CN103410229A - Steel strip and rubber waterstop fixed connection production method - Google Patents
Steel strip and rubber waterstop fixed connection production method Download PDFInfo
- Publication number
- CN103410229A CN103410229A CN2013103873630A CN201310387363A CN103410229A CN 103410229 A CN103410229 A CN 103410229A CN 2013103873630 A CN2013103873630 A CN 2013103873630A CN 201310387363 A CN201310387363 A CN 201310387363A CN 103410229 A CN103410229 A CN 103410229A
- Authority
- CN
- China
- Prior art keywords
- steel plate
- fastening band
- plate bar
- rubber fastening
- rubber waterstop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 50
- 239000010959 steel Substances 0.000 title claims abstract description 50
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 13
- 238000000034 method Methods 0.000 claims description 9
- 238000007789 sealing Methods 0.000 claims description 4
- 239000011148 porous material Substances 0.000 claims description 3
- 238000005987 sulfurization reaction Methods 0.000 claims description 3
- 238000004073 vulcanization Methods 0.000 abstract 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002209 hydrophobic effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Building Environments (AREA)
Abstract
The invention discloses a steel strip and rubber waterstop fixed connection production method. The steel strip and rubber waterstop fixed connection production method comprises a first step and a second step; in the first step, fixed pin mounting holes are formed in steel strips to be installed in a rubber waterstop, fixed pins are vertically fixed on the steel strips, the lengths of the parts, extending out of the upper surfaces and lower surfaces of the steel strips, of the fixed pins are determined according to the thickness of the rubber waterstop, the lower ends of the fixed pins are kept to be enough for extending out of the lower surface of the rubber waterstop, and the upper ends of the fixed pins are kept to be enough for extending out of the upper surface of the rubber waterstop; in the second step, the steel strips and the fixed pins are placed in a rubber waterstop mold, and the steel strips and the fixed pins are fixed to the rubber waterstop in a vulcanization mode. The steel strip and rubber waterstop fixed connection production method overcomes the shortcomings in the prior art, and is simple in design and reasonable in structure; by arranging the multiple vertically arranged fixed pins between the steel strips embedded in the rubber waterstop, the reliability between the steel strips and the rubber waterstop is enhanced.
Description
Technical field
The present invention relates to the rubber technical field, specifically belong to a kind of steel plate bar and be fixedly connected with production method with rubber fastening band.
Background technology
Underground installation, tunnel culvert, hydrophobic aqueduct, check dam, rivers gate, storage liquid structure etc. than the architectural design of large-engineering in, due to can not continuous pouring or foundation deformation, the reasons such as the concrete component that variations in temperature causes expands with heat and contract with cold, need reserved constuction joint, settlement joint, deformation joint.At these seam crossings, must build sealing and bring the leakage problems that prevents the concrete water body.Existing rubber fastening band, steel plate is located in both sides.But because the steel plate batten that forms waterstop is different from the coefficient of expansion between concrete or concrete and rubber, and the steel plate batten is interrupted the setting, after making waterstop solidify in concrete, not only there will be shrinkage crack, the more important thing is that steel plate bar waterstop can be from extracting out concrete or causing serious engineering problem because telescopic hole extended length deficiency causes rupturing.
Summary of the invention
The purpose of this invention is to provide a kind of steel plate bar and be fixedly connected with production method with rubber fastening band, the steel plate bar can have been fixedly secured and is connected with rubber fastening band, method technique is simple, and whole process convenient operation is controlled.
The technical solution used in the present invention is as follows:
A kind of steel plate bar is fixedly connected with production method with rubber fastening band, described the method, comprise the first step, band is packed on steel plate bar in rubber fastening band and had the steady pin installing hole, steady pin vertically is fixed on the steel plate bar, stretch out the length of steel plate bar top and bottom and determine according to the rubber water-proof tape thickness, lower end retains enough stretches out below rubber fastening band, and upper end retains enough stretches out above rubber fastening band;
Second step is put into steel plate bar and steady pin on the rubber fastening band mould, by sulfuration, steel plate bar and steady pin is fixed on rubber fastening band.
Described steady pin is hollow structure, the upper and lower end sealing.
Described steady pin is the double-layered cylinder structure, and described inner layer cylinder upper end has the annulus part of extending to external expansion.
The described steel plate bar that is exposed to the rubber fastening band outside is provided with a plurality of steel plate bars that can make and with concrete, contacts firmly outer marginal pore.
Compared with the prior art, beneficial effect of the present invention is as follows:
The present invention, by between the steel plate bar that will be embedded in rubber fastening band, being provided with the steady pin of a plurality of vertical settings, increases the reliability between steel plate bar and waterstop; The steel plate bar can be fixedly secured and is connected with rubber fastening band, method technique is simple, and whole process convenient operation is controlled.
The accompanying drawing explanation
Fig. 1 is waterstop of the present invention and steel plate bar syndeton schematic diagram.
The specific embodiment
Referring to accompanying drawing, a kind of steel plate bar is fixedly connected with production method with rubber fastening band, described the method, comprise the first step, band is packed on steel plate bar 2 in rubber fastening band 1 and had the steady pin installing hole, steady pin 3 vertically is fixed on the steel plate bar, stretch out the length of steel plate bar top and bottom and determine according to the rubber water-proof tape thickness, lower end retains enough stretches out below rubber fastening band, and upper end retains enough stretches out above rubber fastening band;
Second step is put into steel plate bar and steady pin on the rubber fastening band mould, by sulfuration, steel plate bar and steady pin is fixed on rubber fastening band.
Described steady pin 3 is hollow structure, the upper and lower end sealing, and steady pin is the double-layered cylinder structure, inner layer cylinder 301 upper ends have the annulus part 302 of extending to external expansion.The steel plate bar that is exposed to rubber fastening band 1 outside is provided with a plurality of steel plate bars that can make and with concrete, contacts firmly outer marginal pore 201.Can need to by other fixtures, insert wherein by inner layer cylinder 301 from wherein extracting according to actual conditions, increase its integrated connection intensity.
Claims (4)
1. a steel plate bar is fixedly connected with production method with rubber fastening band, it is characterized in that: described the method, comprise the first step, band is packed on steel plate bar in rubber fastening band and had the steady pin installing hole, steady pin vertically is fixed on the steel plate bar, stretch out the length of steel plate bar top and bottom and determine according to the rubber water-proof tape thickness, lower end retains enough stretches out below rubber fastening band, and upper end retains enough stretches out above rubber fastening band;
Second step is put into steel plate bar and steady pin on the rubber fastening band mould, by sulfuration, steel plate bar and steady pin is fixed on rubber fastening band.
2. a kind of steel plate bar according to claim 1 is fixedly connected with production method with rubber fastening band, it is characterized in that: described steady pin is hollow structure, the upper and lower end sealing.
3. a kind of steel plate bar according to claim 2 is fixedly connected with production method with rubber fastening band, it is characterized in that: described steady pin is the double-layered cylinder structure, and described inner layer cylinder upper end has the annulus part of extending to external expansion.
4. a kind of steel plate bar according to claim 3 is fixedly connected with production method with rubber fastening band, it is characterized in that: the described steel plate bar that is exposed to the rubber fastening band outside is provided with a plurality of steel plate bars that can make and with concrete, contacts firmly outer marginal pore.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013103873630A CN103410229A (en) | 2013-08-30 | 2013-08-30 | Steel strip and rubber waterstop fixed connection production method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013103873630A CN103410229A (en) | 2013-08-30 | 2013-08-30 | Steel strip and rubber waterstop fixed connection production method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103410229A true CN103410229A (en) | 2013-11-27 |
Family
ID=49603266
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013103873630A Pending CN103410229A (en) | 2013-08-30 | 2013-08-30 | Steel strip and rubber waterstop fixed connection production method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103410229A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108481637A (en) * | 2017-04-01 | 2018-09-04 | 丰泽智能装备股份有限公司 | A kind of preparation method for preparing mold and rubber fastening band for producing rubber fastening band |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0921225A (en) * | 1995-07-06 | 1997-01-21 | Unitec:Kk | Structure of interior finishing panel material and its construction method |
CN200975031Y (en) * | 2006-11-07 | 2007-11-14 | 四川新路桥机械有限公司 | Multiple sealing deformation joint apparatus |
CN101372840A (en) * | 2007-08-21 | 2009-02-25 | 上海市建筑科学研究院(集团)有限公司 | Mounting method with detachable rubber water stop mounted inside |
CN201523582U (en) * | 2009-10-07 | 2010-07-14 | 董春楼 | Greenhouse Composite Insulation Quilt |
CN102140848A (en) * | 2011-03-02 | 2011-08-03 | 中设建工集团有限公司 | Expansion joint-adjustable dual-waterproof installation construction process |
CN201972252U (en) * | 2011-01-14 | 2011-09-14 | 江苏东南特种技术工程有限公司 | External water stopper structure |
CN202706229U (en) * | 2012-06-12 | 2013-01-30 | 北京市第三建筑工程有限公司 | Roof deformation joint node structure |
CN203008142U (en) * | 2013-01-22 | 2013-06-19 | 河北省衡水黄河工程橡塑有限公司 | Three-prevention water stop strip |
-
2013
- 2013-08-30 CN CN2013103873630A patent/CN103410229A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0921225A (en) * | 1995-07-06 | 1997-01-21 | Unitec:Kk | Structure of interior finishing panel material and its construction method |
CN200975031Y (en) * | 2006-11-07 | 2007-11-14 | 四川新路桥机械有限公司 | Multiple sealing deformation joint apparatus |
CN101372840A (en) * | 2007-08-21 | 2009-02-25 | 上海市建筑科学研究院(集团)有限公司 | Mounting method with detachable rubber water stop mounted inside |
CN201523582U (en) * | 2009-10-07 | 2010-07-14 | 董春楼 | Greenhouse Composite Insulation Quilt |
CN201972252U (en) * | 2011-01-14 | 2011-09-14 | 江苏东南特种技术工程有限公司 | External water stopper structure |
CN102140848A (en) * | 2011-03-02 | 2011-08-03 | 中设建工集团有限公司 | Expansion joint-adjustable dual-waterproof installation construction process |
CN202706229U (en) * | 2012-06-12 | 2013-01-30 | 北京市第三建筑工程有限公司 | Roof deformation joint node structure |
CN203008142U (en) * | 2013-01-22 | 2013-06-19 | 河北省衡水黄河工程橡塑有限公司 | Three-prevention water stop strip |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108481637A (en) * | 2017-04-01 | 2018-09-04 | 丰泽智能装备股份有限公司 | A kind of preparation method for preparing mold and rubber fastening band for producing rubber fastening band |
CN108481637B (en) * | 2017-04-01 | 2023-08-15 | 丰泽智能装备股份有限公司 | Preparation mold for producing rubber water stop and preparation method of rubber water stop |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104818696B (en) | The manufacture method of the vertical water sealing structure of hydraulic engineering | |
CN202416594U (en) | Rubber water stop with steel sides | |
CN204098937U (en) | Tunnel deformation joint waterproof construction and constructing tunnel structure | |
CN201176640Y (en) | Grouting water expansion steel edge waterstop | |
CN204298998U (en) | Prefabricated assembled wallboard vertically stitches grouting and water-proof weather strip and waterproof construction thereof | |
CN104314314A (en) | Grouting connection construction method | |
CN103821180A (en) | Double-water stop structure for concrete expansion joint and manufacturing and construction method for double-water stop structure | |
CN203008160U (en) | Wall body for top filling of filling wall under beam slab | |
CN103835263A (en) | Prefabricated ditch | |
CN203808113U (en) | Concrete engineering expansion joint vertical water-stop structure | |
CN105971022A (en) | Construction method for concrete engineering deformation joint perpendicular water stop type cavity mold with protrusions | |
CN103410229A (en) | Steel strip and rubber waterstop fixed connection production method | |
CN206800323U (en) | One kind is used for the vertical sealing swaging die of concrete works movement joint | |
CN203487562U (en) | Rubber waterstop and steel lathing fixing structure | |
CN217712488U (en) | Be used for quick shut-in well device of trouble no sand pipe well | |
CN104727276B (en) | The manufacture method of the double; two water sealing structure of concrete extension joint | |
CN204343251U (en) | Horizontal connection structure between concrete cut-off wall and concrete structure | |
CN104631514B (en) | The construction method of the vertical water sealing structure in concrete works expansion joint | |
CN204475355U (en) | Plugging structure | |
CN203808114U (en) | Concrete expansion joint double-waterstop structure | |
CN103774620A (en) | Concrete engineering expansion joint vertical sealing up structure fixing member and application thereof | |
CN105350492B8 (en) | The manufacture method of brace type deformed concrete crack sealing swaging die | |
CN205576763U (en) | Self-locking connecting device for precast concrete box hole | |
CN203296130U (en) | Dropped water connection structure of floor drainage | |
CN204080870U (en) | A kind of concrete work swaging die skeleton |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20131127 |