaped assembly is comprised of the first main body 31, the first arm 33 that is connected to the first main body 31 two ends and the second arm 34, the first connector 33a that is connected to the first arm 33 ends, the second connector 34a that is connected to the second arm 34 ends concrete structure.The second U-shaped assembly is comprised of the second main body 32, the first arm 33 that is connected to the second main body 32 two ends and the 3rd arm 35, the first connector 33a that is connected to the first arm 33 ends, the 3rd connector 35a that is connected to the 3rd arm 35 ends.The shared arm of the first arm 33 wherein, the first connector 33a is shared connector.The first main body 31 and the second main body 32 are perpendicular.The first arm 33, the second arm 34 and the 3rd arm 35 parallel.The first connector 33a, the second connector 34a and the 3rd connector 35a place plane and the first main body 31 and the second main body 32 place plane parallel.The first connector 33a, the second connector 34a and the 3rd connector 35a weld or are riveted on twisting machine housing.This structure makes workman on the ground during mobile twisting machine housing, can optionally grip the first main body 31 parallel to the ground or the second main body 32 perpendicular to the ground, operates more convenient.
Above-described is only the preferred embodiment of the present invention, the invention is not restricted to above embodiment.Be appreciated that the oher improvements and changes that those skilled in the art directly derive or associate without departing from the basic idea of the present invention, within all should thinking and being included in protection scope of the present invention.

Claims (2)

1. a twisting machine housing front handlebar structure, is characterized in that: comprise the first U-shaped assembly and the second U-shaped assembly, described the first U-shaped assembly and the second U-shaped assembly are perpendicular, and shares an arm.
2. twisting machine housing front handlebar structure according to claim 1, is characterized in that: described the first U-shaped assembly is comprised of the first main body (31), the first arm (33) that is connected to the first main body (31) two ends and the second arm (34), the first connector (33a) that is connected to the first arm (33) end, the second connector (34a) that is connected to the second arm (34) end; Described the second U-shaped assembly is comprised of the second main body (32), the first arm (33) that is connected to the second main body (32) two ends and the 3rd arm (35), the first connector (33a) that is connected to the first arm (33) end, the 3rd connector (35a) that is connected to the 3rd arm (35) end; Described the first main body (31) and the second main body (32) are perpendicular; Described the first arm (33), the second arm (34) and the 3rd arm (35) parallel; Described the first connector (33a), the second connector (34a) and the 3rd connector (35a) place plane and the first main body (31) and the second main body (32) place plane parallel.
CN201310574620.1A 2013-11-16 2013-11-16 Front handle structure of pipe twisting machine shell body Pending CN103590767A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310574620.1A CN103590767A (en) 2013-11-16 2013-11-16 Front handle structure of pipe twisting machine shell body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310574620.1A CN103590767A (en) 2013-11-16 2013-11-16 Front handle structure of pipe twisting machine shell body

Publications (1)

Publication Number Publication Date
CN103590767A true CN103590767A (en) 2014-02-19

Family

ID=50081064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310574620.1A Pending CN103590767A (en) 2013-11-16 2013-11-16 Front handle structure of pipe twisting machine shell body

Country Status (1)

Country Link
CN (1) CN103590767A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2365376Y (en) * 1998-10-13 2000-02-23 大连英歌石机械厂 Single handle linking fast-opening and -closing door
US8381834B2 (en) * 2010-02-04 2013-02-26 Robert Bosch Gmbh Drive system for interconnecting attachment devices and handheld rotary power tools
CN203559822U (en) * 2013-11-16 2014-04-23 无锡中地地质装备有限公司 Front handle structure of shell of twisting machine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2365376Y (en) * 1998-10-13 2000-02-23 大连英歌石机械厂 Single handle linking fast-opening and -closing door
US8381834B2 (en) * 2010-02-04 2013-02-26 Robert Bosch Gmbh Drive system for interconnecting attachment devices and handheld rotary power tools
CN203559822U (en) * 2013-11-16 2014-04-23 无锡中地地质装备有限公司 Front handle structure of shell of twisting machine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄洪波等: "深部取心钻探拧卸工具机械化的思考和实践", 《探矿工程(岩土钻掘工程)》, vol. 38, no. 7, 25 July 2011 (2011-07-25), pages 1 - 4 *

Similar Documents

Publication Publication Date Title
CN205135630U (en) Many years rock splitting machine of hand propelled whole car
CN203559822U (en) Front handle structure of shell of twisting machine
CN103711433B (en) A kind of fully-mechanized digging machine load hydraulic rig
CN104959486A (en) Line bending device
CN103590767A (en) Front handle structure of pipe twisting machine shell body
CN104417989A (en) Metal welded pipe clamp
CN202673294U (en) Simple underground danger eliminating rod for mine
CN202984736U (en) Auxiliary device for processing workpiece by jackhammer
CN203135006U (en) Ground wire earth electrode
CN202556376U (en) Multipurpose clamp for electric wrench
CN202202820U (en) Multifunctional drill rod tail sleeve
CN202169378U (en) Adjustable machine tool tailstock
CN204402497U (en) Be suitable for the driving chassis forward beam of different length drill steel
CN203547590U (en) Clamping centering device for drill rod
CN203529243U (en) Metal welded pipe clamp
CN204753599U (en) Special drilling slip casting device of abnormal concrete construction
CN205243504U (en) Electronic spade for coal mine
CN104196465A (en) Connection mode of down-hole hammer and drill stem generally used in rotary drilling rig and application thereof
CN204449904U (en) A kind of efficient mechanical maintenance skid mounted equipment
CN204879050U (en) High pressure water pipe and cable fixing device
CN203367727U (en) Cone punch
CN107882908A (en) Gas spring
CN202271012U (en) Lengthened drill pole of electric hand drill
CN203100941U (en) Main pull bar of anchor pole pulling force detector
CN203390248U (en) High-position punching auxiliary device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140219