[go: up one dir, main page]

CN103582054B - A kind of method and apparatus switched over - Google Patents

A kind of method and apparatus switched over Download PDF

Info

Publication number
CN103582054B
CN103582054B CN201210265518.9A CN201210265518A CN103582054B CN 103582054 B CN103582054 B CN 103582054B CN 201210265518 A CN201210265518 A CN 201210265518A CN 103582054 B CN103582054 B CN 103582054B
Authority
CN
China
Prior art keywords
carrying
target
user equipment
base station
entities
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210265518.9A
Other languages
Chinese (zh)
Other versions
CN103582054A (en
Inventor
梁靖
张大钧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Telecommunications Technology CATT
Datang Mobile Communications Equipment Co Ltd
Original Assignee
China Academy of Telecommunications Technology CATT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Telecommunications Technology CATT filed Critical China Academy of Telecommunications Technology CATT
Priority to CN201210265518.9A priority Critical patent/CN103582054B/en
Publication of CN103582054A publication Critical patent/CN103582054A/en
Application granted granted Critical
Publication of CN103582054B publication Critical patent/CN103582054B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The present embodiments relate to wireless communication technology field, more particularly to a kind of method and apparatus switched over, for solving present in prior art in the E UTRAN network architecture, because UE switching frequency and number of times are all greatly increased, so as to add the problem of risk of communication disruption occurs when switching over for UE.The method of the carrying separation switching of the embodiment of the present invention includes:User equipment is after the carrying separation order from macro base station is received, the corresponding MAC layer entity of target BS and PHY entities set up after user equipment switching;The carrying for being separated to the target BS will be needed to be mapped to the corresponding MAC layer entity of the target BS and PHY entities;And holding and the connection of the macro base station, and access the target BS.The present invention realizes carrying handoff functionality, has further reached the purpose of user plane bearer and chain of command carrying separation and convergence.

Description

A kind of method and apparatus switched over
Technical field
The present invention relates to wireless communication technology field, more particularly to a kind of method and apparatus switched over.
Background technology
At present, the universal land radio access web of evolution(Evolved Universal Terrestrial Radio Access Network, E-UTRAN)By eNB(Evolution base station)Composition, the E-UTRAN network architecture is shown in Figure 1, wherein, Mobility management entity(Mobility Management Entity, MME)It is connected between eNB using S1-MME interface;eNB Access network function is completed, with user equipment(UE, User Equipment)Pass through idle port communication.Network is attached to for each UE, there is a MME to provide service for it, the MME is referred to as UE service MME.S1-MME interface provides chain of command service for UE, Including mobile management and Data Radio Bearer(Data Radio Bearer, DRB)Management function;
Gateway(Serving Gateway, S-GW)It is connected between eNB using S1-U interface, it is attached for each The UE of network, has a S-GW to provide service for it, the S-GW is referred to as UE service S-GW.S1-U interface provides use for UE Family face is serviced, and UE user face data passes through S1-UGPRS tunnel protocols(GTP, GPRS Tunneling Protocol, GTP; GPRS, General Packet Radio Service, GPRS)It is carried between S-GW and eNB and transmits.
User face protocol stack between UE and network is shown in Figure 2, and user plane protocol includes packet data polymerized agreement (Packet Data Convergence Protocol, PDCP), wireless spread-spectrum technology(Radio Link Control, RLC), Medium education(Medium Access Control, MAC)And physical layer(Physical Layer, PHY);Chain of command is assisted Discuss stack shown in Figure 3, chain of command agreement includes wireless heterogeneous networks(Radio Resource Control, RRC)Connect with non- Enter layer(Non-Access Stratum, NAS), wherein, rrc layer message needs the processing by user plane protocol layer, then in sky Mouth is transmitted;NAS layers of message are encapsulated in RRC information, then are eating dishes without rice or wine to be transmitted;In S1-MME interface, in S1 connections Transmission.
In existing Long Term Evolution(Long Term Evolution, LTE)Network/long-term evolution upgrading(Long Term Evolution-Advanced, LTE-A)In network, UE RRC, PDCP, RLC, MAC and PHY peer layer is all located at same In eNB, UE NAS layers peer layer is located to be established in the MME being connected for the S1 of the UE with above-mentioned eNB.In existing protocol, PDCP and RLC entities and DRB/ Signaling Radio Bearers(Signal Radio Bearer, SRB)1/SRB2 correspondences, each DRB, SRB1 or SRB2 correspond to a set of PDCP and RLC entities respectively;DRB/SRB1/SRB2 is converged in MAC layer.Therefore, UE can be simultaneously PDCP and RLC entities, but only one of which MAC layer and physical layer entity are covered with more.SRB belongs to chain of command carrying, and DRB belongs to use Family face is carried.
As user constantly increases to data service rate and the demand of volume of business, traditional macro base station individual layer nerve of a covering The mode of network can not meet the demand of user, therefore, 3rd Generation Partnership Project(3rd Generation Partnership Project, 3GPP)In introduce layering networking mode, in hot spot region, family room The target BS of low-power is laid in the small overlay area such as interior environment, working environment(Local eNB), such as femto base station (Femto eNB), micro-base station(Pico eNB), Home eNodeB(Home eNB), relaying(Relay)Equipment etc..It is existing referring to Fig. 4 Have in hierarchical network, macrocell(Macro cell)Basis covering, home cell are provided(Local cell)Focus covering is provided, There is data/signaling interface between Local cell and Macro Cell(Wire/wireless interface), UE can be operated in Macro Under eNB or Local eNB.
Because the cell coverage area that Local eNB are controlled is small, the UE quantity of service is few, so, it is connected to Local eNB UE tend to obtain more preferable service quality, such as:Obtain higher service rate, higher-quality link etc..Therefore, when even When being connected to the cell that Macro eNB UE is controlled close to Local eNB, Local eNB can be switched to obtain Local eNB The service of offer;When the cell that UE is controlled away from LocaleNB, it is necessary to be switched to the cell of Macro eNB controls, to keep Wireless connection.But, because Local eNB quantity is more, cover small, to cause UE needs frequently to be controlled in Macro eNB cell Switch between the cell of Local eNB controls.Because UE switching frequency and number of times are all greatly increased, exist so as to add UE The risk of communication disruption occurs when switching over.
In summary, in the current E-UTRAN network architecture, because UE switching frequency and number of times are all greatly increased, from And add the risk that communication disruption occurs when switching over for UE.
The content of the invention
A kind of method and apparatus switched over provided in an embodiment of the present invention, to solve E- present in prior art In the UTRAN network architecture, because UE switching frequency and number of times are all greatly increased, sent out so as to add UE when switching over The problem of risk of raw communication disruption.
The embodiments of the invention provide a kind of method for carrying out carrying separation switching, including:
User equipment is after the carrying separation order from macro base station is received, according to what is included in the carrying separation order The configuration information of target BS after user equipment switching, sets up and the media access control MAC layer of the target BS is real Body and physical layer PHY entities distinguish corresponding MAC layer entity and PHY entities;
The user equipment will need the carrying for being separated to the target BS to be mapped to the corresponding MAC layer of the target BS Entity and PHY entities;And
The user equipment keeps the connection with the macro base station, and accesses the target BS.
The embodiments of the invention provide a kind of method for carrying out carrying separation switching, including:
Macro base station determines that user equipment needs to carry out carrying separation switching;
The macro base station sends carrying separation order to the user equipment, to indicate that the user equipment is held according to Carry separation order and carry out carrying separation switching;
Wherein, the user equipment, which carries out carrying separation switching, includes:According to the institute indicated in the carrying separation order The configuration information of the target BS of user equipment after handover is stated, the corresponding MAC layer entity of the target BS is set up and PHY is real Body;The carrying for being separated to the target BS will be needed to be mapped to the corresponding MAC layer entity of the target BS and PHY entities;With And holding and the connection of the macro base station, and access the target BS.
The embodiments of the invention provide it is a kind of carry out carrying convergence switching method, wherein user equipment part carrying with Macro base station is connected, and remaining carrying is connected with home base stations, and this method includes:
The user equipment is after the carrying aggregate command from the macro base station is received, according to the carrying convergence life Order, again with the corresponding MAC layer entity of the home base stations and PHY entities;
The user equipment will need the carrying for converging to the macro base station to be mapped to the corresponding MAC layer entity of the macro base station With PHY entities.
The embodiments of the invention provide it is a kind of carry out carrying convergence switching method, wherein user equipment part carrying with Macro base station is connected, and remaining carrying is connected with home base stations, and this method includes:
The macro base station determines that the user equipment needs to carry out carrying convergence switching;
The macro base station sends carrying aggregate command to the user equipment, to indicate that the user equipment is held according to Carry aggregate command and carry out carrying convergence switching;
Wherein, the user equipment carries out carrying convergence switching according to the carrying aggregate command includes:The user sets It is again real with the corresponding MAC layer of the home base stations according to the carrying aggregate command for after the carrying aggregate command is received Body and PHY entities;The carrying for converging to the macro base station will be needed to be mapped to the corresponding MAC layer entity of the macro base station and PHY realities Body;And send carrying handover success message to the macro base station.
The embodiments of the invention provide a kind of user equipment for carrying out carrying separation switching, including:
First processing module, for after the carrying separation order from macro base station is received, according to the carrying separation life The configuration information of target BS after the user equipment switching included in order, sets up the MAC layer entity with the target BS Distinguish corresponding MAC layer entity and PHY entities with PHY entities;
First mapping block, it would be desirable to which the carrying for being separated to the target BS is mapped to the corresponding MAC of the target BS Layer entity and PHY entities;
AM access module, for keeping the connection with the macro base station, and accesses the target BS.
The embodiments of the invention provide a kind of macro base station for carrying out carrying separation switching, including:
First judging module, determines that user equipment needs to carry out carrying separation switching;
First indicating module, for sending carrying separation order to the user equipment, to indicate the user equipment root Carrying separation switching is carried out according to the carrying separation order.
The embodiments of the invention provide a kind of user equipment for carrying out carrying convergence switching, including:
Configuration module, for after the carrying aggregate command from the macro base station is received, according to the carrying convergence life Order, again with the corresponding MAC layer entity of the home base stations and PHY entities;
Second mapping block, for the carrying for converging to the macro base station will to be needed to be mapped to the corresponding MAC of the macro base station Layer entity and PHY entities.
The embodiments of the invention provide a kind of macro base station for carrying out carrying convergence switching, including:
Second judging module, for determining that the user equipment needs to carry out carrying convergence switching;
Second indicating module, for sending carrying aggregate command to the user equipment, to indicate the user equipment root Carrying convergence switching is carried out according to the carrying aggregate command.
The embodiment of the present invention realizes carrying handoff functionality, has further reached user plane bearer and chain of command carrying separation And the purpose of convergence;The number of times of face switching is controlled due to reducing user equipment, so that in the E-UTRAN network architecture In the case of the switching frequency of user equipment and number of times increase, the wind that communication disruption occurs when switching over for user equipment is reduced Danger.
Brief description of the drawings
The network architecture schematic diagram that Fig. 1 is E-UTRAN in background technology;
Fig. 2 is the user face protocol stack schematic diagram in background technology between UE and network;
Fig. 3 is the chain of command agreement stack schematic diagram in background technology between UE and network;
Fig. 4 is hierarchical network deployment scenario schematic diagram in background technology;
Fig. 5 is the network architecture schematic diagram that the first user plane of the embodiment of the present invention and chain of command are separated;
Fig. 6 is the network architecture schematic diagram that second of user plane of the embodiment of the present invention and chain of command are separated;
Fig. 7 is the schematic diagram that the first user plane of the embodiment of the present invention and chain of command are separated;
Fig. 8 is the user face protocol stack schematic diagram between UE of the embodiment of the present invention and network;
Fig. 9 is the chain of command agreement stack schematic diagram between UE of the embodiment of the present invention and network;
Figure 10 is a kind of method flow schematic diagram for carrying out carrying separation switching of the embodiment of the present invention;
Figure 11 is another method flow schematic diagram for carrying out carrying separation switching of the embodiment of the present invention;
Figure 12 is the schematic diagram that second of user plane of the embodiment of the present invention and chain of command are separated;
Figure 13 is the method flow schematic diagram of another progress carrying separation switching of the embodiment of the present invention;
Figure 14 is a kind of method flow schematic diagram for carrying out carrying convergence switching of the embodiment of the present invention;
Figure 15 is another method flow schematic diagram for carrying out carrying convergence switching of the embodiment of the present invention;
Figure 16 is the method flow schematic diagram of another progress carrying convergence switching of the embodiment of the present invention;
Figure 17 is the schematic diagram that the third user plane of the embodiment of the present invention and chain of command are separated;
Figure 18 is the user device architecture schematic diagram that the embodiment of the present invention carries out carrying separation switching;
Figure 19 is the macro base station structural representation that the embodiment of the present invention carries out carrying separation switching;
Figure 20 is the user device architecture schematic diagram that the embodiment of the present invention carries out carrying convergence switching;
Figure 21 is the macro base station structural representation that the embodiment of the present invention carries out carrying convergence switching.
Embodiment
In order to reduce the cell that UE is controlled in Macro eNB(That is Macro eNB cells)The cell controlled with Local eNB (That is Local eNB cells)Between the frequency that switches over, the network design mode of user plane and chain of command separation is introduced into.Ginseng The network design mode of two kinds of user planes of Fig. 5 and Fig. 6 and chain of command separation is seen, in two kinds of network designs shown in Fig. 5 and Fig. 6 Under scape, when UE is in the only region of Macro eNB MPS process, UE chain of command and user plane are all connected to Macro eNB; When UE is moved to the region of Macro eNB cells and the small area overlapping coverings of Local eNB, UE user plane is all or part of Carrying is transferred to Local eNB, to obtain higher service transmission rate;And UE chain of command carrying is stilled remain in Macro eNB, to prevent chain of command connects handoff failure from causing UE call drops, realize the functions such as mobile management.
Under the scene that UE user plane and chain of command are separated, UE is connected to two or more eNB simultaneously.Referring to Fig. 7, UE It is connected simultaneously with Macro and Local eNB, chain of command and user plane connection is obtained respectively.
Under the scene that UE user plane and chain of command are separated, the protocol stack between UE and network is referring to Fig. 8 and Fig. 9.UE User plane eNB(Local eNB)There is provided user plane data transfer function for UE, its not with UE equity rrc layer, it is impossible to it is right UE carries out RRC controls;UE chain of command eNB(Macro eNB)Chain of command message transfer function is provided for UE, in order to realize pair The carrying and processing of RRC information, UE chain of command eNB need to have the user face protocol stack with UE equities;Because NAS message is needed To be carried by RRC information, so, UE service MME is connected with UE chain of command eNB.
As one kind enhancing, part RRC functions are there may be between UE and user plane eNB, such as UE can read user plane The broadcast message that eNB is sent(ENB is transferred to multiple UE point-to-multipoint RRC information).
In order to support the network architecture of above-mentioned user plane and chain of command separation, the present invention is using corresponding carrying switching Method.
The embodiment of the present invention is described in further detail with reference to Figure of description.
Referring to Figure 10, the method that the embodiment of the present invention carries out carrying separation switching, now user equipment enter macro base station with Target BS(That is home base stations)It is overlapping covered in, this method comprises the following steps:
Step 101, user equipment are after the carrying separation order from macro base station is received, according in the carrying separation order Comprising user equipment switching after target BS configuration information, set up the MAC layer entity and PHY included with target BS The corresponding MAC layer entity of entity and PHY entities;
Wherein, for needing to be separated to the carrying of target BS, by carrying separation order the use can be notified by macro base station Family equipment, can also be provided in the protocol, can also be mutual agreement;
Further, the carrying for needing to be separated to target BS in user equipment can be part or all of DRB, and user sets Standby all SRB remain at macro base station;Or
Needing to be separated in user equipment both includes part or all of DRB in the carrying of target BS, part is included again SRB, and the part SRB of user equipment remains at macro base station.
Further, it can be RB that macro base station, which sends carrying separation order,(Radio bearer)Handover request, wherein, carrying separation In order comprising the target BS identification information, for indicate need to be separated to the information and mesh of the carrying of the target BS Mark the configuration information of base station;
Wherein, the identification information of target BS can be supported for the target BS frequency and physical-layer cell identifier (Physical Cell ID, PCI), or the corresponding E-UTRAN Cell Global Identifier of the target BS(E-UTRAN Cell Global ID, ECGI);
The configuration information of target BS includes the MAC resource distributions and PHY resource distributions of target BS.
If desired be separated to target BS is carried as part carrying, then being used for instruction in carrying separation order needs separation Information to the carrying of target BS is every identification information carried, for example, being if desired separated to being carried as target BS Part DRB, then carrying in separation order is used to indicate the mark for needing the information for being separated to the carrying of target BS for every DRB Information;
If desired be separated to target BS is carried as whole DRB, then being used for instruction in carrying separation order needs separation To target BS carrying information can for every DRB identification information, or for indicating all to separate whole DRB Configured information, it is for instance possible to use whole DRB are transferred to target BS by 1bit information with instruction user equipment.
Further, one kind or the combination in following message can also be included in the carrying separation order:
Need the corresponding RLC configuration informations of the carrying for being separated to the target BS and PDCP configuration informations;
With Radio Link Failure in the target BS(Radio Link Failure, RLF)Related timer information;
The measurement limitation subframe of the target BS, for eliminating area interference, such as enhancement type district interference is eliminated (Enhanced Conference on Intelligent Computing, eICIC);
The serving cell Scell configurations of the target BS, for carrying out carrier aggregation in target BS;
Dedicated preamble preamble for accessing the target BS;And
The Cell Radio Network Temporary Identifier/Identity, Cell-RNTI C-RNTI of target BS.
The carrying that the carrying separation order and user equipment that macro base station of the embodiment of the present invention is sent are sent switches successfully message It can be defined RRC information in existing protocol(Such as RRC connection reallocation messages), or the RRC information newly defined.
Step 102, user equipment will need the carrying for being separated to the target BS to be mapped to the corresponding MAC of the target BS Layer entity and PHY entities, so that user equipment is successfully accessed after the target BS, can utilize and be separated to the target BS Carrying and the corresponding MAC layer entity of the target BS and PHY entities are communicated with the target BS;
In force, user equipment will need the carrying for being separated to target BS to be mapped to the target BS in step 102 Corresponding MAC layer entity and PHY entities include following two modes:
If being included in mode one, carrying separation order needs the corresponding RLC configuration informations of the carrying for being separated to target BS And PDCP configuration informations, user equipment will need the carrying for being separated to target BS to be mapped to the target BS pair in step 102 The MAC layer entity and PHY entities answered include:
User equipment is separated to the corresponding RLC configuration informations of carrying and PDCP configuration informations of target BS as needed, Set up the corresponding RLC entities of the target BS and PDCP entities;And
User equipment and that the corresponding RLC entities of the target BS and PDCP entities are mapped into the target BS is corresponding MAC layer entity and PHY entities.
Specifically, the RLC entities and the data of PDCP entities set up for the carrying being connected with target BS, user equipment Processing procedure includes:
RLC entities will be from low layer(Such as MAC layer)The RLC SDU received are delivered to PDCP entities;PDCP entities are pressed according to head Compression algorithm(Header compression algorithm before not separating)The packet submitted RLC(That is RLC SDU)The compression processing of solution head is carried out, is obtained High level is delivered to corresponding PDCP SDU, and by PDCP SDU(Such as IP layers)Handled.
If not including in mode two, carrying separation order needs the corresponding RLC of the carrying for being separated to target BS to match somebody with somebody confidence Breath and PDCP configuration informations, then user equipment only need to change need the corresponding RLC entities of the carrying for being separated to target BS and The mapping relations of PDCP entities and MAC entity, will need the corresponding RLC entities of the carrying for being separated to target BS and PDCP entities are mapped to the corresponding MAC entity of target BS.
Step 103, user equipment keep the connection with the macro base station, and access the target BS.
Wherein, access procedure is synchronous etc. including uplink/downlink.
Further, user equipment access target BS includes following three kinds of modes in step 103:
If mode A, macro base station are synchronous with target BS, user equipment access target BS includes:
User equipment determines that itself has been successfully accessed target BS.
If mode B, macro base station and target BS are asynchronous, and the Special leader of target BS is included in carrying separation order Code preamble, then user equipment access target BS include:
User equipment accesses target BS according to the dedicated preamble using non-competing Random Access.
If mode C, macro base station and target BS are asynchronous, and do not include the special of target BS in carrying separation order Preamble, then user equipment access target BS include:
User equipment is using competition Random Access access target BS;
Wherein, in competition random access procedure, user is carried in the message m sg3 that user equipment is sent to target BS The identification information of equipment;The msg3 can be the control unit of the RRC information or media access control layer newly defined(MAC Control Element, MAC CE);
Target BS carries the corresponding confirmations of the msg3 and disappeared after msg3 is received in the msg4 returned to user equipment Breath, or MAC CE, uplink scheduling information, wherein, msg4 is dispatched using C-RNTI.
Further, after it is determined that itself being successfully accessed target BS, this method also includes:
User equipment sends carrying to macro base station and switches successfully message.
The carrying that the carrying separation order and user equipment that macro base station of the embodiment of the present invention is sent are sent switches successfully message It can be defined RRC information in existing protocol(Such as RRC connection reallocation messages), or the RRC information newly defined.
Referring to Figure 11, the method that the embodiment of the present invention carries out carrying separation switching comprises the following steps:
Step 111, macro base station determine that user equipment needs to carry out carrying separation switching;
Step 112, macro base station send carrying separation order to user equipment, with instruction user equipment according to carrying separation life Order carries out carrying separation switching.
Accordingly, user equipment, which carries out carrying separation switching, includes:Set up the corresponding MAC layer entity of target BS and PHY Entity;The carrying for being separated to target BS will be needed to be mapped to the corresponding MAC layer entity of the target BS and PHY entities;And The connection with macro base station is kept, and accesses target BS.
Further, the carrying separation order can carry handover request for RB, wherein, include target in carrying separation order The identification information of base station, for indicate need to be separated to the information of the carrying of target BS and the configuration information of target BS;
Wherein, the identification information of target BS can be supported for the target BS frequency and PCI, or ECGI;
The configuration information of target BS includes the MAC resource distributions and PHY resource distributions of target BS.
Further, one kind or the combination in following message can also be included in the carrying separation order:
Need the corresponding RLC configuration informations of the carrying for being separated to the target BS and PDCP configuration informations;
The timer information related to RLF in the target BS;
The measurement limitation subframe of the target BS;
The serving cell Scell configurations of the target BS;
Dedicated preamble for accessing the target BS;And
Target cell Radio Network Temporary Identifier C-RNTI.
Further, the carrying for needing to be separated to the target BS in user equipment can be part or all of DRB, and user The SRB of equipment remains at macro base station;Or
Need the carrying for being separated to the target BS both to include part or all of DRB in user equipment, part is included again SRB。
Further, the one kind or combination of macro base station in following three kinds of modes in step 111, determine user equipment needs Carry out carrying separation switching:
Mode 1, reported according to the measurement of user equipment, determine whether user equipment needs to carry out carrying separation switching;
Specifically, macro base station can report the signal intensity of middle home base stations cell according to UE measurement, determine that user sets It is standby whether to need to carry out carrying separation switching;
If for example, the signal intensity of at least one home base stations cell is more than the intensity threshold of setting, it is determined that user Equipment needs to carry out carrying separation switching, and carries out carrying separation switching using the home base stations as target BS;If all The signal intensity of ground base station cell is not more than the intensity threshold, it is determined that user equipment need not carry out carrying separation switching;
If the quantity of home base stations is at least two, and signal intensity is more than the cell of the intensity threshold respectively positioned at difference Home base stations, then home base stations therefrom where the cell of selection signal maximum intensity be used as target BS carry out carrying separation Switching.
Mode 2, the positional information according to user equipment, determine whether user equipment needs to carry out carrying separation switching;
Specifically, when the distance between user equipment and home base stations cell is less than the distance threshold of some setting, it is grand Base station determines that user equipment needs to carry out carrying separation switching.
Mode 3, the business information according to user equipment, determine whether user equipment needs to carry out carrying separation switching;
If specifically, certain traffic needs of user equipment are larger and low to delay requirement, it is determined that user equipment is needed Carry out carrying separation switching.
Below for the network scenarios shown in Figure 12(UE from Macro eNB overlay area be moved to Macro eNB with Local eNB's is overlapping covered), and so that UE needs part or all of DRB being separated to Local eNB as an example, to this hair The process that bright embodiment carries out carrying separation switching is described in detail.
Example one,
Referring to Figure 13, the method that the present embodiment carries out carrying separation switching is located at macrocell applied to UE(macro cell)With target home cell(Target local cell)It is overlapping covered in, this method comprises the following steps:
Step 131, macro cell judge whether connected UE needs to carry out carrying separation switching;
If so, then performing step 132;
If it is not, then terminating this flow.
It is preferred that, macro cell can be reported according to UE measurement, UE positional information or UE business information, it is determined that Whether the UE needs to carry out carrying separation switching.
Step 132, macro cell send carrying separation order to UE(Such as " RB handover requests "), wherein, the carrying At least include in separation order:Target local cell mark, for indicating that UE needs to be separated to target local cell's The configured information of carrying, target local cell configuration information;
Further, target local cell configuration information includes target local cell MAC resource distributions and physics Layer resource distribution.
For example, macro cell determine UE part or all of DRB being transferred to local cell, UE SRB is still protected Hold in macro cell.
Further, the RB handover requests use a kind of feasible implementation of RRC information:Macro eNB and local ENB configuration information is two sets separate configuration parameters, UE can according to the macro eNB included in the RRC information with Local eNB different configuration parameters are respectively to the corresponding entities of macro and local(As MAC layer entity and physical layer are real Body)Carry out parameter configuration.
Step 133, UE set up target local cell correspondences after the carrying separation order from macro cell is received MAC layer entity and PHY entities, and according to carrying separation order in target local cell MAC resource distributions and physical layer Resource distribution is configured to newly-established MAC layer entity and PHY entities;
The PDCP entities and RLC entities that step 134, UE will need to be separated to target local cell DRB are mapped to mesh Mark the corresponding MAC layer entities of local cell and PHY entities;
If specifically, being included in carrying separation order needs to be separated to the target local cell corresponding RLC/ of DRB PDCP is configured, then UE rebuilds the corresponding RLC/PDCP entities of the DRB;
If not including in carrying separation order needs the corresponding RLC/PDCP of DRB for being separated to target local cell to match somebody with somebody Put, then UE, which need to only change, needs the mapping relations of the corresponding RLC/PDCP entities of the DRB and MAC entity separated.
Step 135, UE judge whether macro cell are synchronous with local cell;
If so, then performing step 136;
If it is not, then performing step 137;
Step 136, UE determine itself to be successfully accessed local cell, and perform step 138;
Step 137, UE initiate to access to target local cell;
Wherein, access procedure is synchronous etc. including uplink/downlink;When UE successfully completes the uplink/downlink with target local cell After synchronization, then UE determines access target Local eNB successes.
Further, if carrying separation order(That is RB handover requests)In include be used for access the special of target local cell Lead code preamble, then UE target local is accessed by the way of non-competing Stochastic accessing according to the dedicated preamble cell;
If carrying separation order(That is RB handover requests)In do not include be used for access the special of target local cell Preamble, then UE uses compete Random Access and access target local cell;Wherein, UE is to target local cell The msg3 of transmission(Message 3)Middle carrying UE identification information, such as C-RNTI;And target local cell are according to the msg3 received, The corresponding RRC confirmation messages of msg3 or MAC CE or UL grant are carried in the msg4 of return;
It is preferred that, the msg3 can be the RRC information or MAC CE newly defined;Msg4 is dispatched using C-RNTI in itself.
Step 138, UE return to carrying after access target local cell, to macro eNB and switch successfully message(Such as " RB switches successfully message ").
It should be noted that the carrying separation order and carrying in the present embodiment switch successfully message and can newly defined RRC information, can also use defined RRC information in agreement, such as RRC connection reallocation messages.
Referring to Figure 14, a kind of method for carrying out carrying convergence switching of the embodiment of the present invention, the part of wherein user equipment is held Load is connected with macro base station, and remaining carrying is connected with home base stations, and this method comprises the following steps:
Step 141, user equipment are after the carrying aggregate command from macro base station is received, according to the carrying aggregate command, Match somebody with somebody the corresponding MAC layer entity of home base stations and PHY entities again;
The configuration information of the macro base station of step 142, user equipment in carrying aggregate command, it would be desirable to converge to grand base The carrying stood is mapped to the corresponding MAC layer entity of the macro base station and PHY entities;
Specifically, user equipment will need to converge to the PDCP entities and RLC entities of the carrying of macro base station, to be mapped to this grand The corresponding MAC layer entity in base station and PHY entities.
Further, the carrying aggregate command can be RB handover requests, and being included in the carrying aggregate command is used to indicate to need Converge to the configuration information of the information of the carrying of macro base station, the configuration information of macro base station and home base stations;
Wherein, when being carried as the part carrying being separated in the carrying of home base stations of macro base station is if desired converged to, is used In the identification information for indicating to need the information for being separated to the carrying of macro base station to be every carrying;Needing to converge to holding for macro base station Carry to be separated to during whole carryings in the carrying of home base stations, for indicating to need to converge to the information of the carrying of home base stations For configured information, it is for instance possible to use all carryings are transferred to macro base station by 1bit information with instruction user equipment;
Further, user equipment matches somebody with somebody the corresponding MAC layer entity of home base stations and PHY entities including following again in step 141 Two kinds of situations:
If situation one, carrying aggregate command indicate to need to converge to the portion for being carried as being separated to the home base stations of macro base station Divide carrying, then user equipment matches somebody with somebody the corresponding MAC layer entity of home base stations and PHY entities again, including:
The configuration information of home base stations of the user equipment in carrying aggregate command, again with the corresponding MAC of home base stations Layer entity and PHY entities.
If situation two, carrying aggregate command indicate to need to converge to macro base station be carried as be separated to the complete of the home base stations Portion is carried, then user equipment matches somebody with somebody the corresponding MAC layer entity of home base stations and PHY entities again, including:
User equipment deletes the corresponding MAC layer entity of home base stations and PHY entities generated.
Further, also include part SRB if being separated to the carrying of home base stations, and need to converge to being carried as macro base station Whole DRB of home base stations are separated to, then are also included in step 141:
User equipment deletes the corresponding SRB of home base stations generated and its relevant configuration information.
After step 142, this method also includes:
User equipment sends carrying to macro base station and switches successfully message.
It should be noted that aggregate command and carrying handover success message are carried in the present embodiment newly to be defined Defined RRC information in RRC information or existing protocol, such as RRC connection reallocation messages.
It should be noted that the side of the carrying convergence switching shown in method and Figure 14 that the carrying separation shown in Figure 10 switches Method can synthesize a flow, the method for forming another carrying switching, including carrying separation handoff procedure and carrying convergence are cut Change process;
Wherein, the RB handover requests from macro base station that user equipment is received in the method for carrying switching, are being carried It is carrying separation order during separation switching, is carrying aggregate command during carrying convergence switching is carried out.
It should be noted that the side of the carrying separation switching shown in method and Figure 11 that the carrying separation shown in Figure 10 switches Method can synthesize a flow, the method for forming another carrying separation switching, that is, first carry out step 111 ~ step 113, then hold Row step 101 ~ step 103.
Referring to Figure 15, a kind of method for carrying out carrying convergence switching of the embodiment of the present invention, the part of wherein user equipment is held Load is connected with macro base station, and remaining carrying is connected with target BS, and this method comprises the following steps:
Step 151, macro base station determine that user equipment needs to carry out carrying convergence switching;
Step 152, macro base station send carrying aggregate command to user equipment, to indicate that the user equipment is converged according to carrying Order carries out carrying convergence switching.
Accordingly, user equipment carries out carrying convergence switching according to carrying aggregate command includes:User equipment is held according to this Carry aggregate command, the corresponding MAC layer entity of configuration target BS and PHY entities;The carrying for converging to macro base station will be needed to map To the corresponding MAC layer entity of the macro base station and PHY entities.
Further, carrying aggregate command is RB handover requests, and included in the carrying aggregate command needs convergence for instruction The configuration information and the configuration information of target BS of information, macro base station to the carrying of macro base station;
Wherein, when being carried as the part carrying being separated in the carrying of home base stations of macro base station is if desired converged to, then For the identification information for indicating to need the information for being separated to the carrying of macro base station to be every carrying;Needing to converge to macro base station During the whole carryings for being carried as being separated in the carrying of home base stations, then for indicating to need to converge to the carrying of target BS Information is configured information, it is for instance possible to use all carryings are transferred to macro base station by 1bit information with instruction user equipment.
Further, the one kind or combination of macro base station in following three kinds of methods determine user equipment needs in step 151 Carry out carrying separation switching:
Method 1, reported according to the measurement of user equipment, determine whether user equipment needs to carry out carrying convergence switching;
Specifically, macro base station can report the signal intensity of the cell of middle target BS control according to UE measurement, it is determined that Whether user equipment needs to carry out carrying convergence switching;
If for example, the signal intensity of at least one Target cell is more than the intensity threshold of setting, it is determined that user equipment Carrying convergence switching need not be carried out;If the signal intensity of all Target cells is all not more than the intensity threshold, it is determined that user Equipment needs to carry out carrying convergence switching.
Method 2, the positional information according to user equipment, determine whether user equipment needs to carry out carrying convergence switching;
Specifically, when the distance between user equipment and Target cell is more than the distance threshold of some setting, macro base station Determine that user equipment needs to carry out carrying convergence switching.
Method 3, the business information according to user equipment, determine whether user equipment needs to carry out carrying convergence switching;
If specifically, the business of user equipment is high to delay requirement, it is determined that user equipment needs progress carrying convergence to cut Change.
It should be noted that the side of the carrying convergence switching shown in method and Figure 14 that the carrying separation shown in Figure 11 switches Method can synthesize a flow, the method for forming another carrying switching, including carrying separation handoff procedure and carrying convergence are cut Change process;
Wherein, the RB handover requests from macro base station that user equipment is received in the method for carrying switching, are being carried It is carrying separation order during separation switching, is carrying aggregate command during carrying convergence switching is carried out.
It should be noted that the side of the carrying convergence switching shown in method and Figure 15 that the carrying separation shown in Figure 14 switches Method can synthesize a flow, the method for forming another carrying convergence switching, that is, first carry out step 151 ~ step 152, then hold Row step 141 ~ step 142.
It should be noted that Figure 10, Figure 11, Figure 14 and Figure 15 method can synthesize a flow, form another and hold The method for carrying switching, including carrying separation handoff procedure and carrying convergence handoff procedure.
Below for the network scenarios shown in Fig. 7(UE all SRB are connected with macro cell, a UE DRB parts It is connected with macro cell, another part is connected with local cell), the mistake of carrying convergence switching is carried out to the embodiment of the present invention Journey is described in detail.
Example two,
Referring to Figure 16, the method that the present embodiment carries out carrying convergence switching is located at macrocell applied to UE(macro cell)With target home cell(Target local cell)It is overlapping covered in, this method comprises the following steps:
Step 161, macro cell judge whether connected UE needs to carry out carrying convergence switching;
If so, then performing step 162;
If it is not, then terminating this flow.
It is preferred that, macro cell can be reported according to UE measurement, UE positional information or UE business information, it is determined that Whether the UE needs to carry out carrying convergence switching.
Step 162, macro cell send carrying aggregate command to UE(Such as " RB handover requests "), wherein, the carrying Included in aggregate command be used to indicating needing to converge to the macro cell information of carrying, macro cell configuration information with And local cell configuration information;
Further, macro cell configuration information includes macro cell MAC resource distributions and physical layer resources are matched somebody with somebody Put;Local cell configuration information includes local cell MAC resource distributions and physical layer resources configuration.
Step 163, the corresponding MAC layer entities of local cell and PHY generated according to the carrying aggregate command, configuration Entity;
Specifically, if desired converging to the macro cell part DRB for being carried as being separated to the local cell, then use The corresponding MAC layer entities of family device configuration local cell and PHY entities, including:
User equipment is according to the configuration informations of home base stations, again with the corresponding MAC layer entity of home base stations and PHY entities.
If desired the macro cell whole DRB for being carried as being separated to the local cell are converged to, then user equipment The corresponding MAC layer entities of local cell and PHY entities are configured, including:
User equipment deletes the corresponding MAC layer entities of local cell and PHY entities generated.
Step 164, UE return to carrying to macro cell and switch successfully message, such as " RB switches successfully message ".
It can be the RRC information newly defined that aggregate command and carrying handover success message are carried in the present embodiment, can also It is defined RRC information in existing protocol, such as RRC connection reallocation messages.
If it should be noted that the part in UE SRB is connected with macro cell, another part and local Cell connections;And the part in UE DRB is connected with macro cell, the solenoid field that another part is connected with local cell Under scape, referring to Figure 17, needing to converge to when being carried as being separated to whole DRB of the local cell of macro cell, then User equipment also needs to delete local while the corresponding MAC layer entities of local cell and PHY entities that have generated is deleted The corresponding SRB of cell and its relevant configuration information.
Based on same inventive concept, a kind of user for carrying out carrying separation switching is additionally provided in the embodiment of the present invention and is set It is standby, because the principle of user equipment solution problem is similar with the method for separating switching of the progress carrying shown in Figure 10, therefore should Implementation for equipment may refer to the implementation of method, repeats part and repeats no more.
Referring to Figure 18, the embodiment of the present invention carries out the user equipment of carrying separation switching, including:
First processing module 181, for after the carrying separation order from macro base station is received, being separated according to the carrying The configuration information of target BS after the user equipment switching included in order, sets up the MAC layer included with target BS real Body and PHY entities distinguish corresponding MAC layer entity and PHY entities;
, wherein it is desired to which being separated to the carrying of target BS includes part or all of DRB;Or
The carrying for being separated to target BS is needed to include part DRB and part SRB;Or
The carrying for being separated to target BS is needed to include whole DRB and part SRB.
First mapping block 182, it would be desirable to which the carrying for being separated to target BS is mapped to the corresponding MAC layer of the target BS Entity and PHY entities;
AM access module 183, for keeping the connection with the macro base station, and accesses the target BS.
Further, carrying separation order can be " mark of target BS to be included in RB handover requests, the carrying separation order Know information, for indicating to need to be separated to the information of the carrying of target BS and the configuration information of target BS;
Accordingly, the first 182 pieces of mould of mapping specifically for:
The carrying indicated in the carrying separation order is mapped to the corresponding MAC layer entity of target BS and PHY entities.
Further, one kind or the combination in following message are also included in carrying separation order:
Need the corresponding wireless spread-spectrum technology RLC configuration informations of the carrying for being separated to target BS and packet data polymerized association Discuss measurement limitation subframe, the target base of timer information, target BS related to RLF in PDCP configuration informations, target BS The cell-radio network of serving cell Scell configurations, the dedicated preamble for accessing target BS and the target BS stood Temporary mark C-RNTI.
Further, the first mapping block 182 specifically for:
Being included in carrying separation order needs the corresponding RLC configuration informations of the DRB for being separated to target BS and PDCP to match somebody with somebody When confidence ceases, the corresponding RLC configuration informations of DRB and PDCP configuration informations of target BS are separated to as needed, target is set up The corresponding RLC entities in base station and PDCP entities, and the corresponding RLC entities of target BS and PDCP entities are mapped to the target base Stand corresponding MAC layer entity and PHY entities.
Further, the first mapping block 182 specifically for:
Not including in carrying separation order needs the corresponding RLC configuration informations of the DRB for being separated to target BS and PDCP During configuration information, it would be desirable to which the corresponding RLC entities of DRB and PDCP entities for being separated to target BS are mapped to the target BS pair The MAC layer entity and PHY entities answered.
Further, AM access module 183 specifically for:
When the macro base station is synchronous with the target BS, determine itself to be successfully accessed the target BS;
It is asynchronous with the target BS in the macro base station, and include the target BS in the carrying separation order Dedicated preamble when, according to the dedicated preamble, the target BS is accessed using non-competing Random Access;
It is asynchronous with the target BS in the macro base station, and if not including the target in the carrying separation order During the dedicated preamble of base station, the target BS is accessed using competition Random Access.
Further, the user equipment also includes:
First sending module 184, for after it is determined that itself being successfully accessed the target BS, being sent to the macro base station Carrying switches successfully message.
The carrying that the carrying separation order and user equipment that macro base station of the embodiment of the present invention is sent are sent switches successfully message It can be defined RRC information in existing protocol(Such as RRC connection reallocation messages), or the RRC information newly defined.
Based on same inventive concept, a kind of macro base station for carrying out carrying separation switching is additionally provided in the embodiment of the present invention, Due to the macro base station solve problem principle with shown in Figure 11 progress carrying separate switching method it is similar, therefore this be used for it is grand The implementation of base station may refer to the implementation of method, repeats part and repeats no more.
Referring to Figure 19, the embodiment of the present invention carries out the macro base station of carrying separation switching, including:
First judging module 191, determines that user equipment needs to carry out carrying separation switching;
First indicating module 192, for sending carrying separation order to user equipment, with instruction user equipment according to carrying Separation order carries out carrying separation switching.
Wherein, the carrying separation order can be RB handover requests, carry the mark for including target BS in separation order Information, for indicate need to be separated to the information of the carrying of target BS and the configuration information of target BS;
Further, one kind or the combination in following message can also be included in the carrying separation order:
Need the corresponding RLC configuration informations of the carrying for being separated to the target BS and PDCP configuration informations;
The timer information related to RLF in the target BS;
The measurement limitation subframe of the target BS;
The serving cell Scell configurations of the target BS;
Dedicated preamble for accessing the target BS;And
Target cell Radio Network Temporary Identifier C-RNTI.
Further, the first judging module 191 specifically for:
Reported according to the measurement of user equipment, positional information and one kind in business information or combination, determine user equipment Need to carry out carrying separation switching.
Based on same inventive concept, a kind of user for carrying out carrying convergence switching is additionally provided in the embodiment of the present invention and is set It is standby, because the method that the user equipment solves the principle of problem to the progress carrying convergence shown in Figure 14 switches is similar, therefore should The implementation of user equipment may refer to the implementation of method, repeats part and repeats no more.
Referring to Figure 20, the embodiment of the present invention carries out the user equipment of carrying convergence switching, including:
Configuration module 201, for after the carrying aggregate command from macro base station is received, according to carrying aggregate command, weight With the corresponding MAC layer entity of home base stations and PHY entities;
Second mapping block 202, for the configuration information according to macro base station in carrying aggregate command, it would be desirable to converge to grand The carrying of base station is mapped to the corresponding MAC layer entity of the macro base station and PHY entities.
Further, carrying aggregate command is RB handover requests, and included in the carrying aggregate command needs convergence for instruction The configuration information and the configuration information of target BS of information, macro base station to the carrying of macro base station.
Further, configuration module 201 specifically for:
Indicate to need to converge to the portion for being carried as being separated in the carrying of home base stations of macro base station in carrying aggregate command During point carrying, the configuration information of the home base stations in carrying aggregate command, again with the corresponding MAC layer entity of home base stations and PHY entities.
Further, configuration module 201 specifically for:
Carrying aggregate command indicate to need to converge to macro base station be carried as be separated to it is complete in the carrying of home base stations When portion is carried, home base stations corresponding all MAC layer entities and PHY entities are deleted.
Further, the user equipment also includes:
Second sending module 203, message is switched successfully for sending carrying to macro base station.
It should be noted that each module shown in each module and Figure 20 shown in Figure 18 can be integrated in a user equipment In, when needing to carry out carrying separation switching, each module shown in Figure 18 is operated;Switch when needing progress carrying convergence When, each module shown in Figure 20 is operated;
Wherein, the RB handover requests from macro base station that user equipment is received, during carrying separation switching is carried out It is carrying aggregate command during carrying convergence switching is carried out for carrying separation order.
Based on same inventive concept, a kind of macro base station for carrying out carrying convergence switching is additionally provided in the embodiment of the present invention, Because the method that the macro base station solves the principle of problem to the progress carrying convergence shown in Figure 15 switches is similar, therefore the macro base station Implementation may refer to the implementation of method, repeat part and repeat no more.
The macro base station of carrying convergence switching is carried out referring to Figure 21, the embodiment of the present invention, including:
Second judging module 211, for determining that user equipment needs to carry out carrying convergence switching;
Second indicating module 212, for sending carrying aggregate command to user equipment, with instruction user equipment according to carrying Aggregate command carries out carrying convergence switching.
Further, carrying aggregate command is RB handover requests, and included in the carrying aggregate command needs convergence for instruction The configuration information and the configuration information of target BS of information, macro base station to the carrying of macro base station.
Further, the second judging module 211 specifically for:
Reported according to the measurement of user equipment, positional information and one kind in business information or combination, determine that the user sets It is standby to need to carry out carrying convergence switching.
It should be noted that each module shown in each module and Figure 21 shown in Figure 19 can be integrated in a macro base station In, when needing to carry out carrying separation switching, each module shown in Figure 19 is operated;Switch when needing progress carrying convergence When, each module shown in Figure 21 is operated;
Wherein, the RB handover requests that macro base station is sent, are carrying separation order during carrying separation switching is carried out, It is carrying aggregate command during carrying convergence switching is carried out.
It should be understood by those skilled in the art that, embodiments of the invention can be provided as method, system or computer program Product.Therefore, the present invention can be using the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware Apply the form of example.Moreover, the present invention can be used in one or more computers for wherein including computer usable program code Usable storage medium(Including but not limited to magnetic disk storage, CD-ROM, optical memory etc.)The computer program production of upper implementation The form of product.
The present invention is with reference to method according to embodiments of the present invention, equipment(System)And the flow of computer program product Figure and/or block diagram are described.It should be understood that can be by every first-class in computer program instructions implementation process figure and/or block diagram Journey and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided The processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce A raw machine so that produced by the instruction of computer or the computing device of other programmable data processing devices for real The device for the function of being specified in present one flow of flow chart or one square frame of multiple flows and/or block diagram or multiple square frames.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction being stored in the computer-readable memory, which is produced, to be included referring to Make the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one square frame of block diagram or The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that in meter Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented processing, thus in computer or The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in individual square frame or multiple square frames.
, but those skilled in the art once know basic creation although preferred embodiments of the present invention have been described Property concept, then can make other change and modification to these embodiments.So, appended claims are intended to be construed to include excellent Select embodiment and fall into having altered and changing for the scope of the invention.
The embodiment of the present invention realizes carrying handoff functionality, has further reached user plane bearer and chain of command carrying separation And the purpose of convergence;The number of times of face switching is controlled due to reducing user equipment, so that in the E-UTRAN network architecture In the case of the switching frequency of user equipment and number of times increase, the wind that communication disruption occurs when switching over for user equipment is reduced Danger.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these changes and modification.

Claims (25)

1. a kind of method for carrying out carrying separation switching, it is characterised in that this method includes:
User equipment is after the carrying separation order from macro base station is received, according to the use included in the carrying separation order The configuration information of target BS after the equipment switching of family, sets up the media access control MAC layer included with the target BS real Body and physical layer PHY entities distinguish corresponding MAC layer entity and PHY entities;
The user equipment will need the carrying for being separated to the target BS to be mapped to the corresponding MAC layer entity of the target BS With PHY entities;And
The user equipment keeps the connection with the macro base station, and accesses the target BS;
Wherein, if being included in the carrying separation order needs the corresponding Radio Link control of the carrying for being separated to the target BS RLC configuration informations processed and packet data polymerized agreement PDCP configuration informations, the user equipment will need to be separated to the target The carrying of base station, which is mapped to the corresponding MAC layer entity of the target BS and PHY entities, to be included:The user equipment is according to the need It is to be separated to arrive the RLC configuration informations and PDCP configuration informations, set up the corresponding RLC entities of the target BS and PDCP is real Body;The corresponding RLC entities of the target BS and PDCP entities are mapped to the corresponding MAC of the target BS by the user equipment Layer entity and PHY entities;
If it is described carrying separation order in do not include need the corresponding RLC configuration informations of the DRB for being separated to the target BS and PDCP configuration informations, it is corresponding that the user equipment will need the carrying for being separated to the target BS to be mapped to the target BS MAC layer entity and PHY entities include:The user equipment needs the carrying for being separated to the target BS corresponding by described RLC entities and PDCP entities are mapped to the corresponding MAC layer entity of the target BS and PHY entities.
2. the method as described in claim 1, it is characterised in that described to need the carrying for being separated to the target BS to include portion Divide or total data radio bearer DRB;Or
It is described to need the carrying for being separated to the target BS to include part DRB and part Signaling Radio Bearer SRB;Or
It is described to need the carrying for being separated to the target BS to include whole DRB and part SRB.
3. method as claimed in claim 2, it is characterised in that the mark of the target BS is included in the carrying separation order Know information, for indicating to need to be separated to the information and the configuration information of the target BS of the carrying of the target BS;
It is real that the user equipment will need the carrying for being separated to the target BS to be mapped to the corresponding MAC layer of the target BS Body and PHY entities, are specifically included:
The user equipment by the carrying indicated in the separation order be mapped to the corresponding MAC layer entity of the target BS and PHY entities.
4. the method as described in claim 1, it is characterised in that the corresponding RLC of the target BS in the user equipment The data handling procedure of entity and PDCP entities includes:
The RLC Service Data Units SDU from MAC layer received is delivered to PDCP entities by RLC entities;
The PDCP entities carry out the compression of solution head according to the RLC SDU from the RLC entities to receiving and handled, and obtain PDCP SDU, and the PDCP SDU are delivered to high level.
5. the method as described in claim 1, it is characterised in that the user equipment accesses the target base according to following manner Stand:
If the macro base station is synchronous with the target BS, the user equipment determines itself to be successfully accessed the target base Stand;Or
If the macro base station is asynchronous with the target BS, and special comprising the target BS in the carrying separation order With lead code, the user equipment accesses the target base according to the dedicated preamble using non-competing Random Access Stand;Or
If the macro base station is asynchronous with the target BS, and if not including the target BS in the carrying separation order Dedicated preamble, the user equipment accesses the target BS using competition Random Access.
6. the method as described in claim 1, it is characterised in that methods described also includes:
The user equipment sends carrying after it is determined that itself being successfully accessed the target BS, to the macro base station and switched successfully Message.
7. a kind of method for carrying out carrying separation switching, it is characterised in that this method includes:
Macro base station determines that user equipment needs to carry out carrying separation switching;
The macro base station sends carrying separation order to the user equipment, to indicate the user equipment according to the carrying point Carrying separation switching is carried out from order;
Wherein, the user equipment, which carries out carrying separation switching, includes:According to the use indicated in the carrying separation order The configuration information of the target BS of family equipment after handover, sets up the corresponding MAC layer entity of the target BS and PHY entities; The carrying for being separated to the target BS will be needed to be mapped to the corresponding MAC layer entity of the target BS and PHY entities;And protect The connection with the macro base station is held, and accesses the target BS;
If being included in the carrying separation order needs the corresponding wireless spread-spectrum technology RLC of the carrying for being separated to the target BS Configuration information and packet data polymerized agreement PDCP configuration informations, the user equipment will need to be separated to the target BS Carrying, which is mapped to the corresponding MAC layer entity of the target BS and PHY entities, to be included:The user equipment needs separation according to described To the RLC configuration informations and PDCP configuration informations, the corresponding RLC entities of the target BS and PDCP entities are set up;It is described The corresponding RLC entities of the target BS and PDCP entities are mapped to the corresponding MAC layer entity of the target BS by user equipment With PHY entities;
If it is described carrying separation order in do not include need the corresponding RLC configuration informations of the DRB for being separated to the target BS and PDCP configuration informations, it is corresponding that the user equipment will need the carrying for being separated to the target BS to be mapped to the target BS MAC layer entity and PHY entities include:The user equipment needs the carrying for being separated to the target BS corresponding by described RLC entities and PDCP entities are mapped to the corresponding MAC layer entity of the target BS and PHY entities.
8. method as claimed in claim 7, it is characterised in that the macro base station is reported according to the measurement of user equipment, position One kind or combination in information and business information, determine that user equipment needs to carry out carrying separation switching.
9. method as claimed in claim 7, it is characterised in that the mark of the target BS is included in the carrying separation order Know information, for indicating to need to be separated to the information and the configuration information of the target BS of the carrying of the target BS.
10. the part carrying of a kind of method for carrying out carrying convergence switching, wherein user equipment is connected with macro base station, remaining carrying It is connected with home base stations, it is characterised in that this method includes:
The user equipment is after the carrying aggregate command from the macro base station is received, according to the carrying aggregate command, weight With the corresponding MAC layer entity of the home base stations and PHY entities;
The user equipment will need the carrying for converging to the macro base station be mapped to the corresponding MAC layer entity of the macro base station and PHY entities;
Wherein, if the carrying aggregate command indicate to need to converge to the macro base station be carried as be separated to the home base stations Part carrying, the user equipment includes with the corresponding MAC layer entity of the home base stations and PHY entities again:The user The configuration information of home base stations of the equipment in the carrying aggregate command, again with the corresponding MAC layer entity of home base stations and PHY entities;If the carrying aggregate command indicate to need to converge to the macro base station be carried as be separated to the home base stations Whole carryings, the user equipment includes with the corresponding MAC layer entity of the home base stations and PHY entities again:The user Equipment deletes the home base stations corresponding all MAC layer entities and PHY entities.
11. method as claimed in claim 10, it is characterised in that included in the carrying aggregate command needs to converge for instruction Gather the configuration information of information, the configuration information of the macro base station and the home base stations of the carrying of the macro base station.
12. method as claimed in claim 10, it is characterised in that will need to converge to the macro base station in the user equipment Carrying be mapped to after the corresponding MAC layer entity of the macro base station and PHY entities, methods described also includes:
The user equipment sends carrying to the macro base station and switches successfully message.
13. the part carrying of a kind of method for carrying out carrying convergence switching, wherein user equipment is connected with macro base station, remaining carrying It is connected with home base stations, it is characterised in that this method includes:
The macro base station determines that the user equipment needs to carry out carrying convergence switching;
The macro base station sends carrying aggregate command to the user equipment, to indicate that the user equipment converges according to the carrying Poly- order carries out carrying convergence switching;
Wherein, the user equipment carries out carrying convergence switching according to the carrying aggregate command includes:The user equipment exists Receive after the carrying aggregate command, according to the carrying aggregate command again with the corresponding MAC layer entity of the home base stations and PHY entities;The carrying for converging to the macro base station will be needed to be mapped to the corresponding MAC layer entity of the macro base station and PHY entities;With And send carrying handover success message to the macro base station;
If the carrying aggregate command indicates to need to converge to the portion for being carried as being separated to the home base stations of the macro base station Divide carrying, the user equipment includes with the corresponding MAC layer entity of the home base stations and PHY entities again:The user equipment The configuration information of home base stations in the carrying aggregate command, it is again real with the corresponding MAC layer entity of home base stations and PHY Body;If the carrying aggregate command indicates to need to converge to the whole for being carried as being separated to the home base stations of the macro base station Carrying, the user equipment includes with the corresponding MAC layer entity of the home base stations and PHY entities again:The user equipment is deleted Except the home base stations corresponding all MAC layer entities and PHY entities.
14. method as claimed in claim 13, it is characterised in that in measurement of the macro base station according to the user equipment Report, positional information and one kind in business information or combination, determine that the user equipment needs to carry out carrying convergence switching.
15. method as claimed in claim 13, it is characterised in that included in the carrying aggregate command needs to converge for instruction Gather the configuration information of information, the configuration information of the macro base station and the home base stations of the carrying of the macro base station.
16. a kind of user equipment for carrying out carrying separation switching, it is characterised in that the user equipment includes:
First processing module, for after the carrying separation order from macro base station is received, according in the carrying separation order Comprising user equipment switching after target BS configuration information, set up the MAC layer entity included with the target BS Distinguish corresponding MAC layer entity and PHY entities with PHY entities;
First mapping block, it would be desirable to which the carrying for being separated to the target BS is mapped to the corresponding MAC layer reality of the target BS Body and PHY entities;
AM access module, for keeping the connection with the macro base station, and accesses the target BS;
Wherein, first mapping block specifically for:Being included in the carrying separation order needs to be separated to the target When the corresponding RLC configuration informations of carrying and PDCP configuration informations of base station, confidence is matched somebody with somebody according to the RLC configuration informations and PDCP Breath, sets up the corresponding RLC entities of the target BS and PDCP entities;And by the corresponding RLC entities of the target BS and PDCP entities are mapped to the corresponding MAC layer entity of the target BS and PHY entities;
It is described carrying separation order in do not include need the corresponding RLC configuration informations of the DRB for being separated to the target BS and During PDCP configuration informations, the corresponding RLC entities of the carrying for being separated to the target BS and PDCP entities is needed to map by described To the corresponding MAC layer entity of the target BS and PHY entities.
17. user equipment as claimed in claim 16, it is characterised in that the target base is included in the carrying separation order The identification information stood, for indicating to need to be separated to information and the configuration of the target BS of the carrying of the target BS Information;
First mapping block specifically for:
The carrying indicated in the separation order is mapped to the corresponding MAC layer entity of the target BS and PHY entities.
18. user equipment as claimed in claim 16, it is characterised in that the AM access module specifically for:
When the macro base station is synchronous with the target BS, determine itself to be successfully accessed the target BS;Or
It is asynchronous with the target BS in the macro base station and special comprising the target BS in the carrying separation order When using lead code, according to the dedicated preamble, the target BS is accessed using non-competing Random Access;Or
It is asynchronous with the target BS in the macro base station, and if not including the target BS in the carrying separation order Dedicated preamble when, the target BS is accessed using competition Random Access.
19. user equipment as claimed in claim 16, it is characterised in that the user equipment also includes:
First sending module, for after it is determined that itself being successfully accessed the target BS, sending carrying to the macro base station and cutting Change success message.
20. a kind of macro base station for carrying out carrying separation switching, it is characterised in that the macro base station includes:
First judging module, determines that user equipment needs to carry out carrying separation switching;
First indicating module, for sending carrying separation order to the user equipment, to indicate the user equipment according to institute State carrying separation order and carry out carrying separation switching;
Wherein, the user equipment, which carries out carrying separation switching, includes:According to the use indicated in the carrying separation order The configuration information of the target BS of family equipment after handover, sets up the corresponding MAC layer entity of the target BS and PHY entities; The carrying for being separated to the target BS will be needed to be mapped to the corresponding MAC layer entity of the target BS and PHY entities;And protect The connection with the macro base station is held, and accesses the target BS;
If being included in the carrying separation order needs the corresponding wireless spread-spectrum technology RLC of the carrying for being separated to the target BS Configuration information and packet data polymerized agreement PDCP configuration informations, the user equipment will need to be separated to the target BS Carrying, which is mapped to the corresponding MAC layer entity of the target BS and PHY entities, to be included:The user equipment needs separation according to described To the RLC configuration informations and PDCP configuration informations, the corresponding RLC entities of the target BS and PDCP entities are set up;It is described The corresponding RLC entities of the target BS and PDCP entities are mapped to the corresponding MAC layer entity of the target BS by user equipment With PHY entities;
If it is described carrying separation order in do not include need the corresponding RLC configuration informations of the DRB for being separated to the target BS and PDCP configuration informations, it is corresponding that the user equipment will need the carrying for being separated to the target BS to be mapped to the target BS MAC layer entity and PHY entities include:The user equipment needs the carrying for being separated to the target BS corresponding by described RLC entities and PDCP entities are mapped to the corresponding MAC layer entity of the target BS and PHY entities.
21. macro base station as claimed in claim 20, it is characterised in that first judging module specifically for:
Reported according to the measurement of user equipment, positional information and one kind in business information or combination, determine user equipment needs Carry out carrying separation switching.
22. a kind of user equipment for carrying out carrying convergence switching, it is characterised in that the user equipment includes:
Configuration module, for after the carrying aggregate command from macro base station is received, according to the carrying aggregate command, again with this The corresponding MAC layer entity in ground base station and PHY entities;
Second mapping block, it is real for the carrying for converging to the macro base station will to be needed to be mapped to the corresponding MAC layer of the macro base station Body and PHY entities;
Wherein, the configuration module specifically for:Indicate to need to converge to holding for the macro base station in the carrying aggregate command During the part carrying for carrying to be separated in the carrying of the home base stations, according to the home base stations in the carrying aggregate command Configuration information, again with the corresponding MAC layer entity of home base stations and PHY entities;Indicate to need convergence in the carrying aggregate command When being carried as the whole carryings being separated in the carrying of the home base stations, the home base stations pair are deleted to the macro base station All MAC layer entities and PHY entities answered.
23. user equipment as claimed in claim 22, it is characterised in that the user equipment also includes:
Second sending module, message is switched successfully for sending carrying to the macro base station.
24. a kind of macro base station for carrying out carrying convergence switching, it is characterised in that the macro base station includes:
Second judging module, for determining that user equipment needs to carry out carrying convergence switching;
Second indicating module, for sending carrying aggregate command to the user equipment, to indicate the user equipment according to institute State carrying aggregate command and carry out carrying convergence switching;
Wherein, the user equipment carries out carrying convergence switching according to the carrying aggregate command includes:The user equipment exists Receive after the carrying aggregate command, it is again real with the corresponding MAC layer entity of home base stations and PHY according to the carrying aggregate command Body;The carrying for converging to the macro base station will be needed to be mapped to the corresponding MAC layer entity of the macro base station and PHY entities;And to The macro base station sends carrying and switches successfully message;
If the carrying aggregate command indicates to need to converge to the portion for being carried as being separated to the home base stations of the macro base station Divide carrying, the user equipment includes with the corresponding MAC layer entity of the home base stations and PHY entities again:The user equipment The configuration information of home base stations in the carrying aggregate command, it is again real with the corresponding MAC layer entity of home base stations and PHY Body;If the carrying aggregate command indicates to need to converge to the whole for being carried as being separated to the home base stations of the macro base station Carrying, the user equipment includes with the corresponding MAC layer entity of the home base stations and PHY entities again:The user equipment is deleted Except the home base stations corresponding all MAC layer entities and PHY entities.
25. macro base station as claimed in claim 24, it is characterised in that second judging module specifically for:
Reported according to the measurement of the user equipment, positional information and one kind in business information or combination, determine that the user sets It is standby to need to carry out carrying convergence switching.
CN201210265518.9A 2012-07-27 2012-07-27 A kind of method and apparatus switched over Active CN103582054B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210265518.9A CN103582054B (en) 2012-07-27 2012-07-27 A kind of method and apparatus switched over

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210265518.9A CN103582054B (en) 2012-07-27 2012-07-27 A kind of method and apparatus switched over

Publications (2)

Publication Number Publication Date
CN103582054A CN103582054A (en) 2014-02-12
CN103582054B true CN103582054B (en) 2017-08-11

Family

ID=50052735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210265518.9A Active CN103582054B (en) 2012-07-27 2012-07-27 A kind of method and apparatus switched over

Country Status (1)

Country Link
CN (1) CN103582054B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020029310A1 (en) 2018-08-09 2020-02-13 Oppo广东移动通信有限公司 Data transmission method and device, and terminal
CN106162785A (en) * 2015-04-03 2016-11-23 池州学院 A kind of variable structure contorl
CN106332048B (en) 2015-06-30 2022-08-19 华为技术有限公司 Data transmission method, wireless network node and communication system
CN110431861B (en) * 2017-04-07 2020-11-06 华为技术有限公司 Base station function deployment method and device
CN110839267B (en) 2018-08-17 2022-01-28 维沃移动通信有限公司 Service node updating method, terminal equipment and network side equipment
CN110868733B (en) * 2018-08-28 2022-02-18 华为技术有限公司 Data transmission method and device
CN111726786B (en) 2019-03-20 2022-04-01 大唐移动通信设备有限公司 Information processing method, device, equipment and computer readable storage medium
CN113766577B (en) * 2020-06-01 2025-02-11 中国电信股份有限公司 Connection mode configuration method, base station and communication system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1906906A (en) * 2004-01-09 2007-01-31 Lg电子株式会社 Optimized radio bearer configuration for voice over IP
CN1977549A (en) * 2004-07-13 2007-06-06 Ut斯达康通讯有限公司 Radio Access Network System in Mobile Communication System
CN103533589A (en) * 2012-07-04 2014-01-22 华为技术有限公司 Network switching method, system, and network side device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1906906A (en) * 2004-01-09 2007-01-31 Lg电子株式会社 Optimized radio bearer configuration for voice over IP
CN1977549A (en) * 2004-07-13 2007-06-06 Ut斯达康通讯有限公司 Radio Access Network System in Mobile Communication System
CN103533589A (en) * 2012-07-04 2014-01-22 华为技术有限公司 Network switching method, system, and network side device

Also Published As

Publication number Publication date
CN103582054A (en) 2014-02-12

Similar Documents

Publication Publication Date Title
CN103582054B (en) A kind of method and apparatus switched over
AU2019203201B2 (en) Radio communication system, base station apparatus, and radio terminal
US11617109B2 (en) Radio access network handover method, base station, and communication method of the base station
US20230239745A1 (en) Radio access network handover method, base station, and communication method of the base station
CN103517356B (en) A kind of method for switching over, system and equipment
JP2023129544A (en) Target radio access network node, source radio access network node, and methods thereof
US9247555B2 (en) Data transmission method, apparatus, and communications system
CN105659688B (en) Method and apparatus for executing operation related with radio bearer setup complete in heterogeneous network
CN104469869B (en) A small cell handover method and base station
CN103139911B (en) Realize the method for carrier aggregation, base station and subscriber equipment
JP2020061792A (en) Wireless terminal, second core network node, and method therefor
CN103947252B (en) Call drop during radio link failure avoids
CN102123460B (en) Method for realizing group calling service handover in trunked mobile communication system
CN103517351B (en) DRB method for building up and equipment
CN105917727A (en) Systems and methods for dual-connectivity operation
CN102164385B (en) Switching method and relay node
CN104854938B (en) A method and base station for establishing a radio bearer
CN103517357B (en) A kind of method switched over, system and equipment
CN105025465B (en) User terminal location report method, base station, mobile management entity and system
CN103338518B (en) A kind of send the method for RRC signaling, base station and system
CN106717059A (en) Service-specific air-interface selection
CN106973416A (en) Radio resource control connection reestablishment method and base station
CN104640165B (en) A kind of data transmission method, equipment and system
CN104521302A (en) Message transmission method and device
CN103702422A (en) Local bearer management method and equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210323

Address after: 100083 No. 29, Haidian District, Beijing, Xueyuan Road

Patentee after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY