CN103590393A - 复合桩的施工方法 - Google Patents

复合桩的施工方法 Download PDF

Info

Publication number
CN103590393A
CN103590393A CN201310585342.XA CN201310585342A CN103590393A CN 103590393 A CN103590393 A CN 103590393A CN 201310585342 A CN201310585342 A CN 201310585342A CN 103590393 A CN103590393 A CN 103590393A
Authority
CN
China
Prior art keywords
pile
composite
composite pile
job practices
hollow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310585342.XA
Other languages
English (en)
Inventor
邢峰
朱建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310585342.XA priority Critical patent/CN103590393A/zh
Publication of CN103590393A publication Critical patent/CN103590393A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了复合桩的施工方法,包括移机就位,已施工好的外围桩中心采用内夯、内夯交互、内螺旋或双套管工艺形成空心桩;采用空心桩内直接先放置钢筋笼再浇筑混凝土,或先压灌混凝土再置钢筋笼,形成复合桩;或在空心桩内沉入管桩,管桩与周围空隙用填充剂注满形成夹心层,形成复合桩。本发明施工方便,形成的复合桩结构合理,工效高;性价比高,可广泛适用于基础工程。

Description

复合桩的施工方法
技术领域
本发明涉及一种复合桩的施工方法。
背景技术
现有的复合桩,由于结构等原因,工效不高,有不理想之出;对于起临时作用的桩而言,其内芯桩不能重复利用,造成浪费。
发明内容
本发明的目的在于提供一种结构合理,工效高的复合桩的施工方法。
本发明的技术解决方案是:
一种复合桩的施工方法,其特征是:包括下列步骤:
(1)移机就位,在已施工好的外围桩的中心采用内夯、内夯交互、内螺旋或双套管工艺形成空心桩;
(2)采用空心桩内直接先放置钢筋笼再浇筑混凝土,或先压灌混凝土再置钢筋笼,形成复合桩;
或在空心桩内沉入管桩,管桩与周围空隙用填充剂注满形成夹心层,形成复合桩。
所述夹心层为水,并经冷冻形成的冰层。
所述夹心层是易热熔的热熔材料层。
所述热熔材料为石蜡、油脂、沥青或硫磺胶泥。
所述夹心层是砂、盐、土、石灰或粉煤灰层,在管桩外包隔膜或外涂减磨剂。
管桩内设置内骨架系统,内骨架系统是钢板、型钢、工字钢、十字板或钢筋笼等;所述管桩是钢管桩、塑钢管、玻璃钢管、橡塑管或预应力空心桩管等。
本发明施工方便,形成的复合桩结构合理,工效高;性价比高,可广泛适用于基础工程。
下面结合实施例对本发明作进一步说明。
具体实施方式
实施例1:
一种复合桩的施工方法,包括下列步骤:
(1)移机就位,在已施工好的外围桩的中心采用内夯、内夯交互、内螺旋或双套管工艺形成空心桩;
(2)采用空心桩内直接先放置钢筋笼再浇筑混凝土,或先压灌混凝土再置钢筋笼,形成复合桩。
实施例2:
一种复合桩的施工方法,其特征是:包括下列步骤:
(1)移机就位,采用内夯、内夯交互、内螺旋或双套管工艺形成空心桩;
(2)在空心桩内沉入管桩,管桩与周围空隙用填充剂注满形成夹心层,形成复合桩。
所述夹心层为水,并经冷冻形成的冰层。在管桩中设置对水进行冷冻的冷却管道。
或所述夹心层是易热熔的热熔材料层,所述热熔材料为石蜡、油脂、沥青或硫磺胶泥,在管桩中设置对热熔材料进行加热熔化的加热管道。
或所述夹心层是砂、盐、土、石灰或粉煤灰层,在管桩外包隔膜或外涂减磨剂。
管桩内设置内骨架系统,内骨架系统是钢板、型钢、工字钢、十字板或钢筋笼等;所述管桩是钢管桩、塑钢管、玻璃钢管、橡塑管或预应力空心桩管等。
需要时,通过将冰层或热熔材料熔化,将管桩和/或内骨架系统取出,反复使用。

Claims (6)

1.一种复合桩的施工方法,其特征是:包括下列步骤:
(1)移机就位,在已施工好的外围桩的中心采用内夯、内夯交互、内螺旋或双套管工艺形成空心桩;
(2)采用空心桩内直接先放置钢筋笼再浇筑混凝土,或先压灌混凝土再置钢筋笼,形成复合桩;
或在空心桩内沉入管桩,管桩与周围空隙用填充剂注满形成夹心层,形成复合桩。
2.根据权利要求1所述的复合桩的施工方法,其特征是:所述夹心层为水,并经冷冻形成的冰层。
3. 根据权利要求1所述的复合桩的施工方法,其特征是:所述夹心层是易热熔的热熔材料层。
4. 根据权利要求3所述的复合桩的施工方法,其特征是:所述热熔材料为石蜡、油脂、沥青或硫磺胶泥。
5. 根据权利要求1所述的复合桩的施工方法,其特征是:所述夹心层是砂、盐、土、石灰或粉煤灰层,在管桩外包隔膜或外涂减磨剂。
6. 根据权利要求1、2、3、4或5所述的复合桩的施工方法,其特征是:管桩内设置内骨架系统,内骨架系统是钢板、型钢、工字钢、十字板或钢筋笼;所述管桩是钢管桩、塑钢管、玻璃钢管、橡塑管或预应力空心桩管。
CN201310585342.XA 2013-11-21 2013-11-21 复合桩的施工方法 Pending CN103590393A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310585342.XA CN103590393A (zh) 2013-11-21 2013-11-21 复合桩的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310585342.XA CN103590393A (zh) 2013-11-21 2013-11-21 复合桩的施工方法

Publications (1)

Publication Number Publication Date
CN103590393A true CN103590393A (zh) 2014-02-19

Family

ID=50080695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310585342.XA Pending CN103590393A (zh) 2013-11-21 2013-11-21 复合桩的施工方法

Country Status (1)

Country Link
CN (1) CN103590393A (zh)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1050421A (zh) * 1990-11-12 1991-04-03 中国建筑科学研究院珠海科研设计部 灌注-预制复合桩的成桩方法
CN1272574A (zh) * 2000-04-03 2000-11-08 王光明 沉管灌注复合桩工法
CN1414186A (zh) * 2002-05-10 2003-04-30 贾燎 套桩的成桩及设计方法
CN1542235A (zh) * 2003-04-29 2004-11-03 天津市水利科学研究所 劲芯深层喷射搅拌桩工法及其专用钻头
CN101270572A (zh) * 2008-04-24 2008-09-24 杨举 一种利用冷冻技术的大坝施工方法
CN101962951A (zh) * 2010-09-14 2011-02-02 东南大学 纤维增强复合深水桥梁混合桩施工方法及其混合桩
CN102587360A (zh) * 2012-03-22 2012-07-18 沙焕焕 大直径劲性复合桩
CN102644269A (zh) * 2012-05-04 2012-08-22 朱建新 非取土复合桩及其施工方法
CN102733376A (zh) * 2012-07-02 2012-10-17 朱建新 复合桩及其施工方法
JP2013163941A (ja) * 2012-02-13 2013-08-22 Kentec Inc 基礎補強パイルおよび基礎補強パイルの施工方法
CN103397633A (zh) * 2013-07-26 2013-11-20 张继红 一种自钻式rca可回收锚杆及其施工方法

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1050421A (zh) * 1990-11-12 1991-04-03 中国建筑科学研究院珠海科研设计部 灌注-预制复合桩的成桩方法
CN1272574A (zh) * 2000-04-03 2000-11-08 王光明 沉管灌注复合桩工法
CN1414186A (zh) * 2002-05-10 2003-04-30 贾燎 套桩的成桩及设计方法
CN1542235A (zh) * 2003-04-29 2004-11-03 天津市水利科学研究所 劲芯深层喷射搅拌桩工法及其专用钻头
CN101270572A (zh) * 2008-04-24 2008-09-24 杨举 一种利用冷冻技术的大坝施工方法
CN101962951A (zh) * 2010-09-14 2011-02-02 东南大学 纤维增强复合深水桥梁混合桩施工方法及其混合桩
JP2013163941A (ja) * 2012-02-13 2013-08-22 Kentec Inc 基礎補強パイルおよび基礎補強パイルの施工方法
CN102587360A (zh) * 2012-03-22 2012-07-18 沙焕焕 大直径劲性复合桩
CN102644269A (zh) * 2012-05-04 2012-08-22 朱建新 非取土复合桩及其施工方法
CN102733376A (zh) * 2012-07-02 2012-10-17 朱建新 复合桩及其施工方法
CN103397633A (zh) * 2013-07-26 2013-11-20 张继红 一种自钻式rca可回收锚杆及其施工方法

Similar Documents

Publication Publication Date Title
CN104895089B (zh) 地下室楼板与支护桩共同工作的永久支护体系的施工方法
CN103953351B (zh) 一种不中断交通情况下的既有隧道下挖扩建施工方法
CN204326566U (zh) 一种利用碳纤维加固钢筋混凝土柱的结构
CN103074890A (zh) 塑料套管与钢管组合现浇混凝土空心管桩及施工方法
CN205503146U (zh) 一种适用于城市敏感区的浅埋隧道新型支护结构
CN208844417U (zh) 一种用于桥墩柱的外预制结构及其外预制内现浇桥墩柱
CN105386443A (zh) Frp管与厚壁钢管复合空心再生混凝土桩
CN206706791U (zh) 基坑降水井封堵结构
CN103032080A (zh) 软弱破碎围岩隧道的支护方法
CN103510511A (zh) 一种顶部加强型现浇混凝土薄壁管桩及施工方法
CN103527201A (zh) 煤矿立井井筒钢管混凝土支架与混凝土管片支护装置
CN106593470A (zh) 高渗透性富水砂层盾构端头加固体系及其施工方法
CN105297708A (zh) 碳纤维与钢管复合再生混凝土桩
CN106437034A (zh) 一种钢管与半预制半现浇建筑垃圾再生混凝土组合柱及制备方法
CN105200983A (zh) Pvc管与厚壁钢管复合空心再生混凝土桩
CN103953036A (zh) 一种滨海盐渍土输电线路桩基接桩用防腐护套施工方法
CN106812248A (zh) 一种建筑垃圾再生混凝土叠合柱及其施工工艺
CN102619521B (zh) 一种立井基岩段井壁结构的施工方法
CN108360505A (zh) 一种穿越溶洞的灌注桩结构及其施工方法
CN202673299U (zh) 一种软弱围岩隧道双层模筑复合式衬砌支护结构
CN204139054U (zh) 拼装式再生钢管混凝土y型桥墩
CN103967215B (zh) 圆形截面轻钢-小径木材-碳纤维组合承重柱及作法
CN203498828U (zh) 一种顶部加强型现浇混凝土薄壁管桩
CN103590393A (zh) 复合桩的施工方法
CN106638694A (zh) 一种现场成型的内衬检查井结构与修复方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140219