[go: up one dir, main page]

CN103230728B - Method for treating hydrogen sulfide on oil well site - Google Patents

Method for treating hydrogen sulfide on oil well site Download PDF

Info

Publication number
CN103230728B
CN103230728B CN201310170397.4A CN201310170397A CN103230728B CN 103230728 B CN103230728 B CN 103230728B CN 201310170397 A CN201310170397 A CN 201310170397A CN 103230728 B CN103230728 B CN 103230728B
Authority
CN
China
Prior art keywords
hydrogen sulfide
concentration
oil
gas
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310170397.4A
Other languages
Chinese (zh)
Other versions
CN103230728A (en
Inventor
朱金才
陈荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Puyang Kerun Petroleum Engineering Technology Co ltd
Original Assignee
BEIJING GREENOIL TECHNOLOGY SERVICES Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING GREENOIL TECHNOLOGY SERVICES Co Ltd filed Critical BEIJING GREENOIL TECHNOLOGY SERVICES Co Ltd
Priority to CN201310170397.4A priority Critical patent/CN103230728B/en
Publication of CN103230728A publication Critical patent/CN103230728A/en
Application granted granted Critical
Publication of CN103230728B publication Critical patent/CN103230728B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pharmaceuticals Containing Other Organic And Inorganic Compounds (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The invention provides a method for treating the hydrogen sulfide on an oil well site. The problems that the treatment of the hydrogen sulfide on the oil well site is not standard, the emission of the hydrogen sulfide gas causes environmental pollution and the hydrogen sulfide gas can cause large hazard to a human body are solved. The method comprises the following steps of: hydrogen sulfide concentration detection, feeding treatment and secondary hydrogen sulfide concentration detection. Therefore, the method has the advantage that the pollution of the hydrogen sulfide gas to outside air and surface is avoided.

Description

Oil wells in field hydrogen sulfide administering method
Technical field
The invention provides a kind of hydrogen sulfide administering method, be specifically related to a kind of oil wells in field hydrogen sulfide administering method.
Background technology
At present, the security requirement more and more specification of the operation of oil wells in field, the control overflow for oil wells in field harmful gas concentration is also more and more stricter.Due to hydrogen sulfide gas to workmen endanger very Datong District time be disposed in air also very serious to the pollution of environment.
Before, oil wells in field does not process mostly to hydrogen sulfide, and not carrying out improvement has following two reasons: one is oil wells in field process hydrogen sulfide, needs a large amount of equipment or personnel; Next is exactly that hydrogen sulfide content is not high, directly goes up desulphurization plant not feasible.
Even if process, mainly namely following two kinds of methods, one is direct emission treatment, connects a pipe exactly at well head, after linking the yamase be far from the crowd, directly discharges in atmosphere; Another kind be burning process because hydrogen sulfide is not individualism, it is present in associated gas, mixed in together with methane ethane etc. in other words, can light.
In fact above two kinds of method improvement to hydrogen sulfide gas are cured the symptoms, not the disease, and during direct emission treatment, hydrogen sulfide runs into water is exactly sulphur hydracid, is also a kind of acidic materials, has an impact like this with regard to direct to earth's surface.What generate when lighting process is sulfur dioxide, is one of main component of acid rain, has impact to earth's surface.
Summary of the invention
The invention provides a kind of oil wells in field hydrogen sulfide administering method, solve oil wells in field hydrogen sulfide and administer lack of standardization, the discharge of hydrogen sulfide gas causes environmental pollution, the problem that hydrogen sulfide gas is large to harm.
Specific embodiment of the invention scheme is as follows:
This oil wells in field hydrogen sulfide administering method, is characterized in that: comprise the following steps:
Step 1] concentration of hydrogen sulfide detection;
Step 1.1] open the valve of sleeve opening, extract the associated gas overflowed in sleeve pipe, survey instrument by gas and the sulfureted hydrogen gas concentration in the associated gas in sleeve pipe is detected;
Step 1.2] sulfureted hydrogen gas concentration of associated gas in oil pipe is detected.
Step 2] dosing;
Step 2.1] according to the concentration of hydrogen sulfide detected, determine the dosage of sulfur elimination;
Step 2.2] open the valve of sleeve opening, detection thimble is with or without pressure;
Step 2.3] if sleeve pipe is without pressure, then open the valve of sleeve bottom, whole sleeve pipe is opened and directly in well, adds sulfur elimination; If sleeve pipe has pressure, first close the valve of sleeve bottom, gas in well cannot be gushed out, in sleeve pipe, add sulfur elimination again, then close sleeve opening valve, then by the valve open of sleeve bottom, treat that sulfur elimination flows to shaft bottom, again by the valve closing of sleeve bottom, the valve open of sleeve opening is added medicine again in sleeve pipe, until determined sulfur elimination all adds complete.
Above-mentioned steps 1.2] comprise following two kinds of modes:
1) open the valve of sleeve opening, extract the associated gas in oil pipe, by gas detecting instrument, the sulfureted hydrogen gas concentration in the associated gas in oil pipe is detected; Then extract the Residual oil of oil pipe inside, the concentration of the sulphur in direct-detection Residual oil, can draw the concentration of hydrogen sulfide; In conjunction with hydrogen sulfide in oil pipe Residual oil and associated gas concentration thus the concentration of hydrogen sulfide in flowline;
2) open the valve of sleeve opening, extract the associated gas overflowed in oil pipe, by liquefier, the hydrogen sulfide gas in associated gas is changed into liquid state; Then the Residual oil of oil pipe inside is extracted; In conjunction with the concentration of two-part liquid sulfur, the concentration of hydrogen sulfide in flowline.
Above-mentioned oil wells in field hydrogen sulfide administering method also comprises the step detected the wind direction at oil well place before concentration of hydrogen sulfide detects.
Above-mentioned gas detector is concentration of hydrogen sulfide detector.
Above-mentioned oil wells in field hydrogen sulfide administering method also comprises after sulfur elimination all adds and detecting the second time concentration of hydrogen sulfide of oil well oil conduit and sleeve pipe.
The dosage of above-mentioned sulfur elimination adopts following computational methods: establish associated gas generation per hour A side, concentration of hydrogen sulfide B, and the sulfur elimination that hydrogen sulfide correspondence uses needs concentration to be C, and the sulfur elimination dosage of needs per hour is D, then D=A × B × C.
The invention has the advantages that:
1, the method for the present invention's employing, by the mode in oil wells in field direct-detection, dosing, directly processes hydrogen sulfide gas, avoids the pollution of hydrogen sulfide gas to extraneous air.
2, the method for the present invention's employing, directly utilizes sulfur elimination by the neutralization of the hydrogen sulfide gas of oil wells in field or oxidation, forms salts substances, avoid the pollution of hydrogen sulfide gas to earth's surface.
Accompanying drawing explanation
Fig. 1 is schematic flow sheet of the present invention
Detailed description of the invention
This oil wells in field hydrogen sulfide administering method, comprises three basic steps: first time detection, dosing, second time detect;
First time is detected particularly: before oil wells in field prepares to carry out operation, important requirement workmen checks whether appliances for labor protection make adequate preparation, protective articles must be neatly dressed, such as: wear cap, mouth mask breathing mask, work clothes, work footwear and rubber gloves etc.Usually ensure to have two workmens at least when entering hydrogen sulfide scene.First enter hydrogen sulfide site operation personnel and must determine wind direction by observation, thus ensure that the process that whole first time detects remains on uptake, ensure the construction safety of workmen.
After wind direction determines, workmen utilizes the associated gas in instrument extraction oil well oil conduit and sleeve pipe, the associated gas that well head extracts is brought back laboratory and carries out simulation laboratory test, simulation well bottom pressure temperature field, sulfur elimination that is dissimilar and variable concentrations all carries out testing and calculating, the sulfur elimination of final every type has a best concentration value, and test effect is best concentration value, the amount of the sulfur elimination required for just adjusting with this concentration value at the scene, and make a record.
After the kind of sulfur elimination and dosage are determined, just can carry out dosing to oil wells in field.First need to enter multi-purpose station to get it filled.Also important requirement personnel inspection appliances for labor protection of getting it filled are needed whether to make adequate preparation before multi-purpose station is got it filled entering, protective articles must be neatly dressed, such as: wear cap, mouth mask breathing mask, work clothes, work footwear and rubber gloves etc., and requiring gets it filled comprehensively checks pump of getting it filled, ensure that machine can normally work.Enter multi-purpose station dosing, first should connect the import and export of pump of getting it filled, the import pipe of pump is inserted in explosive barrel, and outlet tube puts into grug feeding jar mouth, connects power supply, starts pump and starts dosing.
Before entering oil wells in field dosing, also need to check the pressure in sleeve pipe.First open oil wells in field sleeve opening valve, detection thimble is with or without pressure.If sleeve pipe is without pressure, opening sleeve bottom and the valve be connected in well, whole sleeve pipe being opened, directly in well, adding sulfur elimination.
If sleeve pipe has pressure, first close sleeve bottom and the valve be connected in well, gas in well cannot be gushed out, in sleeve pipe, add medicine again, then close sleeve opening valve (medicine can not be overflowed), then by the valve open of sleeve bottom, after two or three minutes, medicine flows in well, finally by the valve closing of sleeve bottom, the valve open of sleeve opening is being added medicine in sleeve pipe.Repeatedly operate by said process, until determined sulfur elimination all adds complete.
Finally carrying out second time detection to the sleeve pipe of oil well and the concentration of hydrogen sulfide of oil pipe, until the concentration of hydrogen sulfide gas is constructed after reaching standard again.
Wherein, the concentration of sulfur elimination generally adopts following computational methods: establish associated gas generation per hour A side, concentration of hydrogen sulfide B, and the sulfur elimination that hydrogen sulfide correspondence uses needs concentration to be C, and the sulphur removal dosage of needs per hour is D, then D=A × B × C.

Claims (6)

1. an oil wells in field hydrogen sulfide administering method, is characterized in that: comprise the following steps:
1] concentration of hydrogen sulfide detects;
1.1] open the valve of sleeve opening, extract the associated gas overflowed in sleeve pipe, by gas detecting instrument, the sulfureted hydrogen gas concentration in the associated gas in sleeve pipe is detected;
1.2] sulfureted hydrogen gas concentration of associated gas in oil pipe is detected;
2] dosing;
2.1] according to the concentration of hydrogen sulfide detected, the dosage of sulfur elimination is determined;
2.2] open the valve of sleeve opening, detection thimble is with or without pressure;
2.3] if sleeve pipe is without pressure, then open the valve of sleeve bottom, whole sleeve pipe is opened, directly in well, add sulfur elimination; If sleeve pipe has pressure, first close the valve of sleeve bottom, gas in well cannot be gushed out, in sleeve pipe, add sulfur elimination again, then close sleeve opening valve, then by the valve open of sleeve bottom, treat that sulfur elimination flows to shaft bottom, again by the valve closing of sleeve bottom, the valve open of sleeve opening is added medicine again in sleeve pipe, until determined sulfur elimination all adds complete.
2. oil wells in field hydrogen sulfide administering method according to claim 1, is characterized in that: described step 1.2] comprise following two kinds of modes:
1) open the valve of sleeve opening, extract the associated gas in oil pipe, by gas detecting instrument, the sulfureted hydrogen gas concentration in the associated gas in oil pipe is detected; Then extract the Residual oil of oil pipe inside, the concentration of the sulphur in direct-detection Residual oil, can draw the concentration of hydrogen sulfide; In conjunction with hydrogen sulfide in oil pipe Residual oil and associated gas concentration thus the concentration of hydrogen sulfide in flowline;
2) open the valve of sleeve opening, extract the associated gas overflowed in oil pipe, by liquefier, the hydrogen sulfide gas in associated gas is changed into liquid state; Then the Residual oil of oil pipe inside is extracted; In conjunction with the concentration of two-part liquid sulfur, the concentration of hydrogen sulfide in flowline.
3. oil wells in field hydrogen sulfide administering method according to claim 1 and 2, is characterized in that: also comprise the step detected the wind direction at oil well place before concentration of hydrogen sulfide detects.
4. oil wells in field hydrogen sulfide administering method according to claim 3, is characterized in that: described gas detecting instrument is concentration of hydrogen sulfide detector.
5. oil wells in field hydrogen sulfide administering method according to claim 4, is characterized in that: also comprise after sulfur elimination all adds and detecting the second time concentration of hydrogen sulfide of oil well oil conduit and sleeve pipe.
6. oil wells in field hydrogen sulfide administering method according to claim 1, it is characterized in that: the dosage of sulfur elimination adopts following computational methods: establish associated gas generation per hour A side, concentration of hydrogen sulfide B, the sulfur elimination that hydrogen sulfide correspondence uses needs concentration to be C, the sulfur elimination dosage of needs per hour is D, then D=A × B × C.
CN201310170397.4A 2013-05-10 2013-05-10 Method for treating hydrogen sulfide on oil well site Active CN103230728B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310170397.4A CN103230728B (en) 2013-05-10 2013-05-10 Method for treating hydrogen sulfide on oil well site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310170397.4A CN103230728B (en) 2013-05-10 2013-05-10 Method for treating hydrogen sulfide on oil well site

Publications (2)

Publication Number Publication Date
CN103230728A CN103230728A (en) 2013-08-07
CN103230728B true CN103230728B (en) 2015-05-20

Family

ID=48878836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310170397.4A Active CN103230728B (en) 2013-05-10 2013-05-10 Method for treating hydrogen sulfide on oil well site

Country Status (1)

Country Link
CN (1) CN103230728B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107937016B (en) * 2017-10-27 2020-05-01 中国石油化工股份有限公司 Hydrogen sulfide high-pressure treatment device of oil well gathering and transportation system
CN107975360B (en) * 2017-10-27 2020-03-27 中国石油化工股份有限公司 Device and method for high-pressure treatment of hydrogen sulfide in oil well gathering and transportation system
CN110821393B (en) * 2018-08-14 2021-01-01 中国石油天然气股份有限公司 Drilling method for hydrogen sulfide-containing well

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4696802A (en) * 1985-11-27 1987-09-29 The Dow Chemical Company Drilling geothermal wells with removal of H2 S
CN101839128A (en) * 2009-03-16 2010-09-22 北京拉非克石油工程技术有限公司 Method for stabilizing active hydrogen sulfide in sulfur-containing oil-gas well
WO2011149597A1 (en) * 2010-05-26 2011-12-01 Exxonmobil Upstream Research Company Assembly and method for multi-zone fracture stimulation of a reservoir using autonomous tubular units
CN102619497B (en) * 2012-04-11 2015-05-06 中国石油天然气股份有限公司 Method for continuously reducing hydrogen sulfide in oil well shaft

Also Published As

Publication number Publication date
CN103230728A (en) 2013-08-07

Similar Documents

Publication Publication Date Title
CN103775122A (en) Simulation experiment device of gas extraction and coal spontaneous combustion of spontaneous combustion-prone and high gas concentration coal seam goaf
CN103230728B (en) Method for treating hydrogen sulfide on oil well site
CN204188341U (en) Air pressure testing/detecting device
CN103994863A (en) Air-tight sealing detection method of threaded connection of oil casing tubes
CN204101338U (en) A kind of down-hole bound polyamine sampling apparatus based on coal extraction system
CN104405372A (en) Method for testing vertical three zone heights of stope cover rock based on high level borehole flow
CN104358559B (en) Method for measuring effective coal-mine gas extraction radius
CN104847346A (en) Coal spontaneous combustion gas marker acquiring device for goaf
Anas et al. Gas monitoring and testing in underground mines using wireless technology
CN103994865A (en) Air-tight sealing detection apparatus of threaded connection of oil casing tubes
CN204113279U (en) Leakage checking and stopping pipe column structure of gas injection and production pipe column
CN101892842A (en) A kind of vertical shaft uncovering coal method
CN204476400U (en) Wellbore construction prevents the drill stem washout testing and analysis system of drilling tool accident
CN104033728B (en) A kind of discarded steel cylinder processing method
CN106907176A (en) A kind of coal gas in mine is from dynamic pressure wind dilution device
CN203241203U (en) A detecting apparatus of the threaded connection hermetic seal of an oil casing
CN210217721U (en) Gas drainage pipeline inspection hole plugging device
CN204330243U (en) A kind of borehole sealing pick-up unit
CN204877407U (en) Oil recovery water injection metering device
CN104048160B (en) Treatment system for disused steel bottle
CN205620183U (en) Gaseous rapid sampling device in disaster area
CN103556966B (en) The dynamic sulfur limitation effect monitoring device of drilling fluid
CN103778833A (en) Novel gas-explosion demonstration device
CN207148096U (en) Goaf observation device
CN208252086U (en) A kind of device of the intelligentized dosing of oil well hydrogen sulfide treatment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160713

Address after: 457001 No. 22 civilized road, Henan City, Puyang Province

Patentee after: PUYANG KERUN PETROLEUM ENGINEERING TECHNOLOGY CO.,LTD.

Address before: 100028 Beijing City, Chaoyang District Henan Xiba Road No. 1 Xintian No. B building room 3002

Patentee before: BEIJING GREENOIL TECHNOLOGY SERVICES Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Treatment method of hydrogen sulfide in oil well site

Effective date of registration: 20210713

Granted publication date: 20150520

Pledgee: Bank of China Limited by Share Ltd. Puyang branch

Pledgor: PUYANG KERUN PETROLEUM ENGINEERING TECHNOLOGY Co.,Ltd.

Registration number: Y2021980006034

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230306

Granted publication date: 20150520

Pledgee: Bank of China Limited by Share Ltd. Puyang branch

Pledgor: PUYANG KERUN PETROLEUM ENGINEERING TECHNOLOGY CO.,LTD.

Registration number: Y2021980006034

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Treatment Method of Hydrogen Sulfide in Oil Well Site

Effective date of registration: 20230315

Granted publication date: 20150520

Pledgee: Bank of China Limited by Share Ltd. Puyang branch

Pledgor: PUYANG KERUN PETROLEUM ENGINEERING TECHNOLOGY CO.,LTD.

Registration number: Y2023980034894

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20150520

Pledgee: Bank of China Limited by Share Ltd. Puyang branch

Pledgor: PUYANG KERUN PETROLEUM ENGINEERING TECHNOLOGY CO.,LTD.

Registration number: Y2023980034894

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Methods for on-site treatment of hydrogen sulfide in oil wells

Granted publication date: 20150520

Pledgee: Bank of China Limited by Share Ltd. Puyang branch

Pledgor: PUYANG KERUN PETROLEUM ENGINEERING TECHNOLOGY CO.,LTD.

Registration number: Y2024980010762