[go: up one dir, main page]

CN103558089B - A kind of triaxial rheology experimental provision of tailings material - Google Patents

A kind of triaxial rheology experimental provision of tailings material Download PDF

Info

Publication number
CN103558089B
CN103558089B CN201310527666.8A CN201310527666A CN103558089B CN 103558089 B CN103558089 B CN 103558089B CN 201310527666 A CN201310527666 A CN 201310527666A CN 103558089 B CN103558089 B CN 103558089B
Authority
CN
China
Prior art keywords
pressure
water
pipe
pore water
nail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310527666.8A
Other languages
Chinese (zh)
Other versions
CN103558089A (en
Inventor
王光进
孔祥云
杨春和
陈玉明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201310527666.8A priority Critical patent/CN103558089B/en
Publication of CN103558089A publication Critical patent/CN103558089A/en
Application granted granted Critical
Publication of CN103558089B publication Critical patent/CN103558089B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明涉及一种尾矿材料的三轴流变实验装置。本发明包括加压顶板、加压轴、重坨Ⅰ、外盖板、挂钩、重坨Ⅱ、传压环、内盖板、凸槽、橡皮膜、卡环、推拉杆、加压板、上隔水板、压力板、承压钢筒、加压容腔、加密铁丝网、下隔水板、孔隙水测压连接管、注水管钉、孔隙水排水连接管、排水管钉、测压管钉、围压测压管、排水管、孔隙水排水管、注水管、孔隙水测压管、震动器、容器底板、传压环预留槽、传压环连接槽、卡环槽、震动弹簧、底板凹槽、隔水板测压口、隔水板排水口、孔隙水测压入口、注水管出口、孔隙水排水管入口、排水管入口、围压测压管入口、围压环丝扣、固定槽。本发明提高了所测尾矿材料流变参数的可靠性和准确性,节省了财力物力。

The invention relates to a triaxial rheological experiment device for tailings materials. The present invention includes pressurized top plate, pressurized shaft, weight I, outer cover, hook, weight II, pressure transmission ring, inner cover, convex groove, rubber film, snap ring, push-pull rod, pressure plate, upper partition Water plate, pressure plate, pressure steel cylinder, pressurized chamber, encrypted barbed wire, lower baffle, pore water pressure measurement connection pipe, water injection pipe nail, pore water drainage connection pipe, drainage pipe nail, pressure measurement pipe nail, Confining pressure piezometer tube, drainage pipe, pore water drainage pipe, water injection pipe, pore water piezometer tube, vibrator, container bottom plate, reserved groove for pressure transmission ring, connection groove for pressure transmission ring, snap ring groove, vibration spring, bottom plate Groove, water baffle pressure measuring port, water baffle drain, pore water pressure measuring inlet, water injection pipe outlet, pore water drain pipe inlet, drain pipe inlet, confining pressure measuring tube inlet, confining pressure ring screw, fixing groove. The invention improves the reliability and accuracy of the measured rheological parameters of the tailings material, and saves financial and material resources.

Description

一种尾矿材料的三轴流变实验装置A Triaxial Rheological Experimental Device for Tailings Materials

技术领域 technical field

本发明涉及一种尾矿材料的三轴流变实验装置,属于矿山岩土工程技术领域。 The invention relates to a triaxial rheological experiment device for tailings materials, which belongs to the technical field of mine geotechnical engineering.

背景技术 Background technique

当前,土力学是以下列基本原理为基础的:1)压力与体积(即孔隙)变化之间以及剪应力和形状变化之间成正比例关系;2)土随时间的压密(固结)是由于水沿土中孔隙运动的结果,并且这个运动服从于渗透定律;3)属于分散介质的土,不仅具有颗粒间的粘聚力,而且具有内摩擦力,这些特性决定了土的抗破坏强度。基于以上这些原理及假设才可能建立土的线性变形理论、渗透固结理论和极限平衡理论。但与此同时,这些原理及假设在一定程度上将土的特性理想化。实际上,土的性状在加荷时是十分复杂的,例如土变形的时间效应,如蠕变、松弛和荷载长期作用下强度降低等,换句话说,土能够随时间的增长而改变本身的应力、应变状态。而土的另一个特点是应力和应变关系的非线性,尤其是随时间而变化的变形。此外,还应考虑到土的基本特性,即它的内摩擦力不仅在极限状态时出现,而且在极限状态之前也出现,从而对变形发展的特点产生影响,土的这种特点是由于它的抗压和抗剪强度不同所形成的,导致了诸如剪应力引起体积变形(剪胀)及均围压力引起剪切变形等等这样一些畸形现象。因此,荷载作用下土的实际性状与理想的概念有重大区别。虽然在一些情况下土特性的理想化对实际计算是可行的,但若忽视土的上述特点,则会导致计算结果与现场情况严重不符;有许多这样的实例:如长期蠕变的结果会导致结构物的变形;计算中采用的瞬时强度而不是长期强度会导致边坡和挡土墙破坏;由于没有考虑非线性,会导致沉降的计算值与实际值有很大差别。考虑了土的变形特点,就有可能较精确地研究土的实际特性,从而可使理论接近于土的实际情况。 At present, soil mechanics is based on the following basic principles: 1) there is a proportional relationship between pressure and volume (i.e., pore) change, and between shear stress and shape change; 2) the compaction (consolidation) of soil over time is As a result of the movement of water along the pores in the soil, and this movement is subject to the law of infiltration; 3) The soil belonging to the dispersion medium not only has the cohesion between particles, but also has internal friction, these characteristics determine the anti-destructive strength of the soil . Based on the above principles and assumptions, it is possible to establish the linear deformation theory, seepage consolidation theory and limit equilibrium theory of soil. But at the same time, these principles and assumptions idealize the properties of soil to a certain extent. In fact, the properties of soil are very complicated when loading, such as the time effect of soil deformation, such as creep, relaxation, and strength reduction under long-term load, etc. In other words, soil can change its own properties with time. Stress and strain state. Yet another characteristic of soil is the non-linearity of the stress-strain relationship, especially the time-dependent deformation. In addition, the basic characteristics of the soil should be taken into account, that is, its internal friction occurs not only at the limit state, but also before the limit state, thereby affecting the characteristics of the deformation development. This characteristic of the soil is due to its The difference in compressive and shear strengths leads to some deformities such as volume deformation (dilatation) caused by shear stress and shear deformation caused by confining pressure. Therefore, the actual behavior of the soil under load differs significantly from the ideal concept. Although idealization of soil properties is feasible for practical calculations in some cases, ignoring the above characteristics of soil will lead to calculation results that are seriously inconsistent with field conditions; there are many such examples: results such as long-term creep can lead to Deformation of structures; instantaneous strength instead of long-term strength used in calculations can lead to failure of slopes and retaining walls; non-linearity is not considered, resulting in settlement calculations that differ significantly from actual values. Considering the deformation characteristics of the soil, it is possible to study the actual characteristics of the soil more accurately, so that the theory can be close to the actual situation of the soil.

中国是一个矿业大国,每年选矿产生尾矿约3亿吨,除小部分作为矿山充填或综合利用外,绝大部分要以尾矿坝的形式堆存。然而,由于我国在尾矿坝方面的科研投入少,科研滞后,科技水平低,导致频频发生尾矿坝溃坝等重大安全事故,如2008年9月8日,山西襄汾县新塔矿业有限公司发生特大尾矿坝溃坝事故,270人死亡,此次事故造成了极其恶劣的社会影响及环境灾害。被安监总局称为“迄今为止全世界最大的尾矿坝事故”,据统计,仅2007年就发生了14起尾矿坝安全事故。然而,矿山尾矿坝的滑坡及溃坝过程一个长期的过程(量变—质变),这个过程是尾矿发生流变的一个过程。因此,开展尾矿材料的三轴流变实验的重要性不言而预。尽管如此,当前开发的流变实验仪多数都是针对“岩石”而开发的流变实验仪,而专门针对尾矿材料或细粒土样的流变仪非常少。 China is a big mining country, and about 300 million tons of tailings are produced by ore dressing every year. Except for a small part as mine filling or comprehensive utilization, most of them are stored in the form of tailings dams. However, due to the low investment in scientific research on tailings dams in my country, the lag in scientific research, and the low level of science and technology, major safety accidents such as tailings dam failures have occurred frequently. For example, on September 8, 2008, Xinta Mining Co., Ltd., Xiangfen County, Shanxi The company suffered a huge tailings dam collapse accident, and 270 people died. This accident caused extremely bad social impact and environmental disasters. It is called "the largest tailings dam accident in the world so far" by the State Administration of Work Safety. According to statistics, there were 14 tailings dam safety accidents in 2007 alone. However, the landslide and dam break process of mine tailings dam is a long-term process (quantitative change-qualitative change), and this process is a process of tailings rheology. Therefore, the importance of carrying out triaxial rheological experiments on tailings materials is self-evident. Nevertheless, most of the currently developed rheometers are rheometers developed for "rocks", and there are very few rheometers specifically for tailings materials or fine-grained soil samples.

发明内容 Contents of the invention

本发明要解决的技术问题是:提供一种尾矿材料的三轴流变实验装置,该装置可以针对矿山尾矿坝的尾矿材料及土样开展室内的三轴流变实验研究。同时,以获取更接近于土体实际的力学特性,也可通过此装置寻找到土样中的相对弱面。以测得相对弱面的强度值,以更准确的获取土体的流变力学参数。 The technical problem to be solved by the present invention is to provide a triaxial rheological experimental device for tailings materials, which can carry out indoor triaxial rheological experimental research on tailings materials and soil samples of mine tailings dams. At the same time, in order to obtain the mechanical properties closer to the actual soil, the relatively weak surface in the soil sample can also be found through this device. In order to measure the strength value of the relatively weak surface, the rheological parameters of the soil can be obtained more accurately.

本发明的技术方案是:一种尾矿材料的三轴流变实验装置,包括加压顶板1、加压轴2、重坨Ⅰ3、外盖板4、挂钩5、重坨Ⅱ6、传压环7、内盖板8、凸槽9、橡皮膜10、卡环11、推拉杆12、加压板13、上隔水板14、压力板15、承压钢筒16、加压容腔18、加密铁丝网19、下隔水板20、孔隙水测压连接管21、注水管钉22、孔隙水排水连接管23、排水管钉24、测压管钉25、围压测压管26、排水管27、孔隙水排水管28、注水管30、孔隙水测压管32、震动器33、容器底板34、传压环预留槽35、传压环连接槽36、卡环槽37、震动弹簧38、底板凹槽39、隔水板测压口40、隔水板排水口41、孔隙水测压入口42、注水管出口43、孔隙水排水管入口44、排水管入口45、围压测压管入口46、围压环丝扣47、固定槽48;加压顶板1两端设置有传压环7并通过传压环7与围压环丝扣47连接,挂钩5固定在加压顶板1的中间位置,挂钩5上放置有重坨Ⅱ6,压力板15通过其上开凿的具有丝扣的固定槽48与围压环丝扣47连接;卡环11位于承压钢筒16内部的卡环槽37内并且与推拉杆12连接,承压钢筒16内设置有橡皮膜10,橡皮膜10外翻固定在承压钢筒16上,承压钢筒16上端和下端均设置有凸槽9,凸槽9外侧设有传压环预留槽35,压力板15位于加压容腔18上部,压力板15上对应传压环预留槽35设有传压环连接槽36,传压环7底部穿过传压环预留槽35安装在传压环连接槽36内,上隔水板14位于加压板13下面,加压板13与上隔水板14均位于加压容腔18上部,加压轴2穿过内盖板8的预留孔并通过轴压环丝扣49与加压板13连接,重坨Ⅰ3位于加压轴2上,内盖板8、外盖板4依次装在承压钢筒16的顶端;注水管钉22、排水管钉24和测压管钉25均固定于承压钢筒16内部并贯穿承压钢筒16底部,围压测压管26与测压管钉25通过围压测压管入口46连通,排水管钉24与排水管27通过排水管入口45连通,孔隙水排水管28与孔隙水排水连接管23通过孔隙水排水管入口44连通,注水管30与注水管钉22通过注水管出口43连通,孔隙水测压管32与孔隙水测压连接管21通过孔隙水测压入口42连通,围压测压管26、排水管27和孔隙水排水管28位于容器底板34的一侧,围压测压管26位于排水管27之上,排水管27位于孔隙水排水管28之上,注水管30和孔隙水测压管32均位于容器底板34的另一侧,注水管30位于孔隙水测压管32之上,下隔水板20安装在容器底板34上、下隔水板20边缘两侧的隔水板测压口40和隔水板排水口41与容器底板34上的孔隙水测压入口42和孔隙水排水管入口相连通,注水管出口43位于容器底板34上表面的一侧,排水管入口45和围压测压管入口46位于容器底板34上表面的另一侧;震动器33通过底板凹槽39安装在在容器底板34中间并且与下隔水板20相连,震动器33上装有震动弹簧38,加密铁丝网19位于下隔水板20上面,孔隙水测压连接管21与孔隙水排水连接管23装在下隔水板20内并位于下隔水板20的边缘两侧。 The technical solution of the present invention is: a triaxial rheological experimental device for tailings materials, including a pressurized top plate 1, a pressurized shaft 2, a weight I3, an outer cover plate 4, a hook 5, a weight II6, and a pressure transmission ring 7 , inner cover plate 8, convex groove 9, rubber film 10, snap ring 11, push-pull rod 12, pressure plate 13, upper baffle plate 14, pressure plate 15, pressure steel cylinder 16, pressure chamber 18, encryption Barbed wire 19, lower water baffle 20, pore water pressure measurement connection pipe 21, water injection pipe nail 22, pore water drainage connection pipe 23, drainage pipe nail 24, pressure measurement pipe nail 25, confining pressure pressure measurement pipe 26, drainage pipe 27 , pore water drainage pipe 28, water injection pipe 30, pore water pressure measuring tube 32, vibrator 33, container bottom plate 34, pressure transmission ring reserved groove 35, pressure transmission ring connection groove 36, snap ring groove 37, vibration spring 38, Bottom plate groove 39, water baffle pressure measuring port 40, water baffle water outlet 41, pore water pressure measuring inlet 42, water injection pipe outlet 43, pore water drainage pipe inlet 44, drain pipe inlet 45, confining pressure piezometer inlet 46. Confining pressure ring screw 47, fixing groove 48; both ends of the pressurized top plate 1 are provided with a pressure transmission ring 7 and connected with the pressure transmission ring 7 and the confining pressure ring thread 47, and the hook 5 is fixed in the middle of the pressurized top plate 1 position, the hook 5 is placed with a heavy lump II6, and the pressure plate 15 is connected to the confining pressure ring thread 47 through the fixed groove 48 with a threaded button dug thereon; the snap ring 11 is located in the snap ring groove 37 inside the pressure-bearing steel cylinder 16 and is connected with the push-pull rod 12, the pressure-bearing steel cylinder 16 is provided with a rubber film 10, the rubber film 10 is turned outward and fixed on the pressure-bearing steel cylinder 16, and the upper and lower ends of the pressure-bearing steel cylinder 16 are provided with convex grooves 9, convex The outside of the groove 9 is provided with a pressure transmission ring reserved groove 35, the pressure plate 15 is located at the upper part of the pressurized chamber 18, and the pressure plate 15 is provided with a pressure transmission ring connecting groove 36 corresponding to the pressure transmission ring reserved groove 35, and the bottom of the pressure transmission ring 7 Through the reserved groove 35 of the pressure transmission ring, it is installed in the connection groove 36 of the pressure transmission ring. The upper water baffle 14 is located under the pressure plate 13, and the pressure plate 13 and the upper water baffle 14 are both located in the upper part of the pressure chamber 18. The pressure shaft 2 passes through the reserved hole of the inner cover plate 8 and connects with the pressure plate 13 through the shaft pressure ring screw 49. The weight I3 is located on the pressure shaft 2, and the inner cover plate 8 and the outer cover plate 4 are installed on the bearing in turn. The top of the pressure steel cylinder 16; the water injection pipe nail 22, the drainage pipe nail 24 and the pressure measurement pipe nail 25 are all fixed inside the pressure bearing steel cylinder 16 and run through the bottom of the pressure bearing steel cylinder 16, the confining pressure pressure measurement tube 26 and the pressure measurement tube The nail 25 communicates with the inlet 46 of the confining pressure measuring tube, the drain pipe nail 24 communicates with the drain pipe 27 through the drain pipe inlet 45, the pore water drain pipe 28 communicates with the pore water drainage connecting pipe 23 through the pore water drain pipe inlet 44, and the water injection pipe 30 communicates with the water injection pipe nail 22 through the water injection pipe outlet 43, the pore water pressure measuring pipe 32 communicates with the pore water pressure measuring connecting pipe 21 through the pore water pressure measuring inlet 42, the confining pressure measuring pipe 26, the drainage pipe 27 and the pore water drainage The pipe 28 is located on one side of the container bottom plate 34, the confining pressure piezometer tube 26 is located on the drain pipe 27, the drain pipe 27 is located on the pore water drain pipe 28, the water injection pipe 30 and the pore water piezometer tube 32 are both located on the container bottom plate On the other side of 34, the water injection pipe 30 is located above the pore water pressure measuring pipe 32, and the lower water baffle 20 is installed on the container bottom plate 34, the water baffle pressure measuring port 40 and the water baffle on both sides of the edge of the lower water baffle 20 The plate drain 41 is connected with the pore water pressure measuring inlet 42 on the container bottom plate 34 and the pore water drainage pipe inlet. 46 is located on the other side of the upper surface of the container bottom plate 34; the vibrator 33 is installed in the middle of the container bottom plate 34 through the bottom plate groove 39 and is connected with the lower water baffle 20; Above the water baffle 20 , the pore water pressure measurement connecting pipe 21 and the pore water drainage connecting pipe 23 are installed in the lower water baffle 20 and are located on both sides of the edge of the lower water baffle 20 .

所述压力板15下移时不与橡皮膜10接触。 The pressure plate 15 is not in contact with the rubber membrane 10 when it moves down.

所述孔隙水排水管入口44、排水管入口45和围压测压管入口46位于容器底板34上表面的一侧,孔隙水测压入口42和注水管出口43位于容器底板34上表面的另一侧,其从左到右的顺序依次为:围压测压管入口46、排水管入口45、孔隙水排水管入口44、孔隙水测压入口42、注水管出口43。 The pore water drainage pipe inlet 44, the drain pipe inlet 45 and the confining pressure piezometer inlet 46 are located on one side of the upper surface of the container bottom plate 34, and the pore water pressure measurement inlet 42 and the water injection pipe outlet 43 are located on the other side of the upper surface of the container bottom plate 34. On one side, the order from left to right is: confining pressure piezometer inlet 46, drain pipe inlet 45, pore water drain pipe inlet 44, pore water piezometer inlet 42, water injection pipe outlet 43.

所述围压测压管26和孔隙水测压管32上装有压力表31。 A pressure gauge 31 is installed on the confining pressure piezometer tube 26 and the pore water piezometer tube 32 .

所述排水管27、孔隙水排水管28和注水管30上均装有阀门29。 A valve 29 is installed on the drain pipe 27 , the pore water drain pipe 28 and the water injection pipe 30 .

所述加压轴2底部装有轴压环丝扣49。 The bottom of the pressurizing shaft 2 is equipped with a shaft pressing ring screw thread 49 .

所述传压环7的弧长为承压钢筒16圆周长的1/4。 The arc length of the pressure transmitting ring 7 is 1/4 of the circumference of the pressure bearing steel cylinder 16 .

所述注水管钉22、排水管钉24和测压管钉25的长度超过承压钢筒16的厚度,注水管钉22,排水管钉24,测压管钉25均为空心管。 The lengths of the water injection pipe nail 22, the drain pipe nail 24 and the pressure measurement pipe nail 25 exceed the thickness of the pressure steel cylinder 16, and the water injection pipe nail 22, the drainage pipe nail 24 and the pressure measurement pipe nail 25 are all hollow pipes.

本发明可归纳为由试样容器装置、水加压装置、轴向加载装置、辅助装置组成。 The present invention can be summarized as being composed of a sample container device, a water pressurizing device, an axial loading device and an auxiliary device.

试样容器装置是由凸槽9,橡皮膜10,卡环11,推拉杆12,压力板15,承压钢筒16,加压容腔18,注水管钉22,排水管钉24,测压管钉25,传压环预留槽35,传压环连接槽36,卡环槽37组成。由于实验过程中,承压钢筒16需承受一定的水压,所以承压钢筒16需具有一定的强度。在实验施加围压之前,卡环11是处于“推出”状态,它的作用在于:在充水前使压力板15位于加压容腔18的顶部,目的在于使加压容腔18能充满水。同时,在试样容器装置的上部和下部都设置了凸槽9,以便在流变实验过程中固定橡皮膜10,防止橡皮膜10的滑动。另外,在承压钢筒16的底部设置了注水管钉22,排水管钉24,测压管钉25,其特点是:注水管钉22,排水管钉24,测压管钉25三个管钉固定于承压钢筒16上,三个管钉的下部呈“尖状”结构且“长出”承压钢筒16,同时注水管钉22,排水管钉24,测压管钉25都是各自连通的,注水管钉22,排水管钉24,测压管钉25的作用在于:第一,能测定加压容腔18中的水压并进行充、放水;第二,三个管钉的下部“长出”承压钢筒16的目的在于保证实验振动过程中注水管钉22,排水管钉24,测压管钉25不脱离容器底板34的连通孔,以防止加压容腔18的水渗出;第三,三个管钉的下部呈“尖状”结构的目的是为了在安装橡皮膜10时,便于戳破与注水管钉22,排水管钉24,测压管钉25位置相对应的橡皮膜10,以便于与下部容器底板34连通。 The sample container device is composed of convex groove 9, rubber film 10, snap ring 11, push-pull rod 12, pressure plate 15, pressure steel cylinder 16, pressurized chamber 18, water injection pipe nail 22, drainage pipe nail 24, pressure measurement The pipe nail 25, the reserved groove 35 for the pressure transmission ring, the connection groove 36 for the pressure transmission ring, and the snap ring groove 37 are formed. Since the pressure-bearing steel cylinder 16 needs to withstand a certain water pressure during the experiment, the pressure-bearing steel cylinder 16 needs to have a certain strength. Before the confining pressure is applied in the experiment, the snap ring 11 is in the state of "pushing out", and its function is to make the pressure plate 15 at the top of the pressurized chamber 18 before filling with water, so that the pressurized chamber 18 can be filled with water . At the same time, convex grooves 9 are provided on the upper and lower parts of the sample container device, so as to fix the rubber membrane 10 during the rheological experiment and prevent the rubber membrane 10 from sliding. In addition, a water injection pipe nail 22, a drain pipe nail 24, and a pressure measurement pipe nail 25 are arranged at the bottom of the pressure-bearing steel cylinder 16. The nails are fixed on the pressure-bearing steel cylinder 16. The lower parts of the three pipe nails have a "pointed" structure and "grow out" of the pressure-bearing steel cylinder 16. At the same time, the water injection pipe nail 22, the drainage pipe nail 24, and the pressure measurement pipe nail 25 Be connected respectively, the water injection pipe nail 22, the drainage pipe nail 24, the effect of the pressure measuring pipe nail 25 is: the first, can measure the water pressure in the pressurized chamber 18 and carry out filling and discharging; second, the three pipes The purpose of the lower part of the nail "growing" the pressure-bearing steel cylinder 16 is to ensure that the water injection pipe nail 22, the drainage pipe nail 24, and the pressure measurement pipe nail 25 do not break away from the communication hole of the container bottom plate 34 during the experimental vibration process, so as to prevent the pressurized cavity from 18 water seeps out; thirdly, the purpose of the lower part of the three pipe nails having a "pointed" structure is to facilitate puncturing and water injection pipe nails 22, drainage pipe nails 24, and pressure measuring pipe nails when the rubber membrane 10 is installed. 25 corresponding rubber membranes 10, so as to communicate with the bottom plate 34 of the lower container.

水加压装置是由加压顶板1,挂钩5,重坨Ⅱ6,传压环7,压力板15,围压环丝扣47,固定槽48组成。当实验时,将传压环7穿过试样容器装置的传压环预留槽35,然后通过围压环丝扣47和固定槽48连接起来,然后通过在挂钩5上加载重坨Ⅱ6的数量,以对压力板15施加不同的重力,从而对三轴流变实验施加不同压力的稳定围压。 Water pressurization device is to be made up of pressurization top plate 1, hook 5, weight Tuo II 6, pressure transmission ring 7, pressure plate 15, surrounding pressure ring screw thread 47, fixed groove 48 forms. When experimenting, pass the pressure transmission ring 7 through the pressure transmission ring reserved groove 35 of the sample container device, and then connect it through the pressure ring thread 47 and the fixing groove 48, and then load the heavy lump II6 on the hook 5 The quantity is used to apply different gravitational forces to the pressure plate 15, so as to apply different stable confining pressures to the triaxial rheological experiment.

轴向加载装置是由加压轴2,重坨Ⅰ3,加压板13,上隔水板14,轴压环丝扣49组成。在实验过程中,先将上隔水板14放于实验的土样17上,之后将加压板13放置于上隔水板14之上,最后将加压轴2穿过内盖板8的预留孔并通过轴压环丝扣49将加压轴2与加压板13连接起来。本装置是通过在加压轴2的上部放置磅坨Ⅰ3的数量来对土样17施加不同的稳定轴压。 The axial loading device is composed of a pressurized shaft 2, a heavy lump I3, a pressurized plate 13, an upper baffle plate 14, and a screw thread 49 for the axially pressed ring. During the experiment, the upper water baffle 14 is first placed on the soil sample 17 of the experiment, then the pressure plate 13 is placed on the upper water baffle 14, and finally the pressure shaft 2 is passed through the predetermined opening of the inner cover plate 8. Leave a hole and connect the pressure shaft 2 with the pressure plate 13 through the shaft pressure ring screw 49 . This device applies different stable axial pressures to the soil sample 17 by placing the number of pounds I3 on the upper part of the pressure shaft 2 .

辅助装置是由加密铁丝网19,下隔水板20,围压测压管26,排水管27,孔隙水排水管28,阀门29,注水管30,压力表31,孔隙水测压管32,震动器33、容器底板34,震动弹簧38,底板凹槽39,隔水板测压口40,隔水板排水口41,孔隙水测压入口42,注水管出口43,孔隙水排水管入口44,排水管入口45,围压测压管入口46组成。在实验过程中,将震动器33安放于容器底板34的底部,其作用在于模拟土样在地震作用时的流变参数,以获得土样动态的流变参数。同时在容器底板34上放置下隔水板20,并且下隔水板20上开有隔水板测压口40和隔水板排水口41两个孔,其作用在于测定土样在不排水和排水条件下的流变力学参数。最后,在下隔水板20上放置加密铁丝网19;设置加密铁丝网19的目的在于防止实验土样中的小颗粒通过隔水板测压口40和隔水板排水口41进入孔隙水测压管32和孔隙水测压管32,从而堵塞孔隙水测压管32和孔隙水测压管32。 The auxiliary device is composed of encrypted barbed wire 19, lower baffle 20, confining pressure piezometer 26, drain pipe 27, pore water drain pipe 28, valve 29, water injection pipe 30, pressure gauge 31, pore water piezometer 32, vibration Device 33, container bottom plate 34, vibrating spring 38, bottom plate groove 39, water baffle pressure measuring port 40, water baffle drain outlet 41, pore water pressure measuring inlet 42, water injection pipe outlet 43, pore water drain pipe inlet 44, The drain pipe inlet 45 and the confining pressure piezometer inlet 46 are composed. During the experiment, the vibrator 33 was placed at the bottom of the container bottom plate 34, and its function was to simulate the rheological parameters of the soil sample under earthquake action, so as to obtain the dynamic rheological parameters of the soil sample. Place lower baffle 20 on container bottom plate 34 simultaneously, and have water baffle pressure measuring port 40 and water baffle discharge port 41 two holes on lower water baffle 20, its effect is to measure soil sample in non-drainage and Rheological parameters under drained conditions. Finally, place an encrypted barbed wire 19 on the lower baffle 20; the purpose of setting the encrypted barbed wire 19 is to prevent small particles in the experimental soil sample from entering the pore water piezometer 32 through the water baffle pressure measuring port 40 and the water baffle outlet 41 And the pore water piezometric tube 32, thereby blocking the pore water piezometric tube 32 and the pore water piezometric tube 32.

容器底板34是由围压测压管26,排水管27,孔隙水排水管28,阀门29,注水管30,压力表31,孔隙水测压管32,底板凹槽39,孔隙水测压入口42,注水管出口43,孔隙水排水管入口44,排水管入口45,围压测压管入口46组成。其中围压测压管26与围压测压管入口46和试样容器装置的测压管钉25连通;排水管27与排水管入口45和试样容器装置的排水管钉24相连通;注水管30与注水管出口43和试样容器装置的注水管钉22连通。而孔隙水测压管32与孔隙水测压连接管21和孔隙水测压入口42相连通;孔隙水排水管28与孔隙水排水连接管23和孔隙水排水管入口44连通。 The container bottom plate 34 is composed of a confining pressure piezometer tube 26, a drain pipe 27, a pore water drain pipe 28, a valve 29, a water injection pipe 30, a pressure gauge 31, a pore water piezometer tube 32, a bottom plate groove 39, and a pore water pressure gauge inlet. 42, water injection pipe outlet 43, pore water drainage pipe inlet 44, drain pipe inlet 45, confining pressure piezometer inlet 46 composition. Wherein the confining pressure piezometer 26 communicates with the confining pressure piezometer inlet 46 and the piezometric pipe nail 25 of the sample container device; the drain pipe 27 communicates with the drain pipe inlet 45 and the drain pipe nail 24 of the sample container device; note The water pipe 30 communicates with the water injection pipe outlet 43 and the water injection pipe nail 22 of the sample container device. The pore water piezometric tube 32 is connected with the pore water piezometric connecting pipe 21 and the pore water piezometric inlet 42; the pore water drainage pipe 28 is connected with the pore water drainage connecting pipe 23 and the pore water drainage pipe inlet 44.

为了能施加持久而稳定的围压即σ3值,本发明设置了水加压装置。 In order to apply a lasting and stable confining pressure, i.e. σ 3 value, the present invention is provided with a water pressurizing device.

为了能施加持久而稳定的围压,本发明设置了轴向加载装置。 In order to apply a lasting and stable confining pressure, the present invention provides an axial loading device.

为了防止橡皮膜在实验过程中滑动,本发明设置了凸槽9。 In order to prevent the rubber film from sliding during the experiment, the present invention provides convex grooves 9 .

为了保证液体能充满加压容腔18,本发明设置了卡环11。 In order to ensure that the liquid can fill the pressurized chamber 18, the present invention provides a snap ring 11.

为了保证“震动流变实验”时水的渗漏,本发明设置了孔隙水测压连接管21及孔隙水排水连接管23。 In order to ensure water leakage during the "vibration rheological experiment", the present invention provides a pore water pressure measurement connecting pipe 21 and a pore water drainage connecting pipe 23 .

为了保证围压测压管26、排水管27和注水管30与加压容腔18的连通,本发明分别设置了测压管钉25、排水管钉24及注水管钉22。 In order to ensure the communication between the confining pressure piezometer tube 26 , the drain pipe 27 and the water injection pipe 30 and the pressurized cavity 18 , the present invention provides a piezometric pipe nail 25 , a drainage pipe nail 24 and a water injection pipe nail 22 respectively.

为了能研究地震作用下土的流变特性,本发明设置了震动器33。 In order to study the rheological properties of the soil under earthquake action, the present invention provides a vibrator 33 .

本发明的操作步骤是: Operation steps of the present invention are:

第一步:先将压力板15放置于加压容腔18的顶部,并推出卡环11将压力板15固定;同时将橡皮膜10包裹在承压钢筒16的内侧,并利用注水管钉22、排水管钉24和测压管钉25将其相对应位置的橡皮膜10戳穿,然后将包裹了橡皮膜10的承压钢筒16放置于容器底板34对应的位置。 Step 1: First place the pressure plate 15 on the top of the pressurized chamber 18, and push out the snap ring 11 to fix the pressure plate 15; at the same time, wrap the rubber film 10 on the inner side of the pressure-bearing steel cylinder 16, and use the water injection pipe nail 22. The drainage pipe nail 24 and the pressure measuring pipe nail 25 puncture the rubber film 10 at the corresponding position, and then place the pressure-bearing steel cylinder 16 wrapped with the rubber film 10 on the corresponding position of the container bottom plate 34 .

第二步:将震动器33置于容器底板34的相应位置,并依次放上下隔水板20和加密铁丝网19,在放置上下隔水板20时,要保证孔隙水测压连接管21和孔隙水排水连接管23分别置于孔隙水测压入口42和孔隙水排水管入口44里。 Step 2: Place the vibrator 33 on the corresponding position of the container bottom plate 34, and place the upper and lower water baffles 20 and the encrypted wire mesh 19 in sequence. When placing the upper and lower water baffles 20, ensure that the pore water pressure measurement connecting pipe 21 and the pores The water drainage connecting pipe 23 is placed in the pore water pressure measuring inlet 42 and the pore water drainage pipe inlet 44 respectively.

第三步:再将制备好的尾矿样或土样装入加密铁丝网19之上的腔体,装好土样后,再依次将上隔水板14和加压板13放置于土样17之上。 The third step: put the prepared tailings sample or soil sample into the cavity above the densified barbed wire 19, and after the soil sample is installed, place the upper water barrier 14 and the pressure plate 13 on the soil sample 17 in sequence above.

第四步:将内盖板8和外盖板4分别安装于承压钢筒16的上部,并将加压轴2通过轴压环丝扣49与加压板13连接。同时,将传压环7穿过传压环预留槽35,并通过围压环丝扣47和固定槽48将传压环7与压力板15相连。 Step 4: Install the inner cover plate 8 and the outer cover plate 4 on the upper part of the pressure-bearing steel cylinder 16 respectively, and connect the pressurizing shaft 2 to the pressurizing plate 13 through the shaft pressure ring screw 49 . At the same time, the pressure transmission ring 7 is passed through the reserved groove 35 of the pressure transmission ring, and the pressure transmission ring 7 is connected with the pressure plate 15 through the pressure ring thread 47 and the fixing groove 48 .

第五步:关闭排水管27的阀门并打开注水管30的阀门,然后往加压容腔18充水,直到充满水为止。同时推入卡环11,将压力板15放下,并在挂钩5增加重坨Ⅱ6的数量直到围压测压管26的压力表的读数达到实验所要求的读数。并记录下孔隙水测压管32的压力表读数变化。 Step 5: Close the valve of the drain pipe 27 and open the valve of the water injection pipe 30, and then fill the pressurized chamber 18 with water until it is full of water. Push in the snap ring 11 at the same time, put the pressure plate 15 down, and increase the number of heavy lumps II6 on the hook 5 until the reading of the pressure gauge of the confining pressure piezometer 26 reaches the reading required by the experiment. And record the pressure gauge reading change of the pore water piezometer tube 32.

第六步:如果是排水实验,则打开孔隙水排水管28的阀门;不排水实验,则关闭孔隙水排水管28的阀门。然后在加压轴2上增加重坨Ⅰ3的数量,直到达到实验要求,然后持续此钟状态(如果实验过程中需要改变实验参数,则按所设计的实验要求来完成),以满足所设计的流变实验的时长,并记录下施加的重量、加压轴2的位移量和孔隙水测压管32的压力表读数直至实验结束。 Step 6: If it is a drainage experiment, then open the valve of the pore water drainage pipe 28; if it is not a drainage experiment, then close the valve of the pore water drainage pipe 28. Then increase the number of heavy lumps I3 on the pressurization axis 2 until the experimental requirements are met, and then continue in this state (if the experimental parameters need to be changed during the experiment, it should be done according to the designed experimental requirements) to meet the designed flow Change the duration of the experiment, and record the weight applied, the displacement of the pressurized shaft 2 and the pressure gauge reading of the pore water piezometer 32 until the end of the experiment.

第七步:实验结束后,取下重坨Ⅰ3和重坨Ⅱ6,并打开排水管27的阀门,排除加压容腔18中的水。最后卸下此实验装置的其它构件,位下一组实验做准备。 Step 7: After the experiment is over, remove the heavy lump I3 and heavy lump II6, and open the valve of the drain pipe 27 to drain the water in the pressurized chamber 18. Finally, other components of the experimental device were removed to prepare for the next set of experiments.

本发明的有益效果是: The beneficial effects of the present invention are:

(1)能开展“排水”与“不排水”条件下的尾矿材料的三轴流变实验。 (1) Be able to carry out triaxial rheological experiments on tailings materials under "drained" and "undrained" conditions.

(2)基于流变实验的实验时间较长,所以依靠增加重坨Ⅱ的数量来压缩液体(一般采用水),从而对土样施加围压(即σ3值)。这不仅节省大量时间、人力和动力费用,而且还能获得稳定且持久的围压。 (2) The experiment time based on the rheological experiment is relatively long, so the liquid (generally water) is compressed by increasing the number of heavy lumps II, thereby exerting confining pressure (ie, σ3 value) on the soil sample. This not only saves a lot of time, manpower and power costs, but also achieves a stable and long-lasting confining pressure.

(3)通过增加轴向加载装置的重坨Ⅰ来对实验土样施加轴向压力,也可获得持久而稳定的轴向压力。 (3) By increasing the weight I of the axial loading device to apply axial pressure to the experimental soil sample, a durable and stable axial pressure can also be obtained.

(4)此发明借助震动器能模拟地震作用下的三轴流变实验(即动三轴流变实验)。 (4) This invention can simulate the triaxial rheological experiment (ie dynamic triaxial rheological experiment) under the action of earthquake by means of the vibrator.

(5)在实验过程中,能实时测定土样中孔隙水压的变化、施加围压的大小等参数。 (5) During the experiment, parameters such as the change of pore water pressure in the soil sample and the magnitude of the applied confining pressure can be measured in real time.

(6)能在实验过程中实时改变流变实验的参数(如调整土样孔隙水压、围压及轴向荷载的大小等),从而能更深入研究土的流变特性。 (6) The parameters of the rheological experiment can be changed in real time during the experiment (such as adjusting the pore water pressure of the soil sample, the confining pressure and the size of the axial load, etc.), so that the rheological characteristics of the soil can be studied in depth.

(7)可完成恒定围压和恒定轴压下的流变实验,同时还可开展非恒定围压和非恒定轴压下的流变实验 (7) Rheological experiments under constant confining pressure and constant axial pressure can be completed, and rheological experiments under unconstant confining pressure and unconstant axial pressure can also be carried out

(8)能在节省大量人力和财力的情况下,获得较为稳定持久的流变参数。 (8) It can obtain relatively stable and long-lasting rheological parameters while saving a lot of manpower and financial resources.

本发明可模拟在地震作用下,开展恒定围压、轴压和非恒定围压、非恒定轴压下的流变实验;同时,可以开展“排水”和“不排水”条件下尾矿材料的三轴流变实验。另外,基于流变实验的实验时间较长,本发明装置是依靠增加重坨的数量来施加不同的围压和轴压,这样获得的压力比动力装置(由电机控制)获得的压力更加“安全”、“稳定”、“持久”,且能节省大量时间、人力和财力。因此,本发明装置不仅节省大量人力、物力及财力,还大大提高了所测尾矿材料流变参数的可靠性和准确性。从而为矿山尾矿坝坝体的稳定性研究提供更可靠的流变参数。 The invention can simulate rheological experiments under constant confining pressure, axial pressure and non-constant confining pressure, non-constant axial pressure under the action of earthquake; at the same time, it can carry out the tailings material under the conditions of "drainage" and "non-drainage" Triaxial rheological experiments. In addition, based on the rheological experiment, the experimental time is relatively long, and the device of the present invention relies on increasing the number of heavy lumps to apply different confining and axial pressures, and the pressure obtained in this way is more "safe" than the pressure obtained by the power device (controlled by the motor). ", "stable", "durable", and can save a lot of time, manpower and financial resources. Therefore, the device of the invention not only saves a lot of manpower, material resources and financial resources, but also greatly improves the reliability and accuracy of the measured rheological parameters of the tailings material. Therefore, more reliable rheological parameters are provided for the stability study of mine tailings dam body.

附图说明 Description of drawings

图1为本发明的整体剖面示意图; Fig. 1 is the overall sectional schematic diagram of the present invention;

图2为本发明的框架结构示意图; Fig. 2 is a schematic diagram of the frame structure of the present invention;

图3为本发明试样容器装置的内部构造示意图; 3 is a schematic diagram of the internal structure of the sample container device of the present invention;

图4为本发明辅助装置的拆分结构示意图; Fig. 4 is a schematic diagram of the split structure of the auxiliary device of the present invention;

图5为本发明水加压装置的拆分结构示意图; Fig. 5 is a schematic diagram of the disassembled structure of the water pressurizing device of the present invention;

图6为本发明轴向加载装置的拆分结构示意图; Fig. 6 is a schematic diagram of the split structure of the axial loading device of the present invention;

图中各标号为:1-加压顶板,2-加压轴,3-重坨Ⅰ,4-外盖板,5-挂钩,6-重坨Ⅱ,7-传压环,8-内盖板,9-凸槽,10-橡皮膜,11-卡环,12-推拉杆,13-加压板,14-上隔水板,15-压力板,16-承压钢筒,17-土样,18-加压容腔,19-加密铁丝网,20-下隔水板,21-孔隙水测压连接管,22-注水管钉,23-孔隙水排水连接管,24-排水管钉,25-测压管钉,26-围压测压管,27-排水管,28-孔隙水排水管,29-阀门,30-注水管,31-压力表,32-孔隙水测压管,33-震动器,34-容器底板,35-传压环预留槽,36-传压环连接槽,37-卡环槽,38-震动弹簧,39-底板凹槽,40-隔水板测压口,41-隔水板排水口,42-孔隙水测压入口,43-注水管出口,44-孔隙水排水管入口,45-排水管入口,46-围压测压管入口,47-围压环丝扣,48-固定槽,49-轴压环丝扣。 The labels in the figure are: 1-pressurized top plate, 2-pressurized shaft, 3-weight block Ⅰ, 4-outer cover, 5-hook, 6-weight block Ⅱ, 7-pressure transmission ring, 8-inner cover . , 18-pressurized chamber, 19-encrypted barbed wire, 20-lower baffle, 21-pore water pressure measurement connecting pipe, 22-water injection pipe nail, 23-pore water drainage connecting pipe, 24-drainage pipe nail, 25 -piezometer nail, 26-confining pressure piezometer, 27-drainage pipe, 28-pore water drainage pipe, 29-valve, 30-water injection pipe, 31-pressure gauge, 32-pore water piezometer, 33- Vibrator, 34-bottom plate of container, 35-reserved groove for pressure transmission ring, 36-connecting groove for pressure transmission ring, 37-snap ring groove, 38-vibration spring, 39-bottom plate groove, 40-water baffle pressure measuring port , 41-water baffle drain, 42-pore water pressure measurement inlet, 43-water injection pipe outlet, 44-pore water drainage pipe inlet, 45-drainage pipe inlet, 46-confined pressure piezometer inlet, 47-confined pressure Ring threaded buckle, 48-fixing groove, 49-axis pressure ring threaded button.

具体实施方式 detailed description

下面结合附图和具体实施方式,对本发明作进一步说明。 The present invention will be further described below in combination with the accompanying drawings and specific embodiments.

实施方式一:如图1-6所示,一种尾矿材料的三轴流变实验装置,包括加压顶板1、加压轴2、重坨Ⅰ3、外盖板4、挂钩5、重坨Ⅱ6、传压环7、内盖板8、凸槽9、橡皮膜10、卡环11、推拉杆12、加压板13、上隔水板14、压力板15、承压钢筒16、加压容腔18、加密铁丝网19、下隔水板20、孔隙水测压连接管21、注水管钉22、孔隙水排水连接管23、排水管钉24、测压管钉25、围压测压管26、排水管27、孔隙水排水管28、注水管30、孔隙水测压管32、震动器33、容器底板34、传压环预留槽35、传压环连接槽36、卡环槽37、震动弹簧38、底板凹槽39、隔水板测压口40、隔水板排水口41、孔隙水测压入口42、注水管出口43、孔隙水排水管入口44、排水管入口45、围压测压管入口46、围压环丝扣47、固定槽48;加压顶板1两端设置有传压环7并通过传压环7与围压环丝扣47连接,挂钩5固定在加压顶板1的中间位置,挂钩5上放置有重坨Ⅱ6,压力板15通过其上开凿的具有丝扣的固定槽48与围压环丝扣47连接;卡环11位于承压钢筒16内部的卡环槽37内并且与推拉杆12连接,承压钢筒16内设置有橡皮膜10,橡皮膜10外翻固定在承压钢筒16上,承压钢筒16上端和下端均设置有凸槽9,凸槽9外侧设有传压环预留槽35,压力板15位于加压容腔18上部,压力板15上对应传压环预留槽35设有传压环连接槽36,传压环7底部穿过传压环预留槽35安装在传压环连接槽36内,上隔水板14位于加压板13下面,加压板13与上隔水板14均位于加压容腔18上部,加压轴2穿过内盖板8的预留孔并通过轴压环丝扣49与加压板13连接,重坨Ⅰ3位于加压轴2上,内盖板8、外盖板4依次装在承压钢筒16的顶端;注水管钉22、排水管钉24和测压管钉25均固定于承压钢筒16内部并贯穿承压钢筒16底部,围压测压管26与测压管钉25通过围压测压管入口46连通,排水管钉24与排水管27通过排水管入口45连通,孔隙水排水管28与孔隙水排水连接管23通过孔隙水排水管入口44连通,注水管30与注水管钉22通过注水管出口43连通,孔隙水测压管32与孔隙水测压连接管21通过孔隙水测压入口42连通,围压测压管26、排水管27和孔隙水排水管28位于容器底板34的一侧,围压测压管26位于排水管27之上,排水管27位于孔隙水排水管28之上,注水管30和孔隙水测压管32均位于容器底板34的另一侧,注水管30位于孔隙水测压管32之上,下隔水板20安装在容器底板34上、下隔水板20边缘两侧的隔水板测压口40和隔水板排水口41与容器底板34上的孔隙水测压入口42和孔隙水排水管入口相连通,注水管出口43位于容器底板34上表面的一侧,排水管入口45和围压测压管入口46位于容器底板34上表面的另一侧;震动器33通过底板凹槽39安装在在容器底板34中间并且与下隔水板20相连,震动器33上装有震动弹簧38,加密铁丝网19位于下隔水板20上面,孔隙水测压连接管21与孔隙水排水连接管23装在下隔水板20内并位于下隔水板20的边缘两侧。 Embodiment 1: As shown in Figures 1-6, a triaxial rheological experimental device for tailings materials, including a pressurized top plate 1, a pressurized shaft 2, a weight I3, an outer cover plate 4, a hook 5, and a weight II6 , pressure transmission ring 7, inner cover plate 8, convex groove 9, rubber film 10, snap ring 11, push-pull rod 12, pressure plate 13, upper baffle plate 14, pressure plate 15, pressure steel cylinder 16, pressure plate Cavity 18, encrypted barbed wire 19, lower baffle 20, pore water pressure measurement connection pipe 21, water injection pipe nail 22, pore water drainage connection pipe 23, drainage pipe nail 24, pressure measurement pipe nail 25, confining pressure pressure measurement tube 26. Drainage pipe 27, pore water drainage pipe 28, water injection pipe 30, pore water pressure measuring pipe 32, vibrator 33, container bottom plate 34, pressure transmission ring reserved groove 35, pressure transmission ring connection groove 36, snap ring groove 37 , vibrating spring 38, bottom plate groove 39, water baffle pressure measuring port 40, water baffle drain outlet 41, pore water pressure measuring inlet 42, water injection pipe outlet 43, pore water drain pipe inlet 44, drain pipe inlet 45, enclosure Pressure measuring tube inlet 46, confining pressure ring screw 47, fixing groove 48; both ends of pressurized top plate 1 are provided with pressure transmission ring 7 and are connected with confining pressure ring thread 47 through pressure transmission ring 7, and hook 5 is fixed on the The middle position of the top plate 1 is placed on the hook 5, and the weight II6 is placed on the hook 5. The pressure plate 15 is connected with the threaded thread 47 of the surrounding pressure ring through the fixed groove 48 dug on it with a threaded thread; the snap ring 11 is located inside the pressure-bearing steel cylinder 16. In the clasp groove 37 of the steel cylinder and connected with the push-pull rod 12, a rubber film 10 is arranged in the pressure-bearing steel cylinder 16, and the rubber membrane 10 is turned outward and fixed on the pressure-bearing steel cylinder 16, and the upper and lower ends of the pressure-bearing steel cylinder 16 are provided with The convex groove 9 is provided with a pressure transmission ring reserved groove 35 on the outside of the convex groove 9, the pressure plate 15 is located on the upper part of the pressurized chamber 18, and the pressure plate 15 is provided with a pressure transmission ring connecting groove 36 corresponding to the pressure transmission ring reserved groove 35, The bottom of the pressure transmission ring 7 passes through the reserved groove 35 of the pressure transmission ring and is installed in the connection groove 36 of the pressure transmission ring. The upper baffle 14 is located under the pressure plate 13, and both the pressure plate 13 and the upper baffle 14 are located On the upper part of the cavity 18, the pressure shaft 2 passes through the reserved hole of the inner cover plate 8 and is connected with the pressure plate 13 through the shaft pressure ring screw 49. The weight I3 is located on the pressure shaft 2, the inner cover plate 8, the outer cover plate 4 are installed on the top of the pressure-bearing steel cylinder 16 in sequence; the water injection pipe nail 22, the drainage pipe nail 24 and the pressure-measuring pipe nail 25 are all fixed inside the pressure-bearing steel cylinder 16 and run through the bottom of the pressure-bearing steel cylinder 16. 26 communicates with the piezometric pipe nail 25 through the inlet 46 of the confining pressure measuring pipe, the drain pipe nail 24 communicates with the drain pipe 27 through the drain pipe inlet 45, and the pore water drain pipe 28 communicates with the pore water drain connection pipe 23 through the pore water drain pipe inlet 44 is connected, the water injection pipe 30 is connected with the water injection pipe nail 22 through the water injection pipe outlet 43, the pore water pressure measurement pipe 32 is connected with the pore water pressure measurement connection pipe 21 through the pore water pressure measurement inlet 42, the confining pressure pressure measurement pipe 26, the drainage pipe 27 and the pore water drain pipe 28 are located on one side of the container bottom plate 34, the confining pressure piezometer tube 26 is located above the drain pipe 27, the drain pipe 27 is located above the pore water drain pipe 28, the water injection pipe 30 and the pore water piezometer tube 32 are located in On the other side of the container bottom plate 34, the water injection pipe 30 is located above the pore water pressure measuring tube 32, and the lower water baffle 20 is installed on the container bottom plate 34, the water baffle pressure measuring port 40 on both sides of the lower water baffle 20 edge and The water baffle outlet 41 communicates with the pore water pressure measuring inlet 42 on the container bottom plate 34 and the pore water drainage pipe inlet. The water injection pipe outlet 43 is located on one side of the upper surface of the container bottom plate 34. The pipe inlet 46 is located on the other side of the upper surface of the container bottom plate 34; the vibrator 33 is installed in the middle of the container bottom plate 34 through the bottom plate groove 39 and is connected with the lower water baffle 20. The vibrator 33 is equipped with a vibrating spring 38 and an encrypted barbed wire 19 Located above the lower water baffle 20 , the pore water pressure measurement connecting pipe 21 and the pore water drainage connecting pipe 23 are installed in the lower water baffle 20 and are located on both sides of the edge of the lower water baffle 20 .

所述压力板15下移时不与橡皮膜10接触。 The pressure plate 15 is not in contact with the rubber membrane 10 when it moves down.

所述孔隙水排水管入口44、排水管入口45和围压测压管入口46位于容器底板34上表面的一侧,孔隙水测压入口42和注水管出口43位于容器底板34上表面的另一侧,其从左到右的顺序依次为:围压测压管入口46、排水管入口45、孔隙水排水管入口44、孔隙水测压入口42、注水管出口43。 The pore water drainage pipe inlet 44, the drain pipe inlet 45 and the confining pressure piezometer inlet 46 are located on one side of the upper surface of the container bottom plate 34, and the pore water pressure measurement inlet 42 and the water injection pipe outlet 43 are located on the other side of the upper surface of the container bottom plate 34. On one side, the order from left to right is: confining pressure piezometer inlet 46, drain pipe inlet 45, pore water drain pipe inlet 44, pore water piezometer inlet 42, water injection pipe outlet 43.

所述围压测压管26和孔隙水测压管32上装有压力表31。 A pressure gauge 31 is installed on the confining pressure piezometer tube 26 and the pore water piezometer tube 32 .

所述排水管27、孔隙水排水管28和注水管30上均装有阀门29。 A valve 29 is installed on the drain pipe 27 , the pore water drain pipe 28 and the water injection pipe 30 .

所述加压轴2底部装有轴压环丝扣49。 The bottom of the pressurizing shaft 2 is equipped with a shaft pressing ring screw thread 49 .

所述传压环7的弧长为承压钢筒16圆周长的1/4。 The arc length of the pressure transmitting ring 7 is 1/4 of the circumference of the pressure bearing steel cylinder 16 .

所述注水管钉22、排水管钉24和测压管钉25的长度超过承压钢筒16的厚度,注水管钉22,排水管钉24,测压管钉25均为空心管。 The lengths of the water injection pipe nail 22, the drain pipe nail 24 and the pressure measurement pipe nail 25 exceed the thickness of the pressure steel cylinder 16, and the water injection pipe nail 22, the drainage pipe nail 24 and the pressure measurement pipe nail 25 are all hollow pipes.

本发明可归纳为由试样容器装置、水加压装置、轴向加载装置、辅助装置组成。 The present invention can be summarized as being composed of a sample container device, a water pressurizing device, an axial loading device and an auxiliary device.

试样容器装置是由凸槽9,橡皮膜10,卡环11,推拉杆12,压力板15,承压钢筒16,加压容腔18,注水管钉22,排水管钉24,测压管钉25,传压环预留槽35,传压环连接槽36,卡环槽37组成。由于实验过程中,承压钢筒16需承受一定的水压,所以承压钢筒16需具有一定的强度。在实验施加围压之前,卡环11是处于“推出”状态,它的作用在于:在充水前使压力板15位于加压容腔18的顶部,目的在于使加压容腔18能充满水。同时,在试样容器装置的上部和下部都设置了凸槽9,以便在流变实验过程中固定橡皮膜10,防止橡皮膜10的滑动。另外,在承压钢筒16的底部设置了注水管钉22,排水管钉24,测压管钉25,其特点是:注水管钉22,排水管钉24,测压管钉25三个管钉固定于承压钢筒16上,三个管钉的下部呈“尖状”结构且“长出”承压钢筒16,同时注水管钉22,排水管钉24,测压管钉25都是各自连通的,注水管钉22,排水管钉24,测压管钉25的作用在于:第一,能测定加压容腔18中的水压并进行充、放水;第二,三个管钉的下部“长出”承压钢筒16的目的在于保证实验振动过程中注水管钉22,排水管钉24,测压管钉25不脱离容器底板34的连通孔,以防止加压容腔18的水渗出;第三,三个管钉的下部呈“尖状”结构的目的是为了在安装橡皮膜10时,便于戳破与注水管钉22,排水管钉24,测压管钉25位置相对应的橡皮膜10,以便于与下部容器底板34连通。 The sample container device is composed of convex groove 9, rubber film 10, snap ring 11, push-pull rod 12, pressure plate 15, pressure steel cylinder 16, pressurized chamber 18, water injection pipe nail 22, drainage pipe nail 24, pressure measurement The pipe nail 25, the reserved groove 35 for the pressure transmission ring, the connection groove 36 for the pressure transmission ring, and the snap ring groove 37 are formed. Since the pressure-bearing steel cylinder 16 needs to withstand a certain water pressure during the experiment, the pressure-bearing steel cylinder 16 needs to have a certain strength. Before the confining pressure is applied in the experiment, the snap ring 11 is in the state of "pushing out", and its function is to make the pressure plate 15 at the top of the pressurized chamber 18 before filling with water, so that the pressurized chamber 18 can be filled with water . At the same time, convex grooves 9 are provided on the upper and lower parts of the sample container device, so as to fix the rubber membrane 10 during the rheological experiment and prevent the rubber membrane 10 from sliding. In addition, a water injection pipe nail 22, a drain pipe nail 24, and a pressure measurement pipe nail 25 are arranged at the bottom of the pressure-bearing steel cylinder 16. The nails are fixed on the pressure-bearing steel cylinder 16. The lower parts of the three pipe nails have a "pointed" structure and "grow out" of the pressure-bearing steel cylinder 16. At the same time, the water injection pipe nail 22, the drainage pipe nail 24, and the pressure measurement pipe nail 25 Be connected respectively, the water injection pipe nail 22, the drainage pipe nail 24, the effect of the pressure measuring pipe nail 25 is: the first, can measure the water pressure in the pressurized chamber 18 and carry out filling and discharging; second, the three pipes The purpose of the lower part of the nail "growing" the pressure-bearing steel cylinder 16 is to ensure that the water injection pipe nail 22, the drainage pipe nail 24, and the pressure measurement pipe nail 25 do not break away from the communication hole of the container bottom plate 34 during the experimental vibration process, so as to prevent the pressurized cavity from 18 water seeps out; thirdly, the purpose of the lower part of the three pipe nails having a "pointed" structure is to facilitate puncturing and water injection pipe nails 22, drainage pipe nails 24, and pressure measuring pipe nails when the rubber membrane 10 is installed. 25 corresponding rubber membranes 10, so as to communicate with the bottom plate 34 of the lower container.

卡环11和卡环槽37是相匹配的,当卡环11完全“推入”卡环槽37时,要保证压力板15能完全不受束缚,它的作用在于:在加压容腔18未充水时,保证压力板15始终处于加压容腔18的顶部;而当加压容腔18充满水后,要保证压力板15能上下自由移动。压力板15是能在加压容腔18中上下自由移动,且压力板15和加压容腔18的腔壁是密封的,其作用在于:通过压缩液体来增加水压,从而对土样17施加围压。凸槽9是压力钢筒16的一部分,它主要设置于压力钢筒16的顶部和底部,它的作用在于:在实验过程中,防止橡皮膜10的滑动。另外,注水管钉22、排水管钉24和测压管钉25三个管钉均固定于承压钢筒16上,且三个管钉的下部呈“圆形尖状”结构且其长度超过承压钢筒16的厚度,同时注水管钉22,排水管钉24,测压管钉25均署空心管即管道是连通的,三个管钉的作用在于:第一,测压管钉25被用于测定加压容腔18中的水压,而注水管钉22,排水管钉24被用于进行加压容腔18的充、放水;第二,三个管钉的长度超过承压钢筒16的厚度,其目的是保证实验振动过程中注水管钉22,排水管钉24,测压管钉25不脱离容器底板34的连通孔,以防止加压容腔18的水渗出;第三,三个管钉的下部呈“尖状”结构的目的是为了在安装橡皮膜10时,便于戳破与注水管钉22,排水管钉24,测压管钉25位置相对应的橡皮膜10,以便于与下部容器底板34连通。传压环预留槽35是直接在压力钢筒16的上表面开凿的圆环形的空心槽,其作用在于:使传压环7穿过传压环预留槽35和压力板15传压环连接槽36相连接,从而压缩加压容腔18中的水。 The snap ring 11 and the snap ring groove 37 are matched. When the snap ring 11 is fully "pushed into" the snap ring groove 37, it is necessary to ensure that the pressure plate 15 can be completely unconstrained. When not filled with water, ensure that the pressure plate 15 is always on the top of the pressurized chamber 18; and when the pressurized chamber 18 is filled with water, ensure that the pressure plate 15 can move freely up and down. The pressure plate 15 can freely move up and down in the pressurized chamber 18, and the wall of the pressure plate 15 and the pressurized chamber 18 is sealed. Apply confining pressure. The convex groove 9 is a part of the pressure steel cylinder 16, which is mainly arranged on the top and bottom of the pressure steel cylinder 16, and its function is to prevent the rubber membrane 10 from sliding during the experiment. In addition, the water injection pipe nail 22, the drainage pipe nail 24 and the pressure measurement pipe nail 25 are all fixed on the pressure-bearing steel cylinder 16, and the lower parts of the three pipe nails have a "round pointed" structure and their length exceeds The thickness of the pressure-bearing steel cylinder 16, the water injection pipe nail 22, the drain pipe nail 24, and the pressure measuring pipe nail 25 are all placed in the hollow pipe, that is, the pipe is connected. The functions of the three pipe nails are: first, the pressure measuring pipe nail 25 It is used to measure the water pressure in the pressurized chamber 18, while the water injection pipe nail 22 and the drain pipe nail 24 are used to fill and discharge the pressurized chamber 18; secondly, the length of the three pipe nails exceeds the pressure bearing The thickness of the steel cylinder 16 is to ensure that the water injection pipe nail 22, the drainage pipe nail 24, and the pressure measurement pipe nail 25 do not break away from the communicating hole of the container bottom plate 34 during the experimental vibration process, so as to prevent the water in the pressurized cavity 18 from seeping out; Third, the purpose of the "pointy" structure at the lower part of the three pipe nails is to facilitate the puncture of the rubber corresponding to the positions of the water injection pipe nail 22, the drainage pipe nail 24, and the pressure measurement pipe nail 25 when the rubber membrane 10 is installed. Membrane 10 so as to communicate with the bottom plate 34 of the lower container. The pressure transmission ring reserved groove 35 is a circular hollow groove directly dug on the upper surface of the pressure steel cylinder 16, and its function is to make the pressure transmission ring 7 pass through the pressure transmission ring reserved groove 35 and the pressure plate 15 for pressure transmission. The ring connection grooves 36 are connected so as to compress the water in the pressurized volume 18 .

水加压装置是由加压顶板1,挂钩5,重坨Ⅱ6,传压环7,压力板15,围压环丝扣47,固定槽48组成。当实验时,将传压环7穿过试样容器装置的传压环预留槽35,然后通过围压环丝扣47和固定槽48连接起来,然后通过在挂钩5上加载重坨Ⅱ6的数量,以对压力板15施加不同的重力,从而对三轴流变实验施加不同压力的稳定围压。加压顶板(1)、挂钩5、传压环7和围压环丝扣47是一个整体。其中传压环7的设置在加压顶板(1)的两端,其弧长为圆周长的1/4,它主要起连接作用,即将加压顶板(1)和围压环丝扣47相连接,同时其弧长取为圆周长的1/4的目的在于,在压环7的侧面留出空间,从而便于在挂钩5上取、放重坨Ⅱ6;固定槽48是在压力板15的上表面开凿的具有丝扣的凹槽,其作用在于:通过围压环丝扣47和固定槽48将整个水加压装置连接起来。 Water pressurization device is to be made up of pressurization top plate 1, hook 5, weight Tuo II 6, pressure transmission ring 7, pressure plate 15, surrounding pressure ring screw thread 47, fixed groove 48 forms. When experimenting, pass the pressure transmission ring 7 through the pressure transmission ring reserved groove 35 of the sample container device, and then connect it through the pressure ring thread 47 and the fixing groove 48, and then load the heavy lump II6 on the hook 5 The quantity is used to apply different gravitational forces to the pressure plate 15, so as to apply different stable confining pressures to the triaxial rheological experiment. The pressurized top plate (1), the hook 5, the pressure transmission ring 7 and the threaded buckle 47 of the surrounding pressure ring are a whole. Wherein the pressure transmission ring 7 is arranged on the two ends of the pressurized top plate (1), and its arc length is 1/4 of the circumference. connection, and the purpose of taking its arc length as 1/4 of the circumference length is to leave a space on the side of the pressure ring 7, so that it is convenient to take and put the heavy lump II6 on the hook 5; The function of the groove with threaded buckle excavated on the upper surface is to connect the whole water pressurizing device through the threaded buckle 47 and the fixing groove 48 of the surrounding pressure ring.

轴向加载装置是由加压轴2,重坨Ⅰ3,加压板13,上隔水板14,轴压环丝扣49组成。在实验过程中,先将上隔水板14放于实验的土样17上,之后将加压板13放置于上隔水板14之上,最后将加压轴2穿过内盖板8的预留孔并通过轴压环丝扣49将加压轴2与加压板13连接起来。本装置是通过在加压轴2的上部放置磅坨Ⅰ3的数量来对土样17施加不同的稳定轴压。隔水板14是直接放置于土样17上的,其作用在于防止土样17中的水渗出;加压轴2是通过轴压环丝扣49与加压板13相连接的,其作用在于:通过在加压轴2的上部增加重坨Ⅰ3的数量,以达到施加不同稳定轴压的目的。 The axial loading device is composed of a pressurized shaft 2, a heavy lump I3, a pressurized plate 13, an upper baffle plate 14, and a screw thread 49 for the axially pressed ring. During the experiment, the upper water baffle 14 is first placed on the soil sample 17 of the experiment, then the pressure plate 13 is placed on the upper water baffle 14, and finally the pressure shaft 2 is passed through the predetermined opening of the inner cover plate 8. Leave a hole and connect the pressure shaft 2 with the pressure plate 13 through the shaft pressure ring screw 49 . This device applies different stable axial pressures to the soil sample 17 by placing the number of pounds I3 on the upper part of the pressure shaft 2 . The water barrier 14 is directly placed on the soil sample 17, and its function is to prevent the water in the soil sample 17 from seeping out; the pressure shaft 2 is connected with the pressure plate 13 through the shaft pressure ring screw 49, and its function is to : By increasing the number of heavy lumps I3 on the upper part of the pressurized shaft 2, the purpose of applying different stable axial pressures can be achieved.

辅助装置是由加密铁丝网19,下隔水板20,围压测压管26,排水管27,孔隙水排水管28,阀门29,注水管30,压力表31,孔隙水测压管32,震动器33、容器底板34,震动弹簧38,底板凹槽39,隔水板测压口40,隔水板排水口41,孔隙水测压入口42,注水管出口43,孔隙水排水管入口44,排水管入口45,围压测压管入口46组成。在实验过程中,将震动器33安放于容器底板34的底部,其作用在于模拟土样在地震作用时的流变参数,以获得土样动态的流变参数。同时在容器底板34上放置下隔水板20,并且下隔水板20上开有隔水板测压口40和隔水板排水口41两个孔,其作用在于测定土样在不排水和排水条件下的流变力学参数。最后,在下隔水板20上放置加密铁丝网19;设置加密铁丝网19的目的在于防止实验土样中的小颗粒通过隔水板测压口40和隔水板排水口41进入孔隙水测压管32和孔隙水测压管32,从而堵塞孔隙水测压管32和孔隙水测压管32。 The auxiliary device is composed of encrypted barbed wire 19, lower baffle 20, confining pressure piezometer 26, drain pipe 27, pore water drain pipe 28, valve 29, water injection pipe 30, pressure gauge 31, pore water piezometer 32, vibration Device 33, container bottom plate 34, vibrating spring 38, bottom plate groove 39, water baffle pressure measuring port 40, water baffle drain outlet 41, pore water pressure measuring inlet 42, water injection pipe outlet 43, pore water drain pipe inlet 44, The drain pipe inlet 45 and the confining pressure piezometer inlet 46 are composed. During the experiment, the vibrator 33 was placed at the bottom of the container bottom plate 34, and its function was to simulate the rheological parameters of the soil sample under earthquake action, so as to obtain the dynamic rheological parameters of the soil sample. Place lower baffle 20 on container bottom plate 34 simultaneously, and have water baffle pressure measuring port 40 and water baffle discharge port 41 two holes on lower water baffle 20, its effect is to measure soil sample in non-drainage and Rheological parameters under drained conditions. Finally, place an encrypted barbed wire 19 on the lower baffle 20; the purpose of setting the encrypted barbed wire 19 is to prevent small particles in the experimental soil sample from entering the pore water piezometer 32 through the water baffle pressure measuring port 40 and the water baffle outlet 41 And the pore water piezometric tube 32, thereby blocking the pore water piezometric tube 32 and the pore water piezometric tube 32.

震动器33安放于容器底板34的底部,其作用在于:模拟土样在地震作用下的流变实验,从而开展流变的动三轴实验;下隔水板20放置于容器底板34上,下隔水板20上开有隔水板测压口40和隔水板排水口41两个孔,其作用在于:防止水渗出,并能测定土样中的水压和在实验中排放土样17中的孔隙水,从而顺利开展排水和不排水条件下的流变实验;加密铁丝网19放置于下隔水板20上,其作用在于:防止实验土样中的小颗粒通过隔水板测压口40和隔水板排水口41进入孔隙水测压管32和孔隙水测压管32,从而堵塞孔隙水测压管32和孔隙水测压管32。 The vibrator 33 is placed on the bottom of the container bottom plate 34, and its function is to: simulate the rheological experiment of the soil sample under the action of an earthquake, so as to carry out the dynamic triaxial experiment of rheology; the lower water barrier 20 is placed on the container bottom plate 34, and the lower Water baffle 20 has two holes, water baffle pressure measuring port 40 and water baffle outlet 41, its function is to: prevent water from seeping out, and can measure the water pressure in the soil sample and discharge soil sample in the experiment pore water in 17, so as to smoothly carry out rheological experiments under drained and undrained conditions; the dense barbed wire 19 is placed on the lower baffle 20, and its function is to prevent small particles in the experimental soil sample from passing through the baffle to measure pressure The port 40 and the water baffle outlet 41 enter the pore water piezometric tube 32 and the pore water piezometric tube 32, thereby blocking the pore water piezometric tube 32 and the pore water piezometric tube 32.

容器底板34是由围压测压管26,排水管27,孔隙水排水管28,阀门29,注水管30,压力表31,孔隙水测压管32,底板凹槽39,孔隙水测压入口42,注水管出口43,孔隙水排水管入口44,排水管入口45,围压测压管入口46组成。围压测压管26与围压测压管入口46和试样容器装置的测压管钉25连通,其作用在于:测定加压容腔18中的水压即施加给实验土样的围压大小;排水管27与排水管入口45和试样容器装置的排水管钉24相连通,其作用在于:实验后排除加压容腔18中的水;注水管30与注水管出口43和试样容器装置的注水管钉22连通,其作用在于:向加压容腔18中注水。而孔隙水测压管32与孔隙水测压连接管21和孔隙水测压入口42相连通,其作用在于:测定土样17中水的孔隙压力;孔隙水排水管28与孔隙水排水连接管23和孔隙水排水管入口44连通,其作用在于:实验过程中排出土样中的孔隙水,从而顺利开展土样的排水三轴流变实验。 The container bottom plate 34 is composed of a confining pressure piezometer tube 26, a drain pipe 27, a pore water drain pipe 28, a valve 29, a water injection pipe 30, a pressure gauge 31, a pore water piezometer tube 32, a bottom plate groove 39, and a pore water pressure gauge inlet. 42, water injection pipe outlet 43, pore water drainage pipe inlet 44, drain pipe inlet 45, confining pressure piezometer inlet 46 composition. The confining pressure piezometer 26 communicates with the confining pressure piezometer inlet 46 and the piezometer nail 25 of the sample container device, and its function is to measure the water pressure in the pressurized chamber 18, that is, the confining pressure applied to the experimental soil sample Size; the drain pipe 27 is connected with the drain pipe nail 24 of the drain pipe inlet 45 and the sample container device, and its effect is to: get rid of the water in the pressurized chamber 18 after the experiment; the water injection pipe 30 is connected with the water injection pipe outlet 43 and the sample The water injection pipe nail 22 of the container device is connected, and its function is to inject water into the pressurized cavity 18 . And the pore water piezometric tube 32 is connected with the pore water piezometric connecting pipe 21 and the pore water piezometric inlet 42, and its effect is to: measure the pore pressure of water in the soil sample 17; 23 communicates with the inlet 44 of the pore water drainage pipe, and its function is to discharge the pore water in the soil sample during the experiment, so as to smoothly carry out the drainage triaxial rheological experiment of the soil sample.

实施方式二:如图1-6所示,一种尾矿材料的三轴流变实验装置,包括加压顶板1、加压轴2、重坨Ⅰ3、外盖板4、挂钩5、重坨Ⅱ6、传压环7、内盖板8、凸槽9、橡皮膜10、卡环11、推拉杆12、加压板13、上隔水板14、压力板15、承压钢筒16、加压容腔18、加密铁丝网19、下隔水板20、孔隙水测压连接管21、注水管钉22、孔隙水排水连接管23、排水管钉24、测压管钉25、围压测压管26、排水管27、孔隙水排水管28、注水管30、孔隙水测压管32、震动器33、容器底板34、传压环预留槽35、传压环连接槽36、卡环槽37、震动弹簧38、底板凹槽39、隔水板测压口40、隔水板排水口41、孔隙水测压入口42、注水管出口43、孔隙水排水管入口44、排水管入口45、围压测压管入口46、围压环丝扣47、固定槽48;加压顶板1两端设置有传压环7并通过传压环7与围压环丝扣47连接,挂钩5固定在加压顶板1的中间位置,挂钩5上放置有重坨Ⅱ6,压力板15通过其上开凿的具有丝扣的固定槽48与围压环丝扣47连接;卡环11位于承压钢筒16内部的卡环槽37内并且与推拉杆12连接,承压钢筒16内设置有橡皮膜10,橡皮膜10外翻固定在承压钢筒16上,承压钢筒16上端和下端均设置有凸槽9,凸槽9外侧设有传压环预留槽35,压力板15位于加压容腔18上部,压力板15上对应传压环预留槽35设有传压环连接槽36,传压环7底部穿过传压环预留槽35安装在传压环连接槽36内,上隔水板14位于加压板13下面,加压板13与上隔水板14均位于加压容腔18上部,加压轴2穿过内盖板8的预留孔并通过轴压环丝扣49与加压板13连接,重坨Ⅰ3位于加压轴2上,内盖板8、外盖板4依次装在承压钢筒16的顶端;注水管钉22、排水管钉24和测压管钉25均固定于承压钢筒16内部并贯穿承压钢筒16底部,围压测压管26与测压管钉25通过围压测压管入口46连通,排水管钉24与排水管27通过排水管入口45连通,孔隙水排水管28与孔隙水排水连接管23通过孔隙水排水管入口44连通,注水管30与注水管钉22通过注水管出口43连通,孔隙水测压管32与孔隙水测压连接管21通过孔隙水测压入口42连通,围压测压管26、排水管27和孔隙水排水管28位于容器底板34的一侧,围压测压管26位于排水管27之上,排水管27位于孔隙水排水管28之上,注水管30和孔隙水测压管32均位于容器底板34的另一侧,注水管30位于孔隙水测压管32之上,下隔水板20安装在容器底板34上、下隔水板20边缘两侧的隔水板测压口40和隔水板排水口41与容器底板34上的孔隙水测压入口42和孔隙水排水管入口相连通,注水管出口43位于容器底板34上表面的一侧,排水管入口45和围压测压管入口46位于容器底板34上表面的另一侧;震动器33通过底板凹槽39安装在在容器底板34中间并且与下隔水板20相连,震动器33上装有震动弹簧38,加密铁丝网19位于下隔水板20上面,孔隙水测压连接管21与孔隙水排水连接管23装在下隔水板20内并位于下隔水板20的边缘两侧。 Embodiment 2: As shown in Figure 1-6, a triaxial rheological experimental device for tailings materials, including a pressurized top plate 1, a pressurized shaft 2, a heavy lump I3, an outer cover plate 4, a hook 5, and a heavy lump II6 , pressure transmission ring 7, inner cover plate 8, convex groove 9, rubber film 10, snap ring 11, push-pull rod 12, pressure plate 13, upper baffle plate 14, pressure plate 15, pressure steel cylinder 16, pressure plate Cavity 18, encrypted barbed wire 19, lower baffle 20, pore water pressure measurement connection pipe 21, water injection pipe nail 22, pore water drainage connection pipe 23, drainage pipe nail 24, pressure measurement pipe nail 25, confining pressure pressure measurement tube 26. Drainage pipe 27, pore water drainage pipe 28, water injection pipe 30, pore water pressure measuring pipe 32, vibrator 33, container bottom plate 34, pressure transmission ring reserved groove 35, pressure transmission ring connection groove 36, snap ring groove 37 , vibrating spring 38, bottom plate groove 39, water baffle pressure measuring port 40, water baffle drain outlet 41, pore water pressure measuring inlet 42, water injection pipe outlet 43, pore water drain pipe inlet 44, drain pipe inlet 45, enclosure Pressure measuring tube inlet 46, confining pressure ring screw 47, fixing groove 48; both ends of pressurized top plate 1 are provided with pressure transmission ring 7 and are connected with confining pressure ring thread 47 through pressure transmission ring 7, and hook 5 is fixed on the The middle position of the top plate 1 is placed on the hook 5, and the weight II6 is placed on the hook 5. The pressure plate 15 is connected with the threaded thread 47 of the surrounding pressure ring through the fixed groove 48 dug on it with a threaded thread; the snap ring 11 is located inside the pressure-bearing steel cylinder 16. In the clasp groove 37 of the steel cylinder and connected with the push-pull rod 12, a rubber film 10 is arranged in the pressure-bearing steel cylinder 16, and the rubber membrane 10 is turned outward and fixed on the pressure-bearing steel cylinder 16, and the upper and lower ends of the pressure-bearing steel cylinder 16 are provided with The convex groove 9 is provided with a pressure transmission ring reserved groove 35 on the outside of the convex groove 9, the pressure plate 15 is located on the upper part of the pressurized chamber 18, and the pressure plate 15 is provided with a pressure transmission ring connecting groove 36 corresponding to the pressure transmission ring reserved groove 35, The bottom of the pressure transmission ring 7 passes through the reserved groove 35 of the pressure transmission ring and is installed in the connection groove 36 of the pressure transmission ring. The upper baffle 14 is located under the pressure plate 13, and both the pressure plate 13 and the upper baffle 14 are located On the upper part of the cavity 18, the pressure shaft 2 passes through the reserved hole of the inner cover plate 8 and is connected with the pressure plate 13 through the shaft pressure ring screw 49. The weight I3 is located on the pressure shaft 2, the inner cover plate 8, the outer cover plate 4 are installed on the top of the pressure-bearing steel cylinder 16 in sequence; the water injection pipe nail 22, the drainage pipe nail 24 and the pressure-measuring pipe nail 25 are all fixed inside the pressure-bearing steel cylinder 16 and run through the bottom of the pressure-bearing steel cylinder 16. 26 communicates with the piezometric pipe nail 25 through the inlet 46 of the confining pressure measuring pipe, the drain pipe nail 24 communicates with the drain pipe 27 through the drain pipe inlet 45, and the pore water drain pipe 28 communicates with the pore water drain connection pipe 23 through the pore water drain pipe inlet 44 is connected, the water injection pipe 30 is connected with the water injection pipe nail 22 through the water injection pipe outlet 43, the pore water pressure measurement pipe 32 is connected with the pore water pressure measurement connection pipe 21 through the pore water pressure measurement inlet 42, the confining pressure pressure measurement pipe 26, the drainage pipe 27 and the pore water drain pipe 28 are located on one side of the container bottom plate 34, the confining pressure piezometer tube 26 is located above the drain pipe 27, the drain pipe 27 is located above the pore water drain pipe 28, the water injection pipe 30 and the pore water piezometer tube 32 are located in On the other side of the container bottom plate 34, the water injection pipe 30 is located above the pore water pressure measuring tube 32, and the lower water baffle 20 is installed on the container bottom plate 34, the water baffle pressure measuring port 40 on both sides of the lower water baffle 20 edge and The water baffle outlet 41 communicates with the pore water pressure measuring inlet 42 on the container bottom plate 34 and the pore water drainage pipe inlet. The water injection pipe outlet 43 is located on one side of the upper surface of the container bottom plate 34. The pipe inlet 46 is located on the other side of the upper surface of the container bottom plate 34; the vibrator 33 is installed in the middle of the container bottom plate 34 through the bottom plate groove 39 and is connected with the lower water baffle 20. The vibrator 33 is equipped with a vibrating spring 38 and an encrypted barbed wire 19 Located above the lower water baffle 20 , the pore water pressure measurement connecting pipe 21 and the pore water drainage connecting pipe 23 are installed in the lower water baffle 20 and are located on both sides of the edge of the lower water baffle 20 .

所述压力板15下移时不与橡皮膜10接触。 The pressure plate 15 is not in contact with the rubber membrane 10 when it moves down.

所述孔隙水排水管入口44、排水管入口45和围压测压管入口46位于容器底板34上表面的一侧,孔隙水测压入口42和注水管出口43位于容器底板34上表面的另一侧,其从左到右的顺序依次为:围压测压管入口46、排水管入口45、孔隙水排水管入口44、孔隙水测压入口42、注水管出口43。 The pore water drainage pipe inlet 44, the drain pipe inlet 45 and the confining pressure piezometer inlet 46 are located on one side of the upper surface of the container bottom plate 34, and the pore water pressure measurement inlet 42 and the water injection pipe outlet 43 are located on the other side of the upper surface of the container bottom plate 34. On one side, the order from left to right is: confining pressure piezometer inlet 46, drain pipe inlet 45, pore water drain pipe inlet 44, pore water piezometer inlet 42, water injection pipe outlet 43.

所述围压测压管26和孔隙水测压管32上装有压力表31。 A pressure gauge 31 is installed on the confining pressure piezometer tube 26 and the pore water piezometer tube 32 .

所述排水管27、孔隙水排水管28和注水管30上均装有阀门29。 A valve 29 is installed on the drain pipe 27 , the pore water drain pipe 28 and the water injection pipe 30 .

所述加压轴2底部装有轴压环丝扣49。 The bottom of the pressurizing shaft 2 is equipped with a shaft pressing ring screw thread 49 .

所述传压环7的弧长为承压钢筒16圆周长的1/4。 The arc length of the pressure transmitting ring 7 is 1/4 of the circumference of the pressure bearing steel cylinder 16 .

所述注水管钉22、排水管钉24和测压管钉25的长度超过承压钢筒16的厚度,注水管钉22,排水管钉24,测压管钉25均为空心管。 The lengths of the water injection pipe nail 22, the drain pipe nail 24 and the pressure measurement pipe nail 25 exceed the thickness of the pressure steel cylinder 16, and the water injection pipe nail 22, the drainage pipe nail 24 and the pressure measurement pipe nail 25 are all hollow pipes.

实施方式三:如图1-6所示,一种尾矿材料的三轴流变实验装置,包括加压顶板1、加压轴2、重坨Ⅰ3、外盖板4、挂钩5、重坨Ⅱ6、传压环7、内盖板8、凸槽9、橡皮膜10、卡环11、推拉杆12、加压板13、上隔水板14、压力板15、承压钢筒16、加压容腔18、加密铁丝网19、下隔水板20、孔隙水测压连接管21、注水管钉22、孔隙水排水连接管23、排水管钉24、测压管钉25、围压测压管26、排水管27、孔隙水排水管28、注水管30、孔隙水测压管32、震动器33、容器底板34、传压环预留槽35、传压环连接槽36、卡环槽37、震动弹簧38、底板凹槽39、隔水板测压口40、隔水板排水口41、孔隙水测压入口42、注水管出口43、孔隙水排水管入口44、排水管入口45、围压测压管入口46、围压环丝扣47、固定槽48;加压顶板1两端设置有传压环7并通过传压环7与围压环丝扣47连接,挂钩5固定在加压顶板1的中间位置,挂钩5上放置有重坨Ⅱ6,压力板15通过其上开凿的具有丝扣的固定槽48与围压环丝扣47连接;卡环11位于承压钢筒16内部的卡环槽37内并且与推拉杆12连接,承压钢筒16内设置有橡皮膜10,橡皮膜10外翻固定在承压钢筒16上,承压钢筒16上端和下端均设置有凸槽9,凸槽9外侧设有传压环预留槽35,压力板15位于加压容腔18上部,压力板15上对应传压环预留槽35设有传压环连接槽36,传压环7底部穿过传压环预留槽35安装在传压环连接槽36内,上隔水板14位于加压板13下面,加压板13与上隔水板14均位于加压容腔18上部,加压轴2穿过内盖板8的预留孔并通过轴压环丝扣49与加压板13连接,重坨Ⅰ3位于加压轴2上,内盖板8、外盖板4依次装在承压钢筒16的顶端;注水管钉22、排水管钉24和测压管钉25均固定于承压钢筒16内部并贯穿承压钢筒16底部,围压测压管26与测压管钉25通过围压测压管入口46连通,排水管钉24与排水管27通过排水管入口45连通,孔隙水排水管28与孔隙水排水连接管23通过孔隙水排水管入口44连通,注水管30与注水管钉22通过注水管出口43连通,孔隙水测压管32与孔隙水测压连接管21通过孔隙水测压入口42连通,围压测压管26、排水管27和孔隙水排水管28位于容器底板34的一侧,围压测压管26位于排水管27之上,排水管27位于孔隙水排水管28之上,注水管30和孔隙水测压管32均位于容器底板34的另一侧,注水管30位于孔隙水测压管32之上,下隔水板20安装在容器底板34上、下隔水板20边缘两侧的隔水板测压口40和隔水板排水口41与容器底板34上的孔隙水测压入口42和孔隙水排水管入口相连通,注水管出口43位于容器底板34上表面的一侧,排水管入口45和围压测压管入口46位于容器底板34上表面的另一侧;震动器33通过底板凹槽39安装在在容器底板34中间并且与下隔水板20相连,震动器33上装有震动弹簧38,加密铁丝网19位于下隔水板20上面,孔隙水测压连接管21与孔隙水排水连接管23装在下隔水板20内并位于下隔水板20的边缘两侧。 Embodiment 3: As shown in Figures 1-6, a triaxial rheological experiment device for tailings materials, including a pressurized top plate 1, a pressurized shaft 2, a weight I3, an outer cover plate 4, a hook 5, and a weight II6 , pressure transmission ring 7, inner cover plate 8, convex groove 9, rubber film 10, snap ring 11, push-pull rod 12, pressure plate 13, upper baffle plate 14, pressure plate 15, pressure steel cylinder 16, pressure plate Cavity 18, encrypted barbed wire 19, lower baffle 20, pore water pressure measurement connection pipe 21, water injection pipe nail 22, pore water drainage connection pipe 23, drainage pipe nail 24, pressure measurement pipe nail 25, confining pressure pressure measurement tube 26. Drainage pipe 27, pore water drainage pipe 28, water injection pipe 30, pore water pressure measuring pipe 32, vibrator 33, container bottom plate 34, pressure transmission ring reserved groove 35, pressure transmission ring connection groove 36, snap ring groove 37 , vibrating spring 38, bottom plate groove 39, water baffle pressure measuring port 40, water baffle drain outlet 41, pore water pressure measuring inlet 42, water injection pipe outlet 43, pore water drain pipe inlet 44, drain pipe inlet 45, enclosure Pressure measuring tube inlet 46, confining pressure ring screw 47, fixing groove 48; both ends of pressurized top plate 1 are provided with pressure transmission ring 7 and are connected with confining pressure ring thread 47 through pressure transmission ring 7, and hook 5 is fixed on the The middle position of the top plate 1 is placed on the hook 5, and the weight II6 is placed on the hook 5. The pressure plate 15 is connected with the threaded thread 47 of the surrounding pressure ring through the fixed groove 48 dug on it with a threaded thread; the snap ring 11 is located inside the pressure-bearing steel cylinder 16. In the clasp groove 37 of the steel cylinder and connected with the push-pull rod 12, a rubber film 10 is arranged in the pressure-bearing steel cylinder 16, and the rubber membrane 10 is turned outward and fixed on the pressure-bearing steel cylinder 16, and the upper and lower ends of the pressure-bearing steel cylinder 16 are provided with The convex groove 9 is provided with a pressure transmission ring reserved groove 35 on the outside of the convex groove 9, the pressure plate 15 is located on the upper part of the pressurized chamber 18, and the pressure plate 15 is provided with a pressure transmission ring connecting groove 36 corresponding to the pressure transmission ring reserved groove 35, The bottom of the pressure transmission ring 7 passes through the reserved groove 35 of the pressure transmission ring and is installed in the connection groove 36 of the pressure transmission ring. The upper baffle 14 is located under the pressure plate 13, and both the pressure plate 13 and the upper baffle 14 are located On the upper part of the cavity 18, the pressure shaft 2 passes through the reserved hole of the inner cover plate 8 and is connected with the pressure plate 13 through the shaft pressure ring screw 49. The weight I3 is located on the pressure shaft 2, the inner cover plate 8, the outer cover plate 4 are installed on the top of the pressure-bearing steel cylinder 16 in sequence; the water injection pipe nail 22, the drainage pipe nail 24 and the pressure-measuring pipe nail 25 are all fixed inside the pressure-bearing steel cylinder 16 and run through the bottom of the pressure-bearing steel cylinder 16. 26 communicates with the piezometric pipe nail 25 through the inlet 46 of the confining pressure measuring pipe, the drain pipe nail 24 communicates with the drain pipe 27 through the drain pipe inlet 45, and the pore water drain pipe 28 communicates with the pore water drain connection pipe 23 through the pore water drain pipe inlet 44 is connected, the water injection pipe 30 is connected with the water injection pipe nail 22 through the water injection pipe outlet 43, the pore water pressure measurement pipe 32 is connected with the pore water pressure measurement connection pipe 21 through the pore water pressure measurement inlet 42, the confining pressure pressure measurement pipe 26, the drainage pipe 27 and the pore water drain pipe 28 are located on one side of the container bottom plate 34, the confining pressure piezometer tube 26 is located above the drain pipe 27, the drain pipe 27 is located above the pore water drain pipe 28, the water injection pipe 30 and the pore water piezometer tube 32 are located in On the other side of the container bottom plate 34, the water injection pipe 30 is located above the pore water pressure measuring tube 32, and the lower water baffle 20 is installed on the container bottom plate 34, the water baffle pressure measuring port 40 on both sides of the lower water baffle 20 edge and The water baffle outlet 41 communicates with the pore water pressure measuring inlet 42 on the container bottom plate 34 and the pore water drainage pipe inlet. The water injection pipe outlet 43 is located on one side of the upper surface of the container bottom plate 34. The pipe inlet 46 is located on the other side of the upper surface of the container bottom plate 34; the vibrator 33 is installed in the middle of the container bottom plate 34 through the bottom plate groove 39 and is connected with the lower water baffle 20. The vibrator 33 is equipped with a vibrating spring 38 and an encrypted barbed wire 19 Located above the lower water baffle 20 , the pore water pressure measurement connecting pipe 21 and the pore water drainage connecting pipe 23 are installed in the lower water baffle 20 and are located on both sides of the edge of the lower water baffle 20 .

所述压力板15下移时不与橡皮膜10接触。 The pressure plate 15 is not in contact with the rubber membrane 10 when it moves down.

所述孔隙水排水管入口44、排水管入口45和围压测压管入口46位于容器底板34上表面的一侧,孔隙水测压入口42和注水管出口43位于容器底板34上表面的另一侧,其从左到右的顺序依次为:围压测压管入口46、排水管入口45、孔隙水排水管入口44、孔隙水测压入口42、注水管出口43。 The pore water drainage pipe inlet 44, the drain pipe inlet 45 and the confining pressure piezometer inlet 46 are located on one side of the upper surface of the container bottom plate 34, and the pore water pressure measurement inlet 42 and the water injection pipe outlet 43 are located on the other side of the upper surface of the container bottom plate 34. On one side, the order from left to right is: confining pressure piezometer inlet 46, drain pipe inlet 45, pore water drain pipe inlet 44, pore water piezometer inlet 42, water injection pipe outlet 43.

所述加压轴2底部装有轴压环丝扣49。 The bottom of the pressurizing shaft 2 is equipped with a shaft pressing ring screw thread 49 .

所述传压环7的弧长为承压钢筒16圆周长的1/4。 The arc length of the pressure transmitting ring 7 is 1/4 of the circumference of the pressure bearing steel cylinder 16 .

所述注水管钉22、排水管钉24和测压管钉25的长度超过承压钢筒16的厚度,注水管钉22,排水管钉24,测压管钉25均为空心管。 The lengths of the water injection pipe nail 22, the drain pipe nail 24 and the pressure measurement pipe nail 25 exceed the thickness of the pressure steel cylinder 16, and the water injection pipe nail 22, the drainage pipe nail 24 and the pressure measurement pipe nail 25 are all hollow pipes.

实施方式四:如图1-6所示,一种尾矿材料的三轴流变实验装置,包括加压顶板1、加压轴2、重坨Ⅰ3、外盖板4、挂钩5、重坨Ⅱ6、传压环7、内盖板8、凸槽9、橡皮膜10、卡环11、推拉杆12、加压板13、上隔水板14、压力板15、承压钢筒16、加压容腔18、加密铁丝网19、下隔水板20、孔隙水测压连接管21、注水管钉22、孔隙水排水连接管23、排水管钉24、测压管钉25、围压测压管26、排水管27、孔隙水排水管28、注水管30、孔隙水测压管32、震动器33、容器底板34、传压环预留槽35、传压环连接槽36、卡环槽37、震动弹簧38、底板凹槽39、隔水板测压口40、隔水板排水口41、孔隙水测压入口42、注水管出口43、孔隙水排水管入口44、排水管入口45、围压测压管入口46、围压环丝扣47、固定槽48;加压顶板1两端设置有传压环7并通过传压环7与围压环丝扣47连接,挂钩5固定在加压顶板1的中间位置,挂钩5上放置有重坨Ⅱ6,压力板15通过其上开凿的具有丝扣的固定槽48与围压环丝扣47连接;卡环11位于承压钢筒16内部的卡环槽37内并且与推拉杆12连接,承压钢筒16内设置有橡皮膜10,橡皮膜10外翻固定在承压钢筒16上,承压钢筒16上端和下端均设置有凸槽9,凸槽9外侧设有传压环预留槽35,压力板15位于加压容腔18上部,压力板15上对应传压环预留槽35设有传压环连接槽36,传压环7底部穿过传压环预留槽35安装在传压环连接槽36内,上隔水板14位于加压板13下面,加压板13与上隔水板14均位于加压容腔18上部,加压轴2穿过内盖板8的预留孔并通过轴压环丝扣49与加压板13连接,重坨Ⅰ3位于加压轴2上,内盖板8、外盖板4依次装在承压钢筒16的顶端;注水管钉22、排水管钉24和测压管钉25均固定于承压钢筒16内部并贯穿承压钢筒16底部,围压测压管26与测压管钉25通过围压测压管入口46连通,排水管钉24与排水管27通过排水管入口45连通,孔隙水排水管28与孔隙水排水连接管23通过孔隙水排水管入口44连通,注水管30与注水管钉22通过注水管出口43连通,孔隙水测压管32与孔隙水测压连接管21通过孔隙水测压入口42连通,围压测压管26、排水管27和孔隙水排水管28位于容器底板34的一侧,围压测压管26位于排水管27之上,排水管27位于孔隙水排水管28之上,注水管30和孔隙水测压管32均位于容器底板34的另一侧,注水管30位于孔隙水测压管32之上,下隔水板20安装在容器底板34上、下隔水板20边缘两侧的隔水板测压口40和隔水板排水口41与容器底板34上的孔隙水测压入口42和孔隙水排水管入口相连通,注水管出口43位于容器底板34上表面的一侧,排水管入口45和围压测压管入口46位于容器底板34上表面的另一侧;震动器33通过底板凹槽39安装在在容器底板34中间并且与下隔水板20相连,震动器33上装有震动弹簧38,加密铁丝网19位于下隔水板20上面,孔隙水测压连接管21与孔隙水排水连接管23装在下隔水板20内并位于下隔水板20的边缘两侧。 Embodiment 4: As shown in Figures 1-6, a triaxial rheological experimental device for tailings materials, including a pressurized top plate 1, a pressurized shaft 2, a weight I3, an outer cover plate 4, a hook 5, and a weight II6 , pressure transmission ring 7, inner cover plate 8, convex groove 9, rubber film 10, snap ring 11, push-pull rod 12, pressure plate 13, upper baffle plate 14, pressure plate 15, pressure steel cylinder 16, pressure plate Cavity 18, encrypted barbed wire 19, lower baffle 20, pore water pressure measurement connection pipe 21, water injection pipe nail 22, pore water drainage connection pipe 23, drainage pipe nail 24, pressure measurement pipe nail 25, confining pressure pressure measurement tube 26. Drainage pipe 27, pore water drainage pipe 28, water injection pipe 30, pore water pressure measuring pipe 32, vibrator 33, container bottom plate 34, pressure transmission ring reserved groove 35, pressure transmission ring connection groove 36, snap ring groove 37 , vibrating spring 38, bottom plate groove 39, water baffle pressure measuring port 40, water baffle drain outlet 41, pore water pressure measuring inlet 42, water injection pipe outlet 43, pore water drain pipe inlet 44, drain pipe inlet 45, enclosure Pressure measuring tube inlet 46, confining pressure ring screw 47, fixing groove 48; both ends of pressurized top plate 1 are provided with pressure transmission ring 7 and are connected with confining pressure ring thread 47 through pressure transmission ring 7, and hook 5 is fixed on the The middle position of the top plate 1 is placed on the hook 5, and the weight II6 is placed on the hook 5. The pressure plate 15 is connected with the threaded thread 47 of the surrounding pressure ring through the fixed groove 48 dug on it with a threaded thread; the snap ring 11 is located inside the pressure-bearing steel cylinder 16. In the clasp groove 37 of the steel cylinder and connected with the push-pull rod 12, a rubber film 10 is arranged in the pressure-bearing steel cylinder 16, and the rubber membrane 10 is turned outward and fixed on the pressure-bearing steel cylinder 16, and the upper and lower ends of the pressure-bearing steel cylinder 16 are provided with The convex groove 9 is provided with a pressure transmission ring reserved groove 35 on the outside of the convex groove 9, the pressure plate 15 is located on the upper part of the pressurized chamber 18, and the pressure plate 15 is provided with a pressure transmission ring connecting groove 36 corresponding to the pressure transmission ring reserved groove 35, The bottom of the pressure transmission ring 7 passes through the reserved groove 35 of the pressure transmission ring and is installed in the connection groove 36 of the pressure transmission ring. The upper baffle 14 is located under the pressure plate 13, and both the pressure plate 13 and the upper baffle 14 are located On the upper part of the cavity 18, the pressure shaft 2 passes through the reserved hole of the inner cover plate 8 and is connected with the pressure plate 13 through the shaft pressure ring screw 49. The weight I3 is located on the pressure shaft 2, the inner cover plate 8, the outer cover plate 4 are installed on the top of the pressure-bearing steel cylinder 16 in sequence; the water injection pipe nail 22, the drainage pipe nail 24 and the pressure-measuring pipe nail 25 are all fixed inside the pressure-bearing steel cylinder 16 and run through the bottom of the pressure-bearing steel cylinder 16. 26 communicates with the piezometric pipe nail 25 through the inlet 46 of the confining pressure measuring pipe, the drain pipe nail 24 communicates with the drain pipe 27 through the drain pipe inlet 45, and the pore water drain pipe 28 communicates with the pore water drain connection pipe 23 through the pore water drain pipe inlet 44 is connected, the water injection pipe 30 is connected with the water injection pipe nail 22 through the water injection pipe outlet 43, the pore water pressure measurement pipe 32 is connected with the pore water pressure measurement connection pipe 21 through the pore water pressure measurement inlet 42, the confining pressure pressure measurement pipe 26, the drainage pipe 27 and the pore water drain pipe 28 are located on one side of the container bottom plate 34, the confining pressure piezometer tube 26 is located above the drain pipe 27, the drain pipe 27 is located above the pore water drain pipe 28, the water injection pipe 30 and the pore water piezometer tube 32 are located in On the other side of the container bottom plate 34, the water injection pipe 30 is located above the pore water pressure measuring tube 32, and the lower water baffle 20 is installed on the container bottom plate 34, the water baffle pressure measuring port 40 on both sides of the lower water baffle 20 edge and The water baffle outlet 41 communicates with the pore water pressure measuring inlet 42 on the container bottom plate 34 and the pore water drainage pipe inlet. The water injection pipe outlet 43 is located on one side of the upper surface of the container bottom plate 34. The pipe inlet 46 is located on the other side of the upper surface of the container bottom plate 34; the vibrator 33 is installed in the middle of the container bottom plate 34 through the bottom plate groove 39 and is connected with the lower water baffle 20. The vibrator 33 is equipped with a vibrating spring 38 and an encrypted barbed wire 19 Located above the lower water baffle 20 , the pore water pressure measurement connecting pipe 21 and the pore water drainage connecting pipe 23 are installed in the lower water baffle 20 and are located on both sides of the edge of the lower water baffle 20 .

所述压力板15下移时不与橡皮膜10接触。 The pressure plate 15 is not in contact with the rubber membrane 10 when it moves down.

所述孔隙水排水管入口44、排水管入口45和围压测压管入口46位于容器底板34上表面的一侧,孔隙水测压入口42和注水管出口43位于容器底板34上表面的另一侧,其从左到右的顺序依次为:围压测压管入口46、排水管入口45、孔隙水排水管入口44、孔隙水测压入口42、注水管出口43。 The pore water drainage pipe inlet 44, the drain pipe inlet 45 and the confining pressure piezometer inlet 46 are located on one side of the upper surface of the container bottom plate 34, and the pore water pressure measurement inlet 42 and the water injection pipe outlet 43 are located on the other side of the upper surface of the container bottom plate 34. On one side, the order from left to right is: confining pressure piezometer inlet 46, drain pipe inlet 45, pore water drain pipe inlet 44, pore water piezometer inlet 42, water injection pipe outlet 43.

所述传压环7的弧长为承压钢筒16圆周长的1/4。 The arc length of the pressure transmitting ring 7 is 1/4 of the circumference of the pressure bearing steel cylinder 16 .

所述注水管钉22、排水管钉24和测压管钉25的长度超过承压钢筒16的厚度,注水管钉22,排水管钉24,测压管钉25均为空心管。 The lengths of the water injection pipe nail 22, the drain pipe nail 24 and the pressure measurement pipe nail 25 exceed the thickness of the pressure steel cylinder 16, and the water injection pipe nail 22, the drainage pipe nail 24 and the pressure measurement pipe nail 25 are all hollow pipes.

实施方式五:如图1-6所示,一种尾矿材料的三轴流变实验装置,包括加压顶板1、加压轴2、重坨Ⅰ3、外盖板4、挂钩5、重坨Ⅱ6、传压环7、内盖板8、凸槽9、橡皮膜10、卡环11、推拉杆12、加压板13、上隔水板14、压力板15、承压钢筒16、加压容腔18、加密铁丝网19、下隔水板20、孔隙水测压连接管21、注水管钉22、孔隙水排水连接管23、排水管钉24、测压管钉25、围压测压管26、排水管27、孔隙水排水管28、注水管30、孔隙水测压管32、震动器33、容器底板34、传压环预留槽35、传压环连接槽36、卡环槽37、震动弹簧38、底板凹槽39、隔水板测压口40、隔水板排水口41、孔隙水测压入口42、注水管出口43、孔隙水排水管入口44、排水管入口45、围压测压管入口46、围压环丝扣47、固定槽48;加压顶板1两端设置有传压环7并通过传压环7与围压环丝扣47连接,挂钩5固定在加压顶板1的中间位置,挂钩5上放置有重坨Ⅱ6,压力板15通过其上开凿的具有丝扣的固定槽48与围压环丝扣47连接;卡环11位于承压钢筒16内部的卡环槽37内并且与推拉杆12连接,承压钢筒16内设置有橡皮膜10,橡皮膜10外翻固定在承压钢筒16上,承压钢筒16上端和下端均设置有凸槽9,凸槽9外侧设有传压环预留槽35,压力板15位于加压容腔18上部,压力板15上对应传压环预留槽35设有传压环连接槽36,传压环7底部穿过传压环预留槽35安装在传压环连接槽36内,上隔水板14位于加压板13下面,加压板13与上隔水板14均位于加压容腔18上部,加压轴2穿过内盖板8的预留孔并通过轴压环丝扣49与加压板13连接,重坨Ⅰ3位于加压轴2上,内盖板8、外盖板4依次装在承压钢筒16的顶端;注水管钉22、排水管钉24和测压管钉25均固定于承压钢筒16内部并贯穿承压钢筒16底部,围压测压管26与测压管钉25通过围压测压管入口46连通,排水管钉24与排水管27通过排水管入口45连通,孔隙水排水管28与孔隙水排水连接管23通过孔隙水排水管入口44连通,注水管30与注水管钉22通过注水管出口43连通,孔隙水测压管32与孔隙水测压连接管21通过孔隙水测压入口42连通,围压测压管26、排水管27和孔隙水排水管28位于容器底板34的一侧,围压测压管26位于排水管27之上,排水管27位于孔隙水排水管28之上,注水管30和孔隙水测压管32均位于容器底板34的另一侧,注水管30位于孔隙水测压管32之上,下隔水板20安装在容器底板34上、下隔水板20边缘两侧的隔水板测压口40和隔水板排水口41与容器底板34上的孔隙水测压入口42和孔隙水排水管入口相连通,注水管出口43位于容器底板34上表面的一侧,排水管入口45和围压测压管入口46位于容器底板34上表面的另一侧;震动器33通过底板凹槽39安装在在容器底板34中间并且与下隔水板20相连,震动器33上装有震动弹簧38,加密铁丝网19位于下隔水板20上面,孔隙水测压连接管21与孔隙水排水连接管23装在下隔水板20内并位于下隔水板20的边缘两侧。 Embodiment 5: As shown in Figures 1-6, a triaxial rheological experimental device for tailings materials, including a pressurized top plate 1, a pressurized shaft 2, a weight I3, an outer cover plate 4, a hook 5, and a weight II6 , pressure transmission ring 7, inner cover plate 8, convex groove 9, rubber film 10, snap ring 11, push-pull rod 12, pressure plate 13, upper baffle plate 14, pressure plate 15, pressure steel cylinder 16, pressure plate Cavity 18, encrypted barbed wire 19, lower baffle 20, pore water pressure measurement connection pipe 21, water injection pipe nail 22, pore water drainage connection pipe 23, drainage pipe nail 24, pressure measurement pipe nail 25, confining pressure pressure measurement tube 26. Drainage pipe 27, pore water drainage pipe 28, water injection pipe 30, pore water pressure measuring pipe 32, vibrator 33, container bottom plate 34, pressure transmission ring reserved groove 35, pressure transmission ring connection groove 36, snap ring groove 37 , vibrating spring 38, bottom plate groove 39, water baffle pressure measuring port 40, water baffle drain outlet 41, pore water pressure measuring inlet 42, water injection pipe outlet 43, pore water drain pipe inlet 44, drain pipe inlet 45, enclosure Pressure measuring tube inlet 46, confining pressure ring screw 47, fixing groove 48; both ends of pressurized top plate 1 are provided with pressure transmission ring 7 and are connected with confining pressure ring thread 47 through pressure transmission ring 7, and hook 5 is fixed on the The middle position of the top plate 1 is placed on the hook 5, and the weight II6 is placed on the hook 5. The pressure plate 15 is connected with the threaded thread 47 of the surrounding pressure ring through the fixed groove 48 dug on it with a threaded thread; the snap ring 11 is located inside the pressure-bearing steel cylinder 16. In the clasp groove 37 of the steel cylinder and connected with the push-pull rod 12, a rubber film 10 is arranged in the pressure-bearing steel cylinder 16, and the rubber membrane 10 is turned outward and fixed on the pressure-bearing steel cylinder 16, and the upper and lower ends of the pressure-bearing steel cylinder 16 are provided with The convex groove 9 is provided with a pressure transmission ring reserved groove 35 on the outside of the convex groove 9, the pressure plate 15 is located on the upper part of the pressurized chamber 18, and the pressure plate 15 is provided with a pressure transmission ring connecting groove 36 corresponding to the pressure transmission ring reserved groove 35, The bottom of the pressure transmission ring 7 passes through the reserved groove 35 of the pressure transmission ring and is installed in the connection groove 36 of the pressure transmission ring. The upper baffle 14 is located under the pressure plate 13, and both the pressure plate 13 and the upper baffle 14 are located On the upper part of the cavity 18, the pressure shaft 2 passes through the reserved hole of the inner cover plate 8 and is connected with the pressure plate 13 through the shaft pressure ring screw 49. The weight I3 is located on the pressure shaft 2, the inner cover plate 8, the outer cover plate 4 are installed on the top of the pressure-bearing steel cylinder 16 in sequence; the water injection pipe nail 22, the drainage pipe nail 24 and the pressure-measuring pipe nail 25 are all fixed inside the pressure-bearing steel cylinder 16 and run through the bottom of the pressure-bearing steel cylinder 16. 26 communicates with the piezometric pipe nail 25 through the inlet 46 of the confining pressure measuring pipe, the drain pipe nail 24 communicates with the drain pipe 27 through the drain pipe inlet 45, and the pore water drain pipe 28 communicates with the pore water drain connection pipe 23 through the pore water drain pipe inlet 44 is connected, the water injection pipe 30 is connected with the water injection pipe nail 22 through the water injection pipe outlet 43, the pore water pressure measurement pipe 32 is connected with the pore water pressure measurement connection pipe 21 through the pore water pressure measurement inlet 42, the confining pressure pressure measurement pipe 26, the drainage pipe 27 and the pore water drain pipe 28 are located on one side of the container bottom plate 34, the confining pressure piezometer tube 26 is located above the drain pipe 27, the drain pipe 27 is located above the pore water drain pipe 28, the water injection pipe 30 and the pore water piezometer tube 32 are located in On the other side of the container bottom plate 34, the water injection pipe 30 is located above the pore water pressure measuring tube 32, and the lower water baffle 20 is installed on the container bottom plate 34, the water baffle pressure measuring port 40 on both sides of the lower water baffle 20 edge and The water baffle outlet 41 communicates with the pore water pressure measuring inlet 42 on the container bottom plate 34 and the pore water drainage pipe inlet. The water injection pipe outlet 43 is located on one side of the upper surface of the container bottom plate 34. The pipe inlet 46 is located on the other side of the upper surface of the container bottom plate 34; the vibrator 33 is installed in the middle of the container bottom plate 34 through the bottom plate groove 39 and is connected with the lower water baffle 20. The vibrator 33 is equipped with a vibrating spring 38 and an encrypted barbed wire 19 Located above the lower water baffle 20 , the pore water pressure measurement connecting pipe 21 and the pore water drainage connecting pipe 23 are installed in the lower water baffle 20 and are located on both sides of the edge of the lower water baffle 20 .

所述压力板15下移时不与橡皮膜10接触。 The pressure plate 15 is not in contact with the rubber membrane 10 when it moves down.

所述孔隙水排水管入口44、排水管入口45和围压测压管入口46位于容器底板34上表面的一侧,孔隙水测压入口42和注水管出口43位于容器底板34上表面的另一侧,其从左到右的顺序依次为:围压测压管入口46、排水管入口45、孔隙水排水管入口44、孔隙水测压入口42、注水管出口43。 The pore water drainage pipe inlet 44, the drain pipe inlet 45 and the confining pressure piezometer inlet 46 are located on one side of the upper surface of the container bottom plate 34, and the pore water pressure measurement inlet 42 and the water injection pipe outlet 43 are located on the other side of the upper surface of the container bottom plate 34. On one side, the order from left to right is: confining pressure piezometer inlet 46, drain pipe inlet 45, pore water drain pipe inlet 44, pore water piezometer inlet 42, water injection pipe outlet 43.

所述注水管钉22、排水管钉24和测压管钉25的长度超过承压钢筒16的厚度,注水管钉22,排水管钉24,测压管钉25均为空心管。 The lengths of the water injection pipe nail 22, the drain pipe nail 24 and the pressure measurement pipe nail 25 exceed the thickness of the pressure steel cylinder 16, and the water injection pipe nail 22, the drainage pipe nail 24 and the pressure measurement pipe nail 25 are all hollow pipes.

实施方式六:如图1-6所示,一种尾矿材料的三轴流变实验装置,包括加压顶板1、加压轴2、重坨Ⅰ3、外盖板4、挂钩5、重坨Ⅱ6、传压环7、内盖板8、凸槽9、橡皮膜10、卡环11、推拉杆12、加压板13、上隔水板14、压力板15、承压钢筒16、加压容腔18、加密铁丝网19、下隔水板20、孔隙水测压连接管21、注水管钉22、孔隙水排水连接管23、排水管钉24、测压管钉25、围压测压管26、排水管27、孔隙水排水管28、注水管30、孔隙水测压管32、震动器33、容器底板34、传压环预留槽35、传压环连接槽36、卡环槽37、震动弹簧38、底板凹槽39、隔水板测压口40、隔水板排水口41、孔隙水测压入口42、注水管出口43、孔隙水排水管入口44、排水管入口45、围压测压管入口46、围压环丝扣47、固定槽48;加压顶板1两端设置有传压环7并通过传压环7与围压环丝扣47连接,挂钩5固定在加压顶板1的中间位置,挂钩5上放置有重坨Ⅱ6,压力板15通过其上开凿的具有丝扣的固定槽48与围压环丝扣47连接;卡环11位于承压钢筒16内部的卡环槽37内并且与推拉杆12连接,承压钢筒16内设置有橡皮膜10,橡皮膜10外翻固定在承压钢筒16上,承压钢筒16上端和下端均设置有凸槽9,凸槽9外侧设有传压环预留槽35,压力板15位于加压容腔18上部,压力板15上对应传压环预留槽35设有传压环连接槽36,传压环7底部穿过传压环预留槽35安装在传压环连接槽36内,上隔水板14位于加压板13下面,加压板13与上隔水板14均位于加压容腔18上部,加压轴2穿过内盖板8的预留孔并通过轴压环丝扣49与加压板13连接,重坨Ⅰ3位于加压轴2上,内盖板8、外盖板4依次装在承压钢筒16的顶端;注水管钉22、排水管钉24和测压管钉25均固定于承压钢筒16内部并贯穿承压钢筒16底部,围压测压管26与测压管钉25通过围压测压管入口46连通,排水管钉24与排水管27通过排水管入口45连通,孔隙水排水管28与孔隙水排水连接管23通过孔隙水排水管入口44连通,注水管30与注水管钉22通过注水管出口43连通,孔隙水测压管32与孔隙水测压连接管21通过孔隙水测压入口42连通,围压测压管26、排水管27和孔隙水排水管28位于容器底板34的一侧,围压测压管26位于排水管27之上,排水管27位于孔隙水排水管28之上,注水管30和孔隙水测压管32均位于容器底板34的另一侧,注水管30位于孔隙水测压管32之上,下隔水板20安装在容器底板34上、下隔水板20边缘两侧的隔水板测压口40和隔水板排水口41与容器底板34上的孔隙水测压入口42和孔隙水排水管入口相连通,注水管出口43位于容器底板34上表面的一侧,排水管入口45和围压测压管入口46位于容器底板34上表面的另一侧;震动器33通过底板凹槽39安装在在容器底板34中间并且与下隔水板20相连,震动器33上装有震动弹簧38,加密铁丝网19位于下隔水板20上面,孔隙水测压连接管21与孔隙水排水连接管23装在下隔水板20内并位于下隔水板20的边缘两侧。 Embodiment 6: As shown in Figure 1-6, a triaxial rheological experimental device for tailings materials, including a pressurized top plate 1, a pressurized shaft 2, a weight I3, an outer cover plate 4, a hook 5, and a weight II6 , pressure transmission ring 7, inner cover plate 8, convex groove 9, rubber film 10, snap ring 11, push-pull rod 12, pressure plate 13, upper baffle plate 14, pressure plate 15, pressure steel cylinder 16, pressure plate Cavity 18, encrypted barbed wire 19, lower baffle 20, pore water pressure measurement connection pipe 21, water injection pipe nail 22, pore water drainage connection pipe 23, drainage pipe nail 24, pressure measurement pipe nail 25, confining pressure pressure measurement tube 26. Drainage pipe 27, pore water drainage pipe 28, water injection pipe 30, pore water pressure measuring pipe 32, vibrator 33, container bottom plate 34, pressure transmission ring reserved groove 35, pressure transmission ring connection groove 36, snap ring groove 37 , vibrating spring 38, bottom plate groove 39, water baffle pressure measuring port 40, water baffle drain outlet 41, pore water pressure measuring inlet 42, water injection pipe outlet 43, pore water drain pipe inlet 44, drain pipe inlet 45, enclosure Pressure measuring tube inlet 46, confining pressure ring screw 47, fixing groove 48; both ends of pressurized top plate 1 are provided with pressure transmission ring 7 and are connected with confining pressure ring thread 47 through pressure transmission ring 7, and hook 5 is fixed on the The middle position of the top plate 1 is placed on the hook 5, and the weight II6 is placed on the hook 5. The pressure plate 15 is connected with the threaded thread 47 of the surrounding pressure ring through the fixed groove 48 dug on it with a threaded thread; the snap ring 11 is located inside the pressure-bearing steel cylinder 16. In the clasp groove 37 of the steel cylinder and connected with the push-pull rod 12, a rubber film 10 is arranged in the pressure-bearing steel cylinder 16, and the rubber membrane 10 is turned outward and fixed on the pressure-bearing steel cylinder 16, and the upper and lower ends of the pressure-bearing steel cylinder 16 are provided with The convex groove 9 is provided with a pressure transmission ring reserved groove 35 on the outside of the convex groove 9, the pressure plate 15 is located on the upper part of the pressurized chamber 18, and the pressure plate 15 is provided with a pressure transmission ring connecting groove 36 corresponding to the pressure transmission ring reserved groove 35, The bottom of the pressure transmission ring 7 passes through the reserved groove 35 of the pressure transmission ring and is installed in the connection groove 36 of the pressure transmission ring. The upper baffle 14 is located under the pressure plate 13, and both the pressure plate 13 and the upper baffle 14 are located On the upper part of the cavity 18, the pressure shaft 2 passes through the reserved hole of the inner cover plate 8 and is connected with the pressure plate 13 through the shaft pressure ring screw 49. The weight I3 is located on the pressure shaft 2, the inner cover plate 8, the outer cover plate 4 are installed on the top of the pressure-bearing steel cylinder 16 in sequence; the water injection pipe nail 22, the drainage pipe nail 24 and the pressure-measuring pipe nail 25 are all fixed inside the pressure-bearing steel cylinder 16 and run through the bottom of the pressure-bearing steel cylinder 16. 26 communicates with the piezometric pipe nail 25 through the inlet 46 of the confining pressure measuring pipe, the drain pipe nail 24 communicates with the drain pipe 27 through the drain pipe inlet 45, and the pore water drain pipe 28 communicates with the pore water drain connection pipe 23 through the pore water drain pipe inlet 44 is connected, the water injection pipe 30 is connected with the water injection pipe nail 22 through the water injection pipe outlet 43, the pore water pressure measurement pipe 32 is connected with the pore water pressure measurement connection pipe 21 through the pore water pressure measurement inlet 42, the confining pressure pressure measurement pipe 26, the drainage pipe 27 and the pore water drain pipe 28 are located on one side of the container bottom plate 34, the confining pressure piezometer tube 26 is located above the drain pipe 27, the drain pipe 27 is located above the pore water drain pipe 28, the water injection pipe 30 and the pore water piezometer tube 32 are located in On the other side of the container bottom plate 34, the water injection pipe 30 is located above the pore water pressure measuring tube 32, and the lower water baffle 20 is installed on the container bottom plate 34, the water baffle pressure measuring port 40 on both sides of the lower water baffle 20 edge and The water baffle outlet 41 communicates with the pore water pressure measuring inlet 42 on the container bottom plate 34 and the pore water drainage pipe inlet. The water injection pipe outlet 43 is located on one side of the upper surface of the container bottom plate 34. The pipe inlet 46 is located on the other side of the upper surface of the container bottom plate 34; the vibrator 33 is installed in the middle of the container bottom plate 34 through the bottom plate groove 39 and is connected with the lower water baffle 20. The vibrator 33 is equipped with a vibrating spring 38 and an encrypted barbed wire 19 Located above the lower water baffle 20 , the pore water pressure measurement connecting pipe 21 and the pore water drainage connecting pipe 23 are installed in the lower water baffle 20 and are located on both sides of the edge of the lower water baffle 20 .

所述孔隙水排水管入口44、排水管入口45和围压测压管入口46位于容器底板34上表面的一侧,孔隙水测压入口42和注水管出口43位于容器底板34上表面的另一侧,其从左到右的顺序依次为:围压测压管入口46、排水管入口45、孔隙水排水管入口44、孔隙水测压入口42、注水管出口43。 The pore water drainage pipe inlet 44, the drain pipe inlet 45 and the confining pressure piezometer inlet 46 are located on one side of the upper surface of the container bottom plate 34, and the pore water pressure measurement inlet 42 and the water injection pipe outlet 43 are located on the other side of the upper surface of the container bottom plate 34. On one side, the order from left to right is: confining pressure piezometer inlet 46, drain pipe inlet 45, pore water drain pipe inlet 44, pore water piezometer inlet 42, water injection pipe outlet 43.

上面结合附图对本发明的具体实施方式作了详细说明,但是本发明并不限于上述实施方式,在本领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化。 The specific implementation of the present invention has been described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned implementation, within the knowledge of those of ordinary skill in the art, it can also be made without departing from the gist of the present invention. Variations.

Claims (6)

1. a triaxial rheology experimental provision for tailings material, is characterized in that: comprise and add coping (1), pressuring shaft (2), heavily stick together I (3), outer cover plate (4), hook (5), heavily stick together II (6), pressure transmission ring (7), inner cover plate (8), tongue (9), rubber membrane (10), snap ring (11), pull bar (12), increased pressure board (13), upper water-stop sheet (14), pressure plare (15), pressure-bearing steel cylinder (16), pressurization cavity volume (18), encryption entanglement (19), lower water-stop sheet (20), pore water pressure measurement connecting pipe (21), water injection pipe nail (22), pore water drainage connecting pipe (23), drainpipe nail (24), piezometric tube nail (25), confined pressure piezometric tube (26), drainpipe (27), pore water drainpipe (28), water injection pipe (30), pore water piezometric tube (32), electromagnetic shaker (33), container floor (34), pressure transmission ring preformed groove (35), pressure transmission ring link slot (36), annular groove (37), vibrations spring (38), bottom plate groove (39), water-stop sheet pressure tap (40), water-stop sheet freeing port (41), pore water pressure measurement entrance (42), water injection pipe outlet (43), pore water drain inlet (44), drain inlet (45), confined pressure piezometric tube entrance (46), confined pressure circumfili button (47), pickup groove (48), add coping (1) two ends be provided with pressure transmission ring (7) and be connected with confined pressure circumfili button (47) by pressure transmission ring (7), hook (5) is fixed on the centre position adding coping (1), hook (5) is placed with and heavily sticks together II (6), pressure plare (15) is connected with confined pressure circumfili button (47) by the pickup groove (48) with screw thread that it is dug, snap ring (11) is positioned at the inner annular groove (37) of pressure-bearing steel cylinder (16) and is connected with pull bar (12), rubber membrane (10) is provided with in pressure-bearing steel cylinder (16), rubber membrane (10) turns up and is fixed on pressure-bearing steel cylinder (16), pressure-bearing steel cylinder (16) top and bottom are provided with tongue (9), tongue (9) outside is provided with pressure transmission ring preformed groove (35), pressure plare (15) is positioned at pressurization cavity volume (18) top, the upper corresponding pressure transmission ring preformed groove (35) of pressure plare (15) is provided with pressure transmission ring link slot (36), pressure transmission ring (7) bottom is arranged in pressure transmission ring link slot (36) through pressure transmission ring preformed groove (35), upper water-stop sheet (14) is positioned at below increased pressure board (13), increased pressure board (13) and upper water-stop sheet (14) are all positioned in soil sample (17), pressuring shaft (2) is also connected with increased pressure board (13) by axial compression circumfili button (49) through the preformed hole of inner cover plate (8), heavily stick together and I (3) be positioned in pressuring shaft (2), inner cover plate (8), outer cover plate (4) is contained in the top of pressure-bearing steel cylinder (16) successively, water injection pipe nail (22), drainpipe nail (24) and piezometric tube nail (25) are all fixed on pressure-bearing steel cylinder (16) inside and run through pressure-bearing steel cylinder (16) bottom, confined pressure piezometric tube (26) is followed closely (25) and is communicated with by confined pressure piezometric tube entrance (46) with piezometric tube, drainpipe nail (24) is communicated with by drain inlet (45) with drainpipe (27), pore water drainpipe (28) is communicated with by pore water drain inlet (44) with pore water drainage connecting pipe (23), water injection pipe (30) is followed closely (22) and is exported (43) by water injection pipe and be communicated with water injection pipe, pore water piezometric tube (32) is communicated with by pore water pressure measurement entrance (42) with pore water pressure measurement connecting pipe (21), confined pressure piezometric tube (26), drainpipe (27) and pore water drainpipe (28) are positioned at the side of container floor (34), confined pressure piezometric tube (26) is positioned on drainpipe (27), drainpipe (27) is positioned on pore water drainpipe (28), water injection pipe (30) and pore water piezometric tube (32) are all positioned at the opposite side of container floor (34), water injection pipe (30) is positioned on pore water piezometric tube (32), lower water-stop sheet (20) is arranged on container floor (34), the lower water-stop sheet pressure tap (40) of water-stop sheet (20) side, edge is communicated with the pore water pressure measurement entrance (42) on container floor (34), the water-stop sheet freeing port (41) of lower water-stop sheet (20) edge opposite side is communicated with the pore water drain inlet (44) on container floor (34), water injection pipe outlet (43) is positioned at the side of container floor (34) upper surface, drain inlet (45) and confined pressure piezometric tube entrance (46) are positioned at the opposite side of container floor (34) upper surface, electromagnetic shaker (33) is arranged in container floor (34) centre by bottom plate groove (39) and is connected with lower water-stop sheet (20), vibrations spring (38) electromagnetic shaker (33) are equipped with, encryption entanglement (19) is positioned at above lower water-stop sheet (20), pore water pressure measurement connecting pipe (21) and pore water drainage connecting pipe (23) are contained in lower water-stop sheet (20), and are positioned at the both sides of edges of lower water-stop sheet (20), do not contact with rubber membrane (10) when described pressure plare (15) moves down, described pore water drain inlet (44), drain inlet (45) and confined pressure piezometric tube entrance (46) are positioned at the side of container floor (34) upper surface, pore water pressure measurement entrance (42) and water injection pipe outlet (43) are positioned at the opposite side of container floor (34) upper surface, and its order is from left to right followed successively by: confined pressure piezometric tube entrance (46), drain inlet (45), pore water drain inlet (44), pore water pressure measurement entrance (42), water injection pipe outlet (43).
2. the triaxial rheology experimental provision of tailings material according to claim 1, is characterized in that: described confined pressure piezometric tube (26) and pore water piezometric tube (32) are equipped with tensimeter (31).
3. the triaxial rheology experimental provision of tailings material according to claim 1, is characterized in that: described drainpipe (27), pore water drainpipe (28) and water injection pipe (30) are all equipped with valve (29).
4. the triaxial rheology experimental provision of tailings material according to claim 1, is characterized in that: axial compression circumfili button (49) is equipped with in described pressuring shaft (2) bottom.
5. the triaxial rheology experimental provision of tailings material according to claim 1, is characterized in that: the arc length of described pressure transmission ring (7) is 1/4 of pressure-bearing steel cylinder (16) circumference.
6. the triaxial rheology experimental provision of tailings material according to claim 1, it is characterized in that: described water injection pipe nail (22), drainpipe nail (24) and piezometric tube nail (25) all run through pressure-bearing steel cylinder (16) bottom and be communicated with pressurization cavity volume (18), water injection pipe nail (22), drainpipe nail (24), piezometric tube nail (25) is hollow tubular.
CN201310527666.8A 2013-10-31 2013-10-31 A kind of triaxial rheology experimental provision of tailings material Expired - Fee Related CN103558089B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310527666.8A CN103558089B (en) 2013-10-31 2013-10-31 A kind of triaxial rheology experimental provision of tailings material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310527666.8A CN103558089B (en) 2013-10-31 2013-10-31 A kind of triaxial rheology experimental provision of tailings material

Publications (2)

Publication Number Publication Date
CN103558089A CN103558089A (en) 2014-02-05
CN103558089B true CN103558089B (en) 2016-01-13

Family

ID=50012399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310527666.8A Expired - Fee Related CN103558089B (en) 2013-10-31 2013-10-31 A kind of triaxial rheology experimental provision of tailings material

Country Status (1)

Country Link
CN (1) CN103558089B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104964881B (en) * 2015-06-30 2017-08-25 昆明理工大学 A triaxial rheological experimental device for measuring the mechanical properties of tailings materials
CN105067407B (en) * 2015-08-14 2017-03-29 昆明理工大学 A kind of triaxial rheology experiment automatic sample saturation device of tailings material
CN105223071B (en) * 2015-10-16 2018-03-06 中国科学院武汉岩土力学研究所 Confined pressure can be added and constrain the load maintainer of sample rotation
CN108152143B (en) * 2017-12-19 2020-01-07 辽宁工程技术大学 Consolidation test device and method with vibration drainage test function
CN109187926B (en) * 2018-09-18 2021-04-20 太原理工大学 Three-axis seepage test device for fractured coal rock mass and desorption-diffusion-seepage test system
CN114720353B (en) * 2022-06-08 2022-08-12 中国有色金属工业昆明勘察设计研究院有限公司 Tailing pond permeation damage simulation device and experiment method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6443741A (en) * 1987-08-10 1989-02-16 Florm Kk Water injecting, pressure testing, and water discharging device for pressure container
JPH0230452B2 (en) * 1982-06-30 1990-07-06 Yamamoto Suiatsu Kogyosho Kk
CN201637635U (en) * 2010-01-26 2010-11-17 化学工业岩土工程有限公司 Triaxial shearing test system for soil samples
CN202757828U (en) * 2012-07-10 2013-02-27 矫震 Tri-axial test confining pressure device
CN203587443U (en) * 2013-10-31 2014-05-07 昆明理工大学 Triaxial rheological experimental apparatus for tailing material

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0230452B2 (en) * 1982-06-30 1990-07-06 Yamamoto Suiatsu Kogyosho Kk
JPS6443741A (en) * 1987-08-10 1989-02-16 Florm Kk Water injecting, pressure testing, and water discharging device for pressure container
CN201637635U (en) * 2010-01-26 2010-11-17 化学工业岩土工程有限公司 Triaxial shearing test system for soil samples
CN202757828U (en) * 2012-07-10 2013-02-27 矫震 Tri-axial test confining pressure device
CN203587443U (en) * 2013-10-31 2014-05-07 昆明理工大学 Triaxial rheological experimental apparatus for tailing material

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
Triaxial compression system for rock testing under high temperature and high pressure;Yangsheng Zhao et al.;《International Journal of Rock Mechanics & Mining Sciences》;20120405;第52卷;第132-138页 *
Triaxial mechanical creep behavior of sandstone;YANG Shengqi et al.;《Mining Science and Technology》;20101231;第20卷(第3期);第0339-0349页 *
一种新型真三轴仪的研制与开发;邵生俊等;《岩石工程学报》;20090831;第31卷(第8期);第1173-1179页 *
应力控制式三轴仪的改装及应用;周秋娟等;《地下空间与工程学报》;20110630;第7卷(第3期);第469-473页 *
温控土工三轴仪的研制及其应用;陈正汉等;《岩石工程学报》;20050831;第27卷(第8期);第928-933页 *

Also Published As

Publication number Publication date
CN103558089A (en) 2014-02-05

Similar Documents

Publication Publication Date Title
CN103558089B (en) A kind of triaxial rheology experimental provision of tailings material
CN103837385B (en) Coarse-grained soil high polymer grouting triaxial test sample preparation device and using method thereof
CN102901676B (en) A kind of vertical direct shear test device
CN203534910U (en) Triaxial creep testing device for stress, seepage and chemical coupling of rock
CN108051351B (en) A kind of loose media osmotic grouting simulation experiment method
CN104374649B (en) A kind of experimental rig and method for being used to observe shear deformation breaks down feature between pile tube and the slip casting soil body
CN107782641B (en) A kind of loose media osmotic grouting simulation test device
CN106018740B (en) Hole pressure touching methods demarcate can system
CN103698228B (en) A kind of large-scale real triaxial shearing test device and application thereof
CN102620996A (en) Operational method for measuring creep parameters and infiltration parameters of smashed rocks simultaneously
CN103513019A (en) Gas channeling simulated evaluation instrument for casing cement slurry
CN103411806B (en) The method of operating of the unidirectional direct tensile test of a kind of cohesive soil and specialized equipment thereof
CN106769500A (en) A kind of ground permeates the test method of gas pressure consolidation
CN206618667U (en) It is a kind of to be used for the experimental rig of property evolution under simulation concrete cut-pff wall Service Environment
CN105137032A (en) Temperature and humidity control constant-strain rate high-pressure consolidation apparatus
CN104594350A (en) Pore pressure counterforce steel pipe pile pulling method and pipe pulling device thereof
CN106198137A (en) A kind of unimolecule high polymer stockpile three axle sample making apparatus and using method
CN103792175A (en) Unsaturated rock-earth mass constant head reverse penetration testing method
CN106644880A (en) Seepage air pressure consolidation apparatus
CN202916155U (en) Vertical direct shear test device
CN206459930U (en) One kind infiltration gas pressure consolidation instrument
CN110954674B (en) A static penetrating test indoor simulation test device
CN110514533B (en) Triaxial device suitable for testing mechanical properties of soil body under water circulation permeation effect and application method
CN110208493B (en) Small hole expansion test device and test method thereof
CN108051320A (en) Rock fracture creep test system under the influence of a kind of temperature

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113

Termination date: 20211031

CF01 Termination of patent right due to non-payment of annual fee