CN103452167A - 一种中间加压泵站 - Google Patents
一种中间加压泵站 Download PDFInfo
- Publication number
- CN103452167A CN103452167A CN2012101750167A CN201210175016A CN103452167A CN 103452167 A CN103452167 A CN 103452167A CN 2012101750167 A CN2012101750167 A CN 2012101750167A CN 201210175016 A CN201210175016 A CN 201210175016A CN 103452167 A CN103452167 A CN 103452167A
- Authority
- CN
- China
- Prior art keywords
- water
- pressure
- control valve
- pump group
- inlet pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 81
- 238000006243 chemical reaction Methods 0.000 claims description 3
- 238000005086 pumping Methods 0.000 claims description 2
- 238000001514 detection method Methods 0.000 abstract 2
- 238000000034 method Methods 0.000 description 3
- 238000004134 energy conservation Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000010030 laminating Methods 0.000 description 2
- 239000008399 tap water Substances 0.000 description 2
- 235000020679 tap water Nutrition 0.000 description 2
- 230000001276 controlling effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- JEGUKCSWCFPDGT-UHFFFAOYSA-N h2o hydrate Chemical compound O.O JEGUKCSWCFPDGT-UHFFFAOYSA-N 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000009418 renovation Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000008400 supply water Substances 0.000 description 1
Images
Landscapes
- Control Of Positive-Displacement Pumps (AREA)
Abstract
在中间加压泵站的水池进水管出安装压力检测装置和调节控制阀,来水通过控制阀后再进入到调节水池,同时进水管上连接叠压泵组,叠压泵组的出水管和中间加压泵站的供水管连接。当进水流量能满足中间加压泵站供水量时,叠压泵组在进水压力上叠加增压供水,如果进水流量高于用户用水流量进水管口压力随着升高,压力检测装置检测到进水管口压力升高到设定的压力值后控制调节控制阀打开,使多余的水量进入到调节水池,压力越高调节控制阀的开度越大,当用水高峰时调节控制阀关闭,中间加压泵站的常压泵组投入运行,将调节水池的水加压后和叠压泵组加压后的水同时向用户供水,以此提高用水高峰时间段内泵站的供水能力,满足用户用水压力需求。
Description
技术领域
本发明涉及一种提高中间加压泵站供水能力技术改造措施,特别是一种提高自来水中间加压泵站单位时间内供水能力的技术措施。
背景技术
现有自来水中间加压泵站一般采用水池加变频模式,水厂给中间加压泵站的供水量一般按日供水量进行设计,水厂供水量都根据日供水量除以24小时的恒定量供给中间加压泵站、但中间加压泵站对用户供水时有高峰和低谷之分(比如水厂设计日供水量1万吨其泵组小时流量为416吨,但用户用水可能为50~800吨),高峰时来水量又不能满足要求,低峰时水量又有富余,导致用户用水高峰时压力低甚至没水用,而水厂水量又供不出去的现象,同时水厂到中间加压泵站的水压全部泄为常压,使中间加压泵站电耗增加。
发明内容
本发明的目的在于:通过一种改造技术措施,提高中间加压泵站单位时间内供水能力,同时利用来水余压达到节能供水的目的。
本发明采用如下技术改进手段实现上述目的:在中间加压泵站的调节水池进水管处安装压力检测装置和调节控制阀,来水通过控制阀后再进入到调节水池,同时进水管上连接叠压泵组,叠压泵组的出水管和中间加压泵站常压泵组的供水管连接。
采用如上技术改进手段后,当进水流量能满足中间加压泵站供水量时,这时叠压泵组在进水压力基础上叠加增压供水,达到节能的目的,同时如果进水流量高于用户用水流量这时进水管口压力会随着升高,这时压力检测装置检测到进水管口压力升高到设定的压力值后控制调节控制阀打开,将多余的水量进入到调节水池,压力越高调节控制阀的开度越大,当用水高峰时调节控制阀关闭,中间加压泵站的常压泵组投入运行,将调节水池的水加压后和叠压泵组加压后的水同时向用户供水,以此提高用水高峰时间段内泵站的供水能力,满足用户用水压力需求。
附图说明
图1为传统中间加压泵站图。
图2为本发明实施状态图。
具体实施方式
如图2所示的一种中间加压泵站由:调节水池1、常压泵组2、叠压泵组3、压力检测装置4、调节控制阀5、连接管和变频控制柜(图中未表)组成,在调节池1的进水管6上安装压力检测装置4和调节控制阀5,进水管6设有和水厂连接的管口8,常压泵组2的进水管和调节水池1连接,常压泵组2的出水口连接至出水总管7,叠压泵组3的进水口通过管道9和进水管6连接,叠压泵组3的出水管10和常压泵组的出水总管7连接,这样当进水流量能满足使用时叠压泵组3投入变频运行,在进水压力基础上进行叠加增压供水,达到节能的目的。当用户用水量小于进水供给量时,压力检测装置4检测到进水压力高于变频控制柜设定的压力时控制调节控制阀5打开,这时多余的水量进入调节水池1进行储存,进水压力越高调节控制阀5的开度越大,进入到调节水池1的水量就越多,保证水厂来水总量保持不变,当用水高峰时常压泵组2自动投入变频运行,由调节水池1取水向用户管网供水,这时系统就同时由叠压泵组3和常压泵组2同时向用户供水,以此提高中间加压泵站单位时间内供水能力,满足用户用水需求。
Claims (2)
1.一种中间加压泵站,其特征在于泵站由: 调节水池、常压泵组、叠压泵组、压力检测装置、调节控制阀、连接管和变频控制柜组成,在中间加压泵站的调节水池进水管处安装压力检测装置和调节控制阀,来水通过控制阀后再进入到调节水池,同时进水管上连接叠压泵组,叠压泵组的出水管和常压泵组的供水管连接。
2.根据权利要求1所述的一种中间加压泵组,其特征在于:压力检测装置检测到进水管口压力升高到设定的压力值后控制调节控制阀打开,多余的水量进入到调节水池,压力越高调节控制阀的开度越大,用水高峰时调节控制阀关闭。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101750167A CN103452167A (zh) | 2012-05-31 | 2012-05-31 | 一种中间加压泵站 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101750167A CN103452167A (zh) | 2012-05-31 | 2012-05-31 | 一种中间加压泵站 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103452167A true CN103452167A (zh) | 2013-12-18 |
Family
ID=49734973
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012101750167A Pending CN103452167A (zh) | 2012-05-31 | 2012-05-31 | 一种中间加压泵站 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103452167A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107272617A (zh) * | 2017-06-20 | 2017-10-20 | 河南华东工控技术有限公司 | 一种中水泵站控制系统及控制方法 |
CN108842857A (zh) * | 2018-08-17 | 2018-11-20 | 魏远良 | 一种自学习智能调峰二次供水系统及其控制方法 |
CN109113135A (zh) * | 2018-09-30 | 2019-01-01 | 四川德胜集团钒钛有限公司 | 一种自动控制供水系统 |
CN113404125A (zh) * | 2021-07-30 | 2021-09-17 | 海盐县三地自来水有限公司 | 一种基于供水加压泵站流量闭环控制的水厂节能方法及系统 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08326109A (ja) * | 1995-06-02 | 1996-12-10 | Hitachi Ltd | 水道直結給水システム |
JP2001214477A (ja) * | 2000-12-05 | 2001-08-07 | Hitachi Ltd | 水道用給液装置 |
CN201224900Y (zh) * | 2008-03-07 | 2009-04-22 | 上海凯泉泵业(集团)有限公司 | 一种智能供水设备 |
CN201321636Y (zh) * | 2008-12-25 | 2009-10-07 | 郑州水业科技发展有限公司 | 集成式智能供水泵站 |
CN201428158Y (zh) * | 2009-04-21 | 2010-03-24 | 开利泵业(集团)有限公司 | 一种无负压供水设备压力监控装置 |
CN201687044U (zh) * | 2010-01-11 | 2010-12-29 | 葛洲坝集团第一工程有限公司 | 一种无负压二次供水高位压力式储水罐 |
-
2012
- 2012-05-31 CN CN2012101750167A patent/CN103452167A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08326109A (ja) * | 1995-06-02 | 1996-12-10 | Hitachi Ltd | 水道直結給水システム |
JP2001214477A (ja) * | 2000-12-05 | 2001-08-07 | Hitachi Ltd | 水道用給液装置 |
CN201224900Y (zh) * | 2008-03-07 | 2009-04-22 | 上海凯泉泵业(集团)有限公司 | 一种智能供水设备 |
CN201321636Y (zh) * | 2008-12-25 | 2009-10-07 | 郑州水业科技发展有限公司 | 集成式智能供水泵站 |
CN201428158Y (zh) * | 2009-04-21 | 2010-03-24 | 开利泵业(集团)有限公司 | 一种无负压供水设备压力监控装置 |
CN201687044U (zh) * | 2010-01-11 | 2010-12-29 | 葛洲坝集团第一工程有限公司 | 一种无负压二次供水高位压力式储水罐 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107272617A (zh) * | 2017-06-20 | 2017-10-20 | 河南华东工控技术有限公司 | 一种中水泵站控制系统及控制方法 |
CN108842857A (zh) * | 2018-08-17 | 2018-11-20 | 魏远良 | 一种自学习智能调峰二次供水系统及其控制方法 |
CN109113135A (zh) * | 2018-09-30 | 2019-01-01 | 四川德胜集团钒钛有限公司 | 一种自动控制供水系统 |
CN113404125A (zh) * | 2021-07-30 | 2021-09-17 | 海盐县三地自来水有限公司 | 一种基于供水加压泵站流量闭环控制的水厂节能方法及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202347587U (zh) | 一种恒压变频供水装置 | |
CN103452167A (zh) | 一种中间加压泵站 | |
CN203452130U (zh) | 一种无负压二次供水系统 | |
CN207331813U (zh) | 小流量差压补偿供水装置 | |
CN205369391U (zh) | 带有双向补偿的供水装置 | |
CN102493529A (zh) | 一种节能型自来水二次加压供水方法和装置 | |
CN203741939U (zh) | 智能箱式无负压给水设备 | |
CN104746576A (zh) | 水箱调储变量变压管网叠压供水设备 | |
CN104074237A (zh) | 带有水质改善模块的新型供水设备 | |
CN201395812Y (zh) | 一种增压稳流供水系统 | |
CN100365216C (zh) | 一种二次加压泵站供水系统 | |
CN108560638A (zh) | 自来水高峰时段调峰系统及其调峰方法 | |
CN202627074U (zh) | 箱式矢量无负压供水设备 | |
CN104746584A (zh) | 智能箱式无负压给水设备 | |
CN109138043A (zh) | 一种高效给水设备 | |
CN201236359Y (zh) | 全自动双变频叠压供水设备 | |
CN208748760U (zh) | 一种全变频智能多联无负压供水设备 | |
CN202148563U (zh) | 一种供水减压系统 | |
CN205557682U (zh) | 一种无负压叠压设备的双稳压装置 | |
CN102776920A (zh) | 一种叠压给水设备 | |
CN104278708A (zh) | 一种智能泵站 | |
CN201933544U (zh) | 超节能型双向给水系统 | |
CN106480933A (zh) | 调峰泵站 | |
CN204023718U (zh) | 一种箱式叠压二次供水稳流补偿系统 | |
CN201844467U (zh) | 太阳能热水器恒压集中供水系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20131218 |