CN103252550B - Method for gas replacement before brazing of small-scale gas cylinder - Google Patents
Method for gas replacement before brazing of small-scale gas cylinder Download PDFInfo
- Publication number
- CN103252550B CN103252550B CN201310191104.0A CN201310191104A CN103252550B CN 103252550 B CN103252550 B CN 103252550B CN 201310191104 A CN201310191104 A CN 201310191104A CN 103252550 B CN103252550 B CN 103252550B
- Authority
- CN
- China
- Prior art keywords
- gas
- bottle body
- brazing
- bottle
- small
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
Description
技术领域 technical field
本发明属于小型气瓶的加工技术领域,具体涉及30盎司一次性气瓶的制造方法。 The invention belongs to the technical field of processing small gas cylinders, and in particular relates to a manufacturing method of a 30-ounce disposable gas cylinder.
背景技术 Background technique
30盎司一次性气瓶是国外大量使用气瓶,一个生产线最基本的要求为月产10万个左右。现有技术中一次性气瓶的焊接过程是在连续式还原性保护气氛钎焊炉中完成的,如图1所示,其具体操作方法为:将已装配好的瓶体放置在进瓶区的耐高温网带链上,并在网带链上放置防滚动垫块,在瓶体上需钎焊部位挂上所需钎焊的无氧铜丝。耐高温网带链上的瓶体随着被网带链驱动轮缓慢进入通道式炉体,并在升温区被加温达到1100℃左右。此时无氧铜丝钎料熔化,同时铜和钢铁表面的油污在高温下被彻底汽化,铜铁等表面的氧化物被高温下的原子氢彻底还原成金属铜和金属铁。熔化后的无氧铜熔液流动性极强,被还原后的钢材表面张力很小,无氧铜熔液通过毛细作用渗入紧密接触的所需焊接部位。此后瓶体随着耐高温网带链进入降温区逐步降温,渗入紧密接触的所需焊接部位的无氧铜熔液重新凝固并逐步降温。在出瓶区钎焊完毕瓶体出炉、此时在此处将瓶体和防滚动垫块取下,整个焊接过程结束。 30-ounce disposable gas cylinders are widely used abroad, and the most basic requirement for a production line is about 100,000 per month. The welding process of disposable gas cylinders in the prior art is completed in a continuous reducing protective atmosphere brazing furnace, as shown in Figure 1, the specific operation method is: the assembled bottle body is placed in the bottle inlet area On the high temperature resistant mesh belt chain, place anti-rolling pads on the mesh belt chain, and hang the required brazed oxygen-free copper wire on the part of the bottle body that needs to be brazed. The bottle body on the high-temperature-resistant mesh belt chain slowly enters the tunnel furnace body along with the driving wheel of the mesh belt chain, and is heated to about 1100°C in the heating zone. At this time, the oxygen-free copper wire solder melts, and at the same time, the oil on the surface of copper and steel is completely vaporized at high temperature, and the oxides on the surface of copper and iron are completely reduced to metallic copper and metallic iron by atomic hydrogen at high temperature. The melted oxygen-free copper melt has strong fluidity, and the surface tension of the reduced steel is very small. The oxygen-free copper melt penetrates into the required welding parts in close contact through capillary action. After that, the bottle body gradually cools down as it enters the cooling zone with the high-temperature-resistant mesh belt chain, and the oxygen-free copper melt that penetrates into the required welding parts in close contact re-solidifies and gradually cools down. After brazing in the bottle outlet area, the bottle body is released from the furnace. At this time, the bottle body and the anti-roll pad are removed here, and the whole welding process ends.
但是由于需钎焊的瓶体内部是一个近乎封闭的系统,只有一个阀座上的3.5mm左右孔与外界连通。当瓶体进入炉膛时瓶内是空气,环境气体是通过氨分解炉生成的氢和氮组成的还原性气体。随着气瓶在炉膛运动,温度由常温升高到1100℃左右再降温到常温。在这过程不可避免有少量的环境气体,进入瓶体内部。如果配合环境的高温,有时会发生炉膛内的氢和瓶体内的氧发生气体爆鸣。这种情况如果在钎焊完成前发生,装配好的瓶体会分裂;如果在钎焊完成后发生,钎焊好的瓶体会在耐高温网带链移位,一般情况会造成该瓶体报废,严重的会由于瓶体在炉膛位置混乱造成堵塞,迫使连续运行的钎焊炉降温停车排故。 However, because the inside of the bottle body to be brazed is a nearly closed system, only a hole of about 3.5mm on the valve seat communicates with the outside world. When the bottle body enters the furnace, there is air in the bottle, and the ambient gas is a reducing gas composed of hydrogen and nitrogen generated by the ammonia decomposition furnace. As the gas cylinder moves in the furnace, the temperature rises from normal temperature to about 1100°C and then cools down to normal temperature. In this process, a small amount of ambient gas inevitably enters the inside of the bottle. If combined with the high temperature of the environment, sometimes the hydrogen in the furnace and the oxygen in the cylinder will produce gas detonation. If this happens before the brazing is completed, the assembled bottle will split; if it happens after the brazing is completed, the brazed bottle will be displaced on the high-temperature-resistant mesh belt chain, and the bottle will generally be scrapped. Seriously, it will cause blockage due to the confusion of the bottle body in the furnace position, forcing the continuously running brazing furnace to cool down and shut down for troubleshooting.
发明内容 Contents of the invention
本发明主要解决的技术问题是提供一种新的30盎司一次性气瓶的制造方法,该方法可防止气瓶在钎焊过程中瓶内气体与炉内气体混合产生爆鸣,造成瓶体报废,甚至钎焊炉降温停车故障。 The technical problem mainly solved by the present invention is to provide a new manufacturing method of a 30-ounce disposable gas cylinder, which can prevent the gas cylinder from mixing with the gas in the furnace to cause detonation during the brazing process, causing the cylinder to be scrapped , and even the brazing furnace cooling shutdown failure.
为解决上述技术问题,本发明采用一种在瓶体完成装配后,放置到通道式气氛保护钎焊炉进瓶区的耐高温网带链上之前进行气体置换的工艺。其特征在于其步骤为: In order to solve the above-mentioned technical problems, the present invention adopts a process of gas replacement after the bottle body is assembled and placed on the high-temperature-resistant mesh belt chain in the bottle-entry area of the channel-type atmosphere protection brazing furnace. It is characterized in that its steps are:
1)将已装配好的瓶体3从传送线中取下。 1) Remove the assembled bottle body 3 from the conveying line.
2)将瓶体3竖直向上。 2) Put the bottle body 3 upright.
3)将加气枪的细长枪嘴2从阀座1上3.5mm孔中插入深到瓶体3底部。 3) Insert the slender nozzle 2 of the air gun from the 3.5mm hole on the valve seat 1 to the bottom of the bottle body 3.
4)打开加气枪开关,将带压力的惰性气体加入瓶体3内,数秒后关闭加气枪并从其孔中拔出。 4) Turn on the switch of the gas filling gun, put the inert gas under pressure into the bottle body 3, turn off the gas filling gun after a few seconds and pull it out from the hole.
5)将完成气体置换的瓶体3放置到通道式气氛保护钎焊炉进瓶区的耐高温网带链上。 5) Place the bottle body 3 that has completed the gas replacement on the high-temperature-resistant mesh belt chain in the bottle-entry area of the channel-type atmosphere protection brazing furnace.
完成上述瓶内气体置换后,继续一次性气瓶钎焊后续操作。 After the above-mentioned gas replacement in the bottle is completed, continue the follow-up operation of the brazing of the disposable gas bottle.
采用这种方法后,能够有效防止瓶体在钎焊过程发生瓶内气体与炉内气体混合而产生爆鸣,从而减少瓶体报废,钎焊炉故障停车机会,提高产品生产的合格率,提高生产效率。 After adopting this method, it can effectively prevent the bottle body from detonating due to the mixture of gas in the bottle and gas in the furnace during the brazing process, thereby reducing the scrapping of the bottle body and the chance of stopping the brazing furnace for failure, improving the qualified rate of product production, and improving Productivity.
附图说明 Description of drawings
图1本发明通道式气氛保护钎焊炉原理图; Fig. 1 channel type atmosphere protection brazing furnace schematic diagram of the present invention;
图2为本发明一种小型气瓶钎焊前气体置换的结构示意图。 Fig. 2 is a structural schematic diagram of gas replacement before brazing of a small gas cylinder according to the present invention.
具体实施方式 Detailed ways
一种小型气瓶钎焊前的气体置换的方法:在瓶体完成装配后,在放置到通道式气氛保护钎焊炉进瓶区的耐高温网带链上之前进行。如图2 所示,包括以下步骤: A gas replacement method before brazing of a small gas cylinder: after the bottle body is assembled, it is carried out before being placed on the high-temperature-resistant mesh belt chain in the bottle-entry area of a channel-type atmosphere protection brazing furnace. As shown in Figure 2, the following steps are included:
1)将已装配好的瓶体3从传送线中取下。 1) Remove the assembled bottle body 3 from the conveying line.
2)将瓶体3竖直向上。 2) Put the bottle body 3 upright.
3)将加气枪的细长枪嘴2从阀座1上3.5mm孔中插入深到瓶体3底部。 3) Insert the slender nozzle 2 of the air gun from the 3.5mm hole on the valve seat 1 to the bottom of the bottle body 3.
4)打开加气枪开关,将带压力的惰性气体加入瓶体3内,数秒后关闭加气枪并从其孔中拔出。 4) Turn on the switch of the gas filling gun, put the inert gas under pressure into the bottle body 3, turn off the gas filling gun after a few seconds and pull it out from the hole.
5)将完成气体置换的瓶体3放置到通道式气氛保护钎焊炉进瓶区的耐高温网带链上。 5) Place the bottle body 3 that has completed the gas replacement on the high-temperature-resistant mesh belt chain in the bottle-entry area of the channel-type atmosphere protection brazing furnace.
6)继续一次性气瓶钎焊后续操作。 6) Continue the follow-up operation of disposable gas cylinder brazing.
另外,步骤3中的加气枪的细长枪嘴2为外直径为2.5mm,壁厚为0.25mm,长度为200mm的黄铜管。 In addition, the slender nozzle 2 of the air-filling gun in step 3 is a brass tube with an outer diameter of 2.5 mm, a wall thickness of 0.25 mm, and a length of 200 mm.
另外,步骤4中的惰性气体为氮气。 In addition, the inert gas in step 4 is nitrogen.
另外,步骤4中的惰性气体压力0.4MPa,加气时间为3秒钟。 In addition, the pressure of the inert gas in step 4 is 0.4 MPa, and the gas addition time is 3 seconds.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310191104.0A CN103252550B (en) | 2013-05-22 | 2013-05-22 | Method for gas replacement before brazing of small-scale gas cylinder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310191104.0A CN103252550B (en) | 2013-05-22 | 2013-05-22 | Method for gas replacement before brazing of small-scale gas cylinder |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103252550A CN103252550A (en) | 2013-08-21 |
CN103252550B true CN103252550B (en) | 2015-06-24 |
Family
ID=48956950
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310191104.0A Active CN103252550B (en) | 2013-05-22 | 2013-05-22 | Method for gas replacement before brazing of small-scale gas cylinder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103252550B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104526098B (en) * | 2015-01-06 | 2016-06-29 | 常州大学 | Gas shield in a kind of small gas cylinder continuous brazing furnace and method of reducing |
CN105618890A (en) * | 2016-03-12 | 2016-06-01 | 常州大学 | Internal gas conversion method before brazing of small gas cylinder |
CN105772884A (en) * | 2016-04-29 | 2016-07-20 | 常州大学 | Solder required for soldering of valve seat before soldering of small-scale gas cylinder and placing method of solder |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10041924C1 (en) * | 2000-08-25 | 2002-06-20 | Joachim Kloecker | Re-usable carbon dioxide capsule has modified vehicle tire valve brazed into it |
CN2601348Y (en) * | 2003-02-18 | 2004-01-28 | 常州飞机制造有限公司 | Small steel cylinder suitable for filling low-pressure liquefied gas and calibrating gas |
DE102006016554A1 (en) * | 2006-04-07 | 2007-10-11 | L'Air Liquide, S.A. a Directoire et Conseil de Surveillance pour l'Etude et l'Exploitation des Procédés Georges Claude | Method for filling at least one compressed gas container with at least one gas, intermediate piece for connecting to an opening of a compressed gas container and compressed gas cylinder fitting |
CN101858484B (en) * | 2009-09-27 | 2012-06-20 | 凯迈(洛阳)气源有限公司 | High-pressure gas bottle and inflating method thereof |
CN201739761U (en) * | 2009-12-24 | 2011-02-09 | 李存扣 | Portable type automatic travelling device |
EP2466186A1 (en) * | 2010-12-16 | 2012-06-20 | Air Products and Chemicals, Inc. | A process for filling a gas storage container |
CN103339239B (en) * | 2011-03-11 | 2015-07-29 | 岩谷产业株式会社 | Inflammable gas |
-
2013
- 2013-05-22 CN CN201310191104.0A patent/CN103252550B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103252550A (en) | 2013-08-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104259610B (en) | A kind of resistance brazing method and device thereof that adopts graphite electrode | |
CN103252550B (en) | Method for gas replacement before brazing of small-scale gas cylinder | |
WO2012154737A3 (en) | Track link with replaceable rail and method of replacing worn rails on track links | |
US20160167148A1 (en) | Steam reflow apparatus and steam reflow method | |
WO2017140009A1 (en) | Continuous vacuum nitrogen-protection brazing furnace | |
JP5943174B2 (en) | Heat treatment method for long steel pipes | |
CN104668688A (en) | Vacuum resistive brazing method for lap piece | |
CN106425038A (en) | Water-cooling forced forming module for one-time forming of vertical weld | |
CN103949984B (en) | A kind of manufacturing process of wear resistant and impact resistant type knockout pipe and welding method thereof | |
CN103084718A (en) | Welding method for 10CrMo9-10 steel | |
CN106513933A (en) | Improved wear-resisting plate surfacing machine | |
CN203003301U (en) | Trolley vacuum brazing furnace | |
CN106514069A (en) | Device inhibiting welding defects of small-diameter aluminum alloy guiding pipe | |
CN201333581Y (en) | Continuous gas-shielded brazing furnace | |
CN104526098B (en) | Gas shield in a kind of small gas cylinder continuous brazing furnace and method of reducing | |
CN102935551A (en) | Flash welding forming method of aluminum alloy thin-wall ring member | |
CN105618890A (en) | Internal gas conversion method before brazing of small gas cylinder | |
CN104475713B (en) | A kind of two-sided composite construction of valve plate blank and casting method thereof | |
CN207695812U (en) | Conticaster stainless steel band weld seam intensifying device | |
CN103286468A (en) | Dissimilar steel welding process of check door and tubing | |
CN105345217A (en) | Online treatment device for continuous casting, finishing and fire cutting slag | |
CN110216343A (en) | The production technology of carbide bit | |
CN204449541U (en) | A kind of efficient many vacuum chambers soldering furnace | |
CN206405575U (en) | A kind of improved wearing plate built-up welder | |
CN201046983Y (en) | Degassing rake for aluminium fabrication |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210309 Address after: Room 407-2-6, building C, Tian'an Digital City, 588 Changwu South Road, Wujin high tech Industrial Development Zone, Changzhou City, Jiangsu Province 213100 Patentee after: CHANGZHOU XIAOGUO INFORMATION SERVICES Co.,Ltd. Address before: Gehu Lake Road Wujin District 213164 Jiangsu city of Changzhou province No. 1 Patentee before: CHANGZHOU University |