[go: up one dir, main page]

CN103195467A - Hydraulic fracturing and grouting solidification combined rock cross-cut coal uncovering method - Google Patents

Hydraulic fracturing and grouting solidification combined rock cross-cut coal uncovering method Download PDF

Info

Publication number
CN103195467A
CN103195467A CN2013101121210A CN201310112121A CN103195467A CN 103195467 A CN103195467 A CN 103195467A CN 2013101121210 A CN2013101121210 A CN 2013101121210A CN 201310112121 A CN201310112121 A CN 201310112121A CN 103195467 A CN103195467 A CN 103195467A
Authority
CN
China
Prior art keywords
grouting
coal seam
hole
coal
fracturing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101121210A
Other languages
Chinese (zh)
Other versions
CN103195467B (en
Inventor
李栋
覃乐
郭臣业
周东平
余模华
王联
周俊杰
徐涛
张翠兰
张迪
何苗
周声才
沈大富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING ENERGY INVESTMENT GROUP TECHNOLOGY CO LTD
Chongqing University
Original Assignee
Chongqing Energy Technology Investment Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Energy Technology Investment Group Co Ltd filed Critical Chongqing Energy Technology Investment Group Co Ltd
Priority to CN201310112121.0A priority Critical patent/CN103195467B/en
Publication of CN103195467A publication Critical patent/CN103195467A/en
Application granted granted Critical
Publication of CN103195467B publication Critical patent/CN103195467B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明公开了一种水力压裂与注浆固化相结合的石门揭煤方法,包括在巷道掘进至煤层垂距10m时,钻穿透煤层的压裂孔并对煤层进行水力压裂,至压裂中出现3MPa以上压力降后注水量达预计值;在巷道掘进至煤层垂距5m时,钻多个注浆孔;通过压裂孔和注浆孔抽采煤层瓦斯;由注浆孔对煤层实施设定量的注浆,注浆压力在15MPa以上;在浆液固化后继续掘进巷道并完成石门揭煤。单孔注浆量包括注浆孔内的注浆量M1和煤层中渗透的注浆量M2,按下式计算:

Figure 2013101121210100004DEST_PATH_IMAGE001
式中:
Figure 252730DEST_PATH_IMAGE002
浆液密度;
Figure 2013101121210100004DEST_PATH_IMAGE003
储备系数;
Figure 371995DEST_PATH_IMAGE004
浆液发泡倍数;钻孔直径;
Figure 250084DEST_PATH_IMAGE006
注浆孔长度;
Figure DEST_PATH_IMAGE007
浆液在煤层中的渗透半径;
Figure 87590DEST_PATH_IMAGE008
注浆孔在煤层中长度;
Figure DEST_PATH_IMAGE009
煤层孔隙率。本发明的有益效果是,可快速、安全揭石门,避免同行进行重复劳动,提高社会效益。

The invention discloses a method for uncovering coal in Shimen by combining hydraulic fracturing and grouting solidification. After the pressure drop of more than 3MPa in the crack occurs, the water injection volume reaches the expected value; when the roadway is excavated to the coal seam vertical distance of 5m, multiple grouting holes are drilled; coal seam gas is extracted through fracturing holes and grouting holes; A set amount of grouting is implemented on the coal seam, and the grouting pressure is above 15MPa; after the grout is solidified, continue to excavate the roadway and complete the coal removal at the Shimen. The single hole grouting amount includes the grouting amount M 1 in the grouting hole and the grouting amount M 2 permeated in the coal seam, calculated according to the following formula:

Figure 2013101121210100004DEST_PATH_IMAGE001
In the formula:
Figure 252730DEST_PATH_IMAGE002
slurry density;
Figure 2013101121210100004DEST_PATH_IMAGE003
reserve factor;
Figure 371995DEST_PATH_IMAGE004
The foaming ratio of the slurry; Drilling diameter;
Figure 250084DEST_PATH_IMAGE006
grouting hole length;
Figure DEST_PATH_IMAGE007
The penetration radius of the slurry in the coal seam;
Figure 87590DEST_PATH_IMAGE008
The length of the grouting hole in the coal seam;
Figure DEST_PATH_IMAGE009
coal seam porosity. The beneficial effect of the invention is that the stone door can be opened quickly and safely, avoiding duplication of work by colleagues, and improving social benefits.

Description

A kind of fracturing is solidified the stone door punching coal method that combines with slip casting
Technical field
The present invention relates to a kind of stone door punching coal method, especially a kind of being applicable to has the quick stone door punching coal method that the fracturing of the low-permeable weak seam of prominent danger by force combines with slip casting curing.
Background technology
In the roadway construction in the high mine of outburst hazard, extensive, the high-intensity coal of the easiest generation and gas were outstanding when crossdrift was exposed the coal seam, were seriously restricting the safe and efficient production of mine.Crossdrift protrusion-dispelling method for uncovering coal of the prior art is more, comprises pre-gas pumping destressing method, coal body solidification method etc.All must contain in the whole bag of tricks according to " coal and gas outburst prevention treatment regulation ", in the step of taking off construction gas pumping hole and mash gas extraction before the crossdrift of carrying out according to a conventional method in the tunnelling process.Yet along with the increase of the coal mining degree of depth, coal and gas outstanding problem seem more and more serious, take single extinction measure to be difficult to reach the purpose of safety, quick exposed coal.Chinese patent publication number CN101598030A; open December 9 2009 date; invention and created name " method for realizing fast coal exposing of coal seam rock cross with outburst danger "; a kind of method that pre-gas pumping release and coal body are fixedly combined is disclosed; comprise by the high-pressure water jet slot; technology such as hydraulic flushing in hole or loosening big gun is destroyed the coal seam in crossdrift periphery certain limit; carry out the gas pumping release then; make a stiffening ring by grout injection in the certain thickness coal seam of crossdrift periphery again; thereby form a protection structure; to guarantee to take off crossdrift safety, this method is applicable to the stone door punching coal with strong prominent dangerous coal seam.Yet, this takes off the crossdrift method in implementation process, technology such as the high-pressure water jet slot, hydraulic flushing in hole or the loosening big gun that adopt are limited to the damage envelope of coal body and the crack that produces in damage envelope, and, weigh the aeration level in coal seam and be to guarantee the key element taking off crossdrift safety and raise the efficiency to the reasonability that parameters such as coal seam grouting amount are selected, but it is also unexposed in this technical scheme, therefore, the colleague also need carry out necessary groping and the experiment experience accumulation in specific implementation process, be not easy to directly apply., require further improvement for this reason, directly adopt with convenient colleague's same nature colliery, avoid the duplication of labour, improve industry and take off the crossdrift level, improve social benefit.
Summary of the invention
The objective of the invention is at the deficiencies in the prior art, provide the coal seam fracturing of a kind of outburst danger to solidify the stone door punching coal method that combines with coal body, with the purpose that reaches fast, safety is exposed coal and gas is projecting coal bed, simultaneously, be convenient to go together and directly adopt, avoid the duplication of labour, improve social benefit.
For achieving the above object, the present invention adopts following technical scheme.
A kind of fracturing is solidified the stone door punching coal method that combines with slip casting, may further comprise the steps:
A, when tunnelling when hanging down apart from 10m apart from the coal seam, creep into the pressure break hole along the tunnelling direction, until penetrating the coal seam, sealing of hole is carried out in the pressure break hole to be handled, and by the pressure break hole fracturing is carried out in coal-bed flooding, after frac pressure continues to rise to the pressure that a setting value occurs and falls △ P, stop pressure break after keeping pressure break to water injection rate to reach predicted value;
B, in tunnelling when hanging down apart from 5m apart from the coal seam, two help to expand earpick shape drill site in the tunnel, construction penetrates a plurality of injected holes in coal seam, the boring scope of injected hole is the outer 2~2.5m of drift section outline line;
C, in injected hole, install Grouting Pipe, injected hole carried out sealing of hole handle, and by pressure break hole and injected hole extraction coal-bed gas to setting requirement;
D, select arbitrary injected hole for the treatment of slip casting, the slurries that can reinforce the coal seam after solidifying to its hole internal pressure perfusion by Grouting Pipe, and interim shutoff all the other treat the injected hole of slip casting; Its grouting pressure when reaching the setting grouting amount, stops slip casting more than 15MPa;
E, circulation step d are until the slip casting of finishing all injected holes;
F, treat slurries solidify and check up to standard after, carry out tunnelling and pass the coal seam according to conventional method, finish stone door punching coal work;
Described pressure falls △ P and is generally more than the 3MPa; Described grouting amount comprises the grouting amount M in the injected hole 1Grouting amount M with infiltration diffusion in the coal seam 2, its single hole slip casting total amount is calculated as follows:
Figure 2013101121210100002DEST_PATH_IMAGE001
In the formula:
Figure 911681DEST_PATH_IMAGE002
-serum density, kg/m 3
Figure 2013101121210100002DEST_PATH_IMAGE003
-reserve factor gets 1.1~1.2 usually;
Figure 153306DEST_PATH_IMAGE004
-slurries coefficient of foaming gets 1.3~1.4 usually;
Figure 2013101121210100002DEST_PATH_IMAGE005
-bore diameter, the mm of unit;
-injected hole length, the m of unit;
The penetration radius of-slurries in the coal seam determined the m of unit by ocurrence of coal seam feature and fracturing effect;
Figure 196534DEST_PATH_IMAGE008
-injected hole is length in the coal seam, the m of unit;
Figure DEST_PATH_IMAGE009
-coal seam porosity.
Described fracturing estimates that water injection rate should be definite according to institute's concrete feature in pressure break coal seam; Described pressure break bore dia is 95mm; Described injected hole diameter is 75mm; It is the seamless steel pipe of 12.5mm that described Grouting Pipe adopts diameter.
The invention has the beneficial effects as follows: the present invention is by at first carrying out fracturing to coal and rock, impel coal body to produce a large amount of perforation cracks, coal and rock is on a large scale behind the release mash gas extraction, again to this zone boring grouting reinforcing, improved the intensity of coal and rock greatly, thereby the outstanding and percussion when effectively resisting exposed coal reaches the purpose of exposed coal fast and safely.When fracturing makes coal and rock produce a large amount of crack, discharged the stress primitively of a part, guaranteed that slurries inject smoothly, and enlarged the scope of grouting and reinforcing.This cover method is being guaranteed under the prerequisite of safe exposed coal, can reduce the extinction engineering quantity, shorten construction period, has satisfied the needs of strong projecting coal bed stone door punching coal fast and safely.Simultaneously, the pressure drop values when the present invention has provided pressure break and the grouting pressure of slip casing by pressure and grouting amount avoid the colleague to carry out the duplication of labour, can bring remarkable social benefit.
Description of drawings
Fig. 1 is the arrangement schematic diagram that pressure break hole 3, injected hole 4 and tunnel in the stone door punching coal method that combines are solidified in fracturing of the present invention and slip casting.
Fig. 2 is the A-A sectional drawing among Fig. 1.
Fig. 3 is the B-B sectional drawing among Fig. 1.
Fig. 4 is that the position of injected hole 4 and Grouting Pipe 7 concerns schematic diagram.
The specific embodiment
The present invention is further illustrated below in conjunction with accompanying drawing, but therefore do not limit the present invention among the described scope of embodiments.
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, a kind of fracturing is solidified the stone door punching coal method that combines with slip casting, it is characterized in that, may further comprise the steps:
A, when tunnel 6 driving to apart from the coal seam 1 when hanging down apart from 10m, 6 tunneling directions creep into pressure break hole 3 along the tunnel, until penetrating coal seam 1, sealing of hole is carried out in pressure break hole 3 to be handled, and carry out fracturing by 3 pairs of coal seam 1 water fillings in pressure break hole, after frac pressure continues to rise to the pressure that a setting value occurs and falls △ P, stop pressure break after keeping pressure break to water injection rate to reach predicted value;
B, 6 drivings are to apart from the coal seam 1 when hanging down apart from 5m in the tunnel, and 6 liang of groups expand earpick shape drill sites 5 in the tunnel, and construction penetrates a plurality of injected holes 4 in coal seam 1, and the boring scope of injected hole 4 is the outer 2~2.5m of tunnel 6 range line profiles;
C, in injected hole 4, install Grouting Pipe 7, injected hole 4 carried out sealing of hole handle and form sealing of hole section 8, and by pressure break hole 3 and injected hole 4 extraction coal seams 1 gas to setting requirement;
D, select arbitrary injected hole 4 for the treatment of slip casting, the slurries that can reinforce the coal seam after solidifying to its hole internal pressure perfusion by Grouting Pipe 7, and interim shutoff all the other treat the injected hole 4 of slip casting; Its grouting pressure when reaching the setting grouting amount, stops slip casting more than 15MPa;
E, circulation step d are until the slip casting of finishing all injected holes 4;
F, treat slurries solidify and check up to standard after, carry out tunnelling and pass the coal seam according to conventional method, finish stone door punching coal work;
Described pressure falls △ P and is generally more than the 3MPa; Described grouting amount comprises the grouting amount M in the injected hole 4 1Grouting amount M with infiltration diffusion in the coal seam 1 2, its single hole slip casting total amount is calculated as follows:
Figure 469384DEST_PATH_IMAGE001
In the formula:
Figure 886721DEST_PATH_IMAGE002
-serum density, kg/m 3
Figure 903219DEST_PATH_IMAGE003
-reserve factor gets 1.1~1.2 usually;
Figure 401196DEST_PATH_IMAGE004
-slurries coefficient of foaming gets 1.3~1.4 usually;
Figure 985892DEST_PATH_IMAGE005
-bore diameter, the mm of unit;
-injected hole 4 length, the m of unit;
Figure 756719DEST_PATH_IMAGE007
The penetration radius of-slurries in coal seam 1 determined the m of unit by ocurrence of coal seam feature and fracturing effect;
Figure 109203DEST_PATH_IMAGE008
-injected hole 4 length in the coal seam, the m of unit;
Figure 51751DEST_PATH_IMAGE009
-coal seam porosity.
Described fracturing estimates that water injection rate should be definite according to institute's concrete feature in pressure break coal seam; Described pressure break hole 3 diameters are 95mm; Described injected hole 4 diameters are 75mm; It is the seamless steel pipe of 12.5mm that described Grouting Pipe 7 adopts diameter.
Though more than combine accompanying drawing and described embodiments of the present invention, but those of ordinary skill in the art can recognize also in the scope to claims and make various variations or modification that these modifications and variations are interpreted as within scope of the present invention and intention.

Claims (3)

1.一种水力压裂与注浆固化相结合的石门揭煤方法,其特征在于,包括以下步骤: 1. A method for uncovering coal in Shimen combined with hydraulic fracturing and grouting solidification, is characterized in that, comprises the following steps: a、当巷道(6)掘进至距煤层(1)垂距10m时,沿巷道(6)掘进方向钻进压裂孔(3),直至穿透煤层(1),对压裂孔(3)进行封孔处理,并通过压裂孔(3)对煤层(1)注水进行水力压裂,当压裂压力持续上升至出现一设定值的压力降△P后,保持压裂至注水量达到预计值后停止压裂; a. When the roadway (6) is excavated to a vertical distance of 10m from the coal seam (1), drill the fracturing hole (3) along the tunneling direction (6) until the coal seam (1) is penetrated, and the fracturing hole (3) Carry out hole sealing treatment, and perform hydraulic fracturing by injecting water into the coal seam (1) through the fracturing hole (3). Stop fracturing after the expected value; b、在巷道(6)掘进至距煤层(1)垂距5m时,在巷道(6)两帮扩挖耳形钻场(5),施工穿透煤层(1)的多个注浆孔(4),注浆孔(4)的钻孔范围为巷道(6)断面轮廓线外2~2.5m; b. When the roadway (6) is excavated to a vertical distance of 5m from the coal seam (1), expand and dig the ear-shaped drill field (5) on both sides of the roadway (6), and construct multiple grouting holes that penetrate the coal seam (1) ( 4), the drilling range of the grouting hole (4) is 2-2.5m outside the section contour of the roadway (6); c、在注浆孔(4)内安设注浆管(7),对注浆孔(4)进行封孔处理,并通过压裂孔(3)和注浆孔(4)抽采煤层(1)瓦斯至设定要求; c. Install the grouting pipe (7) in the grouting hole (4), seal the grouting hole (4), and drain the coal seam through the fracturing hole (3) and the grouting hole (4) (1) Gas to setting requirements; d、选择任一待注浆的注浆孔(4),通过注浆管(7)向其孔内压力灌注凝固后可对煤层进行加固的浆液,并临时封堵其余待注浆的注浆孔(4);其注浆压力在15MPa以上,当达到设定注浆量时,停止注浆; d. Select any grouting hole (4) to be grouted, pour solidified grout into the hole through the grouting pipe (7) to reinforce the coal seam, and temporarily block the remaining grouting holes to be grouted hole (4); the grouting pressure is above 15MPa, when the set grouting amount is reached, the grouting is stopped; e、循环步骤d,直至完成对所有注浆孔(4)的注浆;  e. Cycle step d until the grouting of all grouting holes (4) is completed; f、待浆液固化并检验达标后,按照常规方法掘进巷道并穿过煤层,完成石门揭煤工作;  f. After the slurry is solidified and tested up to the standard, excavate the roadway and pass through the coal seam according to the conventional method, and complete the work of uncovering the coal at the stone gate; 所述的压力降△P为3MPa以上;所述的注浆量包括注浆孔(4)内的注浆量M1和煤层(1)中渗透扩散的注浆量M2,其单孔注浆总量按如下公式计算:  The pressure drop △P is above 3MPa; the grouting amount includes the grouting amount M 1 in the grouting hole (4) and the grouting amount M 2 permeating and diffusing in the coal seam (1). The total amount of pulp is calculated according to the following formula: 式中:—浆液密度,kg/m3In the formula: — density of slurry, kg/m 3 ;
Figure 479796DEST_PATH_IMAGE003
—储备系数,通常取1.1~1.2;
Figure 479796DEST_PATH_IMAGE003
- Reserve coefficient, usually 1.1~1.2;
Figure 780197DEST_PATH_IMAGE004
—浆液发泡倍数,通常取1.3~1.4;
Figure 780197DEST_PATH_IMAGE004
- The foaming ratio of the slurry, usually 1.3 to 1.4;
—钻孔直径,单位mm; —Drilling diameter, in mm; —注浆孔(4)长度,单位m; —the length of the grouting hole (4), in m;
Figure 928915DEST_PATH_IMAGE007
—浆液在煤层(1)中的渗透半径,由煤层赋存特征和压裂效果确定,单位m;
Figure 928915DEST_PATH_IMAGE007
—The penetration radius of the slurry in the coal seam (1), determined by the occurrence characteristics of the coal seam and the fracturing effect, in m;
Figure 901682DEST_PATH_IMAGE008
—注浆孔(4)在煤层中长度,单位m;
Figure 901682DEST_PATH_IMAGE008
—The length of the grouting hole (4) in the coal seam, in m;
Figure 314208DEST_PATH_IMAGE009
—煤层孔隙率。
Figure 314208DEST_PATH_IMAGE009
— Coal seam porosity.
2.根据权利要求1所述的水力压裂与注浆固化相结合的石门揭煤方法,其特征在于,所述压裂孔(3)直径为95mm;所述注浆孔(4)直径为75mm;所述的注浆管(7)采用直径为12.5mm的无缝钢管。 2. The Shimen coal removal method combining hydraulic fracturing and grouting solidification according to claim 1, characterized in that the diameter of the fracturing hole (3) is 95 mm; the diameter of the grouting hole (4) is 75mm; the grouting pipe (7) adopts a seamless steel pipe with a diameter of 12.5mm. 3.根据权利要求1所述的水力压裂与注浆固化相结合的石门揭煤方法,其特征在于,所述的水力压裂预计注水量应根据所压裂煤层具体特征确定。 3. The method for uncovering coal in Shimen by combining hydraulic fracturing and grouting solidification according to claim 1, characterized in that the estimated water injection amount for hydraulic fracturing should be determined according to the specific characteristics of the fractured coal seam.
CN201310112121.0A 2013-04-02 2013-04-02 Hydraulic fracturing and grouting solidification combined rock cross-cut coal uncovering method Expired - Fee Related CN103195467B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310112121.0A CN103195467B (en) 2013-04-02 2013-04-02 Hydraulic fracturing and grouting solidification combined rock cross-cut coal uncovering method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310112121.0A CN103195467B (en) 2013-04-02 2013-04-02 Hydraulic fracturing and grouting solidification combined rock cross-cut coal uncovering method

Publications (2)

Publication Number Publication Date
CN103195467A true CN103195467A (en) 2013-07-10
CN103195467B CN103195467B (en) 2015-02-25

Family

ID=48718266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310112121.0A Expired - Fee Related CN103195467B (en) 2013-04-02 2013-04-02 Hydraulic fracturing and grouting solidification combined rock cross-cut coal uncovering method

Country Status (1)

Country Link
CN (1) CN103195467B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510957A (en) * 2013-10-08 2014-01-15 中国矿业大学 Combined rock cross-cut coal uncovering method
CN103899348A (en) * 2014-04-23 2014-07-02 重庆市能源投资集团科技有限责任公司 Method for fast extracting gas on coalface
CN104213932A (en) * 2014-08-07 2014-12-17 中国矿业大学 Outburst coal bed hydraulic phase change cracking cross-cut coal uncovering method
CN104213921A (en) * 2014-08-07 2014-12-17 中国矿业大学 Freezing-type stone door cross-measure coal uncovering method based on hydraulic seam cutting
CN105003294A (en) * 2015-07-30 2015-10-28 山东科技大学 Method for coal uncovering in cross cut by hydrothermal coupling based coal fracturing
CN105221182A (en) * 2015-09-21 2016-01-06 河南理工大学 Coal uncovering method under the complex geological condition of pole
CN104074539B (en) * 2014-07-22 2016-05-11 贵州大学 One is held back gas drainage under suction structure and implementation method thereof
CN105781552A (en) * 2016-03-07 2016-07-20 安徽理工大学 Novel high-gas outburst coal seam stereoscopic punching crosscut coal uncovering method
CN108386193A (en) * 2018-02-02 2018-08-10 陕西煤业化工技术研究院有限责任公司 A kind of hard integrality top plate chemically expansible pressure break pressure relief method in end
CN108590739A (en) * 2018-04-11 2018-09-28 中国平煤神马能源化工集团有限责任公司 A kind of prominent tunnel regionality energy divides source to control anti-burst method
CN112855073A (en) * 2021-02-04 2021-05-28 河南理工大学 Device and method for solidifying coal bed by using microorganisms in cross-cut coal uncovering process
CN114737970A (en) * 2022-04-02 2022-07-12 陕西长武亭南煤业有限责任公司 Pre-crack hydraulic fracturing roof cutting pressure relief construction method
CN114753849A (en) * 2022-04-20 2022-07-15 中国矿业大学 A layered grouting reinforcement method for soft rock based on hydraulic fracturing and permeability enhancement

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2121062C1 (en) * 1997-04-15 1998-10-27 Московский государственный горный университет Method of withdrawal of methane from coal bed
US20070227732A1 (en) * 2006-03-28 2007-10-04 Schlumberger Technology Corporation Method of fracturing a coalbed gas reservoir
CN101581231A (en) * 2009-06-16 2009-11-18 煤炭科学研究总院沈阳研究院 Gas drainage method for loosening coal body through cross layer boring and hydraulic fracture
CN101603431A (en) * 2009-07-14 2009-12-16 中国矿业大学 A reinforcement method for uncovering coal at the stone gate of the outburst dangerous coal seam

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2121062C1 (en) * 1997-04-15 1998-10-27 Московский государственный горный университет Method of withdrawal of methane from coal bed
US20070227732A1 (en) * 2006-03-28 2007-10-04 Schlumberger Technology Corporation Method of fracturing a coalbed gas reservoir
CN101581231A (en) * 2009-06-16 2009-11-18 煤炭科学研究总院沈阳研究院 Gas drainage method for loosening coal body through cross layer boring and hydraulic fracture
CN101603431A (en) * 2009-07-14 2009-12-16 中国矿业大学 A reinforcement method for uncovering coal at the stone gate of the outburst dangerous coal seam

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
华敬涛等: "鹤煤四矿突出石门快速揭煤技术的研究及应用", 《煤》 *
杨志刚等: "采用注浆加固技术防止石门揭煤时煤与瓦斯突出", 《煤矿安全》 *
王文选等: "水力压裂与强化抽放石门快速揭煤技术", 《煤矿安全》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510957B (en) * 2013-10-08 2016-04-20 中国矿业大学 A kind of combined type coal uncovering method
CN103510957A (en) * 2013-10-08 2014-01-15 中国矿业大学 Combined rock cross-cut coal uncovering method
CN103899348A (en) * 2014-04-23 2014-07-02 重庆市能源投资集团科技有限责任公司 Method for fast extracting gas on coalface
CN104074539B (en) * 2014-07-22 2016-05-11 贵州大学 One is held back gas drainage under suction structure and implementation method thereof
CN104213932A (en) * 2014-08-07 2014-12-17 中国矿业大学 Outburst coal bed hydraulic phase change cracking cross-cut coal uncovering method
CN104213921A (en) * 2014-08-07 2014-12-17 中国矿业大学 Freezing-type stone door cross-measure coal uncovering method based on hydraulic seam cutting
CN105003294A (en) * 2015-07-30 2015-10-28 山东科技大学 Method for coal uncovering in cross cut by hydrothermal coupling based coal fracturing
CN105003294B (en) * 2015-07-30 2017-09-29 山东科技大学 One kind is based on hydrothermal reaction coupling pressure break coal body coal uncovering method
CN105221182B (en) * 2015-09-21 2017-11-17 河南理工大学 Coal uncovering method under the complex geological condition of pole
CN105221182A (en) * 2015-09-21 2016-01-06 河南理工大学 Coal uncovering method under the complex geological condition of pole
CN105781552A (en) * 2016-03-07 2016-07-20 安徽理工大学 Novel high-gas outburst coal seam stereoscopic punching crosscut coal uncovering method
CN108386193A (en) * 2018-02-02 2018-08-10 陕西煤业化工技术研究院有限责任公司 A kind of hard integrality top plate chemically expansible pressure break pressure relief method in end
CN108590739A (en) * 2018-04-11 2018-09-28 中国平煤神马能源化工集团有限责任公司 A kind of prominent tunnel regionality energy divides source to control anti-burst method
CN112855073A (en) * 2021-02-04 2021-05-28 河南理工大学 Device and method for solidifying coal bed by using microorganisms in cross-cut coal uncovering process
CN112855073B (en) * 2021-02-04 2022-09-20 河南理工大学 A device and method for using microorganisms to solidify coal seam in the process of coal excavation in Shimen
CN114737970A (en) * 2022-04-02 2022-07-12 陕西长武亭南煤业有限责任公司 Pre-crack hydraulic fracturing roof cutting pressure relief construction method
CN114753849A (en) * 2022-04-20 2022-07-15 中国矿业大学 A layered grouting reinforcement method for soft rock based on hydraulic fracturing and permeability enhancement

Also Published As

Publication number Publication date
CN103195467B (en) 2015-02-25

Similar Documents

Publication Publication Date Title
CN103195467A (en) Hydraulic fracturing and grouting solidification combined rock cross-cut coal uncovering method
CN102493822B (en) Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN107701188B (en) A method for static expansive cracking and roof cutting pressure relief on the gob side of narrow coal pillars in gob-gob driving
CN102287198B (en) Construction method for river-crossing shield tunnel crushed stratum communication channel
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN102182499B (en) Hydrofracturing-based method and equipment for diminishing dust and eliminating outburst of coal bed
CN102705005B (en) Technology for plugging water bursting in mine by directional diversion grouting
CN103277120B (en) A kind of non-fully deeply freeze vertical thaw after water burst prevention and controls
CN104747075B (en) Shotcrete anti-collapse drilling method in soft coal seam
CN103510957B (en) A kind of combined type coal uncovering method
CN104533452B (en) A kind of underground coal mine crushes coal body stagewise grouting strengthening method
CN104453913A (en) Vertical shaft working face ahead pre-grouting method
CN107143338B (en) A kind of coal mine roadway driving and method for protecting support
CN101603431A (en) A reinforcement method for uncovering coal at the stone gate of the outburst dangerous coal seam
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN103334770A (en) Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN101598030A (en) Method for realizing fast coal exposing of coal seam rock cross with outburst danger
CN108590739B (en) A kind of prominent tunnel regionality energy divides source to control anti-burst method
CN111764863B (en) Method for blocking water gushing of high-pressure drilling hole in underground fault fracture zone
CN103835729A (en) Ground pre-grouting strengthening technology for deep long-distance roadway surrounding rock
CN103912003B (en) The method of water and hole is moved on a kind of simple and efficient shutoff stratum
CN101608552A (en) The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process
CN108119143A (en) A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain
CN112502663B (en) Curtain grouting method based on directional hydraulic-mechanical splitting technology
CN103362117A (en) Full-section grouting method for grouting section

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170109

Address after: Nanbin road 400060 Chongqing Nan''an District No. 162 Building 2 floor 12

Patentee after: CHONGQING ENERGY INVESTMENT GROUP TECHNOLOGY Co.,Ltd.

Patentee after: Chongqing University

Address before: Nanping Nan''an District of Chongqing City Road 400060 No. 8 19 floor

Patentee before: CHONGQING ENERGY INVESTMENT GROUP TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150225