[go: up one dir, main page]

CN103161142A - 一种在现有库区水中建立的双向潜水发电的闸坝 - Google Patents

一种在现有库区水中建立的双向潜水发电的闸坝 Download PDF

Info

Publication number
CN103161142A
CN103161142A CN2013100833538A CN201310083353A CN103161142A CN 103161142 A CN103161142 A CN 103161142A CN 2013100833538 A CN2013100833538 A CN 2013100833538A CN 201310083353 A CN201310083353 A CN 201310083353A CN 103161142 A CN103161142 A CN 103161142A
Authority
CN
China
Prior art keywords
reservoir area
tributary
water
reservoir
gate dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100833538A
Other languages
English (en)
Inventor
汤光华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2013100833538A priority Critical patent/CN103161142A/zh
Publication of CN103161142A publication Critical patent/CN103161142A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

本发明及在现有库区水中建立的双向潜水发电的闸坝,可有效解决现有的水库水利能源利用不足且支流库区中泥沙沉积难以排出的问题,其解决的技术方案是,包括本发明包括闸坝,在库区选择支流与主河道交汇处适当位置建立支撑式闸坝,此位置应当满足以下条件:支流库区上游来水量要小于支流库区容量的5%,在支流库区闸坝内安装的灯泡贯流式水轮发电机的总发电时长应大于3000小时,主河道与支流库区的水位相互落差在2米以上时才可以进行发电,坝基内安装有灯泡贯流式水轮发电机,利用水库蓄水泄洪时水位涨落特性,人为形成闸坝内外的水位高差,进行发电,本发明新颖独特,能使现有水库发电装机容量增大,发电量增加,投资效率大幅度提高。

Description

一种在现有库区水中建立的双向潜水发电的闸坝
技术领域
本发明涉及水利工程,特别是在一种在现有库区水中建立的双向潜水发电的闸坝。
背景技术
水力发电站都是在主河道上建立,利用主河道上游到下游的水位落差安装发电机进行发电,发电为单向且不可逆的,而且由于主河道的两侧存在有不同位置的支流库区,在水库蓄水过程中,主河道内的泥沙随蓄水被带入支流库区中沉积下去,支流库区的容积在不断减小,如何利用库区水位消落差对支流库区河道淤泥进行有效冲刷和清理,也是需要解决的问题。
发明内容
针对上述情况,为克服现有技术之不足,本发明之目的就是提供一种在现有库区水中建立的双向潜水发电的闸坝,可有效解决现有的水库水利能源利用不足且支流库区中泥沙沉积难以排出的问题。
其解决的技术方案是,包括本发明包括闸坝,在库区选择支流与主河道交汇处适当位置建立支撑式闸坝,此位置应当满足以下条件:支流库区上游来水量要小于支流库区容量的5%,在支流库区闸坝内安装的灯泡贯流式水轮发电机的总发电时长应大于3000小时,主河道与支流库区的水位相互落差在2米以上时才可以进行发电,坝基内安装有灯泡贯流式水轮发电机,利用水库蓄水泄洪时水位涨落特性,人为形成闸坝内外的水位高差,进行发电。
本发明新颖独特,能使现有水库发电装机容量增大,发电量增加,投资效率大幅度提高。
附图说明
图1为本发明的主视图。
图2为本发明的左视图。
具体实施方式
以下结合附图对本发明的具体实施方式作进一步详细说明。
由图1、图2给出,本发明包括闸坝,在库区选择支流与主河道交汇处适当位置建立支撑式闸坝1,此位置应当满足以下条件:支流库区上游来水量要小于支流库区容量的5%,在支流库区闸坝1内安装的灯泡贯流式水轮发电机3的总发电时长应大于3000小时,主河道与支流库区的水位相互落差在2米以上时才可以进行发电。闸坝1的坝基2内安装有灯泡贯流式水轮发电机3,利用水库蓄水泄洪时水位涨落特性,人为形成闸坝内外的水位高差,进行发电。在水库进行蓄水时,将支流库区闸坝1的闸门4关闭,当主河道库区的水位上升到相对支流库区水位高出2米后与支流库区形成落差,此时泥沙已经沉淀在主河道底部,适时打开闸门4,主河道库区的水通过灯泡贯流式水轮发电机3进入支流库区,即可利用灯泡贯流式水轮发电机3发电,当支流库区与主河道库区水位都达到最高水位时,主河道的水不再进入支流库区,关闭闸门4,当水库泄洪,主河道的库区水面下降到相对支流库区水位低于2米后打开闸门4,支流库区中的水通过发灯泡贯流式水轮发电机3开始向主河道泄水,可再次发电,这样就实现了双向发电。
如小浪底水库煤窑沟支流库区当容量为1.5亿m3,灯泡贯流式水轮发电机3的总装机容量可达10万千瓦,支流库区内的上游来水量小于支流库区容量的5%,对形成闸坝1内外消落差影响可忽略不计,在水库进行蓄水时,将支流库区闸坝1的闸门4关闭,当主河道库区的水位上升到相对支流库区水位高出2米后与支流库区形成落差,此时泥沙已经沉淀在主河道底部,适时打开闸门4,主河道库区的水通过灯泡贯流式水轮发电机3进入支流库区,即可利用灯泡贯流式水轮发电机3发电,当支流库区与主河道库区水位都达到最高水位时,主河道的水不再进入支流库区,关闭闸门4,当水库泄洪,主河道的库区水面下降到相对支流库区水位低于2米后打开闸门,支流库区中的水通过灯泡贯流式水轮发电机3开始向主河道泄水,可再次发电,这样就实现了双向发电,双向总发电量不低于6000小时的发电时长,年发电量约6亿度,可节约标煤20万吨,减少二氧化碳排放量54万吨,发的电直接接入国家电网,而且在此发电过程中,主河道的泥沙很少流进支流库区,对支流库区的库容没有影响,在支流库区泄水时,将支流口处的泥沙冲走。
本发明新颖独特,可使现有水库发电装机容量增大,发电量大幅度增加,并解决了支流库区沉积泥沙的问题,增加水库使用年限,总发电量6亿度是无污染可持续能源,节约大量标煤,减少了二氧化碳排放量,保护了环境。

Claims (1)

1.一种在现有库区水中建立的双向潜水发电的闸坝,包括闸坝,其特征在于,在库区选择支流与主河道交汇处适当位置建立支撑式闸坝(1),此位置应当满足以下条件:支流库区上游来水量要小于支流库区容量的5%,在支流库区闸坝(1)内安装的灯泡贯流式水轮发电机(3)的总发电时长应大于3000小时,主河道与支流库区的水位相互落差在2米以上时才可以进行发电;闸坝(1)的坝基(2)内安装有灯泡贯流式水轮发电机(3),利用水库蓄水泄洪时水位涨落特性,人为形成闸坝内外的水位高差,进行发电;在水库进行蓄水时,将支流库区闸坝(1)的闸门(4)关闭,当主河道库区的水位上升到相对支流库区水位高出2米后与支流库区形成落差,此时泥沙已经沉淀在主河道底部,适时打开闸门(4),主河道库区的水通过灯泡贯流式水轮发电机(3)进入支流库区,即可利用灯泡贯流式水轮发电机(3)发电,当支流库区与主河道库区水位都达到最高水位时,主河道的水不再进入支流库区,关闭闸门(4),当水库泄洪,主河道的库区水面下降到相对支流库区水位低于2米后打开闸门(4),支流库区中的水通过发灯泡贯流式水轮发电机(3)开始向主河道泄水,可再次发电,这样就实现了双向发电。
CN2013100833538A 2013-03-15 2013-03-15 一种在现有库区水中建立的双向潜水发电的闸坝 Pending CN103161142A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100833538A CN103161142A (zh) 2013-03-15 2013-03-15 一种在现有库区水中建立的双向潜水发电的闸坝

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100833538A CN103161142A (zh) 2013-03-15 2013-03-15 一种在现有库区水中建立的双向潜水发电的闸坝

Publications (1)

Publication Number Publication Date
CN103161142A true CN103161142A (zh) 2013-06-19

Family

ID=48584651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100833538A Pending CN103161142A (zh) 2013-03-15 2013-03-15 一种在现有库区水中建立的双向潜水发电的闸坝

Country Status (1)

Country Link
CN (1) CN103161142A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111075635A (zh) * 2019-11-30 2020-04-28 孙汉东 一种新型潮能发电装置
CN112796289A (zh) * 2021-02-23 2021-05-14 王宽飞 一种设有养鱼场可互轮为尖峰峡谷壶口潮汐发电站

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1103454A (zh) * 1993-12-01 1995-06-07 肖景泓 堤内倒装水轮泵排气虹吸水电机组
CN1446986A (zh) * 2003-03-08 2003-10-08 周治梅 潮汐漂流溪的开建方法
JP2006022611A (ja) * 2004-07-09 2006-01-26 Torishima Pump Mfg Co Ltd ポンプゲート
US20070231117A1 (en) * 2006-04-03 2007-10-04 Alexander Gokhman Two-way generation tidal power plant with one-way turbines
CN101302989A (zh) * 2008-06-30 2008-11-12 深圳市红门科技股份有限公司 利用潮汐涨、落潮的双向发电系统
CN201187397Y (zh) * 2007-09-17 2009-01-28 王林虎 新型潮汐发电机组
CN101666287A (zh) * 2008-09-04 2010-03-10 水利部杭州机械设计研究所 一种双向六工况潮汐机组
CN102242686A (zh) * 2010-05-10 2011-11-16 国家海洋局第二海洋研究所 一种发电方法及发电系统

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1103454A (zh) * 1993-12-01 1995-06-07 肖景泓 堤内倒装水轮泵排气虹吸水电机组
CN1446986A (zh) * 2003-03-08 2003-10-08 周治梅 潮汐漂流溪的开建方法
JP2006022611A (ja) * 2004-07-09 2006-01-26 Torishima Pump Mfg Co Ltd ポンプゲート
US20070231117A1 (en) * 2006-04-03 2007-10-04 Alexander Gokhman Two-way generation tidal power plant with one-way turbines
CN201187397Y (zh) * 2007-09-17 2009-01-28 王林虎 新型潮汐发电机组
CN101302989A (zh) * 2008-06-30 2008-11-12 深圳市红门科技股份有限公司 利用潮汐涨、落潮的双向发电系统
CN101666287A (zh) * 2008-09-04 2010-03-10 水利部杭州机械设计研究所 一种双向六工况潮汐机组
CN102242686A (zh) * 2010-05-10 2011-11-16 国家海洋局第二海洋研究所 一种发电方法及发电系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
柯友根: "江厦潮汐试验电站的历史和现在", 《中国电机工程学会风力与潮汐发电专委会换届暨发展研讨会》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111075635A (zh) * 2019-11-30 2020-04-28 孙汉东 一种新型潮能发电装置
CN111075635B (zh) * 2019-11-30 2020-10-27 孙汉东 一种潮能发电装置
CN112796289A (zh) * 2021-02-23 2021-05-14 王宽飞 一种设有养鱼场可互轮为尖峰峡谷壶口潮汐发电站

Similar Documents

Publication Publication Date Title
CN101649813B (zh) 水流海浪潮汐动能和风能太阳能发电的综合系统
CN202325987U (zh) 浮管贯流式水力发电机
CN100443667C (zh) 阶梯式水力发电站
CN202323895U (zh) 用于阶梯式水利枢纽的尾水渠结构
CN102828893A (zh) 取代核电站的潮汐发电站
CN103953003B (zh) 一种用于围海造地的促淤堤坝及促淤方法
CN103161142A (zh) 一种在现有库区水中建立的双向潜水发电的闸坝
KR101419520B1 (ko) 기설 댐 상류 측 본 수계의 보조댐을 이용한 수력 발전장치 및 그 제어방법
CN102644261A (zh) 阻抗与溢流相结合的调压井建造方法
CN203113298U (zh) 一种在现有库区水中建立的双向潜水发电的闸坝
CN102518093B (zh) 一种投资少工期短的水电站布局结构及其施工方法
CN208009531U (zh) 一种静水发电的压力前池
CN102392778A (zh) 高山储水蓄电池
CN202718071U (zh) 降低库区淤沙的拦河坝结构
CN206220070U (zh) 一种海洋综合发电系统
CN203808019U (zh) 深厚软基高水头多功能坝的布置结构
CN103114565A (zh) 适用于斜坡急流河道引流发电的截流引水系统及水电站
CN203604103U (zh) 铺管式水力发电设施
CN202989883U (zh) 一种与沉箱直立式防波堤相结合的发电装置
CN208456765U (zh) 一种承压水发电装置
RU88360U1 (ru) Приливная электростанция
CN103397977A (zh) 铺管式水力发电方法及其发电设施
CN203834436U (zh) 一种跌水发电装置
CN105019414A (zh) 山区水电工程狭窄取水口用复合闸室结构
TW202113224A (zh) 將波浪動能轉換成位能的構造

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130619