CN103466413B - Method for installing and positioning head sheave at furnace top of blast furnace - Google Patents

Method for installing and positioning head sheave at furnace top of blast furnace Download PDF

Info

Publication number
CN103466413B
CN103466413B CN201310448147.2A CN201310448147A CN103466413B CN 103466413 B CN103466413 B CN 103466413B CN 201310448147 A CN201310448147 A CN 201310448147A CN 103466413 B CN103466413 B CN 103466413B
Authority
CN
China
Prior art keywords
head sheave
steel rope
blast furnace
winch cylinder
main winch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310448147.2A
Other languages
Chinese (zh)
Other versions
CN103466413A (en
Inventor
朱立雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201310448147.2A priority Critical patent/CN103466413B/en
Publication of CN103466413A publication Critical patent/CN103466413A/en
Application granted granted Critical
Publication of CN103466413B publication Critical patent/CN103466413B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Blast Furnaces (AREA)

Abstract

The invention relates to a method for installing and positioning a head sheave at a furnace top of a blast furnace. A main winding machine roller for winding steel wires, and the head sheave at the furnace top of the blast furnace are provided. The method for installing the head sheave at the furnace top of the blast furnace comprises the following steps of installing the main winding machine roller, and confirming that a steel wire rope is wound on a left limiting position and a right limiting position of the main winding machine roller; confirming a position of a contact point of the steel wire rope and the head sheave at an upper part of the head sheave; confirming a winding and swaying angle of the steel wire rope on the main winding machine roller; confirming an included angle of a bisector of a swaying angle of the steel wire rope and an axial line of the winding machine roller; setting a central line of the head sheave along the bisector of the swaying angle of the steel wire rope; and fixing the head sheave on a head sheave support through a fixed bolt. According to the method for installing and positioning the head sheave at the furnace top of the blast furnace, the installing accuracy of the head sheave at the furnace top of the blast furnace is improved, the danger of subsequent working at heights is reduced, the danger that the steel wire rope bites an edge of the head sheave is reduced, the life of the steel wire rope and the head sheave is improved, the engineering cost is saved, and the production safety of the blast furnace is ensured.

Description

Blast furnace roof head sheave installation and locating method
Technical field
The present invention relates to a kind of installation method of blast furnace, specifically, relate to a kind of blast furnace roof head sheave installation and locating method.
Background technology
Blast furnace roof head sheave is installed in position fixing process, is generally according to drawing requirement, first thick installation in position, then wirerope-winding is complete after, then according to the amplitude of oscillation of steel rope reality and whether undercut, repeatedly to adjust.This kind of method mounting and adjusting difficulty is large, and installation effectiveness is low, and aloft work is very dangerous.
Summary of the invention
For above-mentioned deficiency of the prior art, the invention provides a kind of structure simple, safe and reliable, operate stable, without the need to the blast furnace roof head sheave installation and locating method of follow-up adjustment.
The technical solution used in the present invention is:
A kind of blast furnace roof head sheave installation and locating method, by steel wire winding on main winch cylinder, is arranged on blast furnace roof by head sheave; Main winch cylinder drives steel rope to be connected with feeding cart by head sheave, and the head sheave installation steps of blast furnace roof are as follows:
A, installation main winch cylinder, determine that wirerope-winding is in the left-limit position of main winch cylinder and limit on the right-right-hand limit position;
B, according to feeding cart orbital position, determine the steel rope that head sheave top contacts with steel rope and head sheave contacting points position;
C, according to steel rope at the left-limit position of main winch cylinder and limit on the right-right-hand limit position and head sheave top and the steel rope contacting points position determination steel rope winding pendulum angle at main winch cylinder;
D, angular bisector according to wirerope-winding pendulum angle determination pendulum angle, the end position at main winch cylinder and the angle of steel rope and head sheave contacting points position determination steel rope pivot angle bisector and winch cylinder axis according to steel rope pivot angle bisector and steel rope;
E, head sheave center line to be arranged along steel rope pivot angle bisector;
F, by bolt of rear end plate, head sheave to be fixed on day wheel support.
The beneficial effect of hinge structure of the present invention:
Blast furnace roof head sheave installation and locating method of the present invention, improves the setting accuracy of blast furnace roof head sheave, reduces the danger of follow-up aloft work, reduce the danger that steel rope stings head sheave edge, improve the life-span of steel rope and head sheave, save engineering cost, ensure blast fumance safety.
Accompanying drawing explanation
Fig. 1 is the main winch cylinder of blast furnace roof head sheave installation and locating method of the present invention and the positional structure schematic diagram of head sheave;
Fig. 2 is the main winch cylinder of blast furnace roof head sheave installation and locating method of the present invention and the positional structure schematic diagram of left and right head sheave;
Fig. 3 is the partial enlargement structural representation of Fig. 2 head sheave.
Major part nomenclature in accompanying drawing:
In figure:
1, main winch cylinder 2, left-limit position
3, limit on the right-right-hand limit position 4, head sheave
5, the angle of steel rope pivot angle bisector and winch cylinder axis
6, winch cylinder axis
7, head sheave top and steel rope contacting points position 8, steel rope
9, steel rope pivot angle bisector.
Detailed description of the invention
Referring to drawings and Examples, the present invention will be described in detail:
Accompanying drawing 1 to 3 is known, a kind of blast furnace roof head sheave installation and locating method, comprise for winding steel wire main winch cylinder 1, be arranged on the head sheave 4 of blast furnace roof, main winch cylinder 1 drives steel rope 8 to be connected with feeding cart by head sheave 4, head sheave 4 installation steps of blast furnace roof are as follows: install main winch cylinder 1, determine that steel rope 8 is wrapped in left-limit position 2 and the limit on the right-right-hand limit position 3 of main winch cylinder 1; According to feeding cart orbital position, determine head sheave 4 top and steel rope contacting points position 7; The winding pendulum angle of steel rope 8 at main winch cylinder 1 is determined on the left-limit position 2 of main winch cylinder 1 and limit on the right-right-hand limit position 3 and head sheave top and steel rope contacting points position 7 according to steel rope 8; According to the angular bisector 9 of wirerope-winding pendulum angle determination pendulum angle, to determine the angle 5 of steel rope pivot angle bisector 9 and winch cylinder axis 6 on the end position of main winch cylinder 1 and head sheave top and steel rope contacting points position 7 according to steel rope pivot angle bisector 9 and steel rope 8; Head sheave center line is arranged along steel rope pivot angle bisector 9; By bolt of rear end plate, head sheave 4 is fixed on day wheel support.
Blast furnace roof head sheave installation and locating method of the present invention, adopts the horizontal throw between method of projection's measurement furnace roof head sheave and feeding cart winch cylinder; When measurement steel cable is wrapped on feeding cart winch cylinder completely, the width that steel rope is accumulated on master winch cylinder; Determine that steel rope is at the center of winch cylinder point; Utilize method of projection, steel rope is projected in one plane in feeding cart winch centre of the drum's point position and the horizontal throw between head sheave and feeding cart cylinder; Calculate the angle of two projection lines, furnace roof head sheave positions installation according to this angle; Furnace roof head sheave is arrange in pairs, and the position of the head sheave of side also adopts same method to arrange in addition.
Blast furnace roof head sheave installation and locating method of the present invention, improves the setting accuracy of blast furnace roof head sheave, reduces the danger of follow-up aloft work, reduce the danger that steel rope stings head sheave edge, improve the life-span of steel rope and head sheave, save engineering cost, ensure blast fumance safety.

Claims (1)

1. a blast furnace roof head sheave installation and locating method, by steel wire winding on main winch cylinder, is arranged on blast furnace roof by head sheave; Main winch cylinder drives steel rope to be connected with feeding cart by head sheave, and it is characterized in that, the head sheave installation steps of blast furnace roof are as follows:
A, installation main winch cylinder, determine that wirerope-winding is in the left-limit position of main winch cylinder and limit on the right-right-hand limit position;
B, according to feeding cart orbital position, determine the steel rope that head sheave top contacts with steel rope and head sheave contacting points position;
C, according to steel rope at the left-limit position of main winch cylinder and limit on the right-right-hand limit position and head sheave top and the steel rope contacting points position determination steel rope winding pendulum angle at main winch cylinder;
D, angular bisector according to wirerope-winding pendulum angle determination pendulum angle, the end position at main winch cylinder and the angle of steel rope and head sheave contacting points position determination steel rope pivot angle bisector and winch cylinder axis according to steel rope pivot angle bisector and steel rope;
E, head sheave center line to be arranged along steel rope pivot angle bisector;
F, by bolt of rear end plate, head sheave to be fixed on day wheel support.
CN201310448147.2A 2013-09-27 2013-09-27 Method for installing and positioning head sheave at furnace top of blast furnace Active CN103466413B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310448147.2A CN103466413B (en) 2013-09-27 2013-09-27 Method for installing and positioning head sheave at furnace top of blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310448147.2A CN103466413B (en) 2013-09-27 2013-09-27 Method for installing and positioning head sheave at furnace top of blast furnace

Publications (2)

Publication Number Publication Date
CN103466413A CN103466413A (en) 2013-12-25
CN103466413B true CN103466413B (en) 2015-07-15

Family

ID=49791505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310448147.2A Active CN103466413B (en) 2013-09-27 2013-09-27 Method for installing and positioning head sheave at furnace top of blast furnace

Country Status (1)

Country Link
CN (1) CN103466413B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105217414B (en) * 2015-11-09 2017-09-22 湖南省第一工程有限公司 Head sheave of hoister loads and unloads handling method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1077432A (en) * 1992-04-14 1993-10-20 科尼电梯有限公司 Rope suspension arrangement
JP2004161400A (en) * 2002-11-11 2004-06-10 Soda Noki Sekkei Jimusho:Kk Tilting type step eliminating device
CN1827519A (en) * 2005-03-02 2006-09-06 胡勇 Swing type fixed pulley rope-arrangement device and method
CN101007618A (en) * 2006-01-27 2007-08-01 胡勇 Swing winch rope-discharging method and device
CN201592935U (en) * 2009-12-31 2010-09-29 石家庄钢铁有限责任公司 High-reliability blast furnace charging system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1077432A (en) * 1992-04-14 1993-10-20 科尼电梯有限公司 Rope suspension arrangement
US5361873A (en) * 1992-04-14 1994-11-08 Kone Elevator Gmbh Rope suspension arrangement
JP2004161400A (en) * 2002-11-11 2004-06-10 Soda Noki Sekkei Jimusho:Kk Tilting type step eliminating device
CN1827519A (en) * 2005-03-02 2006-09-06 胡勇 Swing type fixed pulley rope-arrangement device and method
CN101007618A (en) * 2006-01-27 2007-08-01 胡勇 Swing winch rope-discharging method and device
CN201592935U (en) * 2009-12-31 2010-09-29 石家庄钢铁有限责任公司 High-reliability blast furnace charging system

Also Published As

Publication number Publication date
CN103466413A (en) 2013-12-25

Similar Documents

Publication Publication Date Title
CN102179416B (en) Wire-pressing roller for straight advancing type wire drawing machine
CN204270734U (en) A kind of cable arrange-line machine apparatus for correcting
CN102519742B (en) Method and system for detecting boom fault and crane
CN206872302U (en) A kind of safety alarm device of workshop movement lifting appliance
CN103466413B (en) Method for installing and positioning head sheave at furnace top of blast furnace
CN104261218A (en) Elevator steel wire rope online nondestructive detection device
CN202837314U (en) Movable laser velocimeter fixing device
CN201678363U (en) Precisely positioning crane spreader
CN203359813U (en) Cantilever lifting limiting device
CN201731881U (en) Bridge arch rib vertical rotation deviation measurement device
CN102319980B (en) Novel process for mounting anchor chain and anchor stopper in matched mode
CN204607430U (en) A kind of overhead traveling crane warning steel cable slot disengaging
CN202038183U (en) Elevating device for pantograph of narrow-track trolley industrial and mining locomotive
CN204281161U (en) Electric block fall arrest operator guards
CN103325616A (en) Roller saddle steel coil occupying detecting device
CN204416944U (en) A kind of hoisting crane conduction rack
CN203667818U (en) Suspension cage for travelling crane trolley line construction
CN203855346U (en) Novel guide wheel
CN103603485B (en) Overhead traveling crane beam steel rail measuring and positioning auxiliary device
CN203380481U (en) Adjustable rotary wire hanging and feeding device
CN203740791U (en) Elevator speed limiter connecting support
CN203813388U (en) Novel head end cable carrying trolley
CN204198153U (en) The online non-destructive detection device of elevator wire rope
CN204209261U (en) Wire reel bracket silk guide frame
CN205283043U (en) Insulated wire strain clamp fastener

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant