CN103194972B - 管口伸出塔壁外侧的斜拉桥索导管施工方法 - Google Patents
管口伸出塔壁外侧的斜拉桥索导管施工方法 Download PDFInfo
- Publication number
- CN103194972B CN103194972B CN201310113080.7A CN201310113080A CN103194972B CN 103194972 B CN103194972 B CN 103194972B CN 201310113080 A CN201310113080 A CN 201310113080A CN 103194972 B CN103194972 B CN 103194972B
- Authority
- CN
- China
- Prior art keywords
- pipe
- built
- cable
- cable guide
- guide pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310113080.7A CN103194972B (zh) | 2013-04-02 | 2013-04-02 | 管口伸出塔壁外侧的斜拉桥索导管施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310113080.7A CN103194972B (zh) | 2013-04-02 | 2013-04-02 | 管口伸出塔壁外侧的斜拉桥索导管施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103194972A CN103194972A (zh) | 2013-07-10 |
CN103194972B true CN103194972B (zh) | 2015-02-11 |
Family
ID=48717778
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310113080.7A Active CN103194972B (zh) | 2013-04-02 | 2013-04-02 | 管口伸出塔壁外侧的斜拉桥索导管施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103194972B (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590333B (zh) * | 2013-11-26 | 2016-02-10 | 中铁大桥勘测设计院集团有限公司 | 分段后装式斜拉索主塔索导管结构 |
CN103952980B (zh) * | 2014-05-15 | 2016-06-08 | 中交第三公路工程局有限公司 | 一种斜拉桥主塔索道管安装定位方法 |
CN104264588B (zh) * | 2014-09-23 | 2016-06-29 | 中交第二航务工程局有限公司 | 索导管定位装置 |
CN105113411B (zh) * | 2015-08-03 | 2017-08-15 | 中铁广州工程局集团有限公司 | 一种斜拉桥主塔索导管安装和快速精确定位方法 |
CN106192759B (zh) * | 2016-07-19 | 2017-11-21 | 中交一公局第三工程有限公司 | 一种斜拉桥主塔索导管大管套小管安装方法 |
CN106480824B (zh) * | 2016-09-30 | 2019-04-30 | 武船重型工程股份有限公司 | 一种钢索塔的吊运方法 |
CN114016405A (zh) * | 2021-11-26 | 2022-02-08 | 中铁二局集团有限公司 | 一种斜拉桥塔柱索导管的安装方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004278148A (ja) * | 2003-03-17 | 2004-10-07 | Sumitomo Mitsui Construction Co Ltd | 橋梁の施工方法 |
CN1936188A (zh) * | 2006-10-16 | 2007-03-28 | 江阴法尔胜住电新材料有限公司 | 斜拉索纠偏装置 |
CN200955122Y (zh) * | 2006-10-16 | 2007-10-03 | 江阴法尔胜住电新材料有限公司 | 带楔块的双重管式索鞍 |
KR20100043165A (ko) * | 2010-02-04 | 2010-04-28 | 스미토모 덴코 스틸 와이어 가부시키가이샤 | 새들 구조체와 긴장용 케이블 |
CN201553986U (zh) * | 2009-12-10 | 2010-08-18 | 中国水电顾问集团华东勘测设计研究院 | 斜拉索钢锚固梁结构 |
-
2013
- 2013-04-02 CN CN201310113080.7A patent/CN103194972B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004278148A (ja) * | 2003-03-17 | 2004-10-07 | Sumitomo Mitsui Construction Co Ltd | 橋梁の施工方法 |
CN1936188A (zh) * | 2006-10-16 | 2007-03-28 | 江阴法尔胜住电新材料有限公司 | 斜拉索纠偏装置 |
CN200955122Y (zh) * | 2006-10-16 | 2007-10-03 | 江阴法尔胜住电新材料有限公司 | 带楔块的双重管式索鞍 |
CN201553986U (zh) * | 2009-12-10 | 2010-08-18 | 中国水电顾问集团华东勘测设计研究院 | 斜拉索钢锚固梁结构 |
KR20100043165A (ko) * | 2010-02-04 | 2010-04-28 | 스미토모 덴코 스틸 와이어 가부시키가이샤 | 새들 구조체와 긴장용 케이블 |
Also Published As
Publication number | Publication date |
---|---|
CN103194972A (zh) | 2013-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103194972B (zh) | 管口伸出塔壁外侧的斜拉桥索导管施工方法 | |
CN203755673U (zh) | 一种用于楼板预留孔洞的现浇模板体系 | |
CN204753844U (zh) | 圆钢管混凝土柱套筒连接节点 | |
CN103590414B (zh) | 一种混凝土管桩与承台的连接结构 | |
CN203569582U (zh) | 一种混凝土管桩与承台的连接结构 | |
CN108677943A (zh) | 多次控制注浆预应力钢锚管锚索组合结构及其施工方法 | |
CN111576403B (zh) | 一种使用phc管桩的接桩结构及承台锚固结构 | |
CN103088819A (zh) | 预应力锚索施工方法 | |
CN111764931B (zh) | 一种高地应力软弱围岩隧道支护结构及其施工方法 | |
CN107524461A (zh) | 一种提高隧道二次衬砌环向止水带防水效果的装置及方法 | |
CN204266193U (zh) | 桩基钢筋笼定位器 | |
CN108104121B (zh) | 用于提高压力型锚索水泥灌浆体抗压强度的结构及方法 | |
CN104358360A (zh) | 一种建筑钢筋连接用全灌浆套筒 | |
CN108266207B (zh) | 一种适用于深厚富水砂层地区的顶管进出洞止水方法及装置 | |
CN110485453A (zh) | 一种桩承台基础结构及其施工方法 | |
CN102808414A (zh) | 灌注混凝土结构物有粘结后张预应力锚固施工方法 | |
CN113356198A (zh) | 单拼槽钢锚杆腰梁结构及使用方法 | |
CN103790176B (zh) | 一种预埋短肢柱结构的施工方法 | |
CN209838429U (zh) | 一种后锚盾构衬砌支护结构 | |
CN206110124U (zh) | 一种灌注桩桩端后压浆装置 | |
CN209838430U (zh) | 一种预留沙漏型孔的盾构管片结构 | |
CN204299044U (zh) | 一种建筑钢筋连接用全灌浆套筒 | |
CN105862859A (zh) | 一种粗钢筋预应力锚杆张拉方法 | |
CN203363529U (zh) | 一种供水预应力钢筒混凝土管修复装置 | |
CN111236331B (zh) | 一种深基坑拼接预制桩测斜管安装结构及其使用方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD. Effective date: 20150113 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20150113 Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Applicant after: Group Co., Ltd., Zhongtie Daqiao Bureau Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer Applicant before: China Zhongtie Major Bridge Engineering Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |