[go: up one dir, main page]

CN103470233A - A natural gas huff and puff oil recovery process system and oil recovery method for heavy oil reservoirs - Google Patents

A natural gas huff and puff oil recovery process system and oil recovery method for heavy oil reservoirs Download PDF

Info

Publication number
CN103470233A
CN103470233A CN2013103642231A CN201310364223A CN103470233A CN 103470233 A CN103470233 A CN 103470233A CN 2013103642231 A CN2013103642231 A CN 2013103642231A CN 201310364223 A CN201310364223 A CN 201310364223A CN 103470233 A CN103470233 A CN 103470233A
Authority
CN
China
Prior art keywords
oil
natural gas
cable
pipe
control valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103642231A
Other languages
Chinese (zh)
Other versions
CN103470233B (en
Inventor
刘雄志
罗林
杨兆平
李忠春
吕锡敏
魏亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201310364223.1A priority Critical patent/CN103470233B/en
Publication of CN103470233A publication Critical patent/CN103470233A/en
Application granted granted Critical
Publication of CN103470233B publication Critical patent/CN103470233B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

A heavy oil reservoir natural gas huff-puff oil production process system and an oil production method. The method comprises the following steps: drilling a well in a target region of an oil reservoir, drilling a stratum, an oil layer, an interlayer and a natural gas layer from top to bottom, communicating the oil layer with the gas layer through a shaft, and perforating the oil layer and the gas layer; selecting the length of an eye tube, and installing a flow meter, a pressure gauge and a flow control valve; a production pipe column and a cable are put in, the production pipe column is sequentially connected with a first oil pipe, an oil well pump, an eye tube, a packer and a second oil pipe in series, and the cable conducts signals; setting a packer; installing a Christmas tree and an oil pumping unit; closing the well, and opening the flow control valve to enable the natural gas to flow into the oil layer; closing the flow control valve, and then stewing; and after the designed soaking time is reached, opening the well to recover oil. The natural gas layer high-pressure energy is fully utilized, so that the natural gas directly flows into the heavy oil layer from the gas layer through the shaft, the problems of complex process flow, high operation cost and high energy consumption are solved, the natural gas huff and puff efficiency is high, and the oil extraction efficiency is greatly improved.

Description

一种稠油油藏天然气吞吐采油工艺系统及采油方法A natural gas huff and puff oil recovery process system and oil recovery method for heavy oil reservoirs

技术领域technical field

本发明涉及石油开采技术领域,尤其是指一种稠油油藏天然气吞吐采油工艺系统及采油方法。The invention relates to the technical field of petroleum exploitation, in particular to a natural gas huff and puff oil recovery process system and oil recovery method for heavy oil reservoirs.

背景技术Background technique

目前,稠油油藏常采用注蒸汽吞吐、SAGD、注天然气吞吐、火烧油层、泵上掺稀举升等方法进行开采。其中,注天然气吞吐的采油方法主要是将气层中的天然气采出地面,获得天然气气源,再用压缩机通过油井将天然气注入油层(吞气过程),天然气溶解到原油中,降低原油黏度,然后,再打开油井将原油和溶解在原油中的天然气一块采出(吐气过程)。At present, heavy oil reservoirs are often exploited by methods such as steam injection huff and puff, SAGD, natural gas injection huff and puff, burning oil layers, and lifting with dilution on pumps. Among them, the oil recovery method of natural gas injection huff and puff is mainly to extract the natural gas in the gas layer on the ground to obtain the natural gas source, and then use the compressor to inject the natural gas into the oil layer through the oil well (gas swallowing process), and the natural gas dissolves into the crude oil to reduce the viscosity of the crude oil , and then, open the oil well to produce crude oil and natural gas dissolved in crude oil together (breathing process).

吐玉克稠油油藏是国内第一个进行天然气吞吐试验的油田。试验阶段采用液态天然气(LNG)作为气源,并采用如下注入工艺:将LNG储罐中的液态天然气经低温液态增压泵增压至压缩机入口,经LNG汽化器汽化后进入压缩机入口缓冲罐,压缩机增压后,进入配气阀组计量后分配至注入井口。具体注气流程为:LNG储罐→低温液态增压泵→汽化器→压缩机入口缓冲罐→注气压缩机→配气阀组→(经单井管线)注气井(殷百寿,李军,稠油天然气吞吐试验地面工艺技术,油气田地面工程第26卷第10期,2007:24)。目前,吐玉克油田和鲁克沁油田实施了天然气吞吐注采一体化技术,该技术需满足以下要求:(1)优化完井和固井方式,为满足注气吞吐气密封性能要求,防止注气过程中发生气窜,确保注气安全,对于水平井直井段、直井油层采用长水泥固井段加直井段全程气密封套管完井;(2)研制天然气吞吐气密封井口及配套工具,能够在高压下实现气密封;注入过程中,要将泵提出泵座悬挂在井口,确保天然气从油管安全注入;井口在一定高度内,能够满足有杆泵采油需求;气密封井口及配套工具主要包括光杆连接器、高压气密封井口、标准套管头、光杆密封器等;(3)针对天然气吞吐注气过程中对管柱气密封的要求,综合考虑注气过程中高压气密封性及生产安全可靠性、设计了注气吞吐注气采油一体化管柱;(4)为满足既可以注气又可以生产,设计了注采切换工艺(具体装置请参考以下文章:巩小雄,王爱华,李军等,深层稠油天然气吞吐注采一体化技术研究与应用,石油天然气学报,第30卷第1期,2008:303-305;白彦华简家斌,稠油天然气吞吐注采一体化技术研究,石油机械,第36卷第8期,2008:74-77)。The Tuyuke heavy oil reservoir is the first oilfield in China to conduct a natural gas throughput test. In the test stage, liquefied natural gas (LNG) was used as the gas source, and the following injection process was adopted: the liquefied natural gas in the LNG storage tank was boosted to the inlet of the compressor through a low-temperature liquid booster pump, vaporized by the LNG vaporizer, and then entered into the buffer tank at the inlet of the compressor After the compressor is pressurized, it enters the gas distribution valve group for metering and distributes it to the injection wellhead. The specific gas injection process is: LNG storage tank → low temperature liquid booster pump → vaporizer → compressor inlet buffer tank → gas injection compressor → gas distribution valve group → (via single well pipeline) gas injection well (Yin Baishou, Li Jun, heavy oil Surface Technology of Natural Gas Huff and Puff Test, Oil and Gas Field Surface Engineering Vol. 26 No. 10, 2007: 24). At present, Tuyuke Oilfield and Lukeqin Oilfield have implemented the integrated technology of natural gas huff and puff injection and production, which needs to meet the following requirements: (1) optimize the well completion and cementing methods, in order to meet the performance requirements of gas injection huff and puff gas sealing, prevent Gas channeling occurs during the gas injection process to ensure the safety of gas injection. For the horizontal well vertical section and the oil layer of the vertical well, the long cement cement section and the vertical well section are used to complete the well; , which can realize air sealing under high pressure; during the injection process, the pump should be lifted out of the pump seat and suspended on the wellhead to ensure the safe injection of natural gas from the tubing; the wellhead is within a certain height, which can meet the oil production requirements of the rod pump; air-sealing wellhead and supporting tools It mainly includes polished rod connectors, high-pressure gas-sealed wellheads, standard casing heads, polished rod sealers, etc.; (3) In view of the requirements for the gas-tightness of the pipe string during the natural gas huff-puff gas injection process, the high-pressure gas sealing performance and Production safety and reliability, design of gas injection huff and puff gas injection and oil production integrated string; (4) In order to meet the requirements of both gas injection and production, the injection-production switching process is designed (for specific devices, please refer to the following articles: Gong Xiaoxiong, Wang Aihua, Li Jun et al., Research and Application of Injection-production Integrated Technology for Deep Heavy Oil Natural Gas Huff-puff, Journal of Petroleum and Natural Gas, Vol. 30, No. 1, 2008: 303-305; , Vol. 36 No. 8, 2008: 74-77).

上述技术对完井及固井方式、井口及配套工具、采油管柱及注采切换工艺有极高的要求,工艺及操作流程非常复杂、作业成本昂贵、能耗大。The above-mentioned technologies have extremely high requirements for well completion and cementing methods, wellheads and supporting tools, oil production strings and injection-production switching processes. The processes and operating procedures are very complicated, costly, and consume a lot of energy.

发明内容Contents of the invention

鉴于背景技术中所述的缺陷,本发明的目的,是提供一种稠油油藏天然气吞吐采油工艺系统及采油方法,充分利用天然气层的自身高压能量,使天然气从气层经井筒直接流入稠油油层,避免了工艺流程复杂、作业成本高、能耗大的问题。In view of the defects described in the background technology, the purpose of the present invention is to provide a natural gas huff and puff oil recovery process system and oil recovery method for heavy oil reservoirs, which can make full use of the high-pressure energy of the natural gas layer to directly flow the natural gas from the gas layer through the wellbore The oil layer avoids the problems of complex process flow, high operation cost and high energy consumption.

上述本发明的目的,是由以下的技术方案所实现的:Above-mentioned purpose of the present invention is achieved by the following technical solutions:

首先需要说明的是,在实际生产操作过程中,常规稠油开采所需要的抽油机、采油树、挂泵装置、抽油泵、抽油杆、尾管、筛管等装置均配合本发明。因为这些装置的结构、作用、安装方法及使用方法已经普及,本发明不再对上述装置的结构、作用、安装方法及使用方法一一赘述。First of all, it should be explained that in the actual production and operation process, the pumping unit, christmas tree, pump hanging device, oil well pump, sucker rod, tailpipe, screen pipe and other devices required for conventional heavy oil exploitation are all matched with the present invention. Because the structure, function, installation method and use method of these devices have been popularized, the present invention no longer repeats the structure, function, installation method and use method of the above-mentioned devices one by one.

本发明提供一种稠油油藏天然气吞吐采油工艺系统,在井筒中下入有生产管柱,所述生产管柱自上而下依次串接有第一油管、抽油泵、眼管、封隔器、第二油管;所述井筒在对应油层和天然气层的位置均具有射孔段;所述封隔器的设置位置位于油层与天然气层之间,以封隔油层与天然气层之间的油套环空。The invention provides a natural gas huff and puff production process system for heavy oil reservoirs. A production string is lowered into the wellbore, and the production string is connected in series from top to bottom with a first oil pipe, an oil pump, an eye pipe, and a packer. The wellbore has a perforation section at the position corresponding to the oil layer and the natural gas layer; the setting position of the packer is between the oil layer and the natural gas layer, so as to seal the oil layer between the oil layer and the natural gas layer. The ring is empty.

如上所述的稠油油藏天然气吞吐采油工艺系统,第二油管里设有用于监测天然气流量的流量计及用于监测天然气压力的压力计;第二油管末端设置有用于控制天然气进入油管流量的流量控制阀。In the heavy oil reservoir natural gas huff and puff production process system described above, the second oil pipe is provided with a flowmeter for monitoring the flow of natural gas and a pressure gauge for monitoring the pressure of natural gas; flow control valve.

如上所述的稠油油藏天然气吞吐采油工艺系统,其特征在于,所述流量计通过第一电缆与位于地面端的流量计终端连接,流量计终端显示流量数值;所述压力计通过第二电缆与位于地面端的压力计终端连接,压力计终端显示压力数值;所述流量控制阀通过第三电缆与位于地面端的流量控制阀终端连接,通过流量控制阀终端调节流量控制阀阀门大小,以控制天然气流量;所述采油工艺系统在井口还安装有采油树,所述采油树上设置有第一电缆孔、第二电缆孔及第三电缆孔,以便第一电缆、第二电缆及第三电缆分别对应穿过;电缆孔与电缆之间的间隙通过橡胶垫密封。The natural gas huff and puff production process system for heavy oil reservoirs as described above is characterized in that the flowmeter is connected to the flowmeter terminal at the ground end through the first cable, and the flowmeter terminal displays the flow value; the pressure gauge is connected through the second cable It is connected to the pressure gauge terminal on the ground side, and the pressure gauge terminal displays the pressure value; the flow control valve is connected to the flow control valve terminal on the ground side through a third cable, and the valve size of the flow control valve is adjusted through the flow control valve terminal to control natural gas flow rate; the oil production process system is also equipped with a Christmas tree at the wellhead, and the first cable hole, the second cable hole and the third cable hole are arranged on the said oil production tree, so that the first cable, the second cable and the third cable are respectively Correspondingly pass through; the gap between the cable hole and the cable is sealed by a rubber gasket.

如上所述的稠油油藏天然气吞吐采油工艺系统,其特征在于,所述第一电缆从所述流量计终端伸出,穿过采油树上的第一电缆孔,沿井口延伸入油套环空,再通过眼管的孔眼进入眼管内部并向下延伸至第二油管,与位于第二油管中的流量计连接;所述第二电缆从所述压力计终端伸出,穿过采油树上的第二电缆孔,沿井口延伸入油套环空,再通过眼管的孔眼进入眼管内部并向下延伸至第二油管,与位于第二油管中的压力计连接;所述第三电缆从所述流量控制阀终端伸出,穿过采油树上的第三电缆孔,沿井口延伸入油套环空,再通过眼管的孔眼进入眼管内部并向下延伸至第二油管,与第二油管末端串接的流量控制阀连接。The natural gas stimulation and puff production process system for heavy oil reservoirs as described above is characterized in that the first cable extends from the flowmeter terminal, passes through the first cable hole on the Christmas tree, and extends into the oil collar along the wellhead empty, then enter the inside of the eye pipe through the hole of the eye pipe and extend down to the second oil pipe, and connect with the flow meter located in the second oil pipe; the second cable protrudes from the end of the pressure gauge and passes through the oil tree The second cable hole on the top extends along the wellhead into the casing annulus, and then enters the inside of the eye pipe through the hole of the eye pipe and extends downward to the second oil pipe to connect with the pressure gauge located in the second oil pipe; the third The cable protrudes from the terminal of the flow control valve, passes through the third cable hole on the Christmas tree, extends along the wellhead into the oil casing annulus, and then enters the inside of the eye pipe through the hole of the eye pipe and extends downward to the second oil pipe, It is connected with the flow control valve connected in series at the end of the second oil pipe.

本发明还提供一种稠油油藏天然气吞吐采油方法,包括:The present invention also provides a natural gas huff and puff recovery method for heavy oil reservoirs, comprising:

步骤A:在油藏目标区域打油井,自上而下地钻穿地层、油层、隔层及天然气层,通过井筒使油层和气层连通,并对对应油层和天然气层的井筒段进行射孔;Step A: Drill oil wells in the target area of the reservoir, drill through formations, oil layers, interlayers and natural gas layers from top to bottom, connect the oil layers and gas layers through the wellbore, and perforate the wellbore sections corresponding to the oil layers and natural gas layers;

步骤B:根据眼管材料强度、天然气层的产能及隔层厚度选用适当长度的眼管;在一根第二油管中设置用于监测天然气流量的流量计及用于监测天然气压力的压力计,在第二油管末端设置用于控制天然气流量的流量控制阀,将流量计、压力计和流量控制阀的电缆分别穿过第二油管和眼管上的孔眼,并使各条电缆的预留长度略大于井筒的深度;Step B: Select an eye pipe of appropriate length according to the material strength of the eye pipe, the production capacity of the natural gas layer and the thickness of the interlayer; set a flowmeter for monitoring the flow of natural gas and a pressure gauge for monitoring the pressure of natural gas in a second oil pipe, A flow control valve for controlling the flow of natural gas is installed at the end of the second oil pipe, and the cables of the flow meter, pressure gauge and flow control valve are respectively passed through the holes on the second oil pipe and the eye pipe, and the reserved length of each cable is Slightly greater than the depth of the wellbore;

步骤C:依序连接第一油管、抽油泵、眼管、封隔器及第二油管,组成生产管柱,在井筒中下入该生产管柱,同时下入第一电缆、第二电缆及第三电缆,并坐封该封隔器至井筒内对应油层与天然气层之间的位置;将第一电缆、第二电缆及第三电缆的自由端分别对应穿过采油树上的第一电缆孔、第二电缆孔及第三电缆孔,分别与流量计终端、压力计终端及流量控制阀终端相接;安装采油树、抽油机等常规井口装置;Step C: Connect the first tubing, oil well pump, borehole, packer and second tubing in sequence to form a production string, run the production string in the wellbore, and simultaneously run the first cable, the second cable and The third cable, and set the packer to the position between the corresponding oil layer and the natural gas layer in the wellbore; respectively pass the free ends of the first cable, the second cable and the third cable through the first cable on the Christmas tree The hole, the second cable hole and the third cable hole are respectively connected to the terminal of the flow meter, the terminal of the pressure gauge and the terminal of the flow control valve; install conventional wellhead devices such as Christmas trees and pumping units;

步骤D:关闭抽油机和采油树上的油嘴以关井,打开流量控制阀的阀门,使天然气经过第二油管管段、眼管、油套环空流入油层;Step D: Close the nozzles on the pumping unit and the Christmas tree to shut down the well, open the valve of the flow control valve, and let the natural gas flow into the oil layer through the second tubing section, the eye pipe, and the casing annulus;

步骤E:关闭流量控制阀的阀门,然后焖井;Step E: close the valve of the flow control valve, and then stew the well;

步骤F:达到设计焖井时间后,保持流量控制阀的阀门关闭,开启所述抽油机和油嘴,开井采油。Step F: After reaching the designed soaking time, keep the valve of the flow control valve closed, open the pumping unit and oil nozzle, and open the well for oil production.

如上所述的方法,其中:在所述步骤E中,当所述流量计监测的天然气注入量达到预定值后,再关闭流量控制阀的阀门。The above-mentioned method, wherein: in the step E, when the injection amount of natural gas monitored by the flow meter reaches a predetermined value, the valve of the flow control valve is then closed.

如上所述的方法,其中:在步骤F的采油过程中,当原油产量达不到设计目标时,重复所述步骤D至步骤F。The above-mentioned method, wherein: in the oil recovery process of step F, when the crude oil output fails to reach the design target, repeat the steps D to F.

如上所述的方法,在步骤C和步骤D之间还包含如下步骤:The above-mentioned method also includes the following steps between step C and step D:

步骤C’:首先关闭所述流量控制阀的阀门,开启所述抽油机和油嘴进行采油,直至采油量低于设计产能时,再进行所述步骤D。Step C': firstly close the valve of the flow control valve, open the pumping unit and oil nozzle to extract oil until the oil output is lower than the design production capacity, and then proceed to the step D.

借由以上技术方案,本发明的特点及优点在于:By virtue of the above technical solutions, the features and advantages of the present invention are:

本发明提出的采油工艺系统及采油方法,尤其适合于在稠油油层下部发育大规模异常高压天然气层的情况。对于非异常高压或规模较小、产能较低的天然气层,天然气层与稠油油层之间的压差不够大、天然气层能量低,可先采用其它开采稠油的方法进行开采,随着开采的进展,稠油油层压力会逐渐降低,当天然气层与油层之间的压差达到一定值时,就可采用本发明提出的采油工艺系统及采油方法。The oil recovery process system and the oil recovery method proposed by the invention are especially suitable for the situation where a large-scale abnormally high-pressure natural gas layer is developed in the lower part of the heavy oil layer. For natural gas layers with non-abnormal high pressure or small scale and low production capacity, the pressure difference between the natural gas layer and the heavy oil layer is not large enough, and the energy of the natural gas layer is low. The pressure of the heavy oil layer will gradually decrease, and when the pressure difference between the natural gas layer and the oil layer reaches a certain value, the oil recovery process system and oil recovery method proposed by the present invention can be used.

本发明通过井筒将天然气层和油层连通,充分利用天然气层与油层之间的压差,引天然气自动流入油层,降低原油黏度,实现天然气吞吐采油,而不需要特殊的完井及固井方式、井口装置、采油管柱及注采切换工艺。所以本发明在提高原油产量和采收率的基础上,特别具有工艺流程简单、采油作业成本低、能耗低等诸多优势,提高了油田经济效益。The invention connects the natural gas layer and the oil layer through the wellbore, makes full use of the pressure difference between the natural gas layer and the oil layer, induces natural gas to flow into the oil layer automatically, reduces the viscosity of crude oil, and realizes natural gas huff and puff oil production without special well completion and cementing methods, Wellhead equipment, production string and injection-production switching process. Therefore, on the basis of improving crude oil output and recovery factor, the present invention has many advantages, such as simple technological process, low oil recovery operation cost, low energy consumption, etc., and improves the economic benefits of the oil field.

附图说明Description of drawings

图1为本发明在吞气过程中的示意图;Fig. 1 is the schematic diagram of the present invention in the gas swallowing process;

图2为本发明在吐气过程中的示意图。Fig. 2 is a schematic diagram of the present invention during exhalation.

具体实施方式Detailed ways

为令本发明的目的、技术手段及技术效果有更完整及清楚的揭露,以下进行详细说明,并请一并参阅附图及部件标号。In order to disclose the purpose, technical means and technical effects of the present invention more completely and clearly, the following is a detailed description, and please refer to the accompanying drawings and component numbers.

请参阅图1,首先介绍本发明的采油工艺系统。Please refer to Fig. 1, at first introduce the oil production process system of the present invention.

一种稠油油藏天然气吞吐采油工艺系统,在井筒5中下入有一套生产管柱1,所述生产管柱1自上而下依次串接有第一油管7、抽油泵20、眼管9、封隔器17及第二油管12;所述井筒5在对应油层8和天然气层13的位置均具有射孔段,各射孔段开设多个炮眼19(或14);所述眼管9的长度由眼管9材料强度、天然气层13的产能及隔层10厚度决定;所述封隔器17的设置位置位于油层8与天然气层13之间,用于封隔油层8与天然气层13之间的油套环空18(指的是生产管柱1与套管28之间的环空),且封隔器17的位置在眼管9强度允许的情况下应尽量靠近天然气层13,以保证眼管9有足够的长度,即具有足够多的孔眼90,从而为天然气提供尽可能多的流通通道。A natural gas huff and puff production process system for heavy oil reservoirs. A set of production string 1 is lowered into the wellbore 5. The production string 1 is sequentially connected with a first oil pipe 7, an oil well pump 20, and an eye pipe from top to bottom. 9. The packer 17 and the second tubing 12; the wellbore 5 has perforation sections at the positions corresponding to the oil layer 8 and the natural gas layer 13, and each perforation section has a plurality of blastholes 19 (or 14); The length of 9 is determined by the material strength of the eye pipe 9, the productivity of the natural gas layer 13, and the thickness of the interlayer 10; The oil casing annulus 18 between 13 (referring to the annulus between the production string 1 and the casing 28), and the position of the packer 17 should be as close as possible to the natural gas layer 13 under the condition that the strength of the eye pipe 9 allows , to ensure that the eye pipe 9 has a sufficient length, that is, there are enough holes 90, so as to provide as many circulation channels as possible for the natural gas.

所述第二油管12里设有用于监测天然气流量的流量计11及用于监测天然气压力的压力计16;第二油管12末端设有用于控制天然气流量的流量控制阀15。The second oil pipe 12 is provided with a flow meter 11 for monitoring the flow of natural gas and a pressure gauge 16 for monitoring the pressure of natural gas; the end of the second oil pipe 12 is provided with a flow control valve 15 for controlling the flow of natural gas.

较佳地,所述流量计11通过第一电缆21与位于地面端的流量计终端26连接,流量计终端26显示流量数值;所述压力计16通过第二电缆22与位于地面端的压力计终端25连接,压力计终端25显示压力数值;所述流量控制阀15通过第三电缆6与位于地面端的流量控制阀终端2连接,通过流量控制阀终端2调节流量控制阀15的阀门大小,从而控制天然气流量;所述采油工艺系统在井口还安装有采油树29,所述采油树上设有第一电缆孔31、第二电缆孔32及第三电缆孔30,以便第一电缆21、第二电缆22及第三电缆6分别对应穿过;电缆孔与电缆之间的间隙通过橡胶垫密封。Preferably, the flowmeter 11 is connected with the flowmeter terminal 26 at the ground end through the first cable 21, and the flowmeter terminal 26 displays the flow value; the pressure gauge 16 is connected with the pressure gauge terminal 25 at the ground end through the second cable 22 connection, the pressure gauge terminal 25 displays the pressure value; the flow control valve 15 is connected to the flow control valve terminal 2 at the ground end through the third cable 6, and the valve size of the flow control valve 15 is adjusted through the flow control valve terminal 2 to control the natural gas flow rate; the oil production process system is also equipped with a Christmas tree 29 at the wellhead, and the first cable hole 31, the second cable hole 32 and the third cable hole 30 are arranged on the said oil production tree, so that the first cable 21, the second cable 22 and the third cable 6 pass through respectively; the gap between the cable hole and the cable is sealed by a rubber pad.

较佳地,所述第一电缆21从所述流量计终端26伸出,穿过采油树29上的第一电缆孔31,沿井口24延伸入油套环空18,再通过眼管9的孔眼90进入眼管9内部并向下延伸至第二油管12,与位于第二油管12中的流量计11连接;所述第二电缆22从所述压力计终端25伸出,穿过采油树29上的第二电缆孔32,沿井口24延伸入油套环空18,再通过眼管9的孔眼90进入眼管9内部并向下延伸至第二油管12,与位于第二油管12中的压力计16连接;所述第三电缆6从所述流量控制阀终端2伸出,穿过采油树29上的第三电缆孔30,沿井口24延伸入油套环空18,再通过眼管9的孔眼90进入眼管9内部并向下延伸至第二油管12,与第二油管12末端串接的流量控制阀15连接。Preferably, the first cable 21 extends from the flowmeter terminal 26, passes through the first cable hole 31 on the Christmas tree 29, extends along the wellhead 24 into the oil casing annulus 18, and then passes through the hole of the eye pipe 9. The hole 90 enters the inside of the eye pipe 9 and extends downward to the second oil pipe 12, and is connected with the flowmeter 11 located in the second oil pipe 12; the second cable 22 protrudes from the pressure gauge terminal 25 and passes through the oil tree The second cable hole 32 on 29 extends into the oil casing annulus 18 along the wellhead 24, and then enters the inside of the eye pipe 9 through the hole 90 of the eye pipe 9 and extends downward to the second oil pipe 12, and is located in the second oil pipe 12 connected to the pressure gauge 16; the third cable 6 extends from the flow control valve terminal 2, passes through the third cable hole 30 on the Christmas tree 29, extends along the wellhead 24 into the oil casing annulus 18, and then passes through the eye The hole 90 of the pipe 9 enters the inside of the eye pipe 9 and extends downward to the second oil pipe 12 , and is connected with the flow control valve 15 connected in series at the end of the second oil pipe 12 .

请一并参阅图1及图2,下面将介绍稠油油藏天然气吞吐的采油方法,该方法包括:Please refer to Figure 1 and Figure 2 together. The oil recovery method of natural gas huff and puff in heavy oil reservoirs will be introduced below. The method includes:

步骤A:在油藏目标区域打油井3,自上而下地钻穿地层4、油层8、隔层10及天然气层13,通过井筒5使油层8和天然气层13连通,并对对应油层8和天然气层13的井筒段进行射孔;Step A: drill an oil well 3 in the target area of the reservoir, drill through the stratum 4, the oil layer 8, the interlayer 10 and the natural gas layer 13 from top to bottom, connect the oil layer 8 and the natural gas layer 13 through the wellbore 5, and correspond to the oil layer 8 and the natural gas layer Perforating the wellbore section of the natural gas layer 13;

步骤B:根据眼管材料强度、天然气层13的产能及隔层10厚度选用适当长度的眼管9;在第二油管12中设置用于监测天然气流量的流量计11及用于监测天然气压力的压力计16,在第二油管12末端设置用于控制天然气流量的流量控制阀15,将流量计11、压力计16和流量控制阀15的电缆分别穿过第二油管12和眼管9上的孔眼90,并使各条电缆的长度略大于井筒5的深度;Step B: Select an eye pipe 9 of appropriate length according to the material strength of the eye pipe, the production capacity of the natural gas layer 13 and the thickness of the interlayer 10; a flow meter 11 for monitoring the flow of natural gas and a flow meter for monitoring the pressure of natural gas are arranged in the second oil pipe 12 Pressure gauge 16, the flow control valve 15 that is used to control the flow of natural gas is arranged at the end of the second oil pipe 12, and the cables of flow meter 11, pressure gauge 16 and flow control valve 15 are respectively passed through the second oil pipe 12 and the eye pipe 9. Eyelet 90, and make the length of each cable slightly greater than the depth of shaft 5;

步骤C:依序连接第一油管7、抽油泵20、眼管9、封隔器17及第二油管12,组成生产管柱1,在井筒5中下入所述生产管柱1,同时下入第一电缆21、第二电缆22及第三电缆6,并坐封封隔器17至井筒5内对应油层8与天然气层13之间的位置;将第一电缆21、第二电缆22及第三电缆6的自由端分别穿过采油树29上的第一电缆孔31、第二电缆孔32及第三电缆孔30,然后分别与流量计终端26、压力计终端25及流量控制阀终端2相接;安装采油树29、抽油机等常规井口装置;Step C: Connect the first tubing 7, the oil well pump 20, the borehole 9, the packer 17 and the second tubing 12 in order to form a production tubing string 1, run the production tubing string 1 into the wellbore 5, and simultaneously run Insert the first cable 21, the second cable 22 and the third cable 6, and set the packer 17 to the position between the corresponding oil layer 8 and the natural gas layer 13 in the wellbore 5; insert the first cable 21, the second cable 22 and the The free end of the third cable 6 passes through the first cable hole 31, the second cable hole 32 and the third cable hole 30 on the Christmas tree 29 respectively, and then connects with the flowmeter terminal 26, the pressure gauge terminal 25 and the flow control valve terminal respectively. 2 phase connection; installation of conventional wellhead devices such as Christmas tree 29 and pumping unit;

步骤D:关闭抽油机和采油树29上的油嘴27以关井,打开流量控制阀15的阀门,使天然气经过第二油管管段12、眼管9、油套环空18流入油层8,此时天然气的流向如图1中的箭头所示;Step D: close the oil nozzle 27 on the pumping unit and the Christmas tree 29 to close the well, open the valve of the flow control valve 15, and let the natural gas flow into the oil layer 8 through the second oil pipe section 12, the eye pipe 9, and the oil casing annulus 18. The flow direction of natural gas is shown by the arrow in Figure 1;

步骤E:关闭流量控制阀15的阀门,然后焖井;Step E: close the valve of the flow control valve 15, then stew the well;

步骤F:达到设计焖井时间后,保持流量控制阀15的阀门关闭,开启抽油机和油嘴27,开井采油,此时原油的流向如图2中箭头所示。Step F: After reaching the designed soaking time, keep the valve of the flow control valve 15 closed, open the pumping unit and the oil nozzle 27, and open the well for oil production. At this time, the flow of crude oil is shown by the arrow in Figure 2.

在所述步骤E中,当所述流量计11所监测的天然气注入量达到预定值后,再关闭流量控制阀15的阀门。天然气注入量的预定值提前用油藏工程和数值模拟等方法论证。In the step E, when the injection amount of natural gas monitored by the flow meter 11 reaches a predetermined value, the valve of the flow control valve 15 is closed. The pre-determined value of natural gas injection rate is demonstrated in advance by methods such as reservoir engineering and numerical simulation.

较佳地,在步骤F的采油过程中,当原油产量达不到设计目标时,重复所述步骤D至步骤F。原油产量是一个动态的过程,随着原油的开采,较稀的油液会率先被开采出,而较浓稠的油液会留在油层中逐渐积累,导致产量降低。一旦原油产量低于设计值,就可以启动本发明的天然气吞吐采油方法,通过将天然气溶入油层稀释稠油,以利于原油的正常产出。Preferably, during the oil recovery process in step F, when the crude oil output fails to reach the design target, repeat steps D to F. Crude oil production is a dynamic process. With the extraction of crude oil, the thinner oil will be extracted first, while the thicker oil will remain in the oil layer and gradually accumulate, resulting in a decrease in production. Once the crude oil output is lower than the design value, the natural gas stimulation and puff oil recovery method of the present invention can be started to dissolve the natural gas into the oil layer to dilute the heavy oil, so as to facilitate the normal output of crude oil.

较佳地,在步骤C和步骤D之间还包含如下步骤:Preferably, the following steps are also included between step C and step D:

步骤C’:首先关闭所述流量控制阀15的阀门,开启抽油机和油嘴27进行采油,直至采油量低于设计产能时,再进行所述步骤D。此步骤表明,在开采初期不需要进行天然气吞吐的阶段,可以照常进行采油作业,直至采油量不符合要求再开启天然气吞吐。Step C': first close the valve of the flow control valve 15, open the pumping unit and the oil nozzle 27 to extract oil until the oil output is lower than the design capacity, and then proceed to the step D. This step shows that in the early stage of production when natural gas throughput is not required, oil recovery operations can be carried out as usual until the oil recovery does not meet the requirements before starting natural gas throughput.

本发明的前提或适用条件是天然气层的折算压力(指天然气从天然气层产出后,经井筒到达油层位置处的剩余压力)远远大于油层的压力,且天然气层储量大、产能高;天然气层与油层之间的压差越大、气层产能越高,则吞气过程越容易进行。The premise or applicable condition of the present invention is that the converted pressure of the natural gas layer (referring to the residual pressure at the position where the natural gas reaches the oil layer through the wellbore after being produced from the natural gas layer) is far greater than the pressure of the oil layer, and the natural gas layer has large reserves and high production capacity; natural gas The larger the pressure difference between the oil layer and the gas layer, the easier the gas swallowing process will be.

若天然气层折算压力略高于、约等于、或略低于油层压力,或天然气层储量较小、产能较低,天然气层不具有足够的能量使天然气大量注入油层,此时就要分以下两种情况:1、对于原油黏度不太高的稠油油层,如果油井可以达到设计产能,则可以先直接进行上述步骤C’进行开采;2、对于原油黏度非常高的稠油油层,如果油井不能达到设计产能,则必须首先采取措施,比如井筒加热等,将稠油先进行一定程度的降黏才能进行上述步骤C’进行开采。随着油层的开采,油层压力逐渐降低,产能下降,而天然气层与油层之间的压力差就会逐渐加大,当天然气层与油层之间的压差达到一定值(通过油藏工程方法和数值模拟方法论证)时,就可以进行上述的步骤D进行天然气吞气过程。If the converted pressure of the natural gas layer is slightly higher than, approximately equal to, or slightly lower than the pressure of the oil layer, or the reserves of the natural gas layer are small and the production capacity is low, and the natural gas layer does not have enough energy to inject a large amount of natural gas into the oil layer, then it should be divided into the following two Two situations: 1. For heavy oil reservoirs with low crude oil viscosity, if the oil well can reach the designed production capacity, the above step C' can be directly carried out for production; 2. For heavy oil reservoirs with very high crude oil viscosity, if the oil well cannot To reach the designed production capacity, measures must be taken first, such as wellbore heating, etc., to reduce the viscosity of the heavy oil to a certain extent before proceeding to the above step C' for production. With the exploitation of the oil layer, the pressure of the oil layer gradually decreases, and the production capacity decreases, while the pressure difference between the natural gas layer and the oil layer will gradually increase. When the pressure difference between the natural gas layer and the oil layer reaches a certain value (through reservoir engineering methods and When the numerical simulation method is demonstrated), the above step D can be carried out to carry out the natural gas swallowing process.

以上所举仅为本发明示意性的部分实施例,并非用以限制本发明的范围,任何本领域的技术人员,在不脱离本发明的构思和原则的前提下所作出的等同变化与修改,均应包括在本专利保护范围之内。The above are only some illustrative embodiments of the present invention, and are not intended to limit the scope of the present invention. Anyone skilled in the art can make equivalent changes and modifications without departing from the concept and principles of the present invention. should be included within the scope of protection of this patent.

Claims (8)

1.一种稠油油藏天然气吞吐采油工艺系统,其特征在于,在井筒中下入有生产管柱,所述生产管柱自上而下依次串接有第一油管、抽油泵、眼管、封隔器、第二油管;所述井筒在对应油层和天然气层的位置均具有射孔段;所述封隔器的设置位置位于油层与天然气层之间,以封隔油层与天然气层之间的油套环空。1. A natural gas huff and puff production process system for heavy oil reservoirs, characterized in that a production string is lowered in the wellbore, and the production string is sequentially connected in series with a first oil pipe, an oil well pump, and an eye pipe from top to bottom , a packer, and a second tubing; the wellbore has a perforation section at the position corresponding to the oil layer and the natural gas layer; the setting position of the packer is between the oil layer and the natural gas layer to seal off the The oil jacket annulus between. 2.根据权利要求1所述的稠油油藏天然气吞吐采油工艺系统,其特征在于,所述第二油管里设有用于监测天然气流量的流量计及用于监测天然气压力的压力计;第二油管末端设置有用于控制天然气进入油管流量的流量控制阀。2. The heavy oil reservoir natural gas huff and puff recovery process system according to claim 1, characterized in that, the second oil pipe is provided with a flowmeter for monitoring the flow of natural gas and a pressure gauge for monitoring the pressure of natural gas; The end of the oil pipe is provided with a flow control valve for controlling the flow of natural gas into the oil pipe. 3.根据权利要求2所述的稠油油藏天然气吞吐采油工艺系统,其特征在于,所述流量计通过第一电缆与位于地面端的流量计终端连接,流量计终端显示流量数值;所述压力计通过第二电缆与位于地面端的压力计终端连接,压力计终端显示压力数值;所述流量控制阀通过第三电缆与位于地面端的流量控制阀终端连接,通过流量控制阀终端调节流量控制阀阀门大小,以控制天然气流量;所述采油工艺系统在井口还安装有采油树,所述采油树上设置有第一电缆孔、第二电缆孔及第三电缆孔,以便第一电缆、第二电缆及第三电缆分别对应穿过;电缆孔与电缆之间的间隙通过橡胶垫密封。3. The heavy oil reservoir natural gas huff and puff recovery process system according to claim 2, wherein the flowmeter is connected with the flowmeter terminal positioned at the ground end through the first cable, and the flowmeter terminal displays the flow value; the pressure The gauge is connected to the pressure gauge terminal on the ground side through the second cable, and the pressure gauge terminal displays the pressure value; the flow control valve is connected to the flow control valve terminal on the ground side through the third cable, and the flow control valve is adjusted through the flow control valve terminal. size, to control the flow of natural gas; the oil production process system is also equipped with a Christmas tree at the wellhead, and the first cable hole, the second cable hole and the third cable hole are arranged on the said oil production tree, so that the first cable, the second cable and the third cable pass through respectively; the gap between the cable hole and the cable is sealed by a rubber pad. 4.根据权利要求3所述的稠油油藏天然气吞吐采油工艺系统,其特征在于,所述第一电缆从所述流量计终端伸出,穿过采油树上的第一电缆孔,沿井口延伸入油套环空,再通过眼管的孔眼进入眼管内部并向下延伸至第二油管,与位于第二油管中的流量计连接;所述第二电缆从所述压力计终端伸出,穿过采油树上的第二电缆孔,沿井口延伸入油套环空,再通过眼管的孔眼进入眼管内部并向下延伸至第二油管,与位于第二油管中的压力计连接;所述第三电缆从所述流量控制阀终端伸出,穿过采油树上的第三电缆孔,沿井口延伸入油套环空,再通过眼管的孔眼进入眼管内部并向下延伸至第二油管,与第二油管末端串接的流量控制阀连接。4. The heavy oil reservoir natural gas huff and puff production process system according to claim 3, characterized in that, the first cable extends from the flowmeter terminal, passes through the first cable hole on the Christmas tree, and runs along the wellhead. Extending into the annulus of the oil jacket, and then entering the interior of the eye pipe through the hole of the eye pipe and extending down to the second oil pipe, and connected with the flow meter located in the second oil pipe; the second cable extends from the end of the pressure gauge , pass through the second cable hole on the Christmas tree, extend along the wellhead into the oil casing annulus, enter the inside of the eye pipe through the hole of the eye pipe and extend down to the second oil pipe, and connect with the pressure gauge located in the second oil pipe The third cable extends from the terminal of the flow control valve, passes through the third cable hole on the Christmas tree, extends along the wellhead into the oil casing annulus, and then enters the inside of the eye pipe through the hole of the eye pipe and extends downward To the second oil pipe, connected with the flow control valve connected in series at the end of the second oil pipe. 5.一种稠油油藏天然气吞吐采油方法,包括:5. A natural gas huff and puff recovery method for heavy oil reservoirs, comprising: 步骤A:在油藏目标区域打油井,自上而下地钻穿地层、油层、隔层及天然气层,通过井筒使油层和气层连通,并对对应油层和天然气层的井筒段进行射孔;Step A: Drill oil wells in the target area of the reservoir, drill through formations, oil layers, interlayers and natural gas layers from top to bottom, connect the oil layers and gas layers through the wellbore, and perforate the wellbore sections corresponding to the oil layers and natural gas layers; 步骤B:根据眼管材料强度、天然气层的产能及隔层厚度选用适当长度的眼管;在一根第二油管中设置用于监测天然气流量的流量计及用于监测天然气压力的压力计,在第二油管末端设置用于控制天然气流量的流量控制阀,将流量计、压力计和流量控制阀的电缆分别穿过第二油管和眼管上的孔眼,并使各条电缆的预留长度略大于井筒的深度;Step B: Select an eye pipe of appropriate length according to the material strength of the eye pipe, the production capacity of the natural gas layer and the thickness of the interlayer; set a flowmeter for monitoring the flow of natural gas and a pressure gauge for monitoring the pressure of natural gas in a second oil pipe, A flow control valve for controlling the flow of natural gas is installed at the end of the second oil pipe, and the cables of the flow meter, pressure gauge and flow control valve are respectively passed through the holes on the second oil pipe and the eye pipe, and the reserved length of each cable is Slightly greater than the depth of the wellbore; 步骤C:依序连接第一油管、抽油泵、眼管、封隔器及第二油管,组成生产管柱,在井筒中下入该生产管柱,同时下入第一电缆、第二电缆及第三电缆,并坐封该封隔器至井筒内对应油层与天然气层之间的位置;将第一电缆、第二电缆及第三电缆的自由端穿过采油树上的第一电缆孔、第二电缆孔及第三电缆孔,分别与流量计终端、压力计终端及流量控制阀终端相接;安装采油树、抽油机;Step C: Connect the first tubing, oil well pump, borehole, packer and second tubing in sequence to form a production string, run the production string in the wellbore, and simultaneously run the first cable, the second cable and the third cable, and set the packer to the position between the corresponding oil layer and the natural gas layer in the wellbore; pass the free ends of the first cable, the second cable and the third cable through the first cable hole, The second cable hole and the third cable hole are respectively connected to the terminal of the flow meter, the terminal of the pressure gauge and the terminal of the flow control valve; install the Christmas tree and the pumping unit; 步骤D:关闭抽油机和采油树上的油嘴以关井,打开流量控制阀的阀门,使天然气经过第二油管管段、眼管、油套环空流入油层;Step D: Close the nozzles on the pumping unit and the Christmas tree to shut down the well, open the valve of the flow control valve, and let the natural gas flow into the oil layer through the second tubing section, the eye pipe, and the casing annulus; 步骤E:关闭流量控制阀的阀门,然后焖井;Step E: close the valve of the flow control valve, and then stew the well; 步骤F:达到设计焖井时间后,保持流量控制阀的阀门关闭,开启所述抽油机和油嘴,开井采油。Step F: After reaching the designed soaking time, keep the valve of the flow control valve closed, open the pumping unit and oil nozzle, and open the well for oil production. 6.根据权利要求5所述的方法,其中:6. The method of claim 5, wherein: 在所述步骤E中,当所述流量计监测的天然气注入量达到预定值后,再关闭流量控制阀的阀门。In the step E, when the injection amount of natural gas monitored by the flow meter reaches a predetermined value, the valve of the flow control valve is closed. 7.根据权利要求5或6所述的方法,其中:7. A method according to claim 5 or 6, wherein: 在步骤F的采油过程中,当原油产量达不到设计目标时,重复所述步骤D至步骤F。During the oil recovery process in step F, when the crude oil output fails to reach the design target, repeat steps D to F. 8.根据权利要求5或6所述的方法,在步骤C和步骤D之间还包含如下步骤:8. The method according to claim 5 or 6, further comprising the steps between step C and step D: 步骤C’:首先关闭所述流量控制阀的阀门,开启所述抽油机和油嘴进行采油,直至采油量低于设计产能时,再进行所述步骤D。Step C': firstly close the valve of the flow control valve, open the pumping unit and oil nozzle to extract oil until the oil output is lower than the design production capacity, and then proceed to the step D.
CN201310364223.1A 2013-08-20 2013-08-20 A natural gas huff and puff oil recovery process system and oil recovery method for heavy oil reservoirs Active CN103470233B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310364223.1A CN103470233B (en) 2013-08-20 2013-08-20 A natural gas huff and puff oil recovery process system and oil recovery method for heavy oil reservoirs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310364223.1A CN103470233B (en) 2013-08-20 2013-08-20 A natural gas huff and puff oil recovery process system and oil recovery method for heavy oil reservoirs

Publications (2)

Publication Number Publication Date
CN103470233A true CN103470233A (en) 2013-12-25
CN103470233B CN103470233B (en) 2016-01-06

Family

ID=49795257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310364223.1A Active CN103470233B (en) 2013-08-20 2013-08-20 A natural gas huff and puff oil recovery process system and oil recovery method for heavy oil reservoirs

Country Status (1)

Country Link
CN (1) CN103470233B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332678A (en) * 2014-07-29 2016-02-17 中国石油化工股份有限公司 Gas injection swallowing-spitting method
CN107035349A (en) * 2017-06-10 2017-08-11 山东恒驰石油装备有限责任公司 A kind of interlayer pressure difference cyclic water stimulation pumping pipe string
CN111350478A (en) * 2018-12-21 2020-06-30 中国石油天然气股份有限公司 Oil production method and device
CN115370320A (en) * 2021-05-19 2022-11-22 中国石油化工股份有限公司 Gas storage well bore for gas reservoir type gas storage, salt deposition prevention method and application
CN116971748A (en) * 2023-09-22 2023-10-31 山东创新石油技术有限公司 Intelligent explosion-proof drainage gas production machine pumping water pump

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2363838C1 (en) * 2008-02-13 2009-08-10 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Procedure for development of bitumen deposits
CN202215220U (en) * 2011-09-23 2012-05-09 中国石油天然气股份有限公司 Concentric layered steam drive downhole process string
CN102650205A (en) * 2012-04-27 2012-08-29 中国石油天然气股份有限公司 Oil production method and oil production well system for turning bottom water reservoir oil well into artesian water injection well
CN102767355A (en) * 2012-08-03 2012-11-07 王维纲 Thick oil steam-huff-and-puff injection-production integrated oil production device
RU2470144C1 (en) * 2011-05-31 2012-12-20 Иван Викторович Грехов Plant for simultaneous-separate extraction of hydrocarbons
CN102852496A (en) * 2012-04-20 2013-01-02 中国石油天然气股份有限公司 A method for producing medium-deep heavy oil reservoirs

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2363838C1 (en) * 2008-02-13 2009-08-10 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Procedure for development of bitumen deposits
RU2470144C1 (en) * 2011-05-31 2012-12-20 Иван Викторович Грехов Plant for simultaneous-separate extraction of hydrocarbons
CN202215220U (en) * 2011-09-23 2012-05-09 中国石油天然气股份有限公司 Concentric layered steam drive downhole process string
CN102852496A (en) * 2012-04-20 2013-01-02 中国石油天然气股份有限公司 A method for producing medium-deep heavy oil reservoirs
CN102650205A (en) * 2012-04-27 2012-08-29 中国石油天然气股份有限公司 Oil production method and oil production well system for turning bottom water reservoir oil well into artesian water injection well
CN102767355A (en) * 2012-08-03 2012-11-07 王维纲 Thick oil steam-huff-and-puff injection-production integrated oil production device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332678A (en) * 2014-07-29 2016-02-17 中国石油化工股份有限公司 Gas injection swallowing-spitting method
CN105332678B (en) * 2014-07-29 2019-04-02 中国石油化工股份有限公司 A kind of method of huff and puff
CN107035349A (en) * 2017-06-10 2017-08-11 山东恒驰石油装备有限责任公司 A kind of interlayer pressure difference cyclic water stimulation pumping pipe string
CN107035349B (en) * 2017-06-10 2024-07-02 山东恒驰石油装备有限责任公司 Interlayer pressure difference water injection huff-puff oil pumping tubular column
CN111350478A (en) * 2018-12-21 2020-06-30 中国石油天然气股份有限公司 Oil production method and device
CN111350478B (en) * 2018-12-21 2022-06-03 中国石油天然气股份有限公司 Oil production method and device
CN115370320A (en) * 2021-05-19 2022-11-22 中国石油化工股份有限公司 Gas storage well bore for gas reservoir type gas storage, salt deposition prevention method and application
CN116971748A (en) * 2023-09-22 2023-10-31 山东创新石油技术有限公司 Intelligent explosion-proof drainage gas production machine pumping water pump
CN116971748B (en) * 2023-09-22 2023-12-08 山东创新石油技术有限公司 Intelligent explosion-proof drainage gas production machine pumping water pump

Also Published As

Publication number Publication date
CN103470233B (en) 2016-01-06

Similar Documents

Publication Publication Date Title
US8820075B2 (en) System and method for producing geothermal energy
CN104695927B (en) An integrated method for fracturing and completion of combined coiled tubing and production tubing strings
CN205225215U (en) A mining device for layered mining of two sets of oil layers
CN103470233B (en) A natural gas huff and puff oil recovery process system and oil recovery method for heavy oil reservoirs
CN204252964U (en) A kind of marine thermal recovery heat injection and production integration tubing string
CN201963283U (en) Double tubing high temperature gas lift process string
CN112267866B (en) Production string and method for staged fracturing of small-diameter pipes for sidetracking and small-bore wells
CN105952378A (en) Tree-shape structure well drilling and completion and yield increasing method
US10597993B2 (en) Artificial lift system
CN115573690A (en) A system and method for thermal recovery of natural gas hydrate based on carbon dioxide storage
CN114961668B (en) Fracture type dry hot rock reservoir double inclined shaft sectional regulation and control reinforced heat collection method
US20150041129A1 (en) Steam injection and production completion system
RU2296213C2 (en) Packer pumping plant for well formations operation
CN104481489A (en) An integrated process method of coiled tubing fracturing and well completion for vertical wells of gas wells
CN203394444U (en) Fire flooding assisted gravity drainage oil injection production process system
CN203441440U (en) Thickened oil recovery system for horizontal well
CN112431579B (en) In-line fracturing device and method for sidetracking and small-bore wells
CN110344801A (en) Fracturing work method, recovery method and mining system for combustible ice exploitation
CN104632195A (en) A water-seeking pipe string and method for a gas-lift-aided horizontal well
CN201620839U (en) Gas well production string
CN204627573U (en) String equipment for SAGD bi-horizontal well
CN214499014U (en) An energy supplement
CN108643871A (en) Controlled gas recovery device and method
US10570714B2 (en) System and method for enhanced oil recovery
RU2425961C1 (en) Well operation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant