CN103074949A - Construction method for environment-friendly light energy-saving wallboard - Google Patents
Construction method for environment-friendly light energy-saving wallboard Download PDFInfo
- Publication number
- CN103074949A CN103074949A CN2013100449497A CN201310044949A CN103074949A CN 103074949 A CN103074949 A CN 103074949A CN 2013100449497 A CN2013100449497 A CN 2013100449497A CN 201310044949 A CN201310044949 A CN 201310044949A CN 103074949 A CN103074949 A CN 103074949A
- Authority
- CN
- China
- Prior art keywords
- wallboard
- plate
- mortar
- groove
- sandwich layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The invention discloses a construction method for an environment-friendly light energy-saving wallboard. The method comprises the steps of paying-off, board lifting, board sawing, sizing, board arranging, correcting, joint grouting, anti-cracking cloth pasting, embedded wire tube slotting, plastering, coating and the like. The construction method disclosed by the invention is convenient in construction and has high efficiency, and the working performance is good.
Description
Technical field
The present invention relates to a kind of job practices of environment-friendly light energy-saving wall board.
Background technology
Existing wall construction is complicated, and inefficiency can not adapt to the requirement that large tracts of land adapts to wallboard.
Summary of the invention
The object of the present invention is to provide the job practices of a kind of easy construction, environment-friendly light energy-saving wall board that efficient is high.
Technical solution of the present invention is:
A kind of job practices of environment-friendly light energy-saving wall board is characterized in that: comprise the following steps:
(1) unwrapping wire, lift plate: wallboard installation position bullet baseline with at the bottom of the floor or beam base line vertical, and sign door opening position after wallboard enters the scene, adopts people or machine plate to be lifted on the installation position of wallboard according to the thickness of plate;
(2) saw plate: the whole plate gauge lattice of wallboard are width 610cm, length 2440cm, when panel width or highly during a whole plate of less than, should use the benefit plate, adjust width and the length of wallboard with the cutting machine cutting;
(3) starching: wipe clean the surface dust of wallboard groove, projection with wet cloth, and with groove, projection that clear water is brushed wet wallboard, again the joint filling polymer mortar is put in the groove and floor baseline of wallboard;
(4) dress plate: moving the wallboard of first-class mortar to dress, to piece together the position in place, erects up and down good baseline, with spade wallboard levered up from the bottom, firmly make between plate and the plate near, polymer mortar is extruded from seam, then scraped off the slurry that protrudes the wallboard face, use again fiery timber wedge that wallboard is temporary fixed;
(5) proofread and correct: after the preliminary assembly unit of wallboard is good, just carrying out adjustment with spade, with smooth, the verticality of paper guiding ruler inspection of 2m, and fixing up and down with timber wedge and reinforcing bar;
(6) grouting is squeegeeed: install and proofread and correct good wallboard after one day, polymer mortar is filled the seam between upper and lower seam and the plate, and timber wedge, reinforcing bar are extracted, and fills and leads up with mortar;
(7) paste anti-cracking cloth: be in the milk complete after, after 3-5 days bonding crack mortar drying shrinkage are finalized the design, be attached to the seam crossing of plate with the latex glass fiber reticular cloth that 50mm is wide;
(8) notching line-embedding pipe: needs are buried underground closed conduit wiring, switch enclosure, install with Portable electric saw cutting wire casing, after installing, fill with mortar again;
(9) plaster, coating
Last application is criticized the end and is coated;
Described wallboard comprises forward and backward cement board, clamps the light weight concrete construction sandwich layer between the forward and backward cement board, and in the left and right two ends of concrete sandwich layer, an end is the projection chimeric with the adjacent wall board groove, and the other end is the protruding chimeric groove with adjacent wall board; Described concrete sandwich layer is the form of distribution foam grain in the concrete, and the diameter of foam grain is 0.1 ~ 0.5cm.The volume of foam beads accounts for 40 ~ 60% of light weight concrete construction sandwich layer volume.
For needs doorframe, door pocket are installed, are directly wrapped door pocket at wallboard with clamping plate, with iron nail and wallboard anchoring, use the decorative panel front cover.
Easy construction of the present invention, efficient height, favorable working performance.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples.
Fig. 1 is the structural representation of wallboard of the present invention.
The specific embodiment
A kind of job practices of environment-friendly light energy-saving wall board is characterized in that: comprise the following steps:
(1) unwrapping wire, lift plate: wallboard installation position bullet baseline with at the bottom of the floor or beam base line vertical, and sign door opening position after wallboard enters the scene, adopts people or machine plate to be lifted on the installation position of wallboard according to the thickness of plate;
(2) saw plate: the whole plate gauge lattice of wallboard are width 610cm, length 2440cm, when panel width or highly during a whole plate of less than, should use the benefit plate, adjust width and the length of wallboard with the cutting machine cutting;
(3) starching: wipe clean the surface dust of wallboard groove, projection with wet cloth, and with groove, projection that clear water is brushed wet wallboard, again the joint filling polymer mortar is put in the groove and floor baseline of wallboard;
(4) dress plate: moving the wallboard of first-class mortar to dress, to piece together the position in place, erects up and down good baseline, with spade wallboard levered up from the bottom, firmly make between plate and the plate near, polymer mortar is extruded from seam, then scraped off the slurry that protrudes the wallboard face, use again fiery timber wedge that wallboard is temporary fixed;
(5) proofread and correct: after the preliminary assembly unit of wallboard is good, just carrying out adjustment with spade, with smooth, the verticality of paper guiding ruler inspection of 2m, and fixing up and down with timber wedge and reinforcing bar;
(6) grouting is squeegeeed: install and proofread and correct good wallboard after one day, polymer mortar is filled the seam between upper and lower seam and the plate, and timber wedge, reinforcing bar are extracted, and fills and leads up with mortar;
(7) paste anti-cracking cloth: be in the milk complete after, after 3-5 days bonding crack mortar drying shrinkage are finalized the design, be attached to the seam crossing of plate with the latex glass fiber reticular cloth that 50mm is wide;
(8) notching line-embedding pipe: needs are buried underground closed conduit wiring, switch enclosure, install with Portable electric saw cutting wire casing, after installing, fill with mortar again;
(9) plaster, coating
Last application is criticized the end and is coated;
Described wallboard comprises forward and backward cement board 1,2, clamps the light weight concrete construction sandwich layer between the forward and backward cement board, and in the left and right two ends of concrete sandwich layer, an end is the projection 5 chimeric with the adjacent wall board groove, and the other end is the protruding chimeric groove 6 with adjacent wall board; Described concrete sandwich layer is the form of distribution foam grain 4 in the concrete 3, and the diameter of foam grain is 0.1 ~ 0.5cm.The volume of foam beads accounts for 40 ~ 60% of light weight concrete construction sandwich layer volume.
For needs doorframe, door pocket are installed, are directly wrapped door pocket at wallboard with clamping plate, with iron nail and wallboard anchoring, use the decorative panel front cover.
Claims (2)
1. the job practices of an environment-friendly light energy-saving wall board is characterized in that: comprise the following steps:
(1) unwrapping wire, lift plate: wallboard installation position bullet baseline with at the bottom of the floor or beam base line vertical, and sign door opening position after wallboard enters the scene, adopts people or machine plate to be lifted on the installation position of wallboard according to the thickness of plate;
(2) saw plate: the whole plate gauge lattice of wallboard are width 610cm, length 2440cm, when panel width or highly during a whole plate of less than, should use the benefit plate, adjust width and the length of wallboard with the cutting machine cutting;
(3) starching: wipe clean the surface dust of wallboard groove, projection with wet cloth, and with groove, projection that clear water is brushed wet wallboard, again the joint filling polymer mortar is put in the groove and floor baseline of wallboard;
(4) dress plate: moving the wallboard of first-class mortar to dress, to piece together the position in place, erects up and down good baseline, with spade wallboard levered up from the bottom, firmly make between plate and the plate near, polymer mortar is extruded from seam, then scraped off the slurry that protrudes the wallboard face, use again fiery timber wedge that wallboard is temporary fixed;
(5) proofread and correct: after the preliminary assembly unit of wallboard is good, just carrying out adjustment with spade, with smooth, the verticality of paper guiding ruler inspection of 2m, and fixing up and down with timber wedge and reinforcing bar;
(6) grouting is squeegeeed: install and proofread and correct good wallboard after one day, polymer mortar is filled the seam between upper and lower seam and the plate, and timber wedge, reinforcing bar are extracted, and fills and leads up with mortar;
(7) paste anti-cracking cloth: be in the milk complete after, after 3-5 days bonding crack mortar drying shrinkage are finalized the design, be attached to the seam crossing of plate with the latex glass fiber reticular cloth that 50mm is wide;
(8) notching line-embedding pipe: needs are buried underground closed conduit wiring, switch enclosure, install with Portable electric saw cutting wire casing, after installing, fill with mortar again;
(9) plaster, coating
Last application is criticized the end and is coated;
Described wallboard comprises forward and backward cement board, clamps the light weight concrete construction sandwich layer between the forward and backward cement board, and in the left and right two ends of concrete sandwich layer, an end is the projection chimeric with the adjacent wall board groove, and the other end is the protruding chimeric groove with adjacent wall board; Described concrete sandwich layer is the form of distribution foam grain in the concrete, and the diameter of foam grain is 0.1 ~ 0.5cm.The volume of foam beads accounts for 40 ~ 60% of light weight concrete construction sandwich layer volume.
2. the job practices of environment-friendly light energy-saving wall board according to claim 1 is characterized in that: for needs doorframe, door pocket are installed, are directly wrapped door pocket at wallboard with clamping plate, with iron nail and wallboard anchoring, use the decorative panel front cover.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100449497A CN103074949A (en) | 2013-02-05 | 2013-02-05 | Construction method for environment-friendly light energy-saving wallboard |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100449497A CN103074949A (en) | 2013-02-05 | 2013-02-05 | Construction method for environment-friendly light energy-saving wallboard |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103074949A true CN103074949A (en) | 2013-05-01 |
Family
ID=48151637
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013100449497A Pending CN103074949A (en) | 2013-02-05 | 2013-02-05 | Construction method for environment-friendly light energy-saving wallboard |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103074949A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104153588A (en) * | 2014-08-26 | 2014-11-19 | 诸城舜昌新型建材有限公司 | Installing method for light internal partition wall board |
CN105888107A (en) * | 2016-05-23 | 2016-08-24 | 青岛海川建设集团有限公司 | Vertical light partition wall installation and fixation structure and construction method thereof |
CN109098319A (en) * | 2018-08-03 | 2018-12-28 | 上海宝冶集团有限公司 | A kind of review light lath wall construction method |
CN111962788A (en) * | 2020-08-07 | 2020-11-20 | 陕西建工第二建设集团有限公司 | Grey supplementing process for installation wire slot |
CN112408241A (en) * | 2020-11-30 | 2021-02-26 | 金双 | Light wall installation construction method |
CN112681606A (en) * | 2020-12-28 | 2021-04-20 | 福州建工(集团)总公司 | Assembled combined inner partition plate and construction method |
CN113006339A (en) * | 2021-03-08 | 2021-06-22 | 中国建筑第二工程局有限公司 | Combined partition board in building and construction method thereof |
CN116084705A (en) * | 2022-12-29 | 2023-05-09 | 贵州建工集团第七建筑工程有限责任公司 | Construction method of assembled composite wallboard for inner partition wall of frame shear wall structure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2841805Y (en) * | 2005-11-17 | 2006-11-29 | 深圳市松林辉建材有限公司 | The environmental protection composite solid wall plate |
CN201125464Y (en) * | 2007-07-13 | 2008-10-01 | 陈国举 | Prefabricated heat preserving acoustic baffling composite wall plate |
CN101586370A (en) * | 2008-05-19 | 2009-11-25 | 王建荣 | Construction method of ceramsite light wallboard |
CN201915548U (en) * | 2011-01-17 | 2011-08-03 | 詹昭滨 | Light composite partition board for buildings |
-
2013
- 2013-02-05 CN CN2013100449497A patent/CN103074949A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2841805Y (en) * | 2005-11-17 | 2006-11-29 | 深圳市松林辉建材有限公司 | The environmental protection composite solid wall plate |
CN201125464Y (en) * | 2007-07-13 | 2008-10-01 | 陈国举 | Prefabricated heat preserving acoustic baffling composite wall plate |
CN101586370A (en) * | 2008-05-19 | 2009-11-25 | 王建荣 | Construction method of ceramsite light wallboard |
CN201915548U (en) * | 2011-01-17 | 2011-08-03 | 詹昭滨 | Light composite partition board for buildings |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104153588A (en) * | 2014-08-26 | 2014-11-19 | 诸城舜昌新型建材有限公司 | Installing method for light internal partition wall board |
CN105888107A (en) * | 2016-05-23 | 2016-08-24 | 青岛海川建设集团有限公司 | Vertical light partition wall installation and fixation structure and construction method thereof |
CN109098319A (en) * | 2018-08-03 | 2018-12-28 | 上海宝冶集团有限公司 | A kind of review light lath wall construction method |
CN111962788A (en) * | 2020-08-07 | 2020-11-20 | 陕西建工第二建设集团有限公司 | Grey supplementing process for installation wire slot |
CN112408241A (en) * | 2020-11-30 | 2021-02-26 | 金双 | Light wall installation construction method |
CN112408241B (en) * | 2020-11-30 | 2022-06-24 | 湖北工建集团第三建筑工程有限公司 | Light wall installation construction method |
CN112681606A (en) * | 2020-12-28 | 2021-04-20 | 福州建工(集团)总公司 | Assembled combined inner partition plate and construction method |
CN113006339A (en) * | 2021-03-08 | 2021-06-22 | 中国建筑第二工程局有限公司 | Combined partition board in building and construction method thereof |
CN116084705A (en) * | 2022-12-29 | 2023-05-09 | 贵州建工集团第七建筑工程有限责任公司 | Construction method of assembled composite wallboard for inner partition wall of frame shear wall structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103074949A (en) | Construction method for environment-friendly light energy-saving wallboard | |
CN104018598B (en) | A kind of exterior wall structure and construction installation method | |
CN103758272B (en) | Autoclaved aerated concrete blocks built-in wall steel pipe buried in advance construction method | |
CN104314204A (en) | Non-form stripping lightweight internal partition board and overall grouting construction method thereof | |
CN106284706A (en) | The construction method of external wall outer insulation rock cotton board | |
CN105804292A (en) | Environment-friendly and energy-saving integrated cast-in-situ lightweight concrete wall and construction method thereof | |
CN205653934U (en) | Cast -in -place lightweight concrete wall body of green energy -conserving integration | |
CN106193499A (en) | A kind of combined heat-insulating integral plate anchoring torr hanging hang structure and process | |
CN106284999A (en) | Assembled architecture haydite concrete batten of internal partition mounting process | |
CN207063515U (en) | A kind of scalable aluminium frame template | |
CN203905374U (en) | Hanging piece for hanging stones or tiles in wet hanging mode | |
CN207829371U (en) | Whole paving marble floor structure on a kind of raised flooring | |
CN203839870U (en) | A wall-mounted concealed distribution box | |
CN207277623U (en) | A kind of integral module assembling type partition wall | |
CN103899072A (en) | Hanging member for wet hanging of stone or tiles and wet hanging method | |
CN209114658U (en) | A kind of precast concrete partition plate structure for staircase | |
CN103276892B (en) | A kind of pulp spraying that is applicable to is coated with filling lightgauge steel joist system | |
CN203613682U (en) | Cast-in-situ template for wall compound insulation system | |
CN109057221A (en) | A kind of cement insulation board outer heat preservation system construction method | |
CN204152113U (en) | Masonry panel balustrade pre-buried structure | |
CN101538904B (en) | Gypsum powder poured integral wall and manufacturing method thereof | |
CN202899526U (en) | Wall body decoration structure for old house renovation | |
CN208202211U (en) | Complete facing fills the processing structure of Sunken wire tube after wall | |
CN204876399U (en) | Collection hoist and mount are positioned integrative prefabricated staircase | |
CN204174830U (en) | A kind of light aggregate concrete hollow batardeau printed line box is installed and matched tube structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130501 |