CN103104259A - 倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法 - Google Patents

倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法 Download PDF

Info

Publication number
CN103104259A
CN103104259A CN2013100524799A CN201310052479A CN103104259A CN 103104259 A CN103104259 A CN 103104259A CN 2013100524799 A CN2013100524799 A CN 2013100524799A CN 201310052479 A CN201310052479 A CN 201310052479A CN 103104259 A CN103104259 A CN 103104259A
Authority
CN
China
Prior art keywords
ore
mining
ore body
roof
subsection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100524799A
Other languages
English (en)
Inventor
周科平
雷涛
邓红卫
杨念哥
高峰
李志宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Tin Group (holding) Co Ltd
Central South University
Original Assignee
Yunnan Tin Group (holding) Co Ltd
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Tin Group (holding) Co Ltd, Central South University filed Critical Yunnan Tin Group (holding) Co Ltd
Priority to CN2013100524799A priority Critical patent/CN103104259A/zh
Publication of CN103104259A publication Critical patent/CN103104259A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

本发明公开了一种倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法。本方法在矿体走向上将中段划分为若干回采单元;在中段的下部布置布置中段运输巷道,分段中布置分段运输平巷;分段运输平巷通过溜井与中段运输巷道相连,分段运输平巷与采场沟通;在各分段顶部矿体与围岩接触处开凿沿矿体走向的注浆硐室;在注浆硐室注浆加固上盘破碎围岩,构筑人工顶板;在人工顶板下的凿岩平台进行爆破落矿;崩落矿石送到溜井,通过中段运输平巷送出;下层分段回采完毕后进行充填,并以该层的人工顶板作为上层分段的底板开始上层分段的回采作业。本发明适于破碎的倾斜矿体的开采,具有生产效率高、回采作业安全性强、矿石贫损指标优、经济效益好的特点。

Description

倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法
技术领域
本发明涉及一种采矿方法,特别是涉及一种倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法,适用于地下金属矿山中倾斜矿体的开采。
背景技术
对于上盘围岩或者上下盘围岩均很破碎的倾斜矿体的开采,在不允许地表崩落的情况下,目前主要采用以下向分层充填法为代表的充填法进行。但是这类采矿方法由于分层高度的限制,回采工艺复杂,采、充成本高,充填接顶差,因此矿山存在采矿效率低和安全隐患大的问题。同时这种方法为了维护矿体上、下盘和采场顶板的稳定性,在回采过程中需留下大量的矿柱,这些矿柱(包括间柱、顶柱和底柱)由于受到地压破坏和矿房回采时的爆破损伤,致使后期回收的生产效率更低、安全性更差、成本更高,矿石资源损失量更大。
发明内容
本发明所要解决的技术问题是对一类上盘或上、下盘围岩均很破碎的倾斜矿体提供一种安全、高效的倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法。
为了解决上述技术问题,本发明所采用的技术方案是:矿房采用无矿柱结构(矿房即不划分矿房矿柱),将矿体划分中段,各中段沿厚度分为分段,在矿体走向上将中段划分为若干回采单元;在中段的下部布置布置中段运输巷道,分段中布置分段运输平巷;分段运输平巷通过溜井与中段运输巷道相连,分段运输平巷通过出矿进路与采场沟通;在各分段顶部矿体与围岩接触处开凿沿矿体走向的注浆硐室;在注浆硐室注浆加固上盘破碎围岩,构筑人工顶板;在人工顶板下的凿岩平台凿向下平行中深孔进行爆破落矿;铲运机由出矿进路进入采场将崩落矿石经分段运输平巷运送到溜井,通过中段运输平巷送出;下层分段回采完毕后进行充填,并以该层的人工顶板作为上层分段的底板开始上层分段的回采作业。
矿体划分的中段厚度为50~70m,每个中段分为厚度15~25m的分段,在矿体走向上将所述中段划分为50~100m的若干连续回采单元。
分段出矿进路的间距为15~20m;注浆硐室构筑是向矿体一侧回采一层高度3.5~4.2m的矿体,并在该层顶部构筑0.8~1.2m厚度的人工顶板,在注浆硐室内向围岩中凿注浆钻孔,进行注浆加固,对局部围岩破碎的区域,加设锚杆或锚索进一步加固。
爆破落矿的具体方法是以中深孔爆破的方式在分段单元一侧端部形成高度为分段高度,宽度3m的切割立槽,再以切割立槽为自由面,在凿岩平台凿向下平行中深孔,进行爆破落矿,崩矿步距4.5~5.5m。
分段回采完毕后进行充填,采用井下加压泵送设备将充填材料送入已回采的分段。
由于充填下层分段和构造上层分段人工顶板及向上盘围岩注浆的工序不存在相互干扰,故上下分段的这两种工作可同时进行以节约时间。下层分段充填结束后,可以将该层的人工顶板作为上层分段的底板,并开始上层分段的回采作业。
本发明的有益效果是:通过构造人工顶板,下一层分段的人工顶板作为上层分段的底板,并和再造的顶板一起形成了一个力学性质良好的作业空间,铲运机可直接进入采场出矿,出矿效率高,可有效保障采场顶板的稳定性;通过注浆可有效加固上盘破碎围岩,为凿岩和出矿工作提供安全的作业空间;分段高度可达15~25m,通过中深孔爆破和井下泵送充填,可显著改善传统分层充填法效率低、成本高的缺点;在安全顶板下的凿岩平台上凿下向平行中深孔,凿岩效率高、作业安全、矿石爆破块度均匀;在安全顶板下采用铲运机平底出矿,出矿效率高;采用充填法可有效控制矿体边界,显著提高了矿石回收率和降低了损失率。
综上所述,本发明具有生产效率高、回采作业安全性强、矿石贫损指标优、经济效益好的特点,对上盘或上下盘围岩均破碎的倾斜矿体是一种有效的采矿方法。
附图说明
图1为本发明采矿方法的正视图。
图2为本发明采矿方法的俯视图。
图3为本发明采矿方法的侧视图。
图中: 1-中段运输巷道;2-出矿进路;3-充填体;4-人工顶板;5-崩落矿石;6-中深孔;7-矿体;8-注浆硐室;9-凿岩平台;10-分段运输平巷;11-节理裂隙;12-注浆钻孔;13-溜井;14-联络道。
具体实施方式
下面根据附图并结合具体实施方式对本发明作进一步说明,本实例仅作为个例对本发明技术方案进行解释,不对保护范围限制。
(1)如图所示,将矿体分为高度在50~70m之间的中段,在每个中段的下部布置中段运输巷道1;然后又将每个中段分为高度在15~25m之间的分段,并在每个分段布置分段运输平巷10,分段运输平巷10通过溜井13与中段运输巷道1相连。在矿体走向上将所述中段划分为50~100m(该长度由人工顶板的强度确定)的若干连续回采单元。
(2)分段运输平巷10通过出矿进路2与采场沟通,各分段出矿进路2的距离以15~20m为宜。在各分段顶部矿体与围岩接触处开凿沿矿体走向的注浆硐室8。
(3)如图所示,从注浆硐室8向矿体一侧回采一层高度为4m左右的矿体,并在该层顶部构筑1m左右厚度的人工顶板4,并形成凿岩平台9;同时,在注浆硐室8向围岩中凿注浆钻孔12进行注浆加固。
(4)在本分段单元一侧端部切割立槽,以中深孔爆破的方式形成,高度为分段高度,宽度为3m左右;切割立槽形成后,以切割立槽为自由面,在凿岩平台9凿下向平行中深孔6进行爆破落矿,崩矿步距5m左右。
(5)采用铲运机通过出矿进路2进入采场将崩落矿石5经分段运输平巷10运送到溜井13,矿石5经溜井13即可通过中段运输平巷1送出。
(6)每个分段回采单元回采完毕后进行充填作业。充填时为了保证充填接顶和充填体的强度要求,可采用井下加压泵送设备将高浓度充填材料送入已回采的分段。
(7)下层分段充填结束后,即可以将该层的人工顶板作为上层分段的底板,然后在此底板上进行上层分段的回采作业。

Claims (5)

1.一种倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法,其特征是:矿房采用无矿柱结构,将矿体划分中段,各中段沿厚度分为分段,在矿体走向上将中段划分为若干回采单元;在中段的下部布置布置中段运输巷道,分段中布置分段运输平巷;分段运输平巷通过溜井与中段运输巷道相连,分段运输平巷通过出矿进路与采场沟通;在各分段顶部矿体与围岩接触处开凿沿矿体走向的注浆硐室;在注浆硐室注浆加固上盘破碎围岩,构筑人工顶板;在人工顶板下的凿岩平台凿向下平行中深孔进行爆破落矿;铲运机由出矿进路进入采场将崩落矿石经分段运输平巷运送到溜井,通过中段运输平巷送出;下层分段回采完毕后进行充填,并以该层的人工顶板作为上层分段的底板开始上层分段的回采作业。
2.根据权利要求1所述的倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法,其特征在于:矿体划分的中段厚度为50~70m,每个中段分为厚度15~25m的分段,在矿体走向上将所述中段划分为50~100m的若干连续回采单元。
3.根据权利要求2所述的倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法,其特征在于:分段出矿进路的间距为15~20m;注浆硐室构筑是向矿体一侧回采一层高度3.5~4.2m的矿体,并在该层顶部构筑0.8~1.2m厚度的人工顶板,在注浆硐室内向围岩中凿注浆钻孔,进行注浆加固,对局部围岩破碎的区域,加设锚杆或锚索进一步加固。
4.根据权利要求2所述的倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法,其特征在于:爆破落矿的具体方法是以中深孔爆破的方式在分段单元一侧端部形成高度为分段高度,宽度3m的切割立槽,再以切割立槽为自由面,在凿岩平台凿向下平行中深孔,进行爆破落矿,崩矿步距4.5~5.5m。
5.根据权利要求2所述的倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法,其特征在于:分段回采完毕后进行充填,采用井下加压泵送设备将充填材料送入已回采的分段。
CN2013100524799A 2013-02-18 2013-02-18 倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法 Pending CN103104259A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100524799A CN103104259A (zh) 2013-02-18 2013-02-18 倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100524799A CN103104259A (zh) 2013-02-18 2013-02-18 倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法

Publications (1)

Publication Number Publication Date
CN103104259A true CN103104259A (zh) 2013-05-15

Family

ID=48312424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100524799A Pending CN103104259A (zh) 2013-02-18 2013-02-18 倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法

Country Status (1)

Country Link
CN (1) CN103104259A (zh)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437766A (zh) * 2013-09-03 2013-12-11 北京矿冶研究总院 一种原地碎裂采矿方法
CN103437768A (zh) * 2013-09-09 2013-12-11 中南大学 一种不留顶底柱预置空间充填采矿法
CN104179505A (zh) * 2014-02-12 2014-12-03 云南磷化集团有限公司 一种磷矿的地下采矿方法
CN104453901A (zh) * 2014-12-08 2015-03-25 广西大学 一种薄矿体中深孔崩矿分段空场嗣后充填采矿方法
CN104612692A (zh) * 2014-12-11 2015-05-13 中南大学 分段崩矿底部结构跟随形成连续充填采矿法
CN104989402A (zh) * 2015-05-27 2015-10-21 广东省冶金建筑设计研究院 一种用于石灰岩地下矿山开采的中深孔房柱采矿法
CN107013228A (zh) * 2017-05-07 2017-08-04 中铁十八局集团有限公司 一种大断面隧道涌水突泥后拱顶空腔围岩再造方法
CN107989614A (zh) * 2017-12-06 2018-05-04 昆明冶金高等专科学校 一种回采上盘围岩破碎的急倾斜厚矿体的采矿方法
CN111550248A (zh) * 2020-05-20 2020-08-18 长沙矿山研究院有限责任公司 预护顶分段空场嗣后充填采矿法
CN112177612A (zh) * 2020-11-10 2021-01-05 长沙矿山研究院有限责任公司 一种下向高分层胶结充填采矿法
CN113775339A (zh) * 2021-11-12 2021-12-10 矿冶科技集团有限公司 一种上盘破碎围岩条件下破碎矿体开采方法
CN113931630A (zh) * 2021-12-17 2022-01-14 北京科技大学 一种深部金属矿床的机械化无废开采方法
CN114810078A (zh) * 2022-04-08 2022-07-29 紫金矿业集团股份有限公司 360°环形深孔注浆采场破碎上下盘环境再造方法
CN115163070A (zh) * 2022-06-14 2022-10-11 山东黄金矿业(莱州)有限公司三山岛金矿 一种适用于急倾斜薄矿体下向采矿方法
CN115324581A (zh) * 2022-07-06 2022-11-11 山东黄金矿业(莱州)有限公司三山岛金矿 一种高应力中厚破碎矿体采矿方法
CN117905464A (zh) * 2024-03-04 2024-04-19 核工业北京化工冶金研究院 一种急倾斜破碎矿体分段连续采矿的方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168579A (zh) * 2011-04-15 2011-08-31 中南大学 中厚倾斜破碎矿体脉内采准无间柱连续分段充填法
CN102606159A (zh) * 2012-03-26 2012-07-25 中南大学 中厚急倾斜破碎矿体框架式人工假顶下向分段胶结充填法
CN102619515A (zh) * 2012-04-26 2012-08-01 鞍钢集团矿业公司 一种顶部充填的高端壁无底柱分段崩落法开采工艺
CN102635356A (zh) * 2012-04-26 2012-08-15 中南大学 急倾斜薄矿脉多爆破自由面中深孔采矿法
CN102678122A (zh) * 2012-05-21 2012-09-19 山东黄金矿业(莱州)有限公司三山岛金矿 一种改进式散体下厚大破碎顶底柱进路回采方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168579A (zh) * 2011-04-15 2011-08-31 中南大学 中厚倾斜破碎矿体脉内采准无间柱连续分段充填法
CN102606159A (zh) * 2012-03-26 2012-07-25 中南大学 中厚急倾斜破碎矿体框架式人工假顶下向分段胶结充填法
CN102619515A (zh) * 2012-04-26 2012-08-01 鞍钢集团矿业公司 一种顶部充填的高端壁无底柱分段崩落法开采工艺
CN102635356A (zh) * 2012-04-26 2012-08-15 中南大学 急倾斜薄矿脉多爆破自由面中深孔采矿法
CN102678122A (zh) * 2012-05-21 2012-09-19 山东黄金矿业(莱州)有限公司三山岛金矿 一种改进式散体下厚大破碎顶底柱进路回采方法

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437766A (zh) * 2013-09-03 2013-12-11 北京矿冶研究总院 一种原地碎裂采矿方法
CN103437766B (zh) * 2013-09-03 2016-03-30 北京矿冶研究总院 一种原地碎裂采矿方法
CN103437768A (zh) * 2013-09-09 2013-12-11 中南大学 一种不留顶底柱预置空间充填采矿法
CN104179505A (zh) * 2014-02-12 2014-12-03 云南磷化集团有限公司 一种磷矿的地下采矿方法
CN104179505B (zh) * 2014-02-12 2016-01-20 云南磷化集团有限公司 一种磷矿的地下采矿方法
CN104453901A (zh) * 2014-12-08 2015-03-25 广西大学 一种薄矿体中深孔崩矿分段空场嗣后充填采矿方法
CN104612692A (zh) * 2014-12-11 2015-05-13 中南大学 分段崩矿底部结构跟随形成连续充填采矿法
CN104612692B (zh) * 2014-12-11 2016-07-27 中南大学 分段崩矿底部结构跟随形成连续充填采矿法
CN104989402A (zh) * 2015-05-27 2015-10-21 广东省冶金建筑设计研究院 一种用于石灰岩地下矿山开采的中深孔房柱采矿法
CN107013228A (zh) * 2017-05-07 2017-08-04 中铁十八局集团有限公司 一种大断面隧道涌水突泥后拱顶空腔围岩再造方法
CN107013228B (zh) * 2017-05-07 2019-03-05 中铁十八局集团有限公司 一种大断面隧道涌水突泥后拱顶空腔围岩再造方法
CN107989614A (zh) * 2017-12-06 2018-05-04 昆明冶金高等专科学校 一种回采上盘围岩破碎的急倾斜厚矿体的采矿方法
CN111550248A (zh) * 2020-05-20 2020-08-18 长沙矿山研究院有限责任公司 预护顶分段空场嗣后充填采矿法
CN111550248B (zh) * 2020-05-20 2021-06-01 长沙矿山研究院有限责任公司 预护顶分段空场嗣后充填采矿法
CN112177612B (zh) * 2020-11-10 2021-08-10 长沙矿山研究院有限责任公司 一种下向高分层胶结充填采矿法
CN112177612A (zh) * 2020-11-10 2021-01-05 长沙矿山研究院有限责任公司 一种下向高分层胶结充填采矿法
CN113775339B (zh) * 2021-11-12 2022-03-11 矿冶科技集团有限公司 一种上盘破碎围岩条件下破碎矿体开采方法
CN113775339A (zh) * 2021-11-12 2021-12-10 矿冶科技集团有限公司 一种上盘破碎围岩条件下破碎矿体开采方法
CN113931630B (zh) * 2021-12-17 2022-03-11 北京科技大学 一种深部金属矿床的机械化无废开采方法
CN113931630A (zh) * 2021-12-17 2022-01-14 北京科技大学 一种深部金属矿床的机械化无废开采方法
CN114810078A (zh) * 2022-04-08 2022-07-29 紫金矿业集团股份有限公司 360°环形深孔注浆采场破碎上下盘环境再造方法
CN115163070A (zh) * 2022-06-14 2022-10-11 山东黄金矿业(莱州)有限公司三山岛金矿 一种适用于急倾斜薄矿体下向采矿方法
CN115163070B (zh) * 2022-06-14 2024-03-12 山东黄金矿业(莱州)有限公司三山岛金矿 一种适用于急倾斜薄矿体下向采矿方法
CN115324581A (zh) * 2022-07-06 2022-11-11 山东黄金矿业(莱州)有限公司三山岛金矿 一种高应力中厚破碎矿体采矿方法
CN117905464A (zh) * 2024-03-04 2024-04-19 核工业北京化工冶金研究院 一种急倾斜破碎矿体分段连续采矿的方法
CN117905464B (zh) * 2024-03-04 2024-08-13 核工业北京化工冶金研究院 一种急倾斜破碎矿体分段连续采矿的方法

Similar Documents

Publication Publication Date Title
CN103104259A (zh) 倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法
CN108612530B (zh) 一种上盘围岩破碎倾斜中厚矿体的采矿方法
CN101338674B (zh) 直接装运矿石的无底柱分段崩落采矿法
CN1260461C (zh) 阶梯式分段挤压崩矿跟随充填连续采矿法
CN102518438B (zh) 一种顶板再造中深孔落矿嗣后充填采矿法
CN104806244B (zh) 一种倾斜中厚矿体充填采矿方法
CN106761912B (zh) 一种适合于不稳定岩层的高效上向进路分层充填采矿方法
CN104895566B (zh) 一种残矿回收采矿法
CN103437769B (zh) 组合再造结构体中深孔落矿协同锚索支护嗣后充填采矿法
CN108843382A (zh) 一种适合缓倾斜围岩不稳定中厚矿体的下向嗣后充填法
CN104481539B (zh) 自拉槽挤压爆破崩落采矿法
CN104847355B (zh) 中厚急倾斜矿体空场连续开采方法
CN103590831A (zh) 一种缓倾斜薄-中厚矿体的新型采矿方法
CN102953732A (zh) 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法
CN101881169A (zh) 一种分段留矿崩落阶段空场嗣后充填采矿法
CN104453901A (zh) 一种薄矿体中深孔崩矿分段空场嗣后充填采矿方法
CN104712358A (zh) 基于首采全岩卸压工作面沿空留巷的高瓦斯煤层群卸压共采方法
CN104481543B (zh) 阶段留矿崩落采矿法
CN102168579A (zh) 中厚倾斜破碎矿体脉内采准无间柱连续分段充填法
CN105201506B (zh) 一种嗣前加固嗣后充填的采矿方法
CN111255459B (zh) 一种用于急倾斜极破碎矿脉的联合下向机械化充填采矿法
CN109707381B (zh) 一种上向高分层超前卸荷嗣后充填空场的采矿法
CN1982649A (zh) 一种采矿方法
CN110984989A (zh) 一种急倾斜中厚矿体的开采方法
CN106761750B (zh) 急倾斜煤层纵向长壁刨铣建槽式开采方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130515