CN103409641A - Plugging method for bottom water tank and crystallizer during stripping electroslag re-melting - Google Patents

Plugging method for bottom water tank and crystallizer during stripping electroslag re-melting Download PDF

Info

Publication number
CN103409641A
CN103409641A CN2013102991235A CN201310299123A CN103409641A CN 103409641 A CN103409641 A CN 103409641A CN 2013102991235 A CN2013102991235 A CN 2013102991235A CN 201310299123 A CN201310299123 A CN 201310299123A CN 103409641 A CN103409641 A CN 103409641A
Authority
CN
China
Prior art keywords
water tank
crystallizer
bottom water
plugging
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102991235A
Other languages
Chinese (zh)
Inventor
臧喜民
姜周华
刘福斌
陈旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Liaoning USTL
Original Assignee
University of Science and Technology Liaoning USTL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Liaoning USTL filed Critical University of Science and Technology Liaoning USTL
Priority to CN2013102991235A priority Critical patent/CN103409641A/en
Publication of CN103409641A publication Critical patent/CN103409641A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

本发明公开了一种抽锭电渣重熔中底水箱和结晶器的封堵方法,有效解决渣液或钢水漏出问题。本发明步骤包括:根据结晶器和底水箱侧面之间的缝隙,在底水箱侧面挖2-6层3-8mm深度和3-8mm宽度的凹槽;缠绕石棉绳,石棉绳半径与凹槽深度相等,长度与凹槽周长相等;将石棉绳镶嵌到底水箱侧面的凹槽内,用木板轻轻拍打紧实;将底水箱升高至结晶器内设定位置,封堵结束。本发明操作简单方便,可以节省封堵时间,并且提高生产效率。

Figure 201310299123

The invention discloses a plugging method for a mid-bottom water tank and a crystallizer in electroslag remelting of ingot drawing, which effectively solves the problem of leakage of liquid slag or molten steel. The steps of the invention include: according to the gap between the crystallizer and the side of the bottom water tank, digging 2-6 layers of grooves with a depth of 3-8 mm and a width of 3-8 mm on the side of the bottom water tank; winding asbestos ropes, the radius of the asbestos ropes and the depth of the grooves Equal, the length is equal to the circumference of the groove; insert the asbestos rope into the groove on the side of the bottom water tank, and gently beat it tightly with a wooden board; raise the bottom water tank to the set position in the crystallizer, and the plugging is completed. The invention is simple and convenient to operate, can save plugging time and improve production efficiency.

Figure 201310299123

Description

一种抽锭电渣重熔中底水箱和结晶器的封堵方法A plugging method for bottom water tank and crystallizer in electroslag remelting ingot drawing

技术领域technical field

本发明属于金属重熔技术领域,特别是一种抽锭电渣重熔中底水箱和结晶器的封堵方法。The invention belongs to the technical field of metal remelting, in particular to a plugging method for a mid-bottom water tank and a crystallizer of ingot-pulling electroslag remelting.

背景技术Background technique

抽锭电渣重熔与固定式电渣重熔工艺相比主要有两个优点,一是因采用T型结晶器技术,打破了固定式电渣重熔生产中填充比必须小于1?的规律,所生产钢锭长度增加到6m或9m,省去初轧和开坯工序直接进入精轧工序,降低生产成本;二是生产效率提高20%~30%,成材率提高5%~10%。Compared with the fixed electroslag remelting process, the ingot electroslag remelting has two main advantages. First, because of the use of T-type crystallizer technology, it breaks the requirement that the filling ratio in the fixed electroslag remelting production must be less than 1? According to the law, the length of the steel ingot produced is increased to 6m or 9m, eliminating the preliminary rolling and blanking process and directly entering the finishing rolling process, reducing production costs; second, the production efficiency is increased by 20% to 30%, and the yield is increased by 5% to 10%. .

固定电渣重熔过程中,在结晶器和底水箱之间安放石棉或钢板等填充物,然后用螺栓将结晶器和底水箱紧固。采用T型结晶器的抽锭电渣重熔过程中,要求底水箱必须升到距离大截面部分的底部150mm范围内才能正常生产,现有的封堵方式已不再适合。During the fixed electroslag remelting process, fillers such as asbestos or steel plates are placed between the crystallizer and the bottom water tank, and then the crystallizer and the bottom water tank are fastened with bolts. In the electroslag remelting process of ingot drawing using a T-shaped crystallizer, it is required that the bottom water tank must be raised to within 150mm from the bottom of the large section to be able to produce normally. The existing plugging method is no longer suitable.

查阅已公开的专利文献,发现两篇与本发明相关的文献:Check the published patent documents and find two documents related to the present invention:

1.中国专利公开(公告)号:CN101653818,公开了一种连铸堵引锭方法,其步骤是:一、检查引锭头部,引锭头的宽度小于结晶器的下口;二、填充楔型石棉板,先将结晶、引锭头的表面吹干;三、摆放钢条与钉屑a石棉堵紧;b在引锭头上面铺撒一层钉屑;本连铸堵引锭方法操作简单,缩短堵引锭时间安全性好。1. Chinese Patent Publication (Announcement) No.: CN101653818 discloses a method for blocking dummy ingots in continuous casting. The steps are: 1. Check the head of the dummy ingot. The width of the dummy head is smaller than the lower opening of the crystallizer; 2. Fill Wedge-shaped asbestos board, first dry the surface of crystallization and dummy head; 3. Place steel bars and nail chips a. The method is simple in operation, shortens the time for blocking the dummy spindle, and has good safety.

2.中国专利公开(公告)号:CN101745621A,公开了一种板坯连铸机引锭头的封堵方法,它的工艺过程特点是,用钢钎将纸绳封堵在引锭头与结晶器的缝隙中,将两块薄铁板放在钩头角部,用钉屑覆盖纸绳四周,在沟槽内最底层平放弹簧,然后向上立放弹簧;沟槽外其余部位均横放,相互间错位摆放。通过本方法进行封堵的引锭头内钢水填充状态良好,堵头与引锭头可靠连接,无起步脱钩或夹坯事故发生,消除起步漏钢现象,避免了重罐返回精炼,保证了现场正常生产节奏,提高了人员和设备的安全系数。2. Chinese Patent Publication (Announcement) No.: CN101745621A, which discloses a method for sealing dummy head of slab continuous casting machine. Place two thin iron plates at the corners of the hook head in the gap of the hook, cover the paper rope with nail shavings, place the spring at the bottom of the groove, and then place the spring upwards; place the rest of the groove horizontally, misaligned with each other. The filling state of molten steel in the dummy head plugged by this method is good, the plug is reliably connected to the dummy head, and there is no accident of decoupling or billet clamping at the start, eliminating the phenomenon of steel breakout at the start, avoiding the return of heavy tanks for refining, and ensuring the safety of the site. The normal production rhythm improves the safety factor of personnel and equipment.

在连铸工艺中利用石棉或纸浆封堵结晶器和引锭之间的缝隙,又在缝隙上方撒有铁屑进行吸收钢水热量,利于凝固同时保护封堵填充物,文献1和2是可行的,因为连铸中从钢水开始注入结晶器至开始拉坯一般时间不超过5min。抽锭电渣工艺与连铸工艺不同,从化渣至开始抽锭一般需要30~80min,按照文献1和2的封堵方法封堵,一般在化渣初期就会将充填物熔化,造成漏渣事故。所以,上述方法不适合抽锭电渣重熔工艺中结晶器和引锭之间的封堵。In the continuous casting process, asbestos or paper pulp is used to block the gap between the crystallizer and the dummy, and iron filings are sprinkled above the gap to absorb the heat of molten steel, which is beneficial to solidification and protects the plugging filler. Documents 1 and 2 are feasible. , because in continuous casting, the time from the injection of molten steel into the crystallizer to the start of casting generally does not exceed 5 minutes. The ingot electroslag extraction process is different from the continuous casting process. It generally takes 30 to 80 minutes from the slag melting to the start of ingot extraction. According to the plugging method of literature 1 and 2, the filling material will be melted in the early stage of slag melting, resulting in slag leakage. ACCIDENT. Therefore, the above method is not suitable for the plugging between the crystallizer and the dummy ingot in the electroslag remelting process of ingot drawing.

发明内容Contents of the invention

本发明提供了一种抽锭电渣重熔中底水箱和结晶器的封堵方法,有效解决渣液或钢水漏出问题。The invention provides a plugging method for a bottom water tank and a crystallizer in electroslag remelting ingot drawing, which effectively solves the problem of leakage of liquid slag or molten steel.

本发明提供的一种抽锭电渣重熔中底水箱和结晶器的封堵方法,包括以下步骤:The present invention provides a plugging method for the mid-bottom water tank and crystallizer of ingot drawing electroslag remelting, comprising the following steps:

a.根据结晶器和底水箱侧面之间的缝隙,在底水箱侧面挖2-6层3-8mm深度和3-8mm宽度的凹槽;a. According to the gap between the crystallizer and the side of the bottom water tank, dig 2-6 layers of grooves with a depth of 3-8mm and a width of 3-8mm on the side of the bottom water tank;

b.缠绕石棉绳,石棉绳半径与凹槽深度相等,长度与凹槽周长相等;b. Winding asbestos rope, the radius of the asbestos rope is equal to the depth of the groove, and the length is equal to the circumference of the groove;

c.将石棉绳镶嵌到底水箱侧面的凹槽内,用木板轻轻拍打紧实;c. Insert the asbestos rope into the groove on the side of the bottom water tank, and gently tap it tightly with a wooden board;

d.将底水箱升高至结晶器内设定位置,封堵结束。d. Raise the bottom water tank to the set position in the crystallizer, and the plugging is completed.

本发明与现有同类技术相比,其显著的有益效果体现在:Compared with existing similar technologies, the present invention has remarkable beneficial effects embodied in:

本发明利用结晶器铜板的冷却作用保护石棉不被熔化。在化渣初期,将有渣液流入结晶器和引锭之间的缝隙,由于结晶器和引锭都有强水冷作用,渣液很快就会凝固,缝隙中凝固的渣壳也将变为封堵的填充物,即使有钢水冲破第一层石棉绳,由于结晶器和底水箱都有很大的冷却强度,而且它们之间的缝隙一般在2至5mm,钢水温度会急剧下降,就不会冲破第二层石棉绳。这样就是实现了封堵的目的。本发明操作简单方便,可以节省封堵时间,并且提高生产效率。The invention utilizes the cooling effect of the crystallizer copper plate to protect the asbestos from being melted. In the initial stage of slag melting, slag liquid will flow into the gap between the crystallizer and the dummy ingot. Due to the strong water cooling effect of the mold and dummy ingot, the slag liquid will solidify soon, and the solidified slag shell in the gap will also become For the plugged filler, even if the molten steel breaks through the first layer of asbestos rope, since the crystallizer and the bottom water tank have great cooling strength, and the gap between them is generally 2 to 5mm, the temperature of the molten steel will drop sharply, and there will be no Will break through the second layer of asbestos rope. This is to achieve the purpose of blocking. The invention is simple and convenient to operate, can save plugging time and improve production efficiency.

附图说明Description of drawings

图1是一种抽锭电渣重熔中底水箱和结晶器的封堵方法封堵准备阶段结构示意图。Fig. 1 is a schematic diagram of the plugging preparation stage structure of a method for plugging the bottom water tank and crystallizer of electroslag remelting ingot drawing.

图2是一种抽锭电渣重熔中底水箱和结晶器的封堵方法封堵结构示意图。Fig. 2 is a schematic diagram of the plugging structure of a plugging method for the bottom water tank and the crystallizer of electroslag remelting ingot drawing.

图中:1.底水箱,2.石棉绳,3.结晶器,4.熔渣,5.电极。In the figure: 1. Bottom water tank, 2. Asbestos rope, 3. Crystallizer, 4. Slag, 5. Electrode.

具体实施方式Detailed ways

下面结合附图,用实施例具体描述本发明。Below in conjunction with accompanying drawing, describe the present invention with embodiment.

实施例1Example 1

如图1、图2所示,一种抽锭电渣重熔中底水箱和结晶器的封堵结构包括:T型结晶器3上口尺寸800×800×200mm,下口600×600×300mm;熔渣4渣量为400kg;电极5为600×600×3000mm;底水箱1为594×594×150mm,凹槽深度3mm,凹槽宽度3mm,3层;石棉绳2为Φ6×2400mm,3根。As shown in Figure 1 and Figure 2, a plugging structure for the bottom water tank and crystallizer of electroslag remelting ingot drawing includes: T-shaped crystallizer 3 The size of the upper opening is 800×800×200mm, and the lower opening is 600×600×300mm The amount of slag 4 is 400kg; the electrode 5 is 600×600×3000mm; the bottom water tank 1 is 594×594×150mm, the groove depth is 3mm, the groove width is 3mm, 3 layers; the asbestos rope 2 is Φ6×2400mm, 3 root.

一种抽锭电渣重熔中底水箱和结晶器的封堵方法,按如下步骤进行:A method for plugging the mid-bottom water tank and crystallizer of electroslag remelting ingot drawing is carried out according to the following steps:

1.将石棉绳2镶嵌到底水箱1的凹槽内,用木板轻轻拍打紧实;1. Insert the asbestos rope 2 into the groove of the bottom water tank 1, and gently pat it tightly with a wooden board;

2.将镶嵌有石棉绳的底水箱升至距离结晶器上口300mm位置,封堵结束。2. Raise the bottom water tank inlaid with asbestos rope to a position 300mm away from the upper mouth of the crystallizer, and the plugging is completed.

实施例2Example 2

如图1、图2所示,一种抽锭电渣重熔中底水箱和结晶器的封堵结构包括:结晶器3为Φ1000×700mm;熔渣4渣量为600kg;电极5为Φ700×3000mm;底水箱1为Φ992×180mm,凹槽深度4mm,凹槽宽度8mm,4层;石棉绳2为Φ8×3140mm,4根。As shown in Figure 1 and Figure 2, a plugging structure of the bottom water tank and crystallizer in the electroslag remelting of ingot drawing includes: the crystallizer 3 is Φ1000×700mm; the slag 4 is 600kg; the electrode 5 is Φ700× 3000mm; bottom water tank 1 is Φ992×180mm, groove depth 4mm, groove width 8mm, 4 layers; asbestos rope 2 is Φ8×3140mm, 4 pieces.

一种抽锭电渣重熔中底水箱和结晶器的封堵方法,具体的封堵工作过程,按如下步骤进行:A method for plugging the mid-bottom water tank and crystallizer of electroslag remelting ingot drawing, and the specific plugging process is carried out according to the following steps:

1.将石棉绳2镶嵌到底水箱1的凹槽内,用木板轻轻拍打紧实;1. Insert the asbestos rope 2 into the groove of the bottom water tank 1, and gently pat it tightly with a wooden board;

2.将镶嵌有石棉绳的底水箱升至距离结晶器上口550mm位置,封堵结束。2. Raise the bottom water tank inlaid with asbestos rope to a position 550mm away from the upper mouth of the crystallizer, and the plugging is completed.

实施例3Example 3

如图1、图2所示,一种抽锭电渣重熔中底水箱和结晶器的封堵结构包括:生产空心锭结晶器3,外结晶器为Φ1200×800mm,内结晶器为Φ400×650mm;熔渣4渣量为700kg;电极5为Φ300×3000mm×10支;底水箱1外圆为Φ1192/内孔Φ792×120mm,内外凹槽深度均为4mm,凹槽宽度均为8mm,5层;石棉绳2为Φ8×3760mm,4根,Φ8×2510mm,4根。As shown in Figure 1 and Figure 2, a plugging structure for the bottom water tank and crystallizer of electroslag remelting ingot pumping includes: a hollow ingot crystallizer 3 is produced, the outer crystallizer is Φ1200×800mm, and the inner mold is Φ400× 650mm; the amount of slag 4 is 700kg; the electrode 5 is Φ300×3000mm×10; the outer circle of the bottom water tank 1 is Φ1192/inner hole Φ792×120mm, the depth of the inner and outer grooves is 4mm, and the width of the groove is 8mm, 5 layer; asbestos rope 2 is Φ8×3760mm, 4 pieces, Φ8×2510mm, 4 pieces.

一种抽锭电渣重熔中底水箱和结晶器的封堵方法,具体的封堵工作过程,按如下步骤进行:A method for plugging the mid-bottom water tank and crystallizer of electroslag remelting ingot drawing, and the specific plugging process is carried out according to the following steps:

1.将石棉绳2分别镶嵌到底水箱1的内外凹槽内,用木板轻轻拍打紧实;1. Insert the asbestos rope 2 into the inner and outer grooves of the bottom water tank 1 respectively, and lightly pat it tightly with a wooden board;

2.将镶嵌有石棉绳的底水箱升至距离结晶器上口500mm位置,封堵结束。2. Raise the bottom water tank inlaid with asbestos rope to a position 500mm away from the upper mouth of the crystallizer, and the plugging is completed.

Claims (1)

1. the method for blocking of end water tank and crystallizer in a stripping esr is characterized in that the method comprises the following steps:
A. according to the gap between crystallizer and water tank side, the end, in water tank side, the end, dig the groove of the 2-6 layer 3-8mm degree of depth and 3-8mm width;
B. be wound around asbestos twine, the asbestos twine radius equates with depth of groove, and length equates with the groove girth;
C. asbestos twine is mounted in the groove of water tank side, the end, with plank chucked consolidation;
D. end water tank is increased to desired location in crystallizer, shutoff finishes.
CN2013102991235A 2013-07-16 2013-07-16 Plugging method for bottom water tank and crystallizer during stripping electroslag re-melting Pending CN103409641A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102991235A CN103409641A (en) 2013-07-16 2013-07-16 Plugging method for bottom water tank and crystallizer during stripping electroslag re-melting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102991235A CN103409641A (en) 2013-07-16 2013-07-16 Plugging method for bottom water tank and crystallizer during stripping electroslag re-melting

Publications (1)

Publication Number Publication Date
CN103409641A true CN103409641A (en) 2013-11-27

Family

ID=49602681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102991235A Pending CN103409641A (en) 2013-07-16 2013-07-16 Plugging method for bottom water tank and crystallizer during stripping electroslag re-melting

Country Status (1)

Country Link
CN (1) CN103409641A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106862537A (en) * 2017-02-20 2017-06-20 潍坊市众诚佳合环保科技股份有限公司 The manufacture craft of gooseneck electroslag casting process and crystallizer

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1857828A (en) * 2006-05-19 2006-11-08 苏州有色金属加工研究院 Continuously lubricating crystallizer for semi-continuous casting of aluminium and aluminium alloy
CN200996038Y (en) * 2007-01-18 2007-12-26 东北大学 Sealing protecter during electroslag remelting process
CN201273584Y (en) * 2008-09-13 2009-07-15 任二平 Sealing door of boiler
CN101774008A (en) * 2010-02-19 2010-07-14 南通爱尔思轻合金精密成型有限公司 Sealing method for low-pressure casting
CN101780359A (en) * 2009-11-23 2010-07-21 安吉县盛丰玻璃纤维有限公司 Sealing ring of filter bag opening of dust remover and manufacturing method thereof
CN201621937U (en) * 2010-03-10 2010-11-03 河南农业大学 Furnace door of intensive barn
CN201875307U (en) * 2010-12-13 2011-06-22 中国船舶重工集团公司第七�三研究所 Square shoulder joint being suitable for O-shaped ring seal
CN102294445A (en) * 2011-08-17 2011-12-28 中国科学院金属研究所 Auxiliary semi-continuous casting crystallizer for low-frequency pulsed magnetic field of magnesium alloy and application thereof
CN102847925A (en) * 2012-10-12 2013-01-02 青铜峡铝业股份有限公司 Raw aluminum liquid extraction device
CN102847895A (en) * 2012-09-17 2013-01-02 中天钢铁集团有限公司 Ingot guide device for steelmaking continuous casting technique and ingot guide method thereof
CN103074089A (en) * 2011-10-25 2013-05-01 山西沁新能源集团股份有限公司 Upper furnace door of clean heat recovery coke oven
CN103130519A (en) * 2013-03-15 2013-06-05 金川集团股份有限公司 Material for sealing electroslag furnace crystallizer and bottom water box and preparation method thereof

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1857828A (en) * 2006-05-19 2006-11-08 苏州有色金属加工研究院 Continuously lubricating crystallizer for semi-continuous casting of aluminium and aluminium alloy
CN200996038Y (en) * 2007-01-18 2007-12-26 东北大学 Sealing protecter during electroslag remelting process
CN201273584Y (en) * 2008-09-13 2009-07-15 任二平 Sealing door of boiler
CN101780359A (en) * 2009-11-23 2010-07-21 安吉县盛丰玻璃纤维有限公司 Sealing ring of filter bag opening of dust remover and manufacturing method thereof
CN101774008A (en) * 2010-02-19 2010-07-14 南通爱尔思轻合金精密成型有限公司 Sealing method for low-pressure casting
CN201621937U (en) * 2010-03-10 2010-11-03 河南农业大学 Furnace door of intensive barn
CN201875307U (en) * 2010-12-13 2011-06-22 中国船舶重工集团公司第七�三研究所 Square shoulder joint being suitable for O-shaped ring seal
CN102294445A (en) * 2011-08-17 2011-12-28 中国科学院金属研究所 Auxiliary semi-continuous casting crystallizer for low-frequency pulsed magnetic field of magnesium alloy and application thereof
CN103074089A (en) * 2011-10-25 2013-05-01 山西沁新能源集团股份有限公司 Upper furnace door of clean heat recovery coke oven
CN102847895A (en) * 2012-09-17 2013-01-02 中天钢铁集团有限公司 Ingot guide device for steelmaking continuous casting technique and ingot guide method thereof
CN102847925A (en) * 2012-10-12 2013-01-02 青铜峡铝业股份有限公司 Raw aluminum liquid extraction device
CN103130519A (en) * 2013-03-15 2013-06-05 金川集团股份有限公司 Material for sealing electroslag furnace crystallizer and bottom water box and preparation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106862537A (en) * 2017-02-20 2017-06-20 潍坊市众诚佳合环保科技股份有限公司 The manufacture craft of gooseneck electroslag casting process and crystallizer

Similar Documents

Publication Publication Date Title
CN104259441B (en) Method for casting large-sized steel ingot with internally arranged cold core and top arranged electromagnetic field
CN101745621A (en) Method for plugging dummy bar head of slab caster
CN103537483B (en) A kind of preparation method of Copper-Aluminum compound strip and complex plate strip casting apparatus
CN110523944B (en) Casting method and device for billet continuous casting machine
CN101905295A (en) A Continuous Casting Mold Device Using Ultrasonic Vibration
CN102847895A (en) Ingot guide device for steelmaking continuous casting technique and ingot guide method thereof
CN102029378A (en) Method for manufacturing super-thick super-huge single steel ingot
CN104493112B (en) Steel ingot casting mold and casting method
CN103409641A (en) Plugging method for bottom water tank and crystallizer during stripping electroslag re-melting
EP2656946A1 (en) Method for enhancing self-feeding ability of heavy section casting blank
CN202804119U (en) Ingot pulling-out device for steel-making continuous-casting process
CN104249142B (en) The pressure casting processes of the sublimate homogeneous densification big strand of grain refining iron and steel
CN102773442A (en) Cast-on method for continuously casting half-rimmed steel
CN208083396U (en) A kind of semi-continuous casting device inhibiting magnesium alloy ingot blank cracking
CN107812904B (en) multi-metal step-type composite casting device and method
CN205043101U (en) Quick cooling device of aluminium ingot
CN207119752U (en) For the system of risers of 358 sprocket wheels
CN206716981U (en) Copper plate of crystallizer seal protecting device
CN115055655A (en) A pouring device and method for large-sized continuous casting round billets
CN205008554U (en) High -efficient portable stalk
CN208214287U (en) A kind of efficient casting system
CN201313163Y (en) A plugging structure for dummy head of slab continuous casting machine
CN113477895A (en) Casting starting device for small continuous casting square billet crystallizer and construction method
CN110385409B (en) Starting method for continuous casting of square billet
CN101987355A (en) Aluminium liquid casting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131127