CN103114602A - 渗透浸渍聚凝粘结体二次融补的基坑止水帷幕及构建方法 - Google Patents
渗透浸渍聚凝粘结体二次融补的基坑止水帷幕及构建方法 Download PDFInfo
- Publication number
- CN103114602A CN103114602A CN2013100483341A CN201310048334A CN103114602A CN 103114602 A CN103114602 A CN 103114602A CN 2013100483341 A CN2013100483341 A CN 2013100483341A CN 201310048334 A CN201310048334 A CN 201310048334A CN 103114602 A CN103114602 A CN 103114602A
- Authority
- CN
- China
- Prior art keywords
- curtain
- pile
- water
- reinforced concrete
- foundation pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 31
- 238000002844 melting Methods 0.000 title description 7
- 230000008018 melting Effects 0.000 title description 7
- 238000007598 dipping method Methods 0.000 title description 2
- 238000006068 polycondensation reaction Methods 0.000 title 1
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 74
- 239000003673 groundwater Substances 0.000 claims abstract description 45
- 230000015271 coagulation Effects 0.000 claims abstract description 32
- 238000005345 coagulation Methods 0.000 claims abstract description 32
- 230000008595 infiltration Effects 0.000 claims abstract description 21
- 238000001764 infiltration Methods 0.000 claims abstract description 21
- 238000005470 impregnation Methods 0.000 claims abstract description 16
- 239000010410 layer Substances 0.000 claims description 60
- 239000004576 sand Substances 0.000 claims description 51
- 238000005553 drilling Methods 0.000 claims description 35
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 35
- 239000004568 cement Substances 0.000 claims description 27
- 239000002002 slurry Substances 0.000 claims description 25
- 239000002689 soil Substances 0.000 claims description 24
- 239000011241 protective layer Substances 0.000 claims description 19
- 239000011148 porous material Substances 0.000 claims description 18
- 238000009412 basement excavation Methods 0.000 claims description 16
- 238000000034 method Methods 0.000 claims description 16
- 229910000831 Steel Inorganic materials 0.000 claims description 15
- 229920006395 saturated elastomer Polymers 0.000 claims description 15
- 239000010959 steel Substances 0.000 claims description 15
- 239000004927 clay Substances 0.000 claims description 12
- 238000010586 diagram Methods 0.000 claims description 10
- 230000003204 osmotic effect Effects 0.000 claims description 10
- 238000009434 installation Methods 0.000 claims description 8
- 239000004567 concrete Substances 0.000 claims description 6
- 238000005507 spraying Methods 0.000 claims description 6
- 239000011435 rock Substances 0.000 claims description 4
- 238000003756 stirring Methods 0.000 claims description 4
- 230000008569 process Effects 0.000 claims description 3
- 238000005086 pumping Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 239000011440 grout Substances 0.000 claims description 2
- 230000008439 repair process Effects 0.000 abstract description 6
- 230000000694 effects Effects 0.000 description 4
- 230000035699 permeability Effects 0.000 description 4
- 239000003337 fertilizer Substances 0.000 description 2
- 229910052500 inorganic mineral Inorganic materials 0.000 description 2
- 239000011707 mineral Substances 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 230000001939 inductive effect Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310048334.1A CN103114602B (zh) | 2013-02-06 | 2013-02-06 | 渗透浸渍聚凝粘结体二次融补的基坑止水帷幕及构建方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310048334.1A CN103114602B (zh) | 2013-02-06 | 2013-02-06 | 渗透浸渍聚凝粘结体二次融补的基坑止水帷幕及构建方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103114602A true CN103114602A (zh) | 2013-05-22 |
CN103114602B CN103114602B (zh) | 2015-06-17 |
Family
ID=48413029
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310048334.1A Expired - Fee Related CN103114602B (zh) | 2013-02-06 | 2013-02-06 | 渗透浸渍聚凝粘结体二次融补的基坑止水帷幕及构建方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103114602B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103993609A (zh) * | 2014-02-20 | 2014-08-20 | 龚金京 | 硅灰砂导排滤水多功能快硬凝结体人工修补基坑止水帷幕 |
CN105464119A (zh) * | 2014-09-11 | 2016-04-06 | 中建四局第一建筑工程有限公司 | 一种深基坑内侧堵漏的倾斜式高压旋喷桩及施工方法 |
CN109930993A (zh) * | 2019-04-22 | 2019-06-25 | 北京城建勘测设计研究院有限责任公司 | 一种卵石地层管井降水成井装置及施工方法 |
CN112609707A (zh) * | 2020-12-09 | 2021-04-06 | 中铁二十局集团第六工程有限公司 | 基坑渗漏水处理方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101338564A (zh) * | 2008-08-08 | 2009-01-07 | 江苏华东建设基础工程有限公司 | 一种双轴水泥土搅拌机插花套接止水帷幕的施工方法 |
CN102002962A (zh) * | 2010-11-01 | 2011-04-06 | 华北有色工程勘察院有限公司 | 堵水帷幕渗透性反演分析施工确定方法 |
KR20120011120A (ko) * | 2010-07-28 | 2012-02-07 | 홍문표 | 수중교각설치공사를 위한 방수커튼의 제작과 설치 |
CN102587400A (zh) * | 2012-03-08 | 2012-07-18 | 天津建岩岩土工程有限公司 | 止水帷幕堵漏方法 |
CN202380471U (zh) * | 2011-12-13 | 2012-08-15 | 中国京冶工程技术有限公司厦门分公司 | 一种基坑的复合止水帷幕结构 |
-
2013
- 2013-02-06 CN CN201310048334.1A patent/CN103114602B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101338564A (zh) * | 2008-08-08 | 2009-01-07 | 江苏华东建设基础工程有限公司 | 一种双轴水泥土搅拌机插花套接止水帷幕的施工方法 |
KR20120011120A (ko) * | 2010-07-28 | 2012-02-07 | 홍문표 | 수중교각설치공사를 위한 방수커튼의 제작과 설치 |
CN102002962A (zh) * | 2010-11-01 | 2011-04-06 | 华北有色工程勘察院有限公司 | 堵水帷幕渗透性反演分析施工确定方法 |
CN202380471U (zh) * | 2011-12-13 | 2012-08-15 | 中国京冶工程技术有限公司厦门分公司 | 一种基坑的复合止水帷幕结构 |
CN102587400A (zh) * | 2012-03-08 | 2012-07-18 | 天津建岩岩土工程有限公司 | 止水帷幕堵漏方法 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103993609A (zh) * | 2014-02-20 | 2014-08-20 | 龚金京 | 硅灰砂导排滤水多功能快硬凝结体人工修补基坑止水帷幕 |
CN103993609B (zh) * | 2014-02-20 | 2017-08-29 | 龚金京 | 硅灰砂导排滤水多功能快硬凝结体人工修补基坑止水帷幕 |
CN105464119A (zh) * | 2014-09-11 | 2016-04-06 | 中建四局第一建筑工程有限公司 | 一种深基坑内侧堵漏的倾斜式高压旋喷桩及施工方法 |
CN109930993A (zh) * | 2019-04-22 | 2019-06-25 | 北京城建勘测设计研究院有限责任公司 | 一种卵石地层管井降水成井装置及施工方法 |
CN112609707A (zh) * | 2020-12-09 | 2021-04-06 | 中铁二十局集团第六工程有限公司 | 基坑渗漏水处理方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103114602B (zh) | 2015-06-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021223573A1 (zh) | 新增暗挖通道与既有站厅层连通接驳施工结构 | |
CN202337983U (zh) | 喷射器、钻头组合结构及组合钻具 | |
CN108442382B (zh) | 横穿深基坑的压力管线原位保护及围护挡土结构及施工方法 | |
CN102518135B (zh) | 水平旋喷土锚和灌注桩复合基坑支护施工工法 | |
CN205172598U (zh) | 管幕旋喷桩支护结构 | |
CN108677924B (zh) | 双排微型钢管桩注浆成墙隔断结构及方法 | |
CN101215834A (zh) | 支腿式地下连续墙施工工法 | |
CN107859145A (zh) | 一种排水管水下接驳施工方法 | |
CN102286984A (zh) | 一种止水帷幕及其施工方法 | |
CN203583498U (zh) | 一种微型桩组合墙支护结构 | |
CN108708284B (zh) | 一种抵抗泄洪急流冲击的钢栈桥施工方法 | |
CN105839651A (zh) | 路基边坡装配式变形自适应防护骨架及其拼接方法 | |
CN103572764A (zh) | 超深人工挖孔桩护壁止水结构及其施工方法 | |
CN103114602B (zh) | 渗透浸渍聚凝粘结体二次融补的基坑止水帷幕及构建方法 | |
CN109610473A (zh) | 一种市政大型池体构筑物基坑支护体系的施工方法 | |
CN109594575A (zh) | 一种沉井周边注浆加固土体施工方法 | |
CN206721870U (zh) | 一种长螺旋钻孔压灌桩用钢筋笼 | |
CN114575355B (zh) | 一种土护降施工方法 | |
CN112127925A (zh) | 一种隧道结构病害修复体系及施工方法 | |
CN110608047A (zh) | 下穿地铁支护结构及其制造方法 | |
CN119122545A (zh) | 一种城市大断面超浅埋暗挖隧道近接快速施工方法 | |
LU506592B1 (en) | Horizontal directional drilling pipeline with unilateral inclination construction method | |
CN103147435A (zh) | 采空区建筑工程地基处理方法 | |
CN108571330A (zh) | 一种处理地铁底板后浇带渗漏水的方法 | |
CN103993609B (zh) | 硅灰砂导排滤水多功能快硬凝结体人工修补基坑止水帷幕 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 100102, room 22, floor 2202, block A, Jinyu International Building, Wangjing West Road, Beijing, Chaoyang District Applicant after: BEIJING MODERN JINYU GEOTECHNICAL ENGINEERING CO.,LTD. Address before: 100102, room 22, floor 2202, block A, Jinyu International Building, Wangjing West Road, Beijing, Chaoyang District Applicant before: BEIJING MODERN JINYU ENGINEERING CONSTRUCTION CO.,LTD. |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: BEIJING MODERN JINYU ENGINEERING CONSTRUCTION CO., LTD. TO: BEIJING MODERN JINYU GEOTECHNICAL ENGINEERING CO., LTD. |
|
ASS | Succession or assignment of patent right |
Owner name: GONG JINJING Free format text: FORMER OWNER: BEIJING MODERN JINYU GEOTECHNICAL ENGINEERING CO., LTD. Effective date: 20150330 |
|
CB03 | Change of inventor or designer information |
Inventor after: Gong Jinjing Inventor before: Zhou Haoliang Inventor before: Gong Jinjing Inventor before: Zhang Zhongfu |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: ZHOU HAOLIANG GONG JINJING ZHANG ZHONGFU TO: GONG JINJING Free format text: CORRECT: ADDRESS; FROM: 100102 CHAOYANG, BEIJING TO: 102500 FANGSHAN, BEIJING |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20150330 Address after: 102500, room 1, unit 6, building 302, five li, windward, Fangshan District, Beijing, Yanshan Applicant after: Gong Jinjing Address before: 100102, room 22, floor 2202, block A, Jinyu International Building, Wangjing West Road, Beijing, Chaoyang District Applicant before: BEIJING MODERN JINYU GEOTECHNICAL ENGINEERING CO.,LTD. |
|
ASS | Succession or assignment of patent right |
Owner name: BEIJING BICHENG LIANHE HUNDRED METERS DEEP UNDERGR Effective date: 20150413 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20150413 Address after: 102500, room 1, unit 6, building 302, five li, windward, Fangshan District, Beijing, Yanshan Applicant after: Gong Jinjing Applicant after: BEIJING BICHENG UNITED HUNDRED METRES DEPTH UNDERGROUND SPACE TUNNELING TECHNOLOGY CO.,LTD. Address before: 102500, room 1, unit 6, building 302, five li, windward, Fangshan District, Beijing, Yanshan Applicant before: Gong Jinjing |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150617 |