CN103352429A - 托架反拉加载预压装置及其张拉预压方法 - Google Patents

托架反拉加载预压装置及其张拉预压方法 Download PDF

Info

Publication number
CN103352429A
CN103352429A CN201310293002XA CN201310293002A CN103352429A CN 103352429 A CN103352429 A CN 103352429A CN 201310293002X A CN201310293002X A CN 201310293002XA CN 201310293002 A CN201310293002 A CN 201310293002A CN 103352429 A CN103352429 A CN 103352429A
Authority
CN
China
Prior art keywords
carriage
stretch
anchor system
steel
draw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310293002XA
Other languages
English (en)
Other versions
CN103352429B (zh
Inventor
赵�智
谢录杲
黄再洪
秦瑞谦
王智勇
马文荣
闫生平
夏凤泉
刘薇
罗坤强
贺明明
杨林益
张军
宋桃红
顾福剑
陈正彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 8 Engineering Group Co Ltd
Original Assignee
China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 8 Engineering Group Co Ltd filed Critical China Railway No 8 Engineering Group Co Ltd
Priority to CN201310293002.XA priority Critical patent/CN103352429B/zh
Publication of CN103352429A publication Critical patent/CN103352429A/zh
Application granted granted Critical
Publication of CN103352429B publication Critical patent/CN103352429B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种托架反拉加载预压装置及其张拉预压方法,属于桥梁技术领域,由放置于托架上的上锚系统,位于所述上锚系统下方的下锚系统,连接所述上、下锚系统的钢绞线束和张拉千斤顶组成,所述上锚系统由在所述托架顶部放置的若干根分配横梁,在所述分配横梁顶部放置的至少两加强纵梁,在所述加强纵梁顶部放置的一加强横梁,以及安装在所述加强横梁和加强纵梁相交处加强横梁顶面的所述张拉千斤顶组成;所述下锚系统由若干组连接柱,连接所述钢绞线束和各组连接柱的双拼工字钢梁,以及锚垫板组成,所述钢绞线束另一端固定于所述张拉千斤顶上。本发明是一种快速、有效、适用的托架反拉加载预压装置及其张拉预压方法。

Description

托架反拉加载预压装置及其张拉预压方法
技术领域
本发明属于桥梁技术领域。
背景技术
预应力混凝土连续梁施工一般采用搭设满堂脚手架立模或是采用挂篮悬臂灌注。当桥墩较高或是桥下无法搭设脚手架时只能采用挂篮悬臂浇筑施工。挂篮施工前提是必须在桥墩上施工完毕0#节段,而0#节段施工一般是通过在墩顶预埋预埋件,安装托架承担0#节段悬臂段的荷载同时提供施工作业空间。
托架及挂篮搭设完毕后正式启用前需对托架和挂篮进行预压,以检测托架和挂篮的安全性、弹性变形和非弹性变形。常规的托架预压为堆载预压,堆载材料常用混凝土预制块、钢材、水箱加水、水袋加水、麻袋装砂等,在堆载预压过程中,需要对大量的预压块(或钢材)进行转运、吊装、卸载工作,工作量较大,费用高,时间长。
发明内容
本发明的目的在于:提出一种快速、有效、适用的托架反拉加载预压装置及其张拉预压方法。
本发明目的通过下述技术方案来实现:
一种托架反拉加载预压装置,由放置于托架上的上锚系统,位于所述上锚系统下方的下锚系统,连接所述上、下锚系统的钢绞线束和张拉千斤顶组成,所述下锚系统为锚固端,上锚系统为张拉端,所述上锚系统由在所述托架顶部放置的若干根分配横梁,在所述分配横梁顶部放置的至少两加强纵梁,在所述加强纵梁顶部放置的一加强横梁,以及安装在所述加强横梁和加强纵梁相交处加强横梁顶面的所述张拉千斤顶组成;所述下锚系统由预埋在承台内、每2根为一组的若干组连接柱,连接所述钢绞线束和各组连接柱的双拼工字钢梁,以及将该钢绞线束一端固定于所述双拼工字钢梁上的锚垫板组成,所述钢绞线束另一端固定于所述张拉千斤顶上。
作为优选方式,所述连接柱为8根Ф32mm精轧螺纹钢,所述双拼工字钢梁为Ⅰ40c工字钢,所述分配横梁为10根Ⅰ32b工字钢,其中所述张拉千斤顶张拉处的4根间距为20cm等间距放置,其余间距为60cm等间距放置,所述加强纵梁为2根Ⅰ40c工字钢,所述加强横梁为Ⅰ32b工字钢。
一种前述托架反拉加载预压装置的张拉预压方法,由以下步骤组成:
第一步,浇筑桥墩承台混凝土前,按照千斤顶在承台上的投影位置在承台内大小里程端预埋好连接柱,然后浇筑桥墩承台混凝土;
第二步,桥墩浇筑至墩顶时,在桥墩大小里程端预埋加强钢板、预留横穿精轧螺纹钢预留孔;
第三步,在桥墩墩顶预留孔内穿上精轧螺纹钢,将托架逐榀安装至预留孔位,托架安装完毕后逐榀对托架、精轧螺纹钢对称进行张拉锚固;
第四步,托架锚固后,在每两榀托架上下主梁间水平焊接斜撑将托架焊接固定,使托架形成整体;
第五步,在托架顶部安放分配横梁,然后在分配横梁顶部安放至少两加强纵梁,接着在加强纵梁顶部安放一加强横梁;
第六步,将双拼工字钢梁安装在承台预埋各组连接柱上,锚固前连接柱需进行张拉;
第七步,在地面切割好钢绞线束,将钢绞线束一端吊运至张拉千斤顶处,钢绞线束另一端通过锚垫板锚固于双拼工字钢梁底部;
第八步,将张拉千斤顶安放至加强横梁和加强纵梁相交处加强横梁顶面,钢绞线束上端穿过千斤顶进行分级张拉,张拉时每桥墩大小里程侧同时进行。
本发明的有益效果:采用本发明对托架进行张拉预压,可大大节约托架预压时间,降低安全风险,减少劳动强度,节约预压成本,张拉设备可重复利用。
附图说明
图1是本发明实施例的正立面图;
图2是本发明实施例的上锚体系平面图;
图3是本发明实施例的上锚体系侧立面图;
图4是本发明实施例的上锚体系正立面图;
图5是本发明实施例的下锚体系的精轧螺纹钢布置平面图;
其中1为托架、2为钢绞线束、3为张拉千斤顶、4为分配横梁、5为加强纵梁、6为加强横梁、7为承台、8为双拼工字钢梁、9为锚垫板、10为精轧螺纹钢、11为桥墩、101为上主梁、102为下主梁、103为水平斜撑。
具体实施方式
下列非限制性实施例用于说明本发明。
如图1至5所示,一种托架反拉加载预压装置,由放置于托架1上的上锚系统,位于上锚系统下方的下锚系统,连接上、下锚系统的钢绞线束2和张拉千斤顶3组成,下锚系统为锚固端,上锚系统为张拉端,上锚系统由在托架1顶部放置的若干根分配横梁4,在分配横梁4顶部放置的至少两加强纵梁5,在加强纵梁5顶部放置的一加强横梁6,以及安装在加强横梁6和加强纵梁5相交处加强横梁6顶面的张拉千斤顶3组成;下锚系统由预埋在承台7内、每2根为一组的若干组连接柱,连接钢绞线束2和各组连接柱的双拼工字钢梁8,以及将该钢绞线束2一端固定于双拼工字钢梁8上的锚垫板9组成,钢绞线束2另一端固定于张拉千斤顶3上。作为优选方式,如本实施例所示,连接柱为8根Ф32mm精轧螺纹钢10,双拼工字钢梁8为Ⅰ40c工字钢,分配横梁4为10根Ⅰ32b工字钢,其中张拉千斤顶3张拉处的4根间距为20cm等间距放置,其余间距为60cm等间距放置,加强纵梁5为2根Ⅰ40c工字钢,加强横梁6为Ⅰ32b工字钢。
一种前述托架反拉加载预压装置的张拉预压方法,由以下步骤组成: 
第一步,浇筑桥墩11承台7混凝土前,按照千斤顶在承台上的投影位置在承台7内大小里程端预埋好8根(共4组,每2根为1组)精轧螺纹钢10,然后浇筑桥墩11承台7混凝土。
第二步,桥墩11浇筑至墩顶时,在桥墩11大小里程端预埋加强钢板、预留横穿精轧螺纹钢预留孔。
第三步,在桥墩11墩顶预留孔内穿上精轧螺纹钢,将托架1逐榀安装至预留孔位,托架1安装完毕后逐榀对托架1精轧螺纹钢对称进行张拉锚固。
第四步,托架1锚固后,在每两榀托架1上下主梁21、22间水平焊接斜撑23将托架1焊接固定,使托架1形成整体(托架1主要由上、下主梁101、102和水平斜撑103组成)。
第五步,在托架1顶部等间距(间距为60cm)安放6根分配横梁4(Ⅰ32b工字钢),千斤顶张拉处4根分配横梁4加密(间距为20cm),然后在分配横梁4顶部千斤顶张拉处安放两加强纵梁5(Ⅰ40c工字钢),接着在两加强纵梁5顶部千斤顶张拉处安放一加强横梁6(Ⅰ32b工字钢)。
第六步,将双拼工字钢梁8(Ⅰ40c工字钢)安装在承台预埋精轧螺纹钢10上,锚固前精轧螺纹钢10需进行张拉。
第七步,在地面切割好钢绞线束,将钢绞线束一端吊运至张拉千斤顶处,钢绞线束另一端通过锚垫板锚固于双拼工字钢梁底部。
第八步,将张拉千斤顶3安放至加强横梁6(Ⅰ32b工字钢)顶部张拉处(加强横梁6上和加强纵梁5相交处),钢绞线束2上端穿过张拉千斤顶3进行分级张拉,张拉时每桥墩大小里程侧同时进行。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。

Claims (3)

1.一种托架反拉加载预压装置,其特征在于:由放置于托架上的上锚系统,位于所述上锚系统下方的下锚系统,连接所述上、下锚系统的钢绞线束和张拉千斤顶组成,所述下锚系统为锚固端,上锚系统为张拉端,所述上锚系统由在所述托架顶部放置的若干根分配横梁,在所述分配横梁顶部放置的至少两加强纵梁,在所述加强纵梁顶部放置的一加强横梁,以及安装在所述加强横梁和加强纵梁相交处加强横梁顶面的所述张拉千斤顶组成;所述下锚系统由预埋在承台内、每2根为一组的若干组连接柱,连接所述钢绞线束和各组连接柱的双拼工字钢梁,以及将该钢绞线束一端固定于所述双拼工字钢梁上的锚垫板组成,所述钢绞线束另一端固定于所述张拉千斤顶上。
2.如权利要求1所述的托架反拉加载预压装置,其特征在于:所述连接柱为8根Ф32mm精轧螺纹钢,所述双拼工字钢梁为Ⅰ40c工字钢,所述分配横梁为10根Ⅰ32b工字钢,其中所述张拉千斤顶张拉处的4根间距为20cm等间距放置,其余间距为60cm等间距放置,所述加强纵梁为2根Ⅰ40c工字钢,所述加强横梁为Ⅰ32b工字钢。
3.一种权利要求1或2所述的托架反拉加载预压装置的张拉预压方法,其特征在于由以下步骤组成:
第一步,浇筑桥墩承台混凝土前,按照千斤顶在承台上的投影位置在承台内大小里程端预埋好连接柱,然后浇筑桥墩承台混凝土;
第二步,桥墩浇筑至墩顶时,在桥墩大小里程端预埋加强钢板、预留横穿精轧螺纹钢预留孔;
第三步,在桥墩墩顶预留孔内穿上精轧螺纹钢,将托架逐榀安装至预留孔位,托架安装完毕后逐榀对托架、精轧螺纹钢对称进行张拉锚固;
第四步,托架锚固后,在每两榀托架上下主梁间水平焊接斜撑将托架焊接固定,使托架形成整体;
第五步,在托架顶部安放分配横梁,然后在分配横梁顶部安放至少两加强纵梁,接着在加强纵梁顶部安放一加强横梁;
第六步,将双拼工字钢梁安装在承台预埋各组连接柱上,锚固前连接柱需进行张拉;
第七步,在地面切割好钢绞线束,将钢绞线束一端吊运至张拉千斤顶处,钢绞线束另一端通过锚垫板锚固于双拼工字钢梁底部;
第八步,将张拉千斤顶安放至加强横梁和加强纵梁相交处加强横梁顶面,钢绞线束上端穿过千斤顶进行分级张拉,张拉时每桥墩大小里程侧同时进行。
CN201310293002.XA 2013-07-12 2013-07-12 托架反拉加载预压装置的张拉预压方法 Active CN103352429B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310293002.XA CN103352429B (zh) 2013-07-12 2013-07-12 托架反拉加载预压装置的张拉预压方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310293002.XA CN103352429B (zh) 2013-07-12 2013-07-12 托架反拉加载预压装置的张拉预压方法

Publications (2)

Publication Number Publication Date
CN103352429A true CN103352429A (zh) 2013-10-16
CN103352429B CN103352429B (zh) 2015-09-09

Family

ID=49308837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310293002.XA Active CN103352429B (zh) 2013-07-12 2013-07-12 托架反拉加载预压装置的张拉预压方法

Country Status (1)

Country Link
CN (1) CN103352429B (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104764618A (zh) * 2015-03-19 2015-07-08 重庆交通建设(集团)有限责任公司 一种桥梁悬臂浇筑挂篮可控等效预压荷载试验方法
CN107227687A (zh) * 2017-06-09 2017-10-03 中铁建大桥工程局集团第五工程有限公司 平衡力系高空横梁托架施工方法
CN108193605A (zh) * 2018-02-24 2018-06-22 中交路桥建设有限公司 水中连续梁桥墩0号块托架预压结构
CN108442357A (zh) * 2018-05-16 2018-08-24 浙江大学城市学院 一种预应力锚索联合排水板预压装置及地基处理方法
CN108489748A (zh) * 2018-03-23 2018-09-04 西安建筑科技大学 一种用于连续梁桥长周期交变加载的试验装置与试验方法
CN108827683A (zh) * 2018-07-20 2018-11-16 中国水利水电第七工程局有限公司 一种桥梁支架反拉预压机构及其预压检测方法
CN109208488A (zh) * 2018-10-24 2019-01-15 中国水利水电第八工程局有限公司 一种高空组合压重的高桥墩预压装置及其施工方法
CN110387829A (zh) * 2019-08-14 2019-10-29 四川路桥华东建设有限责任公司 大型横梁支架通过多点锚固张拉法进行预压的系统及操作方法
CN110578288A (zh) * 2019-08-28 2019-12-17 中铁大桥局集团有限公司 一种钢-混结合梁体系转换装置及钢梁压重方法
CN111622091A (zh) * 2020-05-27 2020-09-04 中铁北京工程局集团第一工程有限公司 一种预制桥墩的受力试验方法
CN112095435A (zh) * 2020-09-27 2020-12-18 广州市第二市政工程有限公司 一种大跨度钢拱架预压的施工方法
CN113235443A (zh) * 2021-05-20 2021-08-10 广西路桥工程集团有限公司 一种装配式0#块施工托架的预压施工方法
CN113737653A (zh) * 2021-08-11 2021-12-03 广东水电二局股份有限公司 一种承重支架的预压装置及其使用方法
CN114687298A (zh) * 2022-03-31 2022-07-01 中交路桥华南工程有限公司 超高竖向临时锚固结构及其施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000199208A (ja) * 1998-10-26 2000-07-18 Sumitomo Rubber Ind Ltd 版状コンクリ―ト構造体の補強方法
CN101672018A (zh) * 2009-08-27 2010-03-17 孙广喜 无轨走行式桁架挂篮
CN102286925A (zh) * 2011-07-08 2011-12-21 四川路航建设工程有限责任公司 桥梁独柱墩组拼箱形托架系统及其安装方法
CN203373666U (zh) * 2013-07-12 2014-01-01 中铁八局集团有限公司 托架反拉加载预压装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000199208A (ja) * 1998-10-26 2000-07-18 Sumitomo Rubber Ind Ltd 版状コンクリ―ト構造体の補強方法
CN101672018A (zh) * 2009-08-27 2010-03-17 孙广喜 无轨走行式桁架挂篮
CN102286925A (zh) * 2011-07-08 2011-12-21 四川路航建设工程有限责任公司 桥梁独柱墩组拼箱形托架系统及其安装方法
CN203373666U (zh) * 2013-07-12 2014-01-01 中铁八局集团有限公司 托架反拉加载预压装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐天爱: ""高桥墩托架及挂篮千斤顶张拉预压施工技术"", 《民营科技》 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104764618B (zh) * 2015-03-19 2017-11-21 重庆交通建设(集团)有限责任公司 一种桥梁悬臂浇筑挂篮可控等效预压荷载试验方法
CN104764618A (zh) * 2015-03-19 2015-07-08 重庆交通建设(集团)有限责任公司 一种桥梁悬臂浇筑挂篮可控等效预压荷载试验方法
CN107227687A (zh) * 2017-06-09 2017-10-03 中铁建大桥工程局集团第五工程有限公司 平衡力系高空横梁托架施工方法
CN108193605A (zh) * 2018-02-24 2018-06-22 中交路桥建设有限公司 水中连续梁桥墩0号块托架预压结构
CN108489748A (zh) * 2018-03-23 2018-09-04 西安建筑科技大学 一种用于连续梁桥长周期交变加载的试验装置与试验方法
CN108489748B (zh) * 2018-03-23 2019-11-12 西安建筑科技大学 一种用于连续梁桥长周期交变加载的试验装置与试验方法
CN108442357A (zh) * 2018-05-16 2018-08-24 浙江大学城市学院 一种预应力锚索联合排水板预压装置及地基处理方法
CN108827683A (zh) * 2018-07-20 2018-11-16 中国水利水电第七工程局有限公司 一种桥梁支架反拉预压机构及其预压检测方法
CN109208488B (zh) * 2018-10-24 2021-01-15 中国水利水电第八工程局有限公司 一种高空组合压重的高桥墩预压装置及其施工方法
CN109208488A (zh) * 2018-10-24 2019-01-15 中国水利水电第八工程局有限公司 一种高空组合压重的高桥墩预压装置及其施工方法
CN110387829A (zh) * 2019-08-14 2019-10-29 四川路桥华东建设有限责任公司 大型横梁支架通过多点锚固张拉法进行预压的系统及操作方法
CN110578288A (zh) * 2019-08-28 2019-12-17 中铁大桥局集团有限公司 一种钢-混结合梁体系转换装置及钢梁压重方法
CN111622091A (zh) * 2020-05-27 2020-09-04 中铁北京工程局集团第一工程有限公司 一种预制桥墩的受力试验方法
CN112095435A (zh) * 2020-09-27 2020-12-18 广州市第二市政工程有限公司 一种大跨度钢拱架预压的施工方法
CN113235443A (zh) * 2021-05-20 2021-08-10 广西路桥工程集团有限公司 一种装配式0#块施工托架的预压施工方法
CN113737653A (zh) * 2021-08-11 2021-12-03 广东水电二局股份有限公司 一种承重支架的预压装置及其使用方法
CN114687298A (zh) * 2022-03-31 2022-07-01 中交路桥华南工程有限公司 超高竖向临时锚固结构及其施工方法
CN114687298B (zh) * 2022-03-31 2023-10-20 中交路桥华南工程有限公司 超高竖向临时锚固结构及其施工方法

Also Published As

Publication number Publication date
CN103352429B (zh) 2015-09-09

Similar Documents

Publication Publication Date Title
CN103352429B (zh) 托架反拉加载预压装置的张拉预压方法
CN102493360B (zh) 钢筋混凝土拱桥施工方法
CN102051858B (zh) 一种千斤顶加载三角桁架挂篮以及荷载试验施工方法
CN203546626U (zh) 钢管混凝土拱桥吊杆更换装置
CN104452597B (zh) 水中墩超长预应力盖梁施工支撑体系
CN203923924U (zh) 0号段托架预压装置
CN106677070A (zh) 一种高空大跨度重载横梁施工支架及施工方法
CN203229874U (zh) 一种可重复使用的简支梁现浇支架体系
CN104404887B (zh) 一种大跨度钢管拱桥无支架吊装工艺
CN102605717A (zh) 墩顶纵向支撑膺架法
CN104846750B (zh) 一种带缝预应力摩擦型抱柱梁托换方法
CN203373666U (zh) 托架反拉加载预压装置
CN110468713B (zh) 一种兼作墩柱模板及预应力支撑的两用装置及其施工方法
CN105714692A (zh) 一种悬臂浇筑梁钢管混凝土临时固结系统
CN105484164A (zh) 一种跨式贝雷梁支架及其施工方法
CN101122115A (zh) 一种塔吊移位的施工方法
CN104562944B (zh) 大跨径叠合梁斜拉桥边钢箱临时锚固体系
CN103938871B (zh) 一种采用钢筋混凝土环梁节点的钢管混凝土柱有粘结预应力框架梁结构的施工方法
CN203188130U (zh) 预应力反张拉预压牛腿式鹰架支撑装置
CN212479255U (zh) 一种用于悬索桥隧道锚锚室拱顶二衬施工设备
CN201908429U (zh) 装配整体式建筑悬挑卸料平台
CN204183710U (zh) 一种先张法制作预应力梁的张拉台座
CN208201663U (zh) 连续刚构桥箱梁0#块无牛腿现浇支架重叠梁
CN202849952U (zh) 盖梁预应力钢绞线张拉挂篮
CN206828969U (zh) 一种高墩柱承重平台反力预压装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant