CN103266548A - Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof - Google Patents

Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof Download PDF

Info

Publication number
CN103266548A
CN103266548A CN2013102207651A CN201310220765A CN103266548A CN 103266548 A CN103266548 A CN 103266548A CN 2013102207651 A CN2013102207651 A CN 2013102207651A CN 201310220765 A CN201310220765 A CN 201310220765A CN 103266548 A CN103266548 A CN 103266548A
Authority
CN
China
Prior art keywords
layer
concrete
macadam
stiffened edge
rubble
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102207651A
Other languages
Chinese (zh)
Other versions
CN103266548B (en
Inventor
王理忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Orangestone Hardscape Co ltd
Original Assignee
ORANGESTONE CONSTRUCTION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ORANGESTONE CONSTRUCTION TECHNOLOGY Co Ltd filed Critical ORANGESTONE CONSTRUCTION TECHNOLOGY Co Ltd
Priority to CN201310220765.1A priority Critical patent/CN103266548B/en
Publication of CN103266548A publication Critical patent/CN103266548A/en
Application granted granted Critical
Publication of CN103266548B publication Critical patent/CN103266548B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a scatteredly paved gravel solidified ground surface structure and a manufacturing method thereof. The ground surface structure comprises thin wood plates which are distributed in a latticed mode, reinforcing edges and bearing ground surfaces, wherein the reinforcing edges are surrounded at the outer sides of the whole lattices of the thin wood plates; the bearing ground surfaces are filled in lattices formed by the thin wood plates; the bearing ground surfaces comprise solidified gravel layers and concrete layers which are sequentially arrayed from top to bottom; hole cavities which run through the concrete layers and the solidified gravel layers are formed on the bearing ground surfaces; the surfaces of the solidified gravel layers are covered with gravel packing, and is filled into the hole cavities; and the surface of the gravel packing is level with the surfaces of the reinforcing edges. The thin wood plate lattices provided by the invention can be of various shapes; in the embodiment, square lattices are adopted for the convenience of understanding, besides the square lattices, the thin wood plate lattices can be manufactured to be other polygons according to the sizes of the thin wood plates or the actual requirements of customers.

Description

A kind of diffusing shop rubble solidifies earth construction and preparation method thereof
Technical field
Invention belongs to building material technical field, is specifically related to a kind of diffusing shop rubble and solidifies earth construction and preparation method thereof.
Background technology
At present in some ruins and cultural relics and historic sites to carry out the sight spot of tourism development a lot, and in these traces, some underground historical relic is not excavated as yet fully, even the embedding location of some historical relics is not also determined.After more early stage historic sites were developed to tourist attractions, these ground, historic site adopted simple concrete to constitute usually.The rigid pavement is given the detection in later stage and is excavated historical relics and bring unusual inconvenience, and the rigid pavement is the structure of sealing, waterproof airtight, changed original ground surface environment, and underground historical relics are subjected to irremediable destruction possibly because of environment change under the situation of external environment flip-flop.In the project of ruins, selected the road surface of the shop rubble that looses afterwards for use, the style of the diffusing floor file face of rubble and the style of ruins project are very approaching, the less stable of floor file face but rubble looses is being travelled through long vehicle, forms wheel easily and is absorbed in and problem such as ground aggregate slip.
Summary of the invention
Hinder later stage historical relic excavation exploitation in order to remedy road surface, above-mentioned traces, change ground surface environment and bring the defective of destruction to historical relic, the present invention proposes a kind of diffusing shop rubble and solidifies earth construction and preparation method thereof.
The technical scheme of this structure is: a kind of diffusing shop rubble solidifies earth construction, described earth construction comprises the veneer that distributes as net shape, the carrying ground that is enclosed in the stiffened edge in the veneer integral grid outside and is filled in the grid inside of veneer formation, described carrying ground comprises curing macadam and the layer of concrete that is arranged in order from top to bottom, have the vestibule that runs through layer of concrete and solidify macadam on the carrying ground, solidify the macadam surface coverage rubble filler is arranged, the rubble filler covers curing macadam surface and is filled in the vestibule, and the surface of rubble filler and stiffened edge flush.In the technical program, (1) road surface is separated into a plurality of separate carrying ground by veneer, when the later stage historical relic is excavated or explored, can should carry ground along veneer and cut out separately with veneer as line of cut, the cutting panels of wood step is simple and convenient, can not cut to concrete, convenient excavation to underground historical relic of later stage is explored, and the veneer later stage may degenerate, need not cut and to take out certain piece carrying ground separately, not influence the exploitation in later stage; (2) road surface has vestibule, fills rubble in the vestibule, and rubble is the structure of water-permeable and air permeable, in use guarantees the unanimity of ground surface environment, prevents underground historical relic and causes damaging because ground environment changes; (3) this ground structure periphery is provided with stiffened edge; guarantee that rubble can not spill the stiffened edge outside; the protection external environment; the curing macadam is fixedly arranged at the vestibule top; solidify the macadam outward appearance and approach with the rubble filler, play the carrying effect also guaranteed simultaneously rubble filler on the road surface have slide a little expose below ground outward appearance unanimity during the curing macadam.
Described stiffened edge comprises that stiffened edge layer of concrete and stiffened edge solidify macadam, the stiffened edge layer of concrete is centered around the veneer outside and maintains an equal level with the layer of concrete height, and stiffened edge curing macadam is fixed on stiffened edge layer of concrete top and upper surface and filling surface and maintains an equal level.In the technical program, stiffened edge solidifies the macadam outward appearance and the rubble filler approaches, and guarantees that road surface is whole consistent, and solidifies the rubble surface irregularity, has increased frictional resistance, prevents that further the rubble filler from sliding into the stiffened edge outside.
Described stiffened edge layer of concrete, layer of concrete material are identical, and stiffened edge solidifies macadam, it is identical to solidify the macadam material.In the technical program, adopt same material to guarantee the simple and direct of construction, and same material outward appearance unanimity, the attractive in appearance of road surface guaranteed.
Described vestibule top is interconnected.Vestibule is interconnected between the top, makes whole road surface seem more neat and artistic.
Below carrying ground, stiffened edge and veneer, also be equipped with leveling layer and basic unit successively.In construction, lay leveling layer and basic unit according to actual needs, guarantee that stablizing of road structure is smooth.
A kind of above-mentioned diffusing shop rubble solidifies the laying method of earth construction, and this method may further comprise the steps:
(1) lays basic unit;
(2) in the fixing peripheral template of basic unit
(3) lay leveling layer in the basic unit of template inboard;
(4) lay veneer and mould, put mould at leveling layer, a plurality of arrangement of molds are placed on the leveling layer, fixing veneer between adjacent mould simultaneously, treat mould put finish after, fix row's veneer again in the mould outermost, make the veneer in the outside and the veneer between the mould constitute network, and leave the space of cast stiffened edge between template and the outside veneer;
(5) lay layer of concrete and stiffened edge layer of concrete, fluid concrete constitutes layer of concrete and stiffened edge layer of concrete in the template that lays and mould, and layer of concrete is identical with stiffened edge layer of concrete height, all is lower than die surface 3cm;
(6) lay to solidify macadam and stiffened edge and solidify macadam, lay respectively on layer of concrete and stiffened edge layer of concrete surface and solidify macadam and stiffened edge solidifies macadam, and stiffened edge solidifies the macadam height and maintains an equal level with template and be higher than curing macadam 3cm;
(7) take out mould, treat that above each layer all behind the coagulation forming, takes out mould and template, the preliminary structure in formation vestibule type road surface;
(8) fill the rubble filler, treat above-mentioned each layer all dry go up intensity after, in solidifying macadam surface and vestibule, fill and compacting rubble formation rubble filler, and it is identical to make rubble filling surface and stiffened edge solidify the macadam height, finishes the laying of earth construction.
In the said method, described mould scribbles release agent before laying.In the technical program, adopt release agent to be convenient to later stage mould and template taking-up, avoid the road surface before finish-drying, to be damaged by delivery.
The height of described veneer is identical with the height of mould, and is lower than the height of template.In the technical program, after construction was finished, the veneer height was lower than the stiffened edge height, what guarantee that the road surface manifests is the rubble filler, the veneer length and width is identical with mould, and the assurance later stage can directly be cut the road surface open along veneer, avoids destroying changing and coagulates soil layer and solidify macadam.
Description of drawings
Fig. 1 is the plan structure schematic diagram of one embodiment of the present invention;
Fig. 2 is the cross-sectional schematic of the earth construction in veneer grid of the present invention;
Among the figure, 1, veneer; 2, stiffened edge; 21, stiffened edge layer of concrete; 22, stiffened edge solidifies macadam; 3, carrying ground; 31, solidify macadam; 32, layer of concrete; 33, vestibule; 34, rubble filler; 4, leveling layer; 5, basic unit.
The specific embodiment
For ease of the understanding of technical solution of the present invention, be introduced below in conjunction with concrete embodiment.As Fig. 1, a kind of diffusing shop rubble solidifies earth construction, described earth construction comprises the veneer 1 that distributes as net shape, the carrying ground 3 that is enclosed in the stiffened edge 2 in the veneer integral grid outside and is filled in the grid inside of veneer formation, described carrying ground comprises curing macadam 31 and the layer of concrete 32 that is arranged in order from top to bottom, have the vestibule 33 that runs through layer of concrete and solidify macadam on the carrying ground, solidify the macadam surface coverage rubble filler 34 is arranged, the rubble filler covers curing macadam surface and is filled in the vestibule, and the surface of rubble filler and stiffened edge flush.In the present embodiment, described stiffened edge comprises that stiffened edge layer of concrete 21 and stiffened edge solidify macadam 22, the stiffened edge layer of concrete is centered around the veneer outside and maintains an equal level with the layer of concrete height, and stiffened edge curing macadam is fixed on stiffened edge layer of concrete top and upper surface and filling surface and maintains an equal level.Described stiffened edge layer of concrete, layer of concrete material are identical, and stiffened edge solidifies macadam, it is identical to solidify the macadam material.Described vestibule top is interconnected.Below carrying ground, stiffened edge and veneer, also be equipped with leveling layer 4 and basic unit 5 successively.
A kind of above-mentioned diffusing shop rubble solidifies the laying method of earth construction, and this method may further comprise the steps:
(1) lays basic unit;
(2) in the fixing peripheral template of basic unit
(3) lay leveling layer in the basic unit of template inboard;
(4) lay veneer and mould, put mould at leveling layer, a plurality of arrangement of molds are placed on the leveling layer, fixing veneer between adjacent mould simultaneously, treat mould put finish after, fix row's veneer again in the mould outermost, make the veneer in the outside and the veneer between the mould constitute network, and leave the space of cast stiffened edge between template and the outside veneer;
(5) lay layer of concrete and stiffened edge layer of concrete, fluid concrete constitutes layer of concrete and stiffened edge layer of concrete in the template that lays and mould, and layer of concrete is identical with stiffened edge layer of concrete height, all is lower than die surface 3cm;
(6) lay to solidify macadam and stiffened edge and solidify macadam, lay respectively on layer of concrete and stiffened edge layer of concrete surface and solidify macadam and stiffened edge solidifies macadam, and stiffened edge solidifies the macadam height and maintains an equal level with template and be higher than curing macadam 3cm;
(7) take out mould, treat that above each layer all behind the coagulation forming, takes out mould and template, the preliminary structure in formation vestibule type road surface;
(8) fill the rubble filler, treat above-mentioned each layer all dry go up intensity after, in solidifying macadam surface and vestibule, fill and compacting rubble formation rubble filler, and it is identical to make rubble filling surface and stiffened edge solidify the macadam height, finishes the laying of earth construction.
In laying construction, mould scribbles release agent before laying.The height of veneer is identical with the height of mould, and is lower than the height of template.When laying, veneer is placed on the leveling layer with mould, and the veneer below maintains an equal level with the mould below, and top and mould top maintain an equal level.
Veneer grid of the present invention can be used as different shape, adopts square net for convenient understanding in the present embodiment, except square net, can also make other polygons according to veneer size or client's actual needs.
Among the present invention, basic unit adopts graded sand and stone/sandy gravel level rubble/graded broken stone compacting to constitute, and leveling layer adopts medium coarse sand to lay and forms, and guarantees its air-and water-permeable.
The above; be preferable case study on implementation of the present invention; be not that the present invention is imposed any restrictions, every any simple modification, change and equivalent structure of above embodiment being done according to the technology of the present invention essence changes, and all still belongs in the protection domain of technical solution of the present invention.

Claims (8)

1. the shop rubble that looses solidifies earth construction, it is characterized in that, described earth construction comprises the veneer (1) that distributes as net shape, the carrying ground (3) that is enclosed in the stiffened edge (2) in the veneer integral grid outside and is filled in the grid inside of veneer formation, described carrying ground comprises curing macadam (31) and the layer of concrete (32) that is arranged in order from top to bottom, have the vestibule (33) that runs through layer of concrete and solidify macadam on the carrying ground, solidify the macadam surface coverage rubble filler (34) is arranged, the rubble filler covers curing macadam surface and is filled in the vestibule, and the surface of rubble filler and stiffened edge flush.
2. diffusing shop according to claim 1 rubble solidifies earth construction, it is characterized in that, described stiffened edge comprises that stiffened edge layer of concrete (21) and stiffened edge solidify macadam (22), the stiffened edge layer of concrete is centered around the veneer outside and maintains an equal level with the layer of concrete height, and stiffened edge curing macadam is fixed on stiffened edge layer of concrete top and upper surface and filling surface and maintains an equal level.
3. diffusing shop according to claim 1 rubble solidifies earth construction, it is characterized in that, described stiffened edge layer of concrete, layer of concrete material are identical, and stiffened edge solidifies macadam, it is identical to solidify the macadam material.
4. rubble curing earth construction in diffusing shop according to claim 1 is characterized in that described vestibule top is interconnected.
5. rubble curing earth construction in diffusing shop according to claim 1 is characterized in that, also is equipped with leveling layer (4) and basic unit (5) successively below carrying ground, stiffened edge and veneer.
6. the described diffusing shop of claim 1 rubble solidifies the laying method of earth construction, it is characterized in that this method may further comprise the steps:
(1) lays basic unit;
(2) in the fixing peripheral template of basic unit
(3) lay leveling layer in the basic unit of template inboard;
(4) lay veneer and mould, put mould at leveling layer, a plurality of arrangement of molds are placed on the leveling layer, fixing veneer between adjacent mould simultaneously, treat mould put finish after, fix row's veneer again in the mould outermost, make the veneer in the outside and the veneer between the mould constitute network, and leave the space of cast stiffened edge between template and the outside veneer;
(5) lay layer of concrete and stiffened edge layer of concrete, fluid concrete constitutes layer of concrete and stiffened edge layer of concrete in the template that lays and mould, and layer of concrete is identical with stiffened edge layer of concrete height, all is lower than die surface 3cm;
(6) lay to solidify macadam and stiffened edge and solidify macadam, lay respectively on layer of concrete and stiffened edge layer of concrete surface and solidify macadam and stiffened edge solidifies macadam, and stiffened edge solidifies the macadam height and maintains an equal level with template and be higher than curing macadam 3cm;
(7) take out mould, treat that above each layer all behind the coagulation forming, takes out mould and template, the preliminary structure in formation vestibule type road surface;
(8) fill the rubble filler, treat above-mentioned each layer all dry go up intensity after, in solidifying macadam surface and vestibule, fill and compacting rubble formation rubble filler, and it is identical to make rubble filling surface and stiffened edge solidify the macadam height, finishes the laying of earth construction.
7. the laying method of rubble curing earth construction in diffusing shop according to claim 6 is characterized in that described mould scribbles release agent before laying.
8. diffusing shop rubble curing earth construction laying method according to claim 6 is characterized in that the height of described veneer is identical with the height of mould, and is lower than the height of template.
CN201310220765.1A 2013-06-05 2013-06-05 Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof Active CN103266548B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310220765.1A CN103266548B (en) 2013-06-05 2013-06-05 Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310220765.1A CN103266548B (en) 2013-06-05 2013-06-05 Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof

Publications (2)

Publication Number Publication Date
CN103266548A true CN103266548A (en) 2013-08-28
CN103266548B CN103266548B (en) 2015-07-15

Family

ID=49010202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310220765.1A Active CN103266548B (en) 2013-06-05 2013-06-05 Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN103266548B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030653A (en) * 2020-07-13 2020-12-04 中国港湾工程有限责任公司 Cement stabilized macadam construction process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3802790A (en) * 1970-03-25 1974-04-09 J Blackburn Methods for producing pavement-like sites
CN1171475A (en) * 1997-06-24 1998-01-28 王兴飞 Antislip colour coverplate of grund stone for protecting tree and its manufacture method
US20080113161A1 (en) * 2006-11-13 2008-05-15 Bomanite Corporation Former for pavement-like sites, method of making same, method of using same, and resulting pavement-like site
CN101418540A (en) * 2008-12-11 2009-04-29 周水林 Construction method of polyethylene grass planting land
CN102296511A (en) * 2011-07-20 2011-12-28 北京中景橙石建筑科技有限公司 Cellular permeable concrete ground structure for grass growing and production method thereof
CN203295916U (en) * 2013-06-05 2013-11-20 北京中景橙石建筑科技有限公司 Scattered broken stone cured road surface structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3802790A (en) * 1970-03-25 1974-04-09 J Blackburn Methods for producing pavement-like sites
CN1171475A (en) * 1997-06-24 1998-01-28 王兴飞 Antislip colour coverplate of grund stone for protecting tree and its manufacture method
US20080113161A1 (en) * 2006-11-13 2008-05-15 Bomanite Corporation Former for pavement-like sites, method of making same, method of using same, and resulting pavement-like site
CN101418540A (en) * 2008-12-11 2009-04-29 周水林 Construction method of polyethylene grass planting land
CN102296511A (en) * 2011-07-20 2011-12-28 北京中景橙石建筑科技有限公司 Cellular permeable concrete ground structure for grass growing and production method thereof
CN203295916U (en) * 2013-06-05 2013-11-20 北京中景橙石建筑科技有限公司 Scattered broken stone cured road surface structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030653A (en) * 2020-07-13 2020-12-04 中国港湾工程有限责任公司 Cement stabilized macadam construction process

Also Published As

Publication number Publication date
CN103266548B (en) 2015-07-15

Similar Documents

Publication Publication Date Title
Hu et al. DEM-CFD simulation on clogging and degradation of air voids in double-layer porous asphalt pavement under rainfall
CN102587243B (en) Urban road water permeability cement concrete pavement structure and construction process thereof
RU2538560C2 (en) Method to widen road structure (versions)
CN105297571B (en) A kind of mud stone filled-up ground structure and its construction method
CN106049217A (en) Assembly type permeable pavement paving c, block bodies and paving structure
CN109594442B (en) Garden road construction process
CN104005313A (en) Construction method for asphalt concrete pavement separation zone kerbs
CN203174615U (en) Step type reinforced earth embankment structure
CN108205057A (en) Underground engineering blocks the simulation test device that water circulation path causes city ground subsidence
CN107100047A (en) Suitable for the rock salt bittern road structure and construction method in playa area
CN206090612U (en) Quick assemble highway side slope retaining wall
KR101019181B1 (en) Road pavement structure using road blocks
CN103266548B (en) Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof
CN204753261U (en) Light -duty road bed of a doublestage shelves structure
CN203295916U (en) Scattered broken stone cured road surface structure
CN103696339A (en) Preparation method for partial water permeation floor tiles and partial water permeation floor tiles
CN213173170U (en) Highway gangue roadbed structure
CN109610505A (en) A method of constructing a foundation pit above a tunnel
CN108004865A (en) Based on the air brick and ventilating layer embankment for strengthening forced convection cooling-down effect
KR20110100805A (en) Pavement and road pavement methods including multiple permeable and repair layers
CN203924081U (en) Slope with multi-step is reinforced discharge structure
CN207552833U (en) A kind of elevated bridge basal perimeter ground road structure
CN111945484B (en) Existing-newly-built parallel row pile plate wall retaining structure and construction method
CN103225262B (en) Mixed type sidewalk structure and construction method thereof
CN211227905U (en) Double-channel slow running diameter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: BEIJING ORANGESTONE ECOLOGICAL ART GROUP TECHNOLOG

Free format text: FORMER OWNER: BEIJING ZHONGJING ORANGE STONE CONSTRUCTION TECHNOLOGY CO., LTD.

Effective date: 20150608

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Chuncai

Inventor after: Wang Lizhong

Inventor before: Wang Lizhong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG LIZHONG TO: LIU CHUNCAI WANG LIZHONG

TA01 Transfer of patent application right

Effective date of registration: 20150608

Address after: 100070, No. 5, No. two, No. 188, South Fourth Ring Road, Beijing, Fengtai District, building 6 (Park)

Applicant after: BEIJING ORANGESTONE ECOLOGICAL ART GROUND TECHNOLOGY Co.,Ltd.

Address before: 100070, No. five, No. two, No. 188, South Fourth Ring Road, Beijing, Fengtai District, China, 6 floors

Applicant before: ORANGESTONE CONSTRUCTION TECHNOLOGY Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 100070, No. 5, No. 2, No. 188, South Fourth Ring Road, Beijing, Fengtai District, building 6 (Park)

Patentee after: BEIJING ORANGESTONE HARDSCAPE CO.,LTD.

Address before: 100070, No. 5, No. two, No. 188, South Fourth Ring Road, Beijing, Fengtai District, building 6 (Park)

Patentee before: BEIJING ORANGESTONE ECOLOGICAL ART GROUND TECHNOLOGY Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof

Effective date of registration: 20181030

Granted publication date: 20150715

Pledgee: China Merchants Bank Limited by Share Ltd. Beijing branch

Pledgor: BEIJING ORANGESTONE HARDSCAPE CO.,LTD.

Registration number: 2018990001013

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221018

Granted publication date: 20150715

Pledgee: China Merchants Bank Limited by Share Ltd. Beijing branch

Pledgor: BEIJING ORANGESTONE HARDSCAPE CO.,LTD.

Registration number: 2018990001013